Search NASA⌕ Search

SEARCH · Search NASA

Results for “Project Cost”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Kansas City, Missouri, Streetlight Electric Vehicle Charging: Strategies and challenges for site selection of streetlight electric vehicle infrastructure in Kansas City, Missouri (Final Report)

Public streetlight charging, whether on streets in central business districts or residential areas, provides easy charging access for apartment residents and homeowners alike. While most electric vehicle (EV) drivers charge at home, they do so in garages or on driveways they own. For renters and residents of multifamily housing (MFH), however, this may not be an option. EVs have a lower cost of ownership compared to conventional vehicles, and a used EV may be an affordable option for a lower-income household. But without easy access to charging, even a low-cost used EV may not be an option for a prospective buyer. An affordable curbside charging network has the potential to expand EV adoption into neighborhoods that have to date seen minimal interest and uptake of the technology and associated charging infrastructure. Streetlight charging networks can provide an economical, scalable, and effective approach to providing equitable and convenient charging. Metropolitan Energy Center (MEC) is dedicated to the mission of creating resource efficiency, environmental health, and economic vitality in the Kansas City region and beyond. Since 1983, MEC has provided resources, outreach, and training to make alternative fuels and energy efficiency commonplace. MEC led a streetlight charging pilot project that installed limited EV charging infrastructure on the streetlight system in Kansas City, Missouri, to demonstrate and test the benefits of curbside charging for EVs at existing on-street parking locations. The project aimed to cost-effectively expand the charging network in Kansas City to support residential charging and provide infrastructure in one or more charging deserts throughout the city. This pilot evaluates the impact and overall success of streetlight charging based on community feedback, utilization of charging infrastructure, technical feasibility, and cost. The project has pursued a data- and community-driven site selection process designed to identify sites with high demand and high opportunity for EV charging. This project was funded by the U.S. Department of Energy (DOE) and awarded to MEC through a competitive proposal process. The novelty and complexity of this project required an organization that could facilitate collaboration across levels of government, community members, and industry partners. For the past 25 years, through Kansas City Regional Clean Cities, MEC has worked with numerous public and private fleets on a variety of projects to improve the environmental performance and efficiency of the regional vehicle fleet. To advance affordable, efficient, and clean transportation efforts, DOE Clean Cities and Communities coalitions create local networks of public and private sector stakeholders and engage communities. Rooted within their local communities, the coalitions serve as experts and ambassadors, bringing to bear the collective knowledge, experience, and practical know-how of the entire network from within DOE, its national laboratories, and diverse stakeholders in the field. MEC and its project partners made in-kind contributions to leverage federal dollars for the benefit of the Kansas City community. Findings from this project will help determine the best applications for streetlight charging technologies to maximize funding impact and serve community needs. The team evaluated locations based on expected charging demand, technical feasibility, safety considerations, and enhanced charging network siting needs. Throughout the project, the team gathered feedback and evaluated ways to make public charging for EVs available to all community members. The insights will help Kansas City and other communities streamline future efforts to support EV drivers through public charging in the city right-of-way. Furthermore, this project will inform citywide guidance for future installations. MEC is committed to a transparent and publicly accessible approach that encourages the collaborative evaluation of streetlight charging. The project has engaged the community to proactively identify and evaluate the benefits and impacts of streetlight charging. It was a priority for the project to ensure the benefits of this pilot are distributed equitably to all members of the Kansas City community and that new charging opportunities and associated resources are available in diverse neighborhoods across the city. The charging infrastructure supports an affordable curbside charging network that will enable more drivers to choose EVs and provide easy charging access for all community members interested in driving an EV. The community feedback received through this project informed future resources and opportunities to make EVs more accessible to all members of the Kansas City community. MEC worked with several community partners on this project, including Missouri University of Science and Technology (MST), Pennsylvania State University (Penn State), the National Renewable Energy Laboratory (NREL); the city of Kansas City, Missouri; Evergy; Black and McDonald (B&M); LilyPad EV; EVNoire; and Westside Housing Organization (WHO). Project partners contributed to the cost match required for DOE grants through capital expenditures, personnel, and other in-kind contributions. Detailed descriptions of project team organizations can be found in Appendix A. Project Partners. Analysts at NREL and MST/PennState developed site maps based on demand and equity considerations. MEC conducted outreach to community members to garner input on project design and site selection, and received approval from the Missouri Public Service Commission (PSC) for Evergy’s EV charging station ownership. MEC worked with all partners to gather additional siting criteria and developed a site selection evaluation checklist, and partners conducted site visits to proposed installation sites. Next, B&M, Evergy, and the city executed all site agreements, conducted site-specific engineering design, acquired associated permits, and issued notices to proceed site by site or in small batches. Finally, from January to April 2023, the project team installed 23 EV charging stations built on Kansas City’s streetlight system in six council districts. Evergy will own, operate, and monitor the stations for 10 years, sharing charging data with MEC for at least 1 year.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Expanding market opportunities: cogeneration strategies for integrated PWR and thermal energy storage systems

We assess the economic viability of nuclear cogeneration by investigating three different modes—fixed dispatch, fully flexible