Search NASA⌕ Search

SEARCH · Search NASA

Results for “CONTRACT MANAGEMENT”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Power and Propulsion Element for Gateway

NASA is taking on the bold objective of returning humans to the Moon by 2024. As part of this effort, the Gateway is being constructed to serve as a command center and way-point in cis-lunar space for lunar exploration missions. The Power and Propulsion Element (PPE) is the first element of Gateway to be launched and will generate all the power and propulsion required over its 15-year service life. To achieve these goals, high-power solar arrays and solar electric propulsion will be implemented and demonstrated. The electrical power system (EPS) of Gateway, prominently featuring lightweight Roll Out Solar Arrays (ROSA) with state-of-the-art Z4J solar cells and a central hinge, will be sized for an end-of-life (EOL) power management and distribution capability of over 55 kilowatts (kW). The solar array circuits are being designed in a modular manner with scalability and extensibility to a 300 kW-class mission. NASA Glenn Research Center is managing the PPE contract on which Maxar Technologies, Inc. is responsible for fabricating and demonstrating the spacecraft. This manuscript provides a summary of the electrical power system, with additional discussion of the ROSA power generation.

Gateway↗

JDD, Inc. Database

JDD Inc, is a maintenance and custodial contracting company whose mission is to provide their clients in the private and government sectors "quality construction, construction management and cleaning services in the most efficient and cost effective manners, (JDD, Inc. Mission Statement)." This company provides facilities support for Fort Riley in Fo,rt Riley, Kansas and the NASA John H. Glenn Research Center at Lewis Field here in Cleveland, Ohio. JDD, Inc. is owned and operated by James Vaughn, who started as painter at NASA Glenn and has been working here for the past seventeen years. This summer I worked under Devan Anderson, who is the safety manager for JDD Inc. in the Logistics and Technical Information Division at Glenn Research Center The LTID provides all transportation, secretarial, security needs and contract management of these various services for the center. As a safety manager, my mentor provides Occupational Health and Safety Occupation (OSHA) compliance to all JDD, Inc. employees and handles all other issues (Environmental Protection Agency issues, workers compensation, safety and health training) involving to job safety. My summer assignment was not as considered "groundbreaking research" like many other summer interns have done in the past, but it is just as important and beneficial to JDD, Inc. I initially created a database using a Microsoft Excel program to classify and categorize data pertaining to numerous safety training certification courses instructed by our safety manager during the course of the fiscal year. This early portion of the database consisted of only data (training field index, employees who were present at these training courses and who was absent) from the training certification courses. Once I completed this phase of the database, I decided to expand the database and add as many dimensions to it as possible. Throughout the last seven weeks, I have been compiling more data from day to day operations and been adding the information to the database. It now consists of seven different categories of data (carpet cleaning, forms, NASA Event Schedules, training certifications, wall and vent cleaning, work schedules, and miscellaneous) . I also did some field inspecting with the supervisors around the site and was present at all of the training certification courses that have been scheduled since June 2004. My future outlook for the JDD, Inc. database is to have all of company s information from future contract proposals, weekly inventory, to employee timesheets all in this same database.

Miller, David A., Jr.↗

Implementing Reliability Centered Maintenance (RCM) with State of the Art PT&I Technologies

Building on the work that was started two decades ago, Jacobs Space Operations Group has utilized state of the art PTI technologies to assess the current condition of the assets they manage under the Test and Operations Support Contract (TOSC). Specifically, the Asset Management department leveraged the benefits of ultrasound technology to quantify a motor issue in the Liquid Oxygen Storage Area, and troubleshoot the sources prior to loading the tank to perform Verification and Validation (VV) activities. This technology was efficient, easy to implement, and provided system engineers with data on a possible source of the problem. In situations where legacy motors are exhibiting unexpected noises, it may seem easier to remove and refurbish the motor and replace the bearings because that solution resolves most of the common causes of the noise. However, that solution would have involved additional spending and may not have solved issues stemming from the foundation, if those existed. By utilizing the ultrasound equipment provided by UE Systems, the sound profiles allowed Jacobs TOSC team to determine that the issue resembled a faulty bearing. After replacing the bearing, the unexpected noise ceased.

