Search NASA⌕ Search

SEARCH · Search NASA

Results for “Leak Testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Tritium Aging of Regenerated LANA.75

Tritium Aging of Regenerated LANA.75 is a multi-year project. Activities include: tritium aging of a LANA.75 sample regenerated in 2018, regenerating a second tritium-aged LANA.75 sample, and verifying the thermal stability of LANA.75 under regeneration conditions. During FY19, the Task Technical Plan (TTP) addendum providing testing guidance for monitoring tritium aging of the regenerated LANA.75 sample was approved. A desorption isotherm at 150 °C was collected on the regenerated LANA.75 sample. A second desorption isotherm at 150 °C is scheduled to be collected along with additional desorption isotherms at 80 and 120 °C. Fabrication, pressure testing, and leak testing of the high temperature test cell for regeneration of the second tritium-aged LANA.75 sample was completed. Selection of the second LANA.75 sample to be regenerated is anticipated in FY20. Thermal stability testing of LANA.75 material was completed. Hydrogen desorption isotherms at 80, 100 and 120 °C were collected prior to and after a lengthy annealing process (200 hours combined over two weeks) at 750 °C. The isotherms showed similar performances for all temperatures. However, the plateau region for the isotherms after the annealing process were flatter, suggesting that the annealing process was beneficial to the hydride. Sample analyses, including XRD, SEM, ICP and particle size distribution, are ongoing.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Valve, normally open, titanium: Pyronetics Model 1425

An operating test series was applied to two explosive actuated, normally open, titanium valves. There were no failures. Tests included: proof pressure and external leakage test, gross leak test, post actuation leakage test, and burst pressure test.

Avalos, E.↗

Final Report: Part 1. In-Place Filter Testing Instrument for Nuclear Material Containers. Part 2. Canister Filter Test Standards for Aerosol Capture Rates.

A portable instrument has been developed to assess the functionality of filter sand o-rings on nuclear material storage canisters, without requiring removal of the canister lid. Additionally, a set of fifteen filter standards were procured for verifying aerosol leakage and pressure drop measurements in the Los Alamos Filter Test System. The US Department of Energy uses several thousand canisters for storing nuclear material in different chemical and physical forms. Specialized filters are installed into canister lids to allow gases to escape, and to maintain an internal ambient pressure while containing radioactive contaminants. Diagnosing the condition of container filters and canister integrity is important to ensure worker and public safety and for determining the handling requirements of legacy apparatus. This report describes the In-Place-Filter-Tester, the Instrument Development Plan and the Instrument Operating Method that were developed at the Los Alamos National Laboratory to determine the “as found” condition of unopened storage canisters. The Instrument Operating Method provides instructions for future evaluations of as-found canisters packaged with nuclear material. Customized stainless steel canister interfaces were developed for pressure-port access and to apply a suction clamping force for the interface. These are compatible with selected Hagan-style and SAVY-4000 storage canisters that were purchased from NFT (Nuclear Filter Technology, Golden, CO). Two instruments were developed for this effort: an initial Los Alamos POC (Proof-of-Concept) unit and the final Los Alamos IPFT system. The Los Alamos POC was used to create the Instrument Development Plan: (1) to determine the air flow and pressure characteristics associated with canister filter clogging, and (2) to test simulated configurations that mimicked canister leakage paths. The canister leakage scenarios included quantifying: (A) air leakage due to foreign material (i.e. dust and hair) fouling of o-rings, (B) leakage through simulated cracks in o-rings, and (C) air leakage due to inadequately tightened canister lids. The Los Alamos POC instrument determined pertinent air flow and pressure quantities, and this knowledge was used to specify a customized Isaac® (Z axis, Salt Lake City, UT) leak test module. The final Los Alamos IPFT (incorporating the Isaac® leak test module) was used to repeat the tests in the Instrument Development Plan (with simulated filter clogging tests and canister leak pathway tests). The Los Alamos IPFT instrument is capable of determining filter clogging and leak rate conditions, without requiring removal of the container lid. The IPFT measures pressure decay rate from 1.7E-03 in WC/sec to 1.7E-01 in WC/sec. On the same unit scale, helium leak testing of canisters has a range from 5.7E-07 in WC/sec to 1.9E-03 in WC/sec. For a 5-quart storage canister, the IPFT measures equivalent leak flow rates from 0.03 to 3.0 cc/sec. The IPFT does not provide the same sensitivity as helium leak testing, but is able to gauge the assembled condition of as-found and in-situ canisters.

