Search NASA⌕ Search

SEARCH · Search NASA

Results for “Probabilistic risk assessment (PRA)”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Validating a Dynamic PWR Safety and Security Model?

Nuclear power plants (NPPs) are assessed for safety and security using separate models that cannot capture how an attacker's decisions and a plant's response unfold together in real time, leaving regulators and operators without a complete picture of true plant vulnerability. Traditional probabilistic risk assessment (PRA) methods treat adversarial events as fixed initiators with predetermined outcomes, and are structurally incapable of representing the time-dependent interplay between physical security events, safety system response, and operator mitigative actions. At Idaho National Laboratory (INL), I contributed to the development and validation of Modeling and Analysis for Safety and Security using the Dynamic EMRALD Framework (MASS-DEF). Where static PRA relies on event-tree logic that cannot evolve mid-scenario, MASS-DEF couples a time-dependent dynamic PRA tool EMRALD (Event Modeling Risk Assessment using Linked Diagrams) with attack simulation software, allowing attacker behavior, plant system states, and operator actions to interact across time. My work focused on validating a general Pressurized Water Reactor (PWR) model. I traced model logic against PWR plant to identified errors in logic and confirm accuracy. I then built and tested attack scenarios against a general PWR model to verify that the model produced expected outcomes across all logical pathways. I also contributed a section to a related technical paper applying the same EMRALD platform to radiation dose modeling. Results show that MASS-DEF can quantitatively demonstrate that many plants exceed their regulatory security thresholds. This demonstrated margin provides a technically defensible basis for reducing the number of guards without compromising regulatory compliance. Physical security costs represent roughly 10% of annual operating budgets, making such reductions directly meaningful to INL's mission of sustaining existing commercial NPPs. This internship strengthened my understanding of nuclear systems, probabilistic modeling, and technical writing, and has solidified my pursuit of a career at a national laboratory.

98 - NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL↗

Space Radiation Cancer Risks and Uncertainities for Different Mission Time Periods

Space radiation consists of solar particle events (SPEs), comprised largely of medium energy protons (less than several hundred MeV); and galactic cosmic ray (GCR), which includes high energy protons and high charge and energy (HZE) nuclei. For long duration missions, space radiation presents significant health risks including cancer mortality. Probabilistic risk assessment (PRA) is essential for radiation protection of crews on long term space missions outside of the protection of the Earth s magnetic field and for optimization of mission planning and costs. For the assessment of organ dosimetric quantities and cancer risks, the particle spectra at each critical body organs must be characterized. In implementing a PRA approach, a statistical model of SPE fluence was developed, because the individual SPE occurrences themselves are random in nature while the frequency distribution of SPEs depends strongly upon the phase within the solar activity cycle. Spectral variability of SPEs was also examined, because the detailed energy spectra of protons are important especially at high energy levels for assessing the cancer risk associated with energetic particles for large events. An overall cumulative probability of a GCR environment for a specified mission period was estimated for the temporal characterization of the GCR environment represented by the deceleration potential (theta). Finally, this probabilistic approach to space radiation cancer risk was coupled with a model of the radiobiological factors and uncertainties in projecting cancer risks. Probabilities of fatal cancer risk and 95% confidence intervals will be reported for various periods of space missions.

Kim,Myung-Hee Y.↗

Probabilistic Risk Assessment of a Light Water Reactor Coupled with a High Temperature Electrolysis Hydrogen Production Plant

Two generic probabilistic risk assessments (PRA) for the addition of a heat extraction system (HES) addition to a light water reactor (LWR) are performed, one for a pressurized water reactor (PWR) and one for a boiling water reactor (BWR). The results investigate the applicability of the potential licensing approaches which do not require a full U.S. Nuclear Regulatory Commission (NRC) licensing review. The PRAs are generic, and some assumptions are made. Many conservative assumptions from a the preliminary PWR PRA report were eliminated using design data for both the HES and the high temperature electrolysis facility (HTEF). The results of the PRA indicate that the 10 CFR 50.59 licensing approach is justified due to the minimal increase in initiating event frequencies for all DBAs, none exceeding 5.6%. The PRA results for CDF and LERF support the use of RG 1.174 as further risk information that supports a change without a full LAR. Further insights provided through hazard analysis and sensitivity studies confirm with high confidence that the safety case for licensing an HES addition and a HTEF sited at 1.0 km from the NPP is strong and that the placement of a HTEF at 0.5 km is a viable case. Site specific information can alter these conclusions.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Applying AI/ML Techniques to U.S. Nuclear Operating Experience Program