Reliability Centered Maintenance↗

EVA Wiki - Transforming Knowledge Management for EVA Flight Controllers and Instructors

The EVA (Extravehicular Activity) Wiki was recently implemented as the primary knowledge database to retain critical knowledge and skills in the EVA Operations group at NASA's Johnson Space Center by ensuring that information is recorded in a common, searchable repository. Prior to the EVA Wiki, information required for EVA flight controllers and instructors was scattered across different sources, including multiple file share directories, SharePoint, individual computers, and paper archives. Many documents were outdated, and data was often difficult to find and distribute. In 2011, a team recognized that these knowledge management problems could be solved by creating an EVA Wiki using MediaWiki, a free and open-source software developed by the Wikimedia Foundation. The EVA Wiki developed into an EVA-specific Wikipedia on an internal NASA server. While the technical implementation of the wiki had many challenges, the one of the biggest hurdles came from a cultural shift. Like many enterprise organizations, the EVA Operations group was accustomed to hierarchical data structures and individually-owned documents. Instead of sorting files into various folders, the wiki searches content. Rather than having a single document owner, the wiki harmonized the efforts of many contributors and established an automated revision control system. As the group adapted to the wiki, the usefulness of this single portal for information became apparent. It transformed into a useful data mining tool for EVA flight controllers and instructors, and also for hundreds of other NASA and contract employees. Program managers, engineers, astronauts, flight directors, and flight controllers in differing disciplines now have an easier-to-use, searchable system to find EVA data. This paper presents the benefits the EVA Wiki has brought to NASA's EVA community, as well as the cultural challenges it had to overcome.

Johnston, Stephanie↗

Development and Demonstration of a Fuel-Efficient, Class 8 Tractor & Trailer Engine System (SuperTruck II)

Navistar presents the SuperTruck II (ST II) Final Report to the Unites States Department of Energy (US DOE), which covers the five Budget Periods (BPs) from 10-1-2016 through 6-30-2022. For ST II, Navistar built on the achievements of the SuperTruck I (ST I) Program as a catalyst to continue critical research, design and development, testing, and operations to reach the ambitious goals of the ST II project. This approach allowed Navistar to continue contributing to the essential needs of our nation for safe, efficient, and cost-effective delivery of goods and services, as we reduced negative environmental effects and improved operational productivity. This document contains information specified in DOE F 4600.2, Final Scientific/Technical Report DOE F 241.3, B. SCIENTIFIC/TECHNICAL REPORTS, explaining how we met and exceeded program requirements. Throughout this Final Report, Navistar extracted information from documents prepared during the project that represent our management, design and development, building, and testing efforts to meet and exceed SuperTruck II project goals. Navistar followed Plan requirements to achieve / exceed Project Objectives: a) >100% improvement in vehicle freight efficiency (FE) (on ton-MPG basis) relative to 2009 baseline with stretch goal of 140% improvement [actual: 170%); b) >55% engine brake thermal efficiency (BTE) demonstrated in operational engine at a 65-mph cruise point on a dynamometer – ≥31% increase from 2009 baseline [actual: 55.20% of combined BTE) ; and c) development and implementation of commercially cost effective technologies (in terms of a simple payback). Technology selection / development path focused on developing technologies applicable for production within 3-year approach, while ensuring technology readiness and cost of ownership for end users. The Program was organized into five budget periods: Requirements / Technology Assessment and Initial Hardware Testing; Technology Development and Concept Readiness Demonstration; Technology Finalization and Validation Tractor / Trailer Fabrication, Integration and Commissioning Demonstration; and Fuel Economy (FE) and Brake Thermal Efficiency (BTE) and Program Completion. Leadership was provided by DOE, with tasks performed by laboratories (Argonne National Laboratory, Lawrence Livermore National Laboratory); partners at Bosch, TPI, Dana, and J.B. Hunt; , and support from University of Michigan and Clemson University. Navistar lead this team with Principal Investigator / Contracting Officer; Project Manager (PM); Vehicle, Engine, and Aftertreatment Engineers; Finance Manager, Technical Program Leads, and Legal/IP; and other key personnel. Work also included personnel in risk management; funding / budget / finance. Work involved analysis, development, testing, and down selection of individual/system engine, aftertreatment, and vehicle technologies, with integration of selected technologies into a prototype vehicle for demonstration of fuel-efficiency gain. Work also included component/integrated system level development of truck and trailer aerodynamics, base engine efficiency, advanced aftertreatment, combustion efficiency, waste heat recovery, hybrid powertrain, reduced rolling resistance, weight reduction, idle reduction, and driver feedback. As ST II progressed, Navistar performed computer-based modeling / simulations of technologies focused on the primary operational areas: Engine, Aftertreatment, and Vehicle. During the ST II Program, the COVID Virus outbreak unexpectedly challenged by the effects of, which affected staffing, scheduling, design, supplies, availability of materials, production procedures, and testing. The DOE responded by extending the program by three quarters to ensure that project tasks were completed for this vital project. Focus continued on analyzing, developing, testing, and down selecting individual-/system-level engine and vehicle technologies for integration of the final selected technologies into a prototype vehicle that would demonstrate fuel-efficiency gains made possible through these technologies. This included component/integrated system-level development of truck and trailer aerodynamics, base engine efficiency, advanced aftertreatment, combustion efficiency, waste heat recovery, solar power, distributed and intelligent vehicle power, hybrid powertrain, reduced rolling resistance, weight reduction, idle reduction, and driver feedback. Throughout the program, function, reliability, and performance at all levels were ensured through testing. Proof of this approach was demonstrated in multiple, on-road demonstrations: Scenario A (Flatland) Fuel Economy, Scenario B (Hilly) Fuel Economy, and City Cycle Tests. Other benefits derived from ST II included new/improved products, publications, patents, and next-step capabilities related to electric/hydrogen vehicles and autonomous driving.