61 RADIATION PROTECTION AND DOSIMETRY↗

Testing and Qualification of Molybdenum Subcapsule Welds for MiniFuel Experiments

This report documents the testing and qualification efforts for welding molybdenum components to support MiniFuel irradiation campaigns. Other details such as general weld parameters, weld joint geometries, and performance limits are also provided in this report. The American Welding Society’s specifications were used to select the nondestructive and destructive tests, which include: gross and fine leak testing, internal pressure proof testing, and creating metallographic mounts of welds. Leak testing and metallographic mounts provide qualitative information about the weld integrity, while the proof testing indicated pressure/usage limits of the molybdenum subcapsule. Based on the testing results provided in the is report, the capsule can be exposed to an internal pressure of at least 20.7 MPa (3000 psi). A sealed capsules is also capable of withstanding the 3.2 MPa (468 psi) external hydrostatic operating pressure of the High Flux Isotope Reactor.

42 ENGINEERING↗

Impact of elliptical boreholes on in situ stress estimation from leak-off test data

We developed an inversion technique to determine in situ stresses for elliptical boreholes of arbitrary trajectory. In this approach, borehole geometry, drilling-induced fracture information, and other available leak-off test data were used to construct a mathematical model, which was in turn applied to finding the inverse of an overdetermined system of equations. The method has been demonstrated by a case study in the Appalachian Basin, USA. The calculated horizontal stresses are in reasonable agreement with the reported regional stress study of the area, although there are no field measurement data of the studied well for direct calibration. The results also indicate that 2% of axis difference in the elliptical borehole geometry can cause a 5% difference in minimum horizontal stress calculation and a 10% difference in maximum horizontal stress calculation.

42 ENGINEERING↗

Ion pump and leak life test

The fabrication and long term testing of a flight type ion pump and sintered inlet leak are described. These tests were conducted over a period of one year at an ion pump pressure of approximately 0.000001 torr. These long term tests were conducted to investigate aging of ion pumps and leaks under continuous use. Pumping speed and leak conductance, as well as other parameters, were measured on a weekly basis with ion pump start tests conducted on a monthly basis.

Ierokomos, N.↗

RH Packaging Maintenance Manual (Rev. 0)

This document provides instructions for performing (1) Inner containment vessel (IV) and outer containment vessel (OC) maintenance leakage rate test on packaging seals and corresponding seal surfaces using a nondestructive helium (He) leak test; (2) IV and OC periodic leakage rate test using nondestructive He leak test; and (3) IV and OC structural pressure tests.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hermetic edge sealing of photovoltaic modules

The feasibility of using an electrostatic bonding (ESB) and ultrasonic welding process to produce hermetic edge seals on terrestrial solar cell modules was investigated. The fabrication sequence is to attach an aluminum foil "gasket' to the perimeter of a glass sheet. A cell circuit is next encapsulated inside the gasket, and its aluminum foil back cover is seam welded ultrasonically to the gasket. An ESB process for sealing aluminum to glass was developed in an ambient air atmosphere, which eliminates the requirement for a vacuum or pressure vessel. An ultrasonic seam welding process was also developed which did not degrade the quality of the ESB seal. Good quality welds with minimal deformation were produced. The effectiveness of the above described sealing techniques was tested by constructing 400 sq cm (8 x 8 s64 sq in) sample modules, and then subjecting them to nondestructive fine and gross leak tests. The gross leak tests identified several different causes of leaks which were then eliminated by modifying the assembly process.