Idaho National Laboratory (INL) has provided technical assistance to the U.S. Nuclear Regulatory Commission (NRC) in reliability and risk analysis including the operating experience (OpE) program since the 1980s. The U.S. nuclear OpE program provides input parameters to the NRC Standardized Plant Analysis Risk models and the industry probabilistic risk assessment (PRA) models. While earlier PRA focuses were on at-power, internal event analysis, the risks from external hazards and during low power shutdown (LPSD) operation could be significant and the needs to develop LPSD PRA and external hazards PRA are on the rise. One issue in developing LPSD PRA is the reasonable estimation of shutdown initiative event (SDIE) frequencies. INL has developed and is maintaining an SDIE database for the NRC. However, this database is based on the reviewing of Licensee Event Reports (LERs), which is believed to be only a subset of “actual” shutdown initiating events occurred in the industry. This paper investigates a new approach to identify and characterize shutdown initiating events from the Institute of Nuclear Power Operations (INPO) industry database using machine learning techniques. The main process in this approach is to find out the relationship between key words in event descriptions and the SDIE categories as in the NRC SDIE database. The relationship can then be applied to the INPO database and search for SDIEs.

99 GENERAL AND MISCELLANEOUS↗

Probabilistic Risk Assessment of a Sustained Lunar Presence

The Artemis Base Camp will be our first sustainable foothold on the lunar frontier. The base camp includes a lunar surface habitat, power systems, and infrastructure needed to develop capabilities on future missions to Mars. NASA Probabilistic Risk Assessment (PRA) methodologies tend to focus on in-flight Loss of Crew (LOC) or Loss of Vehicle (LOV) risk estimates for short mission durations. However, lunar habit support systems and power generation systems will need to continuously operate. Existing risk methodologies will need to adapt to understand risk drivers in new environments under different operating conditions, such as lunar dust and increased micro-meteoroid exposure. Insights from the nuclear and oil industries can provide guidance to NASA risk practitioners to tackle this new challenge.

risk assessment↗

Report on High Energy Arcing Fault Experiments: Experimental Results from Open Box Enclosures

This report documents an experimental program designed to investigate High Energy Arcing Fault (HEAF) phenomena. The experiments focus on providing data to better characterize the arc to improve the prediction of arc energy emitted during a HEAF event. An open box experiment allow for direct observation of the arc, which allows diagnostic instrumentation to record the phenomenological data needed for better characterization of the arc energy source term. The data collected supports characterization of the arc and arc jet, enclosure breach, material loss, and electrical properties. These results will be used to better characterizing the hazard for improvements in fire probabilistic risk assessment (PRA) realism. The experiments were performed at KEMA Labs located in Chalfont, Pennsylvania. The experimental design, setup, and execution were completed by staff from the NRC, the National Institute of Standards and Technology (NIST), Sandia National Laboratories (SNL) and KEMA Labs. In addition, representatives from the Electric Power Research Institute (EPRI) observed some of the experimental setup and execution. The HEAF experiments were performed between August 22, 2020 and September 18, 2020 on near-identical 51 cm (20 in) cube metal boxes suspended from a Unistrut support structure. The three-phase arcing fault was initiated at the ends of the conductors oriented vertically and located at the center of the box. Either aluminum or copper conductors were used for the conductors. The low-voltage experiments used 1 000 volts AC, while the medium-voltage experiments used 6 900 volts AC consistent with other recently completed experiments. Durations of the experiment ranged from 1 s to 5 s with fault currents ranging from 1 kA to 30 kA. Real-time electrical operating conditions, including voltage, current and frequency, were measured during the experiments. Heat fluxes and incident energies were measured with plate thermometers, radiometers, and slug calorimeters at various locations around the electrical enclosures. The experiments were documented with normal and high-speed videography, infrared imaging and photography.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Report on High Energy Arcing Fault Experiments: Experimental Results from Low-Voltage Switchgear Enclosures