Zukouski, Russ↗

Enduring Transuranic Liquid Waste Volume Forecast and Constituent Evaluation (FY20)

The “FY11 Radioactive Liquid Waste (RLW) Influent Boundary Condition Assessment and Forecast” report provided influent volume forecasts that were critical in establishing the design capacity for the new Radioactive Liquid Waste Transuranic (RLW-TRU) capability. The design for the new RLW-TRU capability was paused as the final design was being completed and prior to the transition of the new management and operations contract for Los Alamos National Laboratory (LANL). Recently, NNSA has directed the project to restart and complete the design effort. As part of the restart process, LANL was asked to validate or document any material changes in the influent volumes or constituents that formed the design basis for the new capability. This analysis updates the transuranic liquid waste influents volumes, incorporating the changes in the LANL program of record since the FY11 assessment, and includes a cursory validation of influent constituents. The results of the FY19 update to influent volume forecasts shows: 1) the influent volume of 29,000 L should continue to be used as the project design-basis; 2) There have been no material changes in the operational processes that would change the constituents of concern from either a treatment or material compatibility perspective.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Innovation Flex Time

The authors examine the problem of how to provide a time code for staff to use in pursuit of innovation. Four potential options are explored ranging from not providing funds for this activity, to charging such efforts against existing or expanded program management and program development funds. One solution that provides funded time without raising laboratory overhead rates is identified and referred to as Innovation Flex Time. This would consist of capturing hours worked in excess of the standard work week but not charged to customers and making those hours available to fund time for exploring new ideas. A brief examination of labor relations laws, and laws regulating laboratory directed research and development suggests that Innovation Flex Time is a viable option for the laboratory. However, implementation of Innovation Flex Time would require NNSA approval and modification of the existing management and operations contract.

99 GENERAL AND MISCELLANEOUS↗

CIO Cloud Strategy

The purpose of the Sandia CIO Cloud Strategy is to establish the strategic direction for the adoption of cloud services and technologies as the prevailing IT solution for Sandia National Laboratories. Sandia’s Chief Information Officer (CIO) will champion unified, site-wide adoption of cloud and will amplify business and mission impacts across the Labs. Sandia’s CIO Cloud Strategy aligns to the Federal Cloud Computing Strategy1 (Cloud Smart) and the Sandia Management and Operating Contract (Prime Contract).

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Dictionary of Technical Terms for Aerospace Use

This volume attempts to define the meanings of selected terms in use in areas of activity of the National Aeronautics and Space Administration. The effort has been undertaken because exactness and precision are naturally most lacking in times of rapid language growth; and yet for scientists and engineers precision of meaning can have exceptional, even crucial, importance, as indeed it also can for contracting officers and management in general. But in one sense this book is almost certain to be imperfect. No set of definitions frozen in type can hope to capture the continuing change of living language.

Dictionary↗

NASA technology utilization program: The small business market

Technology transfer programs were studied to determine how they might be more useful to the small business community. The status, needs, and technology use patterns of small firms are reported. Small business problems and failures are considered. Innovation, capitalization, R and D, and market share problems are discussed. Pocket, captive, and new markets are summarized. Small manufacturers and technology acquisition are discussed, covering external and internal sources, and NASA technology. Small business and the technology utilization program are discussed, covering publications and industrial applications centers. Observations and recommendations include small business market development and contracting, and NASA management technology.

Vannoy, J. K.↗

General specifications for the development of a USL NASA PC R and D statistical analysis support package

The University of Southwestern Louisiana (USL) NASA PC R and D statistical analysis support package is designed to be a three-level package to allow statistical analysis for a variety of applications within the USL Data Base Management System (DBMS) contract work. The design addresses usage of the statistical facilities as a library package, as an interactive statistical analysis system, and as a batch processing package.

