Search NASA⌕ Search

SEARCH · Search NASA

Results for “Geothermal power plants”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Wyandotte Integrated Renewable Energy Strategy (WIRES 2) (Final Technical Report)

Wyandotte Municipal Services (WMS), a Michigan Municipal Utility offering electric generation, transmission & distribution, water filtration & distribution and Broadband/Video sought to deploy a set of renewable energy projects for their Electric Utility that contributed to reducing the City’s environmental and energy impact, provided examples that would encourage businesses and citizens to adopt cleaner energy practices and help WMS meet the required renewable energy standards of the State of Michigan (10% in 2015, 15% in 2021). WMS generates and delivers roughly 280,000 megawatt hours (MWh) of electricity annually to more than 10,000 homes and 1,000 businesses within the City of Wyandotte. The Wyandotte Integrated Renewable Energy Strategy – WIRES 2 resulted in deployment of a set of community-scale micro-wind turbines, evaluation and installation of energy-efficient and low-maintenance light-emitting diode (LED) street lights and park lights in highly visible locations in the City and expansion of the geothermal heating and cooling district that already included residential geothermal systems, to include larger scale business/institutional systems at the Utility’s largest electric customer and at the City Library. Finally, WMS identified the need for job training in energy efficiency and renewable energy technologies to further develop a local skilled workforce in these areas. Partially funded by the grant, the wind turbine project provides a benchmark for WMS, local businesses and residents in the evaluation of utility-scale wind v. micro-wind in an urban environment as a renewable energy strategy. Also partially funded by the grant, the LED project benefited the City of Wyandotte by reducing load on the electric system for the public utility but also reduced City costs for streetlighting, parking lot lighting and park lighting without a compromise in security. The project also resulted in a visual success that has led to additional approvals for non-Grant related LED lighting installations resulting in further reduction in the electric load in the City. Commercial Geothermal installations resulted in the Utility being able to eliminate steam customers who formerly utilized the byproduct of steam from WMS electric production. Due to the reduction in natural gas prices and the overall reduction in market purchased power, it was no longer feasible for WMS to operate its Power Plant as a base load plant and to only operate on a market dispatch philosophy when market prices dictated that WMS could produce electricity cheaper than the market purchase price. This has resulted in fewer operating days for the WMS Power Plant, resulting in less environmental impact. WMS has now completely exited the steam business and the ability to offer a geothermal option to two (2) former steam customers (BASF-Wyandotte and the Bacon Memorial Library) allowed for that. In addition, peak loads have been shaved for these two (2) large customers due to the consistent temperature offered by geothermal heating and cooling, reducing the swings associated with thermostat changes caused by outside temperature changes during extreme high and low temperatures. Finally, energy efficiency and renewable energy college-level classes at Wayne County Community College allowed a group of interested students to pursue studies in those technologies through grant provided tuition, books and course materials. This effort provided a foundation of potential future employees not only for WMS but other energy efficiency/renewable energy employers such as Franklin Energy, a partner with WMS in energy optimization efforts with Wyandotte businesses.

17 WIND ENERGY↗

GEOPHIRES v2.0

GEOPHIRES v2.0 is a geothermal techno-economic simulation tool upgraded from GEOPHIRES v1.2. The name stands for "GEOthermal energy for Production of Heat and electricity (“IR”) Economically Simulated". GEOPHIRES combines reservoir, wellbore, and surface plant technical models with cost correlations and levelized cost models to estimate the capital and operation and maintenance costs, instantaneous and lifetime energy production, and overall levelized cost of energy of a geothermal plant. In addition to electricity generation, direct-use heat applications and combined heat and power or cogeneration can be modeled. Various upgrades have been implemented to develop GEOPHIRES v2.0, including: updating the built-in cost correlations, coupling to the external reservoir simulator TOUGH2, enhancing the built-in wellbore simulator, converting the programming language to Python, and making the code open-source. Users are encouraged to build upon the tool, e.g. by implementing their own correlations or coupling to other simulators.