This report documents an experimental program designed to investigate High Energy Arcing Fault (HEAF) phenomena for low-voltage metal enclosed switchgear containing aluminum conductors. This report covers full-scale laboratory experiments using representative nuclear power plant (NPP) three-phase electrical equipment. Electrical, thermal, and pressure data were recorded for each experiment and documented in this report. This report covers experiments performed on two low-voltage switchgear units with each unit consisting of two vertical sections. The data collected supports characterization of the low-voltage HEAF hazard and these results will be used to support potential improvements in fire probabilistic risk assessment (PRA) methods. The experiments were performed at KEMA Labs located in Chalfont, Pennsylvania. The experimental design, setup, and execution were completed by staff from the NRC, the National Institute of Standards and Technology (NIST), Sandia National Laboratories (SNL) and KEMA. In addition, representatives from the Electric Power Research Institute (EPRI) observed some of the experimental setup and execution. The HEAF experiments were performed between August 26 and Augsut 29, 2019 on nearidentical Westinghouse Type DS low-voltage metal-enclosed indoor switchgear. The threephase arcing fault was initiated on the aluminum main bus or in select cases on the copper bus stabs near the breaker. These experiments used either nominal 480 volts AC or 600 volts AC. Durations of the experiments ranged from approximately 0.4 s to 8.3 s with fault currents ranging from approximately 9.2 kA to 19.3 kA. Real-time electrical operating conditions, including voltage, current and frequency, were measured during the experiments. Heat fluxes and incident energies were measured with plate thermometers, radiometers, and slug calorimeters at various locations around the electrical enclosures. Environmental measurements of breakdown, conductivity and electromagnetics were also taken. The experiments were documented with normal and high-speed videography, infrared imaging and photography. The results, while limited, indicated the difficulty in maintaining and sustaining low-voltage arcs on aluminum components of sufficient duration and at a single point as observed operating experience.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Refining Processing Engines from SAPHIRE: Initialization of Fault Tree/Event Tree Solver

SAPHIRE has been extensively employed for over 35 years to model risk-important systems and quantify risk models. As a well-established and thoroughly documented Probabilistic Risk Assessment (PRA) tool, SAPHIRE has continuously tracked computational trends and received regular updates. Despite its ongoing evolution, there remains a need for further enhancements, particularly in dealing with the quantification of exceptionally large models. These improvements could take the form of algorithmic advancements, harnessing the power of parallel computing, and exploring the potential benefits of cloud computing solutions. Considering these aspirations, the notion of a remote solve option was introduced and subsequently evolved into a dedicated project within the SAPHIRE development team. A significant outcome of this initiative is SAPHSOLVE, an engine extracted from the SageRisk API designed specifically for remote solving capabilities. The ongoing project is nearing its culmination, marked by a series of discoveries that have brought undocumented aspects to light. Among these revelations is the intricacy of the input and output format for the SAPHSOLVE engine. This document serves the crucial purpose of meticulously delineating the precise formats for both input and output, as they form an indispensable foundation. The importance of documenting these formats cannot be overstated, as it is a pivotal step in facilitating rigorous testing and comparison. Whether it involves scrutinizing SAPHSOLVE results against those of the internal integrated solver or other external solvers, the ability to construct models or transform existing ones into a compatible SAPHSOLVE format is imperative. Chapter 1 offers a succinct introduction to both SAPHIRE and SAPHSOLVE, followed by Chapter 2 which outlines the roadmap for enhancing SAPHSOLVE. The core of this report is Chapter 3, which intricately elucidates the intricacies of the input and output file formats. To provide a tangible illustration of these formats, a rudimentary example has been compiled and is available in Appendix. SAPHSOLVE represents a novel external solving mechanism developed by the SAPHIRE team, although it has not yet reached the full spectrum of capabilities possessed by SAPHIRE's internal solver. However, the SAPHIRE team has set a comprehensive course for incorporating the functionalities of SAPHSOLVE. A comprehensive outlook on the future of SAPHSOLVE is expounded upon in Chapter 4.