Dominick, Wayne D.↗

Orbiter Auxiliary Power Unit Flight Support Plan

This paper discussed the development of an integrated Orbiter Auxiliary Power Unit (APU) and Improved APU (IAPU) Flight Suuport Plan. The plan identifies hardware requirements for continued support of flight activities for the Space Shuttle Orbiter fleet. Each Orbiter vehicle has three APUs that provide power to the hydraulic system for flight control surface actuation, engine gimbaling, landing gear deployment, braking, and steering. The APUs contain hardware that has been found over the course of development and flight history to have operating time and on-vehicle exposure time limits. These APUs will be replaced by IAPUs with enhanced operating lives on a vehicle-by-vehicle basis during scheduled Orbiter modification periods. This Flight Support Plan is used by program management, engineering, logistics, contracts, and procurement groups to establish optimum use of available hardware and replacement quantities and delivery requirements for APUs until vehicle modifications and incorporation of IAPUs. Changes to the flight manifest and program delays are evaluated relative to their impact on hardware availability.

Guirl, Robert↗

Industrial labor relations manual

The NASA Industrial Labor Relations Manual provides internal guidelines and procedures to assist NASA Field Installations in dealing with contractor labor management disputes, Service Contract Act variance hearings, and to provide access of Labor Union Representatives to NASA for the purpose of maintaining schedules and goals in connection with vital NASA programs. This manual will be revised by page changes as revisions become necessary. Initial distribution of this manual has been made to NASA Headquarters and Field Installations.

Source record↗

Assessing Hurricane Katrina Vegetation Damage at Stennis Space Center using IKONOS Image Classification Techniques

Hurricane Katrina inflicted widespread damage to vegetation in southwestern coastal Mississippi upon landfall on August 29, 2005. Storm damage to surface vegetation types at the NASA John C. Stennis Space Center (SSC) was mapped and quantified using IKONOS data originally acquired on September 2, 2005, and later obtained via a Department of Defense ClearView contract. NASA SSC management required an assessment of the hurricane s impact to the 125,000-acre buffer zone used to mitigate rocket engine testing noise and vibration impacts and to manage forestry and fire risk. This study employed ERDAS IMAGINE software to apply traditional classification techniques to the IKONOS data. Spectral signatures were collected from multiple ISODATA classifications of subset areas across the entire region and then appended to a master file representative of major targeted cover type conditions. The master file was subsequently used with the IKONOS data and with a maximum likelihood algorithm to produce a supervised classification later refined using GIS-based editing. The final results enabled mapped, quantitative areal estimates of hurricane-induced damage according to general surface cover type. The IKONOS classification accuracy was assessed using higher resolution aerial imagery and field survey data. In-situ data and GIS analysis indicate that the results compare well to FEMA maps of flooding extent. The IKONOS classification also mapped open areas with woody storm debris. The detection of such storm damage categories is potentially useful for government officials responsible for hurricane disaster mitigation.

Spruce, Joseph P.↗

Thoughts on Earned Value Assessments

This slide presentation reviews the concepts of Earned Value reporting and Earned Value Metrics (EVM) and the implementation for the Constellation Program. EVM is used to manage both the contract and civil service workforce, and used as a measure of contractor costs and performance. The Program EVM is not as useful for Level of Effort tasking, for either contractor, or civil service employees. Some issues and concerns in reference to EVM and the process for the use of EVM for Mission assurance are reviewed,

Pido, Kelle↗

Experimental Creep Life Assessment for the Advanced Stirling Convertor Heater Head

The United States Department of Energy is planning to develop the Advanced Stirling Radioisotope Generator (ASRG) for the National Aeronautics and Space Administration (NASA) for potential use on future space missions. The ASRG provides substantial efficiency and specific power improvements over radioisotope power systems of heritage designs. The ASRG would use General Purpose Heat Source modules as energy sources and the free-piston Advanced Stirling Convertor (ASC) to convert heat into electrical energy. Lockheed Martin Corporation of Valley Forge, Pennsylvania, is integrating the ASRG systems, and Sunpower, Inc., of Athens, Ohio, is designing and building the ASC. NASA Glenn Research Center of Cleveland, Ohio, manages the Sunpower contract and provides technology development in several areas for the ASC. One area is reliability assessment for the ASC heater head, a critical pressure vessel within which heat is converted into mechanical oscillation of a displacer piston. For high system efficiency, the ASC heater head operates at very high temperature (850 C) and therefore is fabricated from an advanced heat-resistant nickel-based superalloy Microcast MarM-247. Since use of MarM-247 in a thin-walled pressure vessel is atypical, much effort is required to assure that the system will operate reliably for its design life of 17 years. One life-limiting structural response for this application is creep; creep deformation is the accumulation of time-dependent inelastic strain under sustained loading over time. If allowed to progress, the deformation eventually results in creep rupture. Since creep material properties are not available in the open literature, a detailed creep life assessment of the ASC heater head effort is underway. This paper presents an overview of that creep life assessment approach, including the reliability-based creep criteria developed from coupon testing, and the associated heater head deterministic and probabilistic analyses. The approach also includes direct benchmark experimental creep assessment. This element provides high-fidelity creep testing of prototypical heater head test articles to investigate the relevant material issues and multiaxial stress state. Benchmark testing provides required data to evaluate the complex life assessment methodology and to validate that analysis. Results from current benchmark heater head tests and newly developed experimental methods are presented. In the concluding remarks, the test results are shown to compare favorably with the creep strain predictions and are the first experimental evidence for a robust ASC heater head creep life.

