Search NASA⌕ Search

SEARCH · Search NASA

Results for “ESPCS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Internal Financing for Carbon Reduction Projects

This fact sheet summarizes 6 common internal financing modes and provides examples for each: Capital Expenditure/Operating Outlay, Self-Funded Energy Performance Contracts (ESPC), Carbon Fee Funds, Green Bonds, Green Revolving Funds, and Capital Investment Funds.

financing, carbon reduction, carbon emissions, ESP↗

Best Practices for Smart Grid-Interactive Efficient Building Ready Performance Contracts

Grid-interactive efficient building (GEB) measures reduce costs and optimize energy use for additional grid services by coordinating building energy loads and providing continuous demand management. Incorporating GEB energy conservation measures (ECMs) in performance contracts is reliant upon multiple factors. These factors include site selection with utility tariffs and incentives favorable to GEB, the identification of GEB as a priority in the initial stages of the contracting process, integration of GEB within comprehensive performance contracts with multiple other ECMs, and careful consideration of GEB measurement and verification (M&V) for energy savings performance contracts (ESPCs) and performance assurance for utility energy service contracts (UESCs).

building energy loads↗

Analysis of Integrated Vapor Transport Biases

Abstract High-fidelity analyses and forecasts of integrated vapor transport (VT) are central to the study of Earth’s hydrological cycle as well as high-impact phenomena such as monsoons and atmospheric rivers. The impact of the in-line analysis correction-based additive inflation (ACAI) on IVT biases and forecast errors is examined within the Navy Earth System Prediction Capability (Navy ESPC) global coupled system. The ACAI technique uses atmospheric analysis corrections from the data assimilation system to approximate model bias and as a representation of stochastic model error to simultaneously reduce systematic and random errors and improve ensemble performance. ACAI reduces the global average magnitude of the 7- and 14-day IVT bias by 16%–17% during Northern Hemisphere summer, reaching 70% reductions in some tropical regions. The global average IVT bias reduction is similar to the bias reduction for low-level wind speed bias and considerably smaller than the bias reduction in total precipitable water. The localized regions where ACAI increases IVT bias occur where the control IVT biases change sign and structure with increasing forecast lead time, such as the South Asian monsoon region. Substituting analyzed wind or moisture fields for the forecast fields when calculating the forecast IVT confirms that, on average, wind errors dominate the IVT error calculation in the tropics, although wind and moisture error contributions are comparable in the extratropics. The existence of regions where using either analyzed winds or analyzed moisture increases IVT bias or mean absolute error reveals areas with compensating errors.

Reynolds, Carolyn A.↗

Y-12 Site Sustainability Plan

The accomplishments to date and the long-range planning of the Y-12 Energy Management and Sustainability and Stewardship programs support the U.S. Department of Energy (DOE) and the National Nuclear Security Administration (NNSA) vision for a commitment to energy effi ciency and sustainability and to achievement of the Guiding Principles. Specifi cally, the Y-12 vision is to support the Environment, Safety and Health Policy and the DOE Strategic Sustainability Performance Plan (SSPP), while promoting overall sustainability and reduction of greenhouse gas (GHG) emissions. The mission of the Y-12 Energy Management program is to incorporate energy-efficient technologies site-wide and to position Y-12 to meet NNSA energy requirement needs through 2025 and beyond. This plan addresses: Greenhouse Gas Reduction and Comprehensive Greenhouse Gas Inventory; Buildings, ESPC Initiative Schedule, and Regional and Local Planning; Fleet Management; Water Use Efficiency and Management; Pollution Prevention and Waste Reduction; Sustainable Acquisition; Electronic Stewardship and Data Centers; Renewable Energy; Climate Change; and Budget and Funding.