Nowlan, M. J.↗

An Evaluation of Ultra-High Pressure Regulator for Robotic Lunar Landing Spacecraft

The Robotic Lunar Lander Development (RLLD) Project Office at NASA Marshall Space Flight Center (MSFC) has studied several lunar surface science mission concepts. These missions focus on spacecraft carrying multiple science instruments and power systems that will allow extended operations on the lunar surface. Initial trade studies of launch vehicle options for these mission concepts indicate that the spacecraft design will be significantly mass-constrained. To minimize mass and facilitate efficient packaging, the notional propulsion system for these landers has a baseline of an ultra-high pressure (10,000 psig) helium pressurization system that has been used on Defense missiles. The qualified regulator is capable of short duration use; however, the hardware has not been previously tested at NASA spacecraft requirements with longer duration. Hence, technical risks exist in using this missile-based propulsion component for spacecraft applications. A 10,000-psig helium pressure regulator test activity is being carried out as part of risk reduction testing for MSFC RLLD project. The goal of the test activity is to assess the feasibility of commercial off-the-shelf ultra-high pressure regulator by testing with a representative flight mission profile. Slam-start, gas blowdown, water expulsion, lock-up, and leak tests are also performed on the regulator to assess performance under various operating conditions. The preliminary test results indicated that the regulator can regulate helium to a stable outlet pressure of 740 psig within the +/- 5% tolerance band and maintain a lock-up pressure less than +5% for all tests conducted. Numerous leak tests demonstrated leakage less than 10-3 standard cubic centimeters per second (SCCS) for internal seat leakage at lock-up and less than10-5 SCCS for external leakage through the regulator ambient reference cavity. The successful tests have shown the potential for 10,000 psig helium systems in NASA spacecraft and have reduced risk associated with hardware availability and hardware ability to meet RLL mission requirements.

Burnside, Christopher↗

Model 9975 O-Ring Fixture Long-Term Leak Performance (FY2020 Status Report)

Leak testing experiments to monitor the aging performance of Viton GLT and GLT-S O-rings used in the model 9975 shipping package has been ongoing since 2004 at Savannah River National Laboratory. Seventy tests using mock-up 9975 primary containment vessels (PCVs) with GLT O-rings were assembled and heated to temperatures ranging from 200 to 450 °F. In addition, fourteen tests with GLT-S O-rings were initiated in 2008 and heated to temperatures ranging from 200 to 400 °F. The conditioning temperatures are elevated compared to the calculated maximum O-ring temperature in a 9975 package in storage, 158 °F, to accelerate aging and enable observations of O-ring failures in a reasonable time frame. The fixtures are leak tested periodically and all GLT O-ring fixtures aging at 350 °F or above have failed to maintain a leak-tight seal. Eight GLT O-ring fixtures aging at 300 °F have failed after 2.8 to 5.7 years at temperature while the remaining fixtures at 300 °F were retired from testing following more than five years without failure. No failures have yet been observed in GLT O-ring fixtures aging at 200 °F for 12 to 14 years or aging at 270 °F for 8.5 years. All GLT-S O-ring fixtures aging at 300 °F or above have failed their leak test. No failures have yet been observed in GLT-S O-ring fixtures aging at 200 and 250 °F for 10 to 10.5 years. Data from the O-ring fixtures are generally consistent with results from compression stress-relaxation testing, and provide confidence in the predictive models based on those results. However, uncertainty exists in extrapolating these elevated temperature results to the lower temperatures of interest for normal storage in K-Area Complex (KAC). Oxygen consumption testing, which includes results from temperatures near KAC normal storage temperatures, is ongoing to provide further confidence and corroborate these extrapolations. The collective data from these test efforts suggest the minimum O-ring service life at KAC normal storage conditions should be at least 34 years for GLT and GLT-S O-rings. Measurement of compression set in O-rings removed from failed fixtures, compared to that from KAC surveillance O-rings, indicates margin remains for O-rings still in service. Aging and periodic leak testing will continue for the remaining PCV fixtures.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