97 MATHEMATICS AND COMPUTING↗

Advancing Multi-Hazard Risk and Safety Considerations for Aging Nuclear Facilities (Revision 1)

This project will demonstrate a multi-hazard time-dependent probabilistic risk assessment (PRA) approach for nuclear facilities considering aging-related deterioration of structures. A generic pressurized water reactor (PWR) reactor subjected to seismic mainshock-aftershock sequences considering the aging of the containment structure will be used as a case study to demonstrate the multi-hazard PRA approach. Using advanced modeling and simulation, seismic mainshock-aftershock fragility functions will be simulated for the containment structure considering aging effects. A multi-hazard PRA model for a generic PWR reactor will be built to quantify the multi-hazard core damage frequency (CDF) and large early release frequency (LERF) with explicit time-dependent modeling of event sequences. To date, the cascading impacts of multi-hazards are not adequately accounted for in the PRA models for nuclear facilities. In addition, for both initial and periodic evaluation of facilities to withstand natural phenomena hazards (NPH), deterioration of the SSCs due to aging and other effects is not adequately considered. By advancing multi-hazard considerations accounting for aging effects, this project will contribute to improved understanding of the safety of aging nuclear facilities. Project outcomes such as the multi-hazard CDF and LERF will also allow facility owners to optimize upgrade and retrofit protocols. This project is divided into two components: (1) advanced modeling and simulations; and (2) multi-hazard PRA. For the first component, Idaho National Laboratory’s (INL) Multi-hazard Analysis for STOchastic time-DOmaiN phenomena (MASTODON) and BlackBear codes will be used to simulate the seismic response and damage of a containment structure under cascading mainshock-aftershock sequences with aging effects. Uncertainties related to the seismic inputs, material parameters, and environmental factors such as temperature and humidity will be identified and propagated to the fragility functions. These fragility functions, which consider aging effects, will be time dependent. The second component will take the fragility information from the first component to build a multi-hazard time-dependent PRA model starting from a generic PWR model to evaluate the multi-hazard CDF and LERF and characterize the associated consequences. For this component, OpenPRA Web Application and SAPHIRE code will be used. Events such as the Fukushima Daiichi accident have highlighted the importance of considering the cascading impacts of multi-hazards for PRA. Moreover, many of the reactors in the current nuclear fleet in the United States (US) are already operating well beyond their initially planned design life, and applications for further extensions to operating licenses are being considered. Therefore, considering multi-hazard effects and aging deterioration in the NPH risk assessment process will contribute to the safety of both existing and future nuclear facilities. Outcomes of this project will thus directly benefit the standards DOE-STD-1020-16 and DOE-HDBK-1224-18.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

NASA System Safety Handbook: System Safety Framework and Concepts for Implementation - Volume 1