99 GENERAL AND MISCELLANEOUS↗

Estimating customer electricity savings from projects installed by the U.S. ESCO industry

The U.S. energy service company (ESCO) industry has a well-established track record of delivering substantial energy and dollar savings in the public and institutional facilities sector, typically through the use of energy savings performance contracts (ESPC) (Larsen et al. 2012; Goldman et al. 2005; Hopper et al. 2005, Stuart et al. 2013). This ~$6.4 billion industry, which is expected to grow significantly over the next five years, may play an important role in achieving demand-side energy efficiency under local/state/federal environmental policy goals. To date, there has been little or no research in the public domain to estimate electricity savings for the entire U.S. ESCO industry. Estimating these savings levels is a foundational step in order to determine total avoided greenhouse gas (GHG) emissions from demand-side energy efficiency measures installed by U.S. ESCOs. We introduce a method to estimate the total amount of electricity saved by projects implemented by the U.S. ESCO industry using the Lawrence Berkeley National Laboratory (LBNL) /National Association of Energy Service Companies (NAESCO) database of projects and LBNL’s biennial industry survey. We report two metrics: incremental electricity savings and savings from ESCO projects that are active in a given year (e.g., 2012). Overall, we estimate that in 2012 active U.S. ESCO industry projects generated about 34 TWh of electricity savings—15 TWh of these electricity savings were for MUSH market customers who did not rely on utility customer-funded energy efficiency programs (see Figure 1). This analysis shows that almost two-thirds of 2012 electricity savings in municipal, local and state government facilities, universities/colleges, K-12 schools, and healthcare facilities (i.e., the so-called “MUSH” market) were not supported by a utility customer-funded energy efficiency program.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Energy Efficiency Program Financing

In this technical brief we characterize the programmatic energy efficiency financing market from a quantitative perspective. Financing in this report refers to provision of capital—which is paid back over time—to cover upfront costs of energy efficiency. It does not refer to rebates and other types of incentives. We gather and report data on the volume of capital for energy efficiency financing that originated from five programmatic sources: on-bill programs; other utility financing programs; property assessed clean energy (PACE) programs; state energy office (SEO) revolving loan funds (RLF); and energy savings performance contracting (ESPC) programs. We estimate the amount of investment moving through EE financing programs, the sources of capital they employ, and program availability and activity by geography and market sector (residential and non-residential). We also present information on trends in investment by program type, and on the presence or absence of certain program design features, such as credit enhancements and interest rate buydowns. The result is a much more comprehensive accounting of programmatic energy efficiency financing activity than exists elsewhere.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

PV Production - Conceptual Location Analysis

The purpose of a Conceptual Location Analysis is to identify potential project/building sites in the planning phase of a project. The analysis includes review and comment on the potential sites by relevant disciplines. Site criteria encompasses DOE and NNSA requirements pertaining to real property and environmental stewardship and additionally addresses SNL site planning objectives such as sustainability and efficiency. This analysis is intended to be used as a tool to provide a comprehensive perspective on siting decisions, and is not intended to supersede previous siting decisions or agreements. This conceptual location analysis is for the siting of PV for power production. The goal of this Conceptual Location Analysis is to weigh different sites, and come to a consensus on preferred sites for potential solar arrays through an Energy Savings Performance Contract (ESPC) or a Utility Energy Service Contract (UESC).