Krause, David L.↗

Limiting Future Collision Risk to Spacecraft: An Assessment of NASA's Meteoroid and Orbital Debris Programs

Over the past 50 years, various NASA communities have contributed significantly to maturing NASA s meteoroid and orbital debris (MMOD)1 programs to their current state. As a result of these community efforts, and to NASA s credit, NASA s MMOD programs and models are now widely used and respected by the providers and users of both government and commercial satellites, nationally as well as internationally. Satellites have been redesigned to protect critical components from MMOD damage by moving critical components from exterior surfaces to deep inside a satellite s structure. Orbits are monitored and altered to minimize the risk of collision with tracked orbital debris. MMOD shielding added to the International Space Station (ISS) protects critical components and astronauts from potentially catastrophic damage that might result from smaller, untracked debris and meteoroid impacts. The space shuttle, as it orbited Earth, and whether docked to the ISS or not, was optimally oriented to protect its fragile thermal protection and thermal radiation systems from MMOD damage. In addition, astronauts inspected its thermal protection system for MMOD damage before the shuttle reentered Earth s atmosphere; Orion, NASA s capsule to carry astronauts to low Earth orbit, includes designs to mitigate the threat of MMOD damage and provide increased safety to the crew. When a handful of reasonable assumptions are used in NASA s MMOD models, scenarios are uncovered that conclude that the current orbital debris environment has already reached a "tipping point." That is, the amount of debris - in terms of the population of large debris objects, as well as overall mass of debris in orbit - currently in orbit has reached a threshold where it will continually collide with itself, further increasing the population of orbital debris. This increase will lead to corresponding increases in spacecraft failures, which will only create more feedback into the system, increasing the debris population growth rate. The increase thus far has been most rapid in low Earth orbit (LEO), with geosynchronous Earth orbits (GEOs) potentially suffering the same fate, but over a much longer time period. The exact timing and pace of this exponential growth are uncertain, but the serious implications of such a scenario require careful attention because of the strategic importance of U.S. space operations. The Office of Science and Technology Policy and the Office of Management and Budget contracted with the National Research Council for a study to perform three tasks: review NASA s MMOD programs and efforts, recommend in which of those NASA should increase or decrease its effort or change focus, and determine whether NASA should pursue work in any new MMOD areas. The official letter requesting the study and the full statement of task for the Committee for the Assessment of NASA s Orbital Debris Programs are in Appendixes A and B, respectively.

Source record↗

NASA Glenn Research Center Support of the ASRG Project

A high efficiency radioisotope power system is being developed for long-duration NASA space science missions. The U.S. Department of Energy (DOE) managed a flight contract with Lockheed Martin Space Systems Company (LMSSC) to build Advanced Stirling Radioisotope Generators (ASRGs), with support from NASA Glenn Research Center (GRC). Sunpower Inc. held two parallel contracts to produce Advanced Stirling Convertors (ASCs), one with DOELockheed Martin to produce ASC-F flight units, and one with GRC for the production of ASC-E3 engineering unit pathfinders that are built to the flight design. In support of those contracts, GRC provided testing, materials expertise, government furnished equipment, inspections, and related data products to DOELockheed Martin and Sunpower. The technical support includes material evaluations, component tests, convertor characterization, and technology transfer. Material evaluations and component tests have been performed on various ASC components in order to assess potential life-limiting mechanisms and provide data for reliability models. Convertor level tests have been used to characterize performance under operating conditions that are representative of various mission conditions. Technology transfers enhanced contractor capabilities for specialized production processes and tests. Despite termination of flight ASRG contract, NASA continues to develop the high efficiency ASC conversion technology under the ASC-E3 contract. This paper describes key government furnished services performed for ASRG and future tests used to provide data for ongoing reliability assessments.

Technology Transfer↗