System safety assessment is defined in NPR 8715.3C, NASA General Safety Program Requirements as a disciplined, systematic approach to the analysis of risks resulting from hazards that can affect humans, the environment, and mission assets. Achievement of the highest practicable degree of system safety is one of NASA's highest priorities. Traditionally, system safety assessment at NASA and elsewhere has focused on the application of a set of safety analysis tools to identify safety risks and formulate effective controls.1 Familiar tools used for this purpose include various forms of hazard analyses, failure modes and effects analyses, and probabilistic safety assessment (commonly also referred to as probabilistic risk assessment (PRA)). In the past, it has been assumed that to show that a system is safe, it is sufficient to provide assurance that the process for identifying the hazards has been as comprehensive as possible and that each identified hazard has one or more associated controls. The NASA Aerospace Safety Advisory Panel (ASAP) has made several statements in its annual reports supporting a more holistic approach. In 2006, it recommended that "... a comprehensive risk assessment, communication and acceptance process be implemented to ensure that overall launch risk is considered in an integrated and consistent manner." In 2009, it advocated for "... a process for using a risk-informed design approach to produce a design that is optimally and sufficiently safe." As a rationale for the latter advocacy, it stated that "... the ASAP applauds switching to a performance-based approach because it emphasizes early risk identification to guide designs, thus enabling creative design approaches that might be more efficient, safer, or both." For purposes of this preface, it is worth mentioning three areas where the handbook emphasizes a more holistic type of thinking. First, the handbook takes the position that it is important to not just focus on risk on an individual basis but to consider measures of aggregate safety risk and to ensure wherever possible that there be quantitative measures for evaluating how effective the controls are in reducing these aggregate risks. The term aggregate risk, when used in this handbook, refers to the accumulation of risks from individual scenarios that lead to a shortfall in safety performance at a high level: e.g., an excessively high probability of loss of crew, loss of mission, planetary contamination, etc. Without aggregated quantitative measures such as these, it is not reasonable to expect that safety has been optimized with respect to other technical and programmatic objectives. At the same time, it is fully recognized that not all sources of risk are amenable to precise quantitative analysis and that the use of qualitative approaches and bounding estimates may be appropriate for those risk sources. Second, the handbook stresses the necessity of developing confidence that the controls derived for the purpose of achieving system safety not only handle risks that have been identified and properly characterized but also provide a general, more holistic means for protecting against unidentified or uncharacterized risks. For example, while it is not possible to be assured that all credible causes of risk have been identified, there are defenses that can provide protection against broad categories of risks and thereby increase the chances that individual causes are contained. Third, the handbook strives at all times to treat uncertainties as an integral aspect of risk and as a part of making decisions. The term "uncertainty" here does not refer to an actuarial type of data analysis, but rather to a characterization of our state of knowledge regarding results from logical and physical models that approximate reality. Uncertainty analysis finds how the output parameters of the models are related to plausible variations in the input parameters and in the modeling assumptions. The evaluation of unrtainties represents a method of probabilistic thinking wherein the analyst and decision makers recognize possible outcomes other than the outcome perceived to be "most likely." Without this type of analysis, it is not possible to determine the worth of an analysis product as a basis for making decisions related to safety and mission success. In line with these considerations the handbook does not take a hazard-analysis-centric approach to system safety. Hazard analysis remains a useful tool to facilitate brainstorming but does not substitute for a more holistic approach geared to a comprehensive identification and understanding of individual risk issues and their contributions to aggregate safety risks. The handbook strives to emphasize the importance of identifying the most critical scenarios that contribute to the risk of not meeting the agreed-upon safety objectives and requirements using all appropriate tools (including but not limited to hazard analysis). Thereafter, emphasis shifts to identifying the risk drivers that cause these scenarios to be critical and ensuring that there are controls directed toward preventing or mitigating the risk drivers. To address these and other areas, the handbook advocates a proactive, analytic-deliberative, risk-informed approach to system safety, enabling the integration of system safety activities with systems engineering and risk management processes. It emphasizes how one can systematically provide the necessary evidence to substantiate the claim that a system is safe to within an acceptable risk tolerance, and that safety has been achieved in a cost-effective manner. The methodology discussed in this handbook is part of a systems engineering process and is intended to be integral to the system safety practices being conducted by the NASA safety and mission assurance and systems engineering organizations. The handbook posits that to conclude that a system is adequately safe, it is necessary to consider a set of safety claims that derive from the safety objectives of the organization. The safety claims are developed from a hierarchy of safety objectives and are therefore hierarchical themselves. Assurance that all the claims are true within acceptable risk tolerance limits implies that all of the safety objectives have been satisfied, and therefore that the system is safe. The acceptable risk tolerance limits are provided by the authority who must make the decision whether or not to proceed to the next step in the life cycle. These tolerances are therefore referred to as the decision maker's risk tolerances. In general, the safety claims address two fundamental facets of safety: 1) whether required safety thresholds or goals have been achieved, and 2) whether the safety risk is as low as possible within reasonable impacts on cost, schedule, and performance. The latter facet includes consideration of controls that are collective in nature (i.e., apply generically to broad categories of risks) and thereby provide protection against unidentified or uncharacterized risks.