14 SOLAR ENERGY↗

Financing Microgrids in the Federal Sector

Recent high-impact events such as hurricanes and wildfires highlight the need for energy system resilience. One potential impact of these events is the loss of utility grid power to federal sites, negatively affecting the ability to carry out their missions. Depending on the need to sustain critical functions, it may be important to continue operations during an outage of the electric grid, or at least have power restored quickly after the event. One approach to addressing this need is through a microgrid. Microgrids can provide a more reliable solution than the traditional approach of using a backup generator at individual buildings. A microgrid can enhance a site’s electrical power system during normal operations, as well as provide reliable backup power to critical loads when electric utility power is interrupted. Many times, certain components of a microgrid (and potentially the entire system) can be justified economically and paid for out of energy savings or avoided costs. In cases where savings can cover the project costs, one of several privately financed procurement mechanisms may be used to implement the project. Procurement options available to all federal agencies include utility energy services contracts (UESC), energy savings performance contracts (ESPC), and utility services contracts (USC); other mechanisms such as a power purchase agreement (PPA), enhanced use lease (EUL), and utility privatization (UP) may also be useful to agencies that have the authority to use them. Implementing a microgrid in a comprehensive effort that also includes energy efficiency can provide an important savings component, while reducing power requirements for critical loads, thus reducing the cost of the microgrid and associated distributed energy resources (DER). However, it can be difficult to achieve enough savings and avoided costs to cover the entire microgrid system, so leveraging these avoided costs in combination with appropriated funds may be necessary to implement the full project. When a site is deciding if a microgrid is the best solution, activities early in the process include identifying critical loads and existing DERs, conversations with the local electric utility, and implementation options that work best for the agency and site. This paper explores procurement options and agreements that may be useful to federal agencies interested in implementing microgrids at their sites. Microgrid complexities, implementation considerations, and suggestions to get started are also discussed. This information will be most useful to agencies when they are exploring electric energy system resilience options and/or considering different procurement options to meet their needs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Guidance and Recommendations for Streamlining Reporting for Federal Energy and Water Efficiency Projects

Federal agencies are required to report on their progress in meeting various energy and water management requirements. These reporting requirements encompass energy and water projects at federal facilities, including projects that are alternatively financed, e.g., conducted through energy savings performance contracts (ESPCs) or utility energy service contracts (UESCs). The purpose of this guidance is to provide recommendations to streamline federal agency reporting. The guidance recommends the use of eProject Builder (ePB), a project development and archiving tool for energy projects. ePB carries additional value in its simplification of federal agency reporting by dovetailing with the Federal Energy Management Program’s (FEMP’s) EISA 432 Compliance Tracking System (CTS).

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

U.S. ESCO Industry: Industry Size and Recent Market Trends

This study is the latest in a series of LBNL research into U.S. ESCO industry characteristics and market trends. The research is based on interviews with ESCO industry executives conducted during the fall of 2019 and the first half of 2020. Nearly all companies that identified themselves as ESCOs were contacted as part of this project. We find that after a period of little growth (2011-2014), industry revenues reached an estimated $6 billion in 2018, or a 3.4% annual average growth rate from 2015-2018. ESCOs primarily serve the public an institutional sectors (e.g., federal, state, and local governments; university and colleges; and K-12 schools). In 2018, project investments by public and institutional organizations accounted for over 90% of industry revenue, which is consistent with previous industry studies. ESCO activity in the Middle Atlantic, East North Central, and Pacific regions in the U.S. delivered the highest share of revenue in 2018, which is also consistent with earlier research. ESCOs reported that a majority of their customers use energy savings performance contracts (ESPCs) primarily for facility capital improvement needs and resilience rather than utility savings. In addition, the importance of non-energy benefits (e.g., water savings, avoided operations and maintenance costs, and avoided capital costs) accounted for in the project savings guarantee reportedly increased in all markets during 2016-2018 compared to previous time periods. The study found that the ESCO industry faces several key challenges, including: (1) increasing project development times due to more complex projects and other factors; (2) difficulty finding qualified subcontractors in some regions, including minority- women- and disadvantaged population-owned small business enterprises; and (3) difficulty accessing project documents and quickly fulfilling customer requests to justify project payments several years into the performance period of a project.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Case Studies in Leveraging Performance Contracts for Resilience Projects

The resilience of federal facilities has become increasingly important among lawmakers, agency leadership, and the American public as high impact natural hazards occur more frequently over time. Resilience is broadly defined as the ability of a federal facility to withstand, respond to, and recover rapidly from disruptions to maintain critical functions. The Department of Energy (DOE) Federal Energy Management Program (FEMP) was codified to facilitate the strengthening of federal energy and water efficiency and resilience. Performance contracting is one of the mechanisms through which federal agencies can finance projects at their facilities, but resilience improvement measures do not always result in utility cost savings, which are the primary driver behind performance contracts. This report provides example cases where performance contracts, specifically energy savings performance contracts (ESPC) or utility energy service contracts (UESCs), were used to implement a resilience measure at a federal facility.