FY2025 Status Report: Model 9975 O Ring Fixture Long-Term Leak Performance

Leak testing experiments to monitor the aging performance of Viton® GLT and GLT-S O-rings used in the model 9975 shipping package have been ongoing since 2004 at Savannah River National Laboratory. Seventy tests using mock-up 9975 primary containment vessels (PCVs) with GLT O-rings were assembled and heated to temperatures ranging from 200 to 450 °F. Due to material substitution, fourteen tests with GLT-S O-rings were initiated in 2008 and heated to temperatures ranging from 200 to 400 °F. The conditioning temperatures are elevated compared to the calculated maximum O-ring temperature in a 9975 package in storage, 158 °F, to accelerate aging and enable observations of O-ring failures in a reasonable time frame. The mock-up PCV fixtures are leak tested periodically, and all GLT O-ring fixtures aged at 350 °F or above have failed to maintain a leak-tight seal. Eight GLT O-ring fixtures aged at 300 °F have failed after 2.8 to 5.7 years at temperature while the remaining fixtures at 300 °F were retired from testing following more than five years of aging without failure. Two of these retired fixtures were returned to testing and heated to 350 °F to evaluate the impact of additional heating at higher temperature for aged O-rings. Fixture #20 failed after 3 months while fixture #18 failed after 9 months at 350 °F. These O-rings demonstrated that aged and in-service O-rings can continue to be used, even at higher temperatures, after being in storage, and their leak performance are consistent with other samples at 350 °F. There has been one GLT O-ring fixture which failed after 13.4 years of aging at 200 °F. However, 20 other GLT O-rings aging at 200 °F have remained leak-tight for over 16.9 years and remain in test. There are two GLT O-ring fixtures at 270 °F; one fixture has failed after 12.9 years while the other fixture remains in test after 12.5 years. All GLT-S O-ring fixtures aged at 300 °F or above have failed their leak test. No failures have yet been observed in GLT-S O-ring fixtures aging at 250 °F for 14.9 years, while one GLT-S O-ring fixture failed after 12.4 years at 200 °F. The leak testing data to date suggest the GLT and GLT-S O-rings aging in the K-Area Complex (KAC) storage at temperatures of 158 °F might maintain a leak-tight seal for up to 59 years. Data from the O-ring fixtures are generally consistent with results from compression stress-relaxation testing and provide confidence in the predictive models based on those results. However, uncertainty exists in extrapolating these elevated temperature results to the lower temperatures of interest for normal storage in KAC. The collective data from these test efforts suggest the minimum O-ring service life at KAC normal storage conditions should be at least 34 years for GLT and GLT-S O-rings. Measurement of compression set in O-rings removed from failed fixtures, compared to that from KAC surveillance O-rings, indicate significant margin remains for O-rings still in service in 9975 packages in KAC. Aging and periodic leak testing will continue for the remaining 24 mock-up PCV fixtures.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Review of Aging Data on EPDM O-Rings in the H1616 Shipping Package

Currently, all H1616 shipping package containers undergo annual re-verification testing, including containment vessel leak testing to verify leak-tightness (<1 x 10 -7 ref cc/sec air) as per ANSI N14.5. The purpose of this literature review is to supplement aging studies currently being performed by SRNL on the EPDM O-rings to provide the technical basis for extending annual re-verification testing for the H1616 shipping package and to predict the life of the seals at bounding service conditions. The available data suggest that the EPDM O-rings can retain significant mechanical properties and sealing force at or below bounding service temperatures (169 °F or 76 °C) beyond the 1 year maintenance period. Interpretation of available data suggests that a service life of at least 2 years and potentially 4-6 years may be possible at bounding temperatures. Seal lifetimes at lower, more realistic temperatures will likely be longer. Being a hydrocarbon elastomer, EPDM O-rings may exhibit an inhibition period due to the presence of antioxidants. Once antioxidants are consumed, mechanical properties and seal performance could decline at a faster rate. Testing is being performed to validate the assumptions outlined in this report and to assess the long-term performance of O-ring seals under actual service conditions.

42 ENGINEERING↗

Forensic Analysis of Faulted NSTX-U Inner Poloidal Field Coil

The failure of the NSTX-U PF1A upper coil suspended plasma operations during the project's first operational campaign after commissioning. Initial nondestructive testing and examination of the failed coil was followed by extensive nondestructive radiography. Destructive testing facilitated visual borescope/videoscope inspection through the cooling path, vacuum testing, and electrical testing of every conductor segment. One conductor cooling path visually evidenced a void through the sidewall of the cooling path in a layer-to-layer region. The identified void in the conductor cooling path was not proximal to a braze or joggle. Electrical testing indicated that the voided conductor segment was a member of a group of 14 conductor segments that evidenced low-resistance connectivity. Four braze joints and two lead segments were subjected to 400-lbf/in 2 hydrostatic pressure testing followed by helium leak testing and evidenced that there were no detectable leaks in the tested cooling path segments. The faulted region was proximal to the center of the coil pack and evidenced historical electrical pitting and molten conductor debris. Samples of the epoxy resin insulation system were extracted and analyzed with dynamic mechanical analysis and differential scanning calorimetry techniques. Epoxy resin insulation samples were subjected to immersion testing per ASTM D570. Metallurgical samples were extracted from the coil pack conductors and subjected to hardness testing and grain structure analysis. The base material testing results indicated no abnormalities. In conclusion, the coil incipient failure was determined to most likely have resulted from conductive material located between conductor and insulation layers.