Dezfuli, Homayoon↗

A framework to implement human reliability analysis during early design stages of advanced reactors

Nuclear power plants require human actions throughout their lifecycle from design, construction, operation, and decommissioning. However, for advanced reactors (e.g., Generation IV), the reliance on human intervention in safety-related actions is expected to be reduced or completely replaced by automated actions. The Probabilistic Risk Assessment (PRA) Standard for Advanced Non-LWR Nuclear Power Plants requires that the impacts of all operator actions are captured and incorporated in the risk of the modeled plant. Moreover, the Modernization of Technical Requirements for Licensing Advanced Reactors requires human reliability analysis (HRA) to be included throughout all design and PRA development stages. However, due to the lack of details during the early design stages, HRA is often postponed until the design is mature enough. Conducting HRA in later design stages, though it may be adequate in capturing pre-, at-, and post-initiators comes short of informing the design itself in the iterative design lifecycle. Hence, this paper presents a framework to include HRA during the design's early stages, pre-conceptual or conceptual. The proposed framework provides a process for the removal of operator actions that do not contribute to the risk and the identification of all key operator actions that are critical to the safety of the design. The results of this framework are then used to inform the design of those safety-related operator actions to update the design further. Then, using information from the updated design, this framework can be reapplied to investigate the impact of the design update on human reliability. The PRA model of the X-energy's pre-conceptual Xe-100 high-temperature gas-cooled pebble-bed reactor (HTGR-PB) design is used to demonstrate the approach. In the pre-conceptual Xe-100 PRA model, also called Phase 0 PRA model, human actions were considered an integral part of analyzing the plant response to different initiating events. Hence, in this paper, all possible human actions in the Xe-100 PRA model are identified, analyzed, and removed to emulate a design relying only on the available automated control systems. The preliminary results of this assessment show how safe the Xe-100 design is even without crediting any human actions. The results also list necessary sequences in which operator actions are critical to the risk profile of the design.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

A systematic decision-making methodology to formalize the selection of degree of realism in screening analysis of probabilistic risk assessment

In the nuclear power domain, Probabilistic Risk Assessment (PRA) is used to inform decision-making for Nuclear Power Plants (NPPs). Recently, there has been an increase in the utilization of modeling and simulation (M&S) to support the estimation of PRA inputs. Risk analysts should carefully select the PRA items that require M&S and their degree of realism (DoR) with consideration of the required resources. To support this selection, this article formulates a systematic decision-making approach for the DoR selection. The DoR selection is made based on two predictive decision-making attributes: the predicted differences in safety risk estimate (ΔSaRi) and the cost of analysis (ΔCAN). This research also develops and quantifies causal models to estimate ΔSaRi and ΔCAN. The causal model-based prediction of ΔSaRi and ΔCAN helps reduce the trial-and-error nature of the DoR selection in the PRA screening analysis and provides insights for DoR selection and the gradual refinements of PRA realism. This approach is demonstrated for a case study on fire PRA of NPPs, where an adequate DoR is selected from two fire models: an engineering correlation and a zone model.

Alkhatib, Sari [Department of Nuclear, Plasma, and↗

Preliminary Nuclear Containment Vessel Modeling for Multi-Hazard Probabilistic Risk Assessment under Seismic Hazards and Concrete Degradation

The current practice for natural phenomena hazards (NPH) risk assessment of nuclear facilities is to compute the risk for each hazard independently and then compound the total risk as a combination of single hazard risks. This state of practice does not consider correlations between hazards and the cascading impacts to structures, systems, and components (SSCs), and could thus underestimate the NPH risk or overestimate the nuclear facility safety. Events such as the Fukushima Daiichi accident have highlighted the importance of multi-hazard risk considerations to nuclear power plants (NPPs) that quantify the cascading damage effects to SSCs in the risk models. Moreover, the current fleet of NPPs in the United States is aging; these NPPs are now expected to operate well beyond their initially planned design life. Aging-related deterioration can potentially decrease the capacity of critical structures such as containment vessels to withstand NPH. Such aging considerations may not be adequately accounted for by the current NPH risk assessment guidelines. This paper presents a preliminary modeling and simulation of a representative reinforced concrete containment vessel subjected to seismic mainshock and aftershock considering concrete degradation due to alkali silica reaction. The broader aim is to develop multi-hazard time-dependent fragility functions that could be subsequently used in the probabilistic risk assessment (PRA) model. The multi-hazard component comes into play due to the consideration of damage to the containment vessel under seismic loads and concrete degradation. Consideration of concrete degradation also brings into play the time-dependent nature of the containment vessel response. The response of the containment vessel under varying degrees of concrete degradation to seismic loads is investigated. The results presented are simulated using the Multi-hazard Analysis for STOchastic time-DOmaiN phenomena (MASTODON) software for seismic analysis and the Blackbear software for concrete degradation and damage modeling. Both software are open source and developed within the Multiphysics Object-Oriented Simulation Environment (MOOSE).