Beckers, Koenraad↗

GBCGE Subsurface Database Explorer and APIs

This submission defines a DOI for the Great Basin Center for Geothermal Energy's (GBCGE) Subsurface Database Explorer web application and underlying data services, and acknowledges the INGENIOUS project as a major source of funding for data compilation and quality assurance. The GBCGE Subsurface Database Explorer is an interactive web mapping application that provides public access to the GBCGE Subsurface Database, and its collection of datasets pertinent to geothermal exploration, oil and gas exploration, critical mineral exploration, and other subsurface characterization for the Great Basin Region, western US. This is a living database, and will be continuously updated with new data and datasets as funding and motivations allow. The underlying database views that populate the web application are on an automated refresh schedule. Data sources and acknowledgements: We thank our partners with the Nevada Division of Minerals (NDOM), the Southern Methodist University (SMU), and Great Basin State Geological Surveys for their active efforts in data curation, schema design, and quality assurance. We also thank contributors among the USGS, Oregon Institute of Technology, State Divisions of Water Resources, State Divisions of Oil, Gas, and Minerals, and State Geological Surveys for open data availability and direct contributions made under the National Geothermal Data System (NGDS).

15 GEOTHERMAL ENERGY↗

Derisking Superhot Geothermal Plays with Value of Information: Utilizing Play Fairway Analysis, Geophysics and Technoeconomics

This paper describes a methodology for evaluating how the play fairways analysis (e.g., favorability) can improve our chances of making geothermal development decisions. We make statistical resource assessments and couple them with technoeconomic analysis utilizing previous favorability work performed for the Newberry Volcano. We demonstrate how the favorability can be used in a decision analysis framework because the Newberry favorability also estimated an associated uncertainty. The specific decision considered is how large of a power plant to build, which is difficult given the uncertainty about the resource size. Our results focus on two resource types, hydrothermal and enhanced geothermal systems, and they demonstrate how estimates of the minimum, most likely, and maximum estimates of the geothermal resource (denoted as the P10, P50, and P90, respectively) can be used in a decision analysis framework. Lastly, the value of information results explore using favorability with and without the magnetotelluric and gravity data from the Newberry Volcano. As expected, the favorability is more reliable, according to our methodology, at indicating the resource size when it includes the two geophysical models.

enhanced geothermal system↗

Quantifying Socioeconomic Impacts of Electricity Generating Technologies

The levelized cost of energy (LCOE) and other cost metrics used in energy planning do not account for out-of-market impacts of the technology choice. While a decision-maker at the utility or asset owner level may compare multiple forms of electricity generating technology using LCOE, a decision-maker over energy policy or community stakeholders may be interested in considering impacts beyond those that LCOE measures. This report quantifies economic impacts such as jobs and wage growth across electricity generation technologies then develops an approach to systematically compare socioeconomic metrics across technology choices. To address additional workforce related impacts, this report also compares the typical workforce education requirements and annual income levels for multiple types of electricity generating facilities. The grid scale electricity generating technologies analyzed in this report produce power using conventional hydroelectric dams, coal, natural gas, nuclear reactors, solar PV, land-based wind turbines, geothermal heat, and woody biomass combustion. Although it doesn’t generate electricity itself, the economic impacts associated with battery storage equipment manufacturing and installation were also analyzed.

03 NATURAL GAS↗

Recent Thermal and Hydraulic Stimulation Results at Raft River, ID EGS Site

The Raft River geothermal system, located 160 km northwest of Salt Lake City, Utah is the site of a Department of Energy Enhanced Geothermal System (EGS) stimulation demonstration project. The target well RRG-9 ST-1, is roughly 1.6 km (1 mile) south of the power plant. This well has undergone a series of thermal and hydraulic stimulation treatments. Furthermore, the well passes through approximately 1,524 m MD (5,000 ft. MD) of laterally discontinuous Quaternary and Tertiary volcanoclastic and volcanic rocks that unconformably overlie the Precambrian basement. The Elba Quartzite formation located in the Precambrian basement is the target zone for the stimulation program. Fluid injected into the well exits through a fracture zone in the Elba Quartzite at 1,567 m TVD (5,140 ft. TVD). In June 2013 low-rate stimulation began at RRG-9 ST-1 using injection water from the geothermal plant. The average injection rate, temperature, and well head pressure of the low-rate stimulation was 163 Lpm (43 gpm), 34°C, and 1,931kPa (280 psig), respectively. This injection continued through late August of 2013 when wellhead pressures were intentionally increased to approximately 5,516 kPa (800 psig) at approximately 984 Lpm (260 gpm). From September 12 to September 24, 2013 cold well water was injected. The average surface injection temperature was approximately 12°C. On September 25, 2013 injection of the warmer plant water was resumed. This was continued through the rest of 2013 and into 2014. Between April 1, 2014 and April 4, 2014, a higher rate hydraulic stimulation was conducted. Colder water (~10°C) was injected at rates of 20 bpm to 30 bpm (3,178 Lpm to 4,770 Lpm) at wellhead pressures of 5,861 kPa (850 psig) over approximately 24 hours. Microseismic activity was recorded near the Tertiary-Precambrian contact. Subsequently, injection of water from the plant was resumed. As of mid-January, 2015, over 666 million liters (176 million gallons) have been injected into the well. The fate of this water is the subject of ongoing numerical analyses and continuous site monitoring. Various analyses have been implemented to monitor and assess the ongoing stimulation program. Modified Hall plot analysis shows increasing conductivity and/or a decreasing skin factor around the wellbore. Since April, 2014, the injectivity index has increased significantly from 0.28 Lpm/kPa (0.5 gpm/psig) to 0.93 Lpm/kPa (1.7 gpm/psig).

enhanced geothermal system↗

Techno-Economic Performance of Eavor Loop 2.0

This project evaluated techno-economic performance for a sample Eavor-Loop 2.0 design for electricity production and direct-use heating. The Eavor-Loop 2.0 design investigated is a 7.5-km deep closed-loop geothermal system consisting of 12 laterals for a total of more than 90 km of downhole well and lateral length. Both a high geothermal gradient scenario of 60 degrees C/km and a low geothermal gradient scenario of 30 degrees C/km were considered. With pure water injected at 60 degrees C and 80 kg/s, reservoir simulations with the Slender-Body Theory simulator indicate average production temperatures over a 30-year lifetime of ~125 degrees C and ~210 degrees C for the low and high geothermal gradient scenario, respectively. These correspond to heat production of ~22 M Wth and ~51 M Wth, respectively. Using IPSEpro simulations, we find average power production of ~2.2 M We and ~8.6 M We, respectively, for a subcritical organic Rankine cycle power plant with air-cooled condensers. Cost estimates indicate the overall capital and levelized costs are dominated by the lateral drilling cost. Obtaining a levelized cost of electricity below $70/M Wh requires a geothermal gradient of 60 degrees C/km, a discount rate below 9%, and lateral drilling cost below $400/m. A well cost model indicates that ~$400/m for the Eavor-Loop 2.0 design investigated can be obtained for a drilling rate of penetration about 40 ft/hr (with bit life of 50 hours), and omitting casing and cement. Traditional (geothermal) well drilling has achieved these drilling rate conditions, including the Utah FORGE project where the rate of penetration has exceeded 50 ft/hr in granite. However, it is unclear if these conditions are still valid for drilling the Eavor-Loop 2.0 laterals (i.e., ~82 km of laterals at 4 to 7.5-km vertical depth with rock temperatures up to 460 degrees C), as such downhole completion has never been developed before. Competitive levelized cost of heat values ($1.2-$8.2/GJ) are calculated, even for the low geothermal gradient scenario (30 degrees C/km) and lateral drilling cost of $600/m.

advanced geothermal system↗

Investigating Performance of Geothermal Reservoirs With Bi-Directional Heat Transfer for Seasonal Thermal Storage Using Thermal-Hydraulic Reservoir Simulations

This paper presents initial simulation results of deep subsurface seasonal thermal storage of waste heat from a natural gas-fired power plant during the summer months for providing heating during winter months at the Cornell University main campus in Ithaca, New York. An injection temperature profile is calculated with the MEnU tool and numerical reservoir simulations are conducted with the simulator FALCON. Both a porous medium and large single fracture geothermal reservoir are considered at about 3 km depth with initial reservoir temperature of 75 degrees C. Simulations indicate that a much smaller reservoir - which is technically easier and less risky to develop - is sufficient when operating the reservoir for seasonal thermal storage instead of for continuous heat production. For example, storing 13 GWh of heat seasonally in a 100 m thick porous medium based on the Galway formation requires about 65 m of well spacing to limit the yearly variation in production temperature to 10 degrees C. Operating this reservoir for continuous heat production would require a well spacing of 365 m to limit the thermal decline to 10 degrees C after 10 years. Neglecting wellbore heat losses and assuming uniform and homogeneous properties, a round-trip thermal efficiency of 100% can be obtained if the yearly averaged injection temperature matches the initial reservoir temperature.

district heating↗

Resilient cooling through geothermal district energy system

Decarbonization and resilience to heat waves have recently become high priorities for building and district energy systems. Geothermal coupled district heating and cooling systems that operate a water loop near ground temperature gain increasing adoption to support decarbonization. In these systems, vapor-compression machines, distributed in the energy transfer stations, lift the temperature up or down to the needs of the particular building. In principle, these systems can provide low-power, free cooling from the geothermal bore field during heat waves when electricity is often scarce. However, the performance of such a resilience operation mode and its implication on the energy system configuration and the sizing of the bore field and HVAC equipment is not yet understood. Consequently, we are assessing their resilience, power use and design implications under a scenario of a heat wave on five working days during which chillers are switched off to reduce electrical consumption. Our analysis is based on high-fidelity, coupled dynamic models of district energy, building-side HVAC and actual control logic, with whole building energy simulation used to assess thermal conditions in a 2004 vintage multi-zone office building in Chicago, IL. The results show that relying only on waterside economizer cooling, the indoor thermal conditions can be maintained in a tolerable range for the majority of the building zones with half the electrical energy compared to standard chiller operation. Thermal comfort in the hottest zones can be further improved by oversizing the cooling coil. However, the waterside economizer has significant implications on the system configuration and sizing: The geothermal bore field needs to be sized about 30% larger than the upper limit of the range observed for conventional geothermal systems. Nevertheless, if a central chiller plant is added, the bore field can be downsized to the typical design range. The latter configuration still allows compressor-less cooling during the heat wave with peak power reduced by 60% compared to the standard design and chiller operation.

15 GEOTHERMAL ENERGY↗

Assessment of Economic Impact of Permitting Timelines on Produced Geothermal Power in Imperial County, California

Despite having a large geothermal power potential in the United States, only a small fraction has been developed for power generation. Various barriers, including technical, financial, and regulatory permit delays, are attributed to lower contribution of geothermal energy in the national grid. Unpredictable environmental reviews and permitting timelines are some of the non-technical barriers that can cause delays in geothermal exploration and utilization plans. Our study shows that the geothermal permitting timelines can vary from six months to several years, depending on the presence or absence of biological resources, cultural resources, and sensitive environmental issues at the project site. The potential impacts of these permit barriers can range from investors abandoning geothermal development to making the product (i.e., electricity) more expensive and uncompetitive. In this study, we conducted economic analysis to assess the impact of permitting timelines on cost of produced electricity from geothermal resources using data from existing geothermal plants as well as prospective sites. In this paper, we present collected timelines data, approach, and results of economic impact of permitting timelines on geothermal power. We evaluated the various environmental management and permit review processes by considering a hypothetical geothermal project in the Salton Sea Known Geothermal Resource Area. Because of the variety of the biological and environmental issues and the involvement of local, state, and federal agencies with overlapping jurisdictions, this project could go through one of the many California Environmental Quality Act (CEQA) and National Environmental Policy Act (NEPA) review scenarios that range from the least to the most complex in its circumstances. The fastest CEQA/NEPA review timelines would have the project completed in six years. In contrast, the project would substantially need longer time to complete if it were located in an area with significant environmental resources or cultural issues that required permitting from various agencies. With increasing project completion timelines, the simplified levelized cost of electricity (sLCOE) can be 4 to 11% higher with longer CEQA/NEPA review timelines than the sLCOE value with the fastest CEQA/NEPA review timeline. Lengthier CEQA/NEPA review timelines could also result in loss of $64 million to $227 million in potential revenue. Such significant economic impacts could determine the success of a geothermal project.

15 GEOTHERMAL ENERGY↗

Play Fairway Analysis: Structurally Controlled Geothermal Systems in the Eastern Great Basin Extensional Regime, Utah

A research team with membership from the University of Utah/Energy & Geoscience Institute, the University of Utah/Dept. of Geology & Geophysics, and the Utah Geological Survey, undertook a play fairway analysis (PFA) for geothermal resources in the Eastern Great Basin (EGB) extensional tectonic regime of western Utah. This is a high-priority region for geothermal exploration because active Basin and Range (B&R) extension with volcanism having a N-S strike is superimposed upon pre-existing E-W belts of plutonic rocks and large-scale structural lineaments. Cumulative heat flow along the N-S strike of the state totals approximately 5 GWt above background stable interior. Three electricity producing power plants currently exist with substantial potential for increase. Succinctly, our PFA approach aims to resolve potential sources of heat and permeability in the region, which are the two principal criteria for establishing a geothermal resource. An initial Phase 1 was carried out using only existing geoscientific data in the area. Criteria selected for focusing heat potential include direct heat flow measurements in boreholes, magnetotelluric (MT) low resistivity anomalies, fluid/gas geochemistry, and proximity to recent volcanic eruptions. Permeability is established through geological structures (fault density, critically stressed areas, seismicity, gravity), and MT low resistivity anomalies. In Phase II of this PFA project, additional geological, geophysical and geochemical data were acquired and analysis carried out primarily over promising composite common risk (CCR) areas initially identified in Phase I in order to focus prospectivity and prepare for drilling recommendations. These prospects are near the Twin Peaks rhyolite field, high heat flow areas north of the producing Cove Fort system, and geophysical structure beneath the Crater Knoll area off the northeast flank of the Mineral Mountains. Additional data included MT site fill-in, structural mapping and analysis using high-resolution imagery, gravity and on-ground mapping, Nodal 3C passive seismic collection, and passive 3He surveying. Heat source and permeability potential are again expressed in terms of their individual common risk segment (CRS) maps, with a color scheme using green for most favorable (low risk) and red for least favorable (high risk). Diverse data types are united through the technique of probability kriging, which establishes prospectivity thresholds for each data type and then computes probability of exceeding that threshold over the PFA area. Modified CRS and CCRS maps are compared to those of Phase I to highlight tighter prospectivity focus. In doing so, the prospectivity threshold for heat was increased significantly to narrow the targeting. In the final Phase III of this project where a recommended deep thermal gradient hole was sited, additional geophysical, geochemical and geological field collection and analysis was carried out to refine drill hole targeting. This includes prospect-scale MT, gravity, structure, passive seismic deployment (Cove Fort area), and detailed 3He isotope profiling. It was the recommendation of the DOE Technical Monitoring Team (TMT) that one or more holes be sited in the north-ern Cove Fort area where legacy TG gradient holes showed high cumulative heat flow. These were to be of moderate depth, 2000-3000 feet, to reach the geothermal fluid table expected to start in excess of 1000 feet depth. The drilling organization stipulated by the DOE/GTO was that of the USGS Research Drilling Program (RDP) centered in Las Vegas, NV. A detailed well plan, appended to this report, was developed principally by Dr. Ben Barker consulting to University of Utah, Dr. Steve Pye on the DOE TMT, Mr. Steven Crawford of the USGS-RDP, and the project PI Phil Wannamaker. However, temperature and possible H 2 S at the systems lead to cancellation of the drilling last-minute as this appeared outside the experience base of the USGS-RDP. We hope to have the opportunity to revisit the test drilling and expand the Play Fairway Analysis of this region at some point in the future.

15 GEOTHERMAL ENERGY↗

Illinois Compressed Air Energy Storage

Compressed Air Storage Energy (CAES) is one of the few mid- technology readiness level (TRL) energy storage technologies that can address the long-duration infrastructure needed for dealing with variable electric output from renewable energy sources and be reliable backup source for replacing natural gas during supply interruptions. In CAES the goal is to capture and store compressed air in subsurface sedimentary strata when off-peak power is available, or there is a need for grid balancing. The stored high-pressure air is returned to the surface and used to power turbines during reductions in either renewable energy or supply issues with fossil fuels. The Illinois CAES project evaluates the feasibility of capturing surplus electrical energy from renewable sources and off-peak energy at a fossil fuel power plant at the University of Illinois Urbana - Champaign (UIUC) campus. The UIUC Abbott Power Plant uses natural gas and coal to generate electricity (capacity: 35 MWe by coal and 49 MWe by NG). UIUC receives additional electricity from on campus solar farm, and off-campus wind farm. Also, UIUC offsets electricity usage by integrating geothermal energy systems into building heating Also, UIUC offsets steam, hot and chilled water usage by integrating geothermal energy systems into building heating and cooling systems. Furthermore, the two UIUC solar farms (Solar Farm 1 is 21 acres and Solar Farm 2 is 54 acres) to generate 4.68 megawatts (MW) and 12.1 MW, respectively. Campus receives 8.6% of the wind-generated electricity from the Rail Splitter Wind Farm. The project objectives were to design an integrated system to 1) capture surplus electrical energy from renewable sources and the Abbott Power Plant using a CAES system, 2) store both the compressed air and the thermal heat generated by compression in the subsurface as part of an adiabatic system, 3) simulate the movement of the air and heat in the subsurface, 4) recover the compressed air and stored thermal heat to rotate turbine generators during sustained interruption due to weather events or fossil fuel disruptions.

03 NATURAL GAS↗

Assessing the Economic Value of Underground Thermal Storage for Hybrid Geothermal Power

Solutions are needed to address resource adequacy in the electric power system for highly decarbonized systems. The storage duration, the length of time a storage device can provide continuous output at its rated capacity, must be sufficient to receive full credit toward resource adequacy. Longer peaks and high fractions of variable renewable generation have increased the required duration to potentially seasonal durations. Underground Thermal Energy Storage (UTES) can be adapted to a hybrid storage power plant or heating and cooling applications to satisfy the need for long-duration storage. In this study, we use the Renewable Energy Deployment System (ReEDS) capacity expansion model to evaluate the increase in value for an enhanced geothermal system (EGS) resources by adding UTES. In modeled scenarios, using geothermal without storage as a baseline we compare the increase in economic value for plants with a range of storage characteristics. The added value of a hybrid storage plant changes depending on assumptions including the length of storage duration, efficiency, and ability to charge storage from the grid during periods of low energy prices. Relating proposed characteristics for geothermal UTES hybrids to the modeled economic value provides insight into economically viable costs for developing UTES as well as what combination of technology characteristics and future energy and policy assumptions drive significant value increases.

capacity expansion model↗

GeoThermalCloud: Cloud Fusion of Big Data and Multi-Physics Models using Machine Learning for Discovery, Exploration, and Development of Hidden Geothermal Resources

The primary goals of this project are exploring hidden geothermal resources in the U.S.A. and designing profitable enhanced geothermal systems (EGS). Many processes and parameters control geothermal exploration and energy production from geothermal fields. Diverse datasets (e.g., geology, geochemistry, geophysics, satellite, airborne geophysics) are available to help characterize subsurface geothermal conditions. Sparse and multi-scale characteristics of these datasets prohibit properly leveraging these datasets for geothermal exploration and profitable EGS design. Recent advancements in machine learning (ML) promise to resolve these issues. The tremendous challenges and risks of geothermal exploration and production bring the demand for novel ML methods and tools that can (1) analyze large field datasets, (2) assimilate model simulations (large inputs and outputs), (3) process sparse datasets, (4) perform transfer learning (between sites with different exploratory levels), (5) extract hidden geothermal signatures in the field and simulation data, (6) label geothermal resources and processes, (7) identify high-value data acquisition targets, and (8) guide geothermal exploration and production by selecting optimal exploration, production, and drilling strategies. To address these necessities, ML-based geothermal resources exploration and enhanced geothermal systems (EGS) design tools have been developed. The exploration tool is called GeoThermalCloud and EGS design tool is called GeoDT-ML. GeoThermalCloud (https://github.com/SmartTensors/GeoThermalCloud.jl) utilizes a LANL unsupervised ML platform called SmartTensors (https://tensors.lanl.gov/) to automate data analyses and interpretations by extracting hidden signatures to identify geothermal prospects. Also, it enables the identification of critical measurements needed to identify geothermal resource signatures. Alternatively, GeoDT-ML (https://github.com/SmartTensors/GeoThermalCloud.jl/tree/master/EGS) is an ML-based alternative to GeoDT (https://github.com/GeoDesignTool/GeoDT.git), a fast, simplified multi-physics solver to evaluate EGS project designs in uncertain geologic systems. GeoDT-ML leverages recent advances in deep learning and high-performance computing. It is a faster and simpler version of GeoDT. To make this project a success, we used capabilities of LANL, PNNL, Google, Stanford, and Julia Computing. We analyzed eight datasets of the U.S.A. using GeothermalCloud and demonstrated potential highly prospective geothermal resources and identified key factors defining highly prospective sites. The first data set includes 44 locations in southwest New Mexico and 18 geological, hydrogeological, geophysical, geothermal, geochemical attributes. We defined low- and medium-temperature hydrothermal systems and discovered a new highly prospective site. The second data set analyzed 18 shallow water chemistry attributes at 14,342 locations in the Great Basin. It demarcated modestly, moderately, and highly prospective sites including key attributes for each type of prospectivity. The third data set analyzed Utah FORGE data including satellite (InSAR), geophysical (gravity, seismic), geochemical, and geothermal attributes. Here, we performed prospectivity analysis to identify future drilling locations using geological, geochemical, and geophysical attributes. Maps of temperature at depth and heat flow are constructed based on the available data. Prospectivity maps were generated, and drilling locations were proposed for future geothermal field exploration. The fourth data set analyzed 21 attributes at 120 locations in Tularosa Basin, New Mexico; data comes from past play fairway analyses in this region. ML analyses identified geothermal signatures associated with modestly, moderately, and highly hydrothermal systems. We also defined dominant attributes and spatial distribution of the geothermal signatures. The fifth, sixth, seventh, and eighth datasets include Tohatchi Springs, New Mexico, Hawaii, Brady site, Nevada, and EGS Collab, respectively. Moreover, we coupled GeothermalCloud and magnetotellurics data to pinpoint drilling locations for developing geothermal projects in the Tularosa Basin, New Mexico. GeothermalCloud found potential prospective locations for geothermal resources near White Sands Missile Range and McGregor Range at Fort Bliss. Magnetotellurics data determined the potential depth (~1800m) of geothermal prospects at McGregor Range based on apparent resistivity structures/layers in the subsurface. The McGregor Range consists of three resistivity layers and two resistivity structures. Magnetotellurics data also helps identify that the western portion of the McGregor Range has thick and low-resistivity earth materials. The low resistivity to the west is most likely for a fault system. Assuming temperature is consistent with a geothermal reservoir, the west-central part of the McGregor Range has the highest geothermal potential because of the increase in porosity and associated permeability attributed to the interpreted fault system. Also, we devised a coupling strategy between a process model and GeothermalCloud to characterize hydrogeological conditions and geothermal conditions, respectively. The process model characterizes hydrogeological and geothermal conditions on highly prospective geothermal sites provided by GeothermalCloud. We developed a physics-informed neural network (PINN) version of the Burns equation that can be easily coupled with GeothermalCloud. Furthermore, we performed an optimal design decision maximizing the economic value of an EGS power plant. This study optimized the range of well spacing between injection and production wells maximizing net present value in dollars (NPV). For this task, we used the GeoDT to simulate the Utah FORGE EGS development cycle from the initial well design to the end of production. Next, we accomplished another crucial task, which is predicting permeability of geothermal reservoirs. Predicting permeability of geothermal reservoirs is a non-trivial task because of huge computational runtime of simulation and lack of measurements. To avoid these limitations, we used easy-to-measure chemical concentrations in the subsurface as measurement data and convolutional neural network based ML model of a high-fidelity model. Next, we predicted permeability using Markov chain Monte Carlo simulation. We found that Markov chain Monte Carlo simulation predicts permeability with a high certainty if the prediction zone in the simulation area has chemical concentration data. Finally, we analyzed the DOE funded INGENIOUS and GeoDAWN projects data. For discovering hidden geothermal systems in the Great Basin, the INGENIOUS project accumulated old data, collected new data, and released them in 2022. The dataset includes a total of 24 geological, geophysical, and geochemical attributes. Data resolution and scale significantly vary prohibiting an appropriate usage. To avoid such limitations, we brought all data in the same resolution and scale by applying the inverse distance weighting interpolation technique for predicting data in unsampled locations. Subsequently, we analyzed LiDAR data of the GeoDAWN project. We received data in tiles format. The DOE’s overarching goal is to use ML on LiDAR data for finding favorable geological structures (e.g., step up faults in Brady, Nevada). To serve the purpose, we need to label favorable geologic structures that correspond to LiDAR data. We wrote an algorithm to label the LiDAR data with the favorable geologic structures.

15 GEOTHERMAL ENERGY↗

Shallow Geothermal Resources for Cooling Applications at the University of Hawai'i

Drilling activities account for 30% to 57% of the cost to develop and install a geothermal plant. Therefore, an accurate representation of the cost to drill a well is paramount in techno-economic analysis to determine the feasibility of a geothermal power project. In 2022, the National Renewable Energy Laboratory (NREL) endeavored to revise the U.S. Department of Energy (DOE) GeoVision baseline drilling cost curves due to extensive improvement in drilling rates at the Utah Frontier Observatory Research in Geothermal Energy (FORGE) demonstration site. That effort did not culminate in the recommendation of new curves because the actual project costs did not match the reported performance improvements and were at or above the GeoVision baseline. The need for another iteration of this analysis has arisen from industry record drilling performance reported by recent commercial field-scale and demonstration projects, including Fervo Energy's Cape Station, the Utah FORGE 16B(78)-32 demonstration and the Geysers Power Company's GDC-36 demonstration. Therefore, in this work, we have estimated the resulting industry average rate of penetration (ROP) and bit life and applied these parameters as inputs to the Well Cost Simplified model used in the GeoVision analysis. The resulting revised cost curves show a significant decline from the GeoVision baseline. For vertical wells, the magnitude of cost decline ranges between 12% and 24% while for deviated wells, cost reductions between 18% and 26% are estimated. The revised cost curves are in good agreement with actual cost data and therefore, quantify the economic impact of the utilization of (and advances in) polycrystalline diamond compact (PDC) bit technology and the application of physics-based methodologies that optimize mechanical specific energy.