99 GENERAL AND MISCELLANEOUS↗

Performance contracting centers of expertise: a framework for federal implementation

This report examines the establishment and operation of Energy Performance Contracting (EPC) Centers of Expertise (COEs) within the federal government. EPCs, including Energy Savings Performance Contracts (ESPCs) and Utility Energy Service Contracts (UESCs), are critical mechanisms for advancing energy efficiency, resilience, and infrastructure modernization without the need for significant upfront appropriations. However, EPCs require specialized knowledge in project development, contracting, financing, legal parameters and technical project oversight. Currently federal agencies have varying levels of expertise and institutionalized policy to effectively and consistently use congressionally authorized EPCs which have decades of proven and impactful use. To address these challenges, several federal agencies have created COEs to centralize expertise, standardize practices, and streamline implementation. This report reviews statutory and policy drivers, highlights the benefits and challenges and presents case studies from the General Services Administration (GSA), the Department of Veterans Affairs (VA) and the U.S. Army Engineering and Support Center Huntsville (HNC). Recommendations are also provided for agencies considering the establishment of EPC COEs, which will bring much needed structure, consistency and lead to implementation of these energy and infrastructure building projects to save costs for U.S. taxpayers.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Partial Support for the Federal Committee for Meteorological Services and Supporting Research

An interagency collaboration initiated between Navy, Air Force and NOAA and expanded to DOE, NASA, and NSF in 2012, for coordination of research to operations of a National earth system analysis and prediction capability. The goal of ESPC is to meet broad but specific agency requirements for an earth system analysis and prediction framework to support one-day to decadal global prediction at appropriate horizontal and vertical resolution; including the atmosphere, ocean, land, cryosphere, and space.

54 ENVIRONMENTAL SCIENCES↗

The Long-Term Performance of Small-Cell Batteries Without Cell-Balancing Electronics

Tests approx.8 yrs ago showed Sony HC do not imbalance. AEA developed a theory (ESPC 2002): a) Self-discharge (SD) decreases with state-of-charge (SOC); b) Cells diverge to a state of dynamic equilibrium; c) Equilibrium spread depends on cell SD uniformity. Balancing model verified against test data. Short-term measures of SD difficult in Sony cells and very small values, depends on technique. Long-term evidence supports lower SD at low SD. Battery testing best proof of performance, typically mission specific tests.

Pearson, C.↗

Getting from Goals to Projects in the Ground (Presentation)

Presentation given at the 2012 Department of Homeland Security Renewable Energy Roundtable on Energy Savings Performance Contracts (ESPCs) and Power Purchase Agreements (PPAs) for Renewable Energy (RE).

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Army Reserve Comprehensive Water Efficiency Assessments

The Army Reserve has partnered with the Pacific Northwest National Laboratory (PNNL) to develop comprehensive water assessments for numerous Army Reserve Centers in all five regions including the Pacific islands and Puerto Rico, and at Fort Buchanan and Fort Hunter Liggett. The objective of these assessments is to quantify water use at the site, and identify innovative water efficiency projects that can be implemented to help reduce water demand and increase efficiency. Several of these assessments have focused on a strategic plan for achieving net zero water to help meet the Army’s Net Zero Directive . The Army Reserve has also leveraged this approach as part of the energy conservation investment program (ECIP), energy savings performance contracts (ESPCs), and utility energy service contracts (UESCs). This article documents the process involved.

McMordie Stoughton, Kate↗