42 ENGINEERING↗

Structures, Systems, and Components Classification Criteria for the Versatile Test Reactor

The Versatile Test Reactor (VTR) is a fast spectrum test reactor currently being developed in the United States under the direction of the US Department of Energy (DOE), Office of Nuclear Energy. The VTR mission is to enable accelerated testing of advanced reactor fuels and materials required for advanced reactor technologies. The conceptual design of the 300 MWth sodium-cooled metallic-fueled pool-type fast reactor has been led by the U.S. National Laboratories in collaboration with General Electric-Hitachi and Bechtel National Inc. As part of the VTR authorization process by the DOE, it is necessary to identify the safety classification of structures, systems, and components (SSCs) to determine the proper design, surveillance, operation, and incident-reporting requirements. Since VTR is utilizing a risk-informed, performance-based authorization process based on the Licensing Modernization Project (LMP) described in NEI 18-04 [1], the criteria for SSC classification, which are reviewed here, includes both risk information from the probabilistic risk assessment (PRA) and prescriptive requirements.

Grabaskas, David↗

Markov Decision Processes for Intelligent, Risk-Informed Asset-Management Decision-Making

Advanced nuclear reactors are a promising option for aiding the world in achieving its net-zero carbon emission goals, however, there are significant challenges to attaining and maintaining economic competitiveness with other sources of electricity. To improve the economic competitiveness of advanced reactor designs, a project was initiated to explore the use of Markov Decision Processes (MDPs) to guide asset-management decision-making during advanced reactor operation. MDPs are a powerful tool for optimizing decision-making in complex environments and their application to advanced reactors can aid in planning maintenance and repair activities to minimize downtime and maximize generation. The described approach expands on previous work regarding the use of MDPs for operational decision-making through the direct incorporation of real-time plant information. The integral MDP analysis includes information from online component diagnostic tools and the plant’s real-time generation risk assessment (GRA) and probabilistic risk assessment (PRA), which evaluate plant risk from both an economic and safety perspective. The result is an asset-management optimization framework that is based on real-time data regarding plant component status and the current best-estimate of plant risk. The paper presents an overview of the theoretical framework to incorporate the different information pathways into an integral MDP analysis, along with example analyses.

Grabaskas, David↗

Development of Dry Cask Risk Tools

The Nuclear Regulatory Commission (NRC) has repeatedly expressed a desire to increase the use of risk in its decision-making. The Probabilistic Risk Assessment (PRA) Policy Statement published in 1995 formalized the Commission’s commitment to risk-informed regulation through the expanded use of PRA. While a great deal of work has been done to incorporate risk insights into the regulatory framework for at-power nuclear reactors. Far less progress has been made to risk inform the dry-casks and nuclear waste transportation areas of the nuclear fuel cycle. INL was tasked with incorporating the information from the two completed dry cask PRAs as well as any additional available information into a tool that helps the NRC use those insights to identify levels of risk at various stages in the nuclear waste cycle. The first task was to address the License Amendment Request (LAR) Process for Dry Cask storage, the second task is for the incorporate transportation into the tool, and the third and final task will be incorporate any additional regulatory applications for dry cask storage. This report covers the first task of the tool and will eventually incorporate the remaining two tasks may be completed in the future and built off the model described here. Task 1 specifically asked to incorporate the risk insights into the process for determining and prioritizing review of license amendment changes related to storage applications by outlining a resource allocation strategy and defining recommendations of for the depth and breadth of the LAR review. It was requested that the tool be similar in design to the SDP notebooks/worksheets and contain quantitative, qualitative, or semi-quantitative approaches to assessing the risk of the change. The final tool that was selected by INL to be developed was a flowchart and associated rationale document that allows the reviewer to quickly assess potential LAR changes and their associated risks as well as the rationale behind the risk categorization. This risk categorization will lead to specific actionable recommendations to expect from a change of that specific category. This allows for a more consistent review process as well as improving the overall efficiency of the review itself.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Technical and Licensing Considerations for Micro-Reactors

The U.S. Nuclear Regulatory Commission (NRC) has interacted with vendors pursuing the commercialization of micro-reactors (i.e., reactors capable of producing about 1 MW(th) to 20 MW(th) of energy from nuclear fission). It is envisioned that micro-reactors could be assembled and fueled in a factory and shipped to a site. Many of the sites are expected to be remote locations requiring off-grid power or in some cases military bases. The objective of this effort is to explore the technical issues and the approach required to reach a finding of "reasonable assurance of public health and safety" for this new and different class of reactors. The analysis performed here leverages available micro-reactor design and testing data available from national laboratory experience as well as commercial design information to explore technical issues. Some factors considered include source term, accidents that would need to be analyzed, and the extent of the probabilistic risk assessment (PRA). The technical evaluation was performed within the framework of the Licensing Modernization Project (LMP) to identify licensing basis events, classification of structures, systems and components, and defense-in-depth needed to provide regulatory certainty. With this framework and technical evaluation in mind, the scope and content of a micro-reactor licensing application is discussed.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Risk-Informed ATF and FLEX Analysis for an Enhanced Resilient BWR Under Design-Basis and Beyond-Design-Basis Accidents

This report documents the activities performed by the Idaho National Laboratory (INL) during fiscal year (FY) 2020 for the U.S. Department of Energy (DOE) Light Water Reactor Sustainability (LWRS) Program, Risk-Informed System Analysis (RISA) Pathway, Enhanced Resilient Plant (ERP) Systems research. The purpose of the RISA Pathway research and development is to support plant owner-operator decisions with the aim to improve the economics, reliability, and maintain the high levels of safety of current nuclear power plants over periods of extended plant operations. The concept of ERP refers to the combinations of accident-tolerant fuel (ATF), optimal use of diverse and flexible coping strategy (FLEX), enhancements to plant components and systems, and the incorporation of augmented or new passive cooling systems, as well as improved fuel cycle efficiency. The objective of the ERP research effort is to use the RISA methods and toolkit in industry applications, including methods development and early demonstration of technologies, in order to enhance existing reactors’ safety features (both active and passive) and to substantially reduce operating costs through risk-informed approaches to plant design modifications to the plant and their characterization. One main focus of the FY 2020 efforts documented in this report was to extend the analyses conducted in FYs 2018 and 2019 for a pressurized water reactor (PWR) to a boiling water reactor (BWR). The same analysis process, risk analysis approaches, and analysis tools as in the previous work for PWR were used for a generic BWR with near-term ATF cladding (i.e., Iron-Chromium-Aluminum [FeCrAl] cladding and Chromium [Cr]-coated cladding) designs under the postulated station blackout (SBO) and medium loss-of-coolant (MLOCA) accident scenarios. In addition, a FLEX model was developed and incorporated into a generic BWR probabilistic risk assessment (PRA) model using the INL-developed software tool, Systems Analysis Programs for Hands-on Integrated Reliability Evaluations (SAPHIRE), to assess the risk impact from FLEX. The other main focus of the FY 2020 efforts was to advance analysis methods, including developing dynamic approach for FLEX human reliability analysis (HRA) using the INL-developed software tool, Event Modeling Risk Assessment using Linked Diagrams (EMRALD), as well as developing a multicriterion benefit evaluation (MCBE) method for evaluating costs and benefits of safety enhancements in nuclear power plants (NPPs). As a case study, the MCBE method was applied to evaluate the costs and benefits brought by FLEX implementation.

99 GENERAL AND MISCELLANEOUS↗