25 ENERGY STORAGE↗

Model 9975 O Ring Fixture LongTerm Leak Performance (FY2021 Status Report)

Leak testing experiments to monitor the aging performance of Viton® GLT and GLT-S O-rings used in the model 9975 shipping package has been ongoing since 2004 at Savannah River National Laboratory. Seventy tests using mock-up 9975 primary containment vessels (PCVs) with GLT O-rings were assembled and heated to temperatures ranging from 200 to 450 °F. Due to material substitution, fourteen tests with GLT-S O-rings were initiated in 2008 and heated to temperatures ranging from 200 to 400 °F. The conditioning temperatures are elevated compared to the calculated maximum O-ring temperature in a 9975 package in storage, 158 °F, to accelerate aging and enable observations of O-ring failures in a reasonable time frame. The fixtures are leak tested periodically and all GLT O-ring fixtures aging at 350 °F or above have failed to maintain a leak-tight seal. Eight GLT O-ring fixtures aging at 300 °F have failed after 2.8 to 5.7 years at temperature while the remaining fixtures at 300 °F were retired from testing following more than five years without failure. There has been one GLT O-ring fixture which failed after 13.4 years aging at 200 °F. However, 19 other GLT O-rings aging at 200 °F have remained leak-tight for over 14 years and remain in test. No failures have yet been observed in GLT O-ring fixtures aging at 270 °F for 9.5 years. All GLT-S O-ring fixtures aging at 300 °F or above have failed their leak test. No failures have yet been observed in GLT-S O-ring fixtures aging at 200 and 250 °F for 11.5 years. Data from the O-ring fixtures are generally consistent with results from compression stress-relaxation testing, and provide confidence in the predictive models based on those results. However, uncertainty exists in extrapolating these elevated temperature results to the lower temperatures of interest for normal storage in K-Area Complex (KAC). Oxygen consumption testing, which includes results from temperatures near KAC normal storage temperatures, is ongoing to provide further confidence and corroborate these extrapolations. The collective data from these test efforts suggest the minimum O-ring service life at KAC normal storage conditions should be at least 34 years for GLT and GLT-S O-rings. Measurement of compression set in O-rings removed from failed fixtures, compared to that from KAC surveillance O-rings, indicate significant margin remains for O-rings still in service in 9975 packages in KAC. Aging and periodic leak testing will continue for the remaining 26 mock-up PCV fixtures.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Model 9975 O-Ring Fixture Long-Term Leak Performance (FY2022 Status Report)

Leak testing experiments to monitor the aging performance of Viton® GLT and GLT-S O-rings used in the model 9975 shipping package has been ongoing since 2004 at Savannah River National Laboratory. Seventy tests using mock-up 9975 primary containment vessels (PCVs) with GLT O-rings were assembled and heated to temperatures ranging from 200 to 450 °F. Due to material substitution, fourteen tests with GLT-S O-rings were initiated in 2008 and heated to temperatures ranging from 200 to 400 °F. The conditioning temperatures are elevated compared to the calculated maximum O-ring temperature in a 9975 package in storage, 158 °F, to accelerate aging and enable observations of O-ring failures in a reasonable time frame. The fixtures are leak tested periodically and all GLT O-ring fixtures aging at 350 °F or above have failed to maintain a leak-tight seal. Eight GLT O-ring fixtures aging at 300 °F have failed after 2.8 to 5.7 years at temperature while the remaining fixtures at 300 °F were retired from testing following more than five years without failure. There has been one GLT O-ring fixture which failed after 13.4 years aging at 200 °F. However, 20 other GLT O-rings aging at 200 °F have remained leak-tight for over 14 years and remain in test. No failures have yet been observed in GLT O-ring fixtures aging at 270 °F for 10.4 years. All GLT-S O-ring fixtures aging at 300 °F or above have failed their leak test. No failures have yet been observed in GLT-S O-ring fixtures aging at 250 °F for 12.5 years. This year, one GLT-S O-ring fixture failed after 12.4 years aging at 200 °F. Data from the O-ring fixtures are generally consistent with results from compression stress-relaxation testing, and provide confidence in the predictive models based on those results. However, uncertainty exists in extrapolating these elevated temperature results to the lower temperatures of interest for normal storage in K-Area Complex (KAC). Oxygen consumption testing, which includes results from temperatures near KAC normal storage temperatures, is ongoing to provide further confidence and corroborate these extrapolations. The collective data from these test efforts suggest the minimum O-ring service life at KAC normal storage conditions should be at least 34 years for GLT and GLT-S O-rings. Measurement of compression set in O-rings removed from failed fixtures, compared to that from KAC surveillance O-rings, indicate significant margin remains for O-rings still in service in 9975 packages in KAC. Aging and periodic leak testing will continue for the remaining 25 mock-up PCV fixtures.