building cooling↗

2025 Geothermal Drilling Cost Curves Update: Preprint

Drilling activities account for 30% to 57% of the cost to develop and install a geothermal plant. Therefore, an accurate representation of the cost to drill a well is paramount in techno-economic analysis to determine the feasibility of a geothermal power project. In 2022, the National Renewable Energy Laboratory (NREL) endeavored to revise the U.S. Department of Energy (DOE) GeoVision baseline drilling cost curves due to extensive improvement in drilling rates at the Utah Frontier Observatory Research in Geothermal Energy (FORGE) demonstration site. That effort did not culminate in the recommendation of new curves because the actual project costs did not match the reported performance improvements and were at or above the GeoVision baseline. The need for another iteration of this analysis has arisen from industry record drilling performance reported by recent commercial field-scale and demonstration projects, including Fervo Energy’s Cape Station, the Utah FORGE 16B(78)-32 demonstration and the Geysers Power Company’s GDC-36 demonstration. Therefore, in this work, we have estimated the resulting industry average rate of penetration (ROP) and bit life and applied these parameters as inputs to the Well Cost Simplified model used in the GeoVision analysis. The resulting revised cost curves show a significant decline from the GeoVision baseline. For vertical wells, the magnitude of cost decline ranges between 12% and 24% while for deviated wells, cost reductions between 18% and 26% are estimated. The revised cost curves are in good agreement with actual cost data and therefore, quantify the economic impact of the utilization of (and advances in) polycrystalline diamond compact (PDC) bit technology and the application of physics-based methodologies that optimize mechanical specific energy.

15 GEOTHERMAL ENERGY↗

Analysis of curtailment at The Geysers geothermal Field, California

Geothermal energy has traditionally been viewed as a baseload energy source, but the rapid growth of intermittent renewable energy has led to a need for more flexibility in power generation to avoid mandatory curtailment imposed by grid operators. This study of curtailment at The Geysers provides insights into the magnitude, duration, frequency, temporal and spatial distribution, and potential causes of curtailment events between 2013 and 2018. Annual levels of curtailment range during this period from 9 to 47 GW h, representing 0.15 to 0.81 % of the net generation. Most curtailments occurred at the power plants connected to a lower capacity transmission line and may result from transmission constriction. There is a clear link between negative pricing and economic curtailment, especially when solar production is higher. Economic curtailment events tend to be only a few hours and vary in magnitude up to almost 300 MW, whereas transmission-related curtailment events can be up to several weeks in duration. It is likely that curtailment of geothermal power will be an increasing concern, and could be mitigated by flexible generation strategies and increases in energy storage. It is critical to know the nature of curtailment events so that flexible generation options can be assessed properly.

15 GEOTHERMAL ENERGY↗

Long-run Marginal Emission Rates for Electricity - Workbooks for 2022 Cambium Data

These workbooks contain modeled estimates of long-run marginal emission rates (LRMER) for the contiguous United States. A LRMER is an estimate of the rate of emissions that would be either induced or avoided by a change in electric demand, taking into account how the change could influence both the operation as well as the structure of the grid (i.e., the building and retiring of capital assets, such as generators and transmission lines). It is therefore distinct from the more-commonly-known short-run marginal, which treat grid assets as fixed. Long-run marginal emissions rates are generally appropriate to use when trying to comprehensively estimate the impact of a long-lived (i.e., more than several years) intervention. There are two workbooks that supply the data at two different geographic resolutions: states and GEA regions (20 regions that are similar to, but not exactly the same as, the US EPA's eGRID regions). For more data underlying these emissions factors, see the Cambium 2022 project at https://scenarioviewer.nrel.gov/. For more details on input assumptions and methodology see the associated report (Cambium 2022 Scenario Descriptions and Documentation, https://www.nrel.gov/docs/fy23osti/84916.pdf). This data is planned to be updated annually. Information on the latest versions can be found at https://www.nrel.gov/analysis/cambium.html.

01 COAL, LIGNITE, AND PEAT↗