36 MATERIALS SCIENCE↗

Characterization of an explosively bonded aluminum proton beam window for the Spallation Neutron Source

An effort is underway at the Spallation Neutron Source (SNS) to change the design of the 1st Generation high-nickel alloy proton beam window (PBW) to one that utilizes aluminum for the window material. One of the key challenges to implementation of an aluminum PBW at the SNS was selection of an appropriate joining method to bond an aluminum window to the stainless steel bulk shielding of the PBW assembly. An explosively formed bond was selected as the most promising joining method for the aluminum PBW design. A testing campaign was conducted to evaluate the strength and efficacy of explosively formed bonds that were produced using two different interlayer materials: niobium and titanium. The characterization methods reported here include tensile testing, thermal-shock leak testing, optical microscopy, and advanced scanning electron microscopy. All tensile specimens examined failed in the aluminum interlayer and measured tensile strengths were all slightly greater than the native properties of the aluminum interlayer, while elongation values were all slightly lower. A leak developed in the test vessel with a niobium interlayer joint after repeated thermal-shock cycles, and was attributed to an extensive crack network that formed in a layer of niobium-rich intermetallics located on the bond interfaces of the niobium interlayer; the test vessel with a titanium interlayer did not develop a leak under the conditions tested. Due to the experience gained from these characterizations, the explosively formed bond with a titanium interlayer was selected for the aluminum PBW design at the SNS.

316L Stainless Steel↗

Fracture control plan for propellant and pressurant tanks

To assure the functional integrity of the GLL-RPM fuel and pressurized gas tank, all activities during entire lifetime of the tank, from manufacture to the end of the mission, must be monitored. Specifications are given for all procedures which influence the tank structure including design, manufacture, cleaning, test operations, and storage. Tests to be conducted to demonstrate that requirements of the fracture control plan are satisfied include static tests, cyclic load tests, proof tests, He-leak test, and acceptance tests.

Source record↗

An Evaluation of a High Pressure Regulator for NASA's Robotic Lunar Lander Spacecraft

The Robotic Lunar Lander (RLL) development project office at NASA Marshall Space Flight Center is currently studying several lunar surface science mission concepts. The focus is on spacecraft carrying multiple science instruments and power systems that will allow extended operations on the lunar surface or other air-less bodies in the solar system. Initial trade studies of launch vehicle options indicate the spacecraft will be significantly mass and volume constrained. Because of the investment by the DOD in low mass, highly volume efficient components, NASA has investigated the potential integration of some of these technologies in space science applications. A 10,000 psig helium pressure regulator test activity has been conducted as part of the overall risk reduction testing for the RLL spacecraft. The regulator was subjected to typical NASA acceptance testing to assess the regulator response to the expected RLL mission requirements. The test results show the regulator can supply helium at a stable outlet pressure of 740 psig within a +/- 5% tolerance band and maintain a lock-up pressure less than the +5% above nominal outlet pressure for all tests conducted. Numerous leak tests demonstrated leakage less than 10-3 standard cubic centimeters per second (SCCS) for the internal seat leakage at lock-up and less than 10-5 SCCS for external leakage through the regulator body. The successful test has shown the potential for 10,000 psig helium systems in NASA spacecraft and has reduced risk associated with hardware availability and hardware ability to meet RLL mission requirements.

Burnside, Christopher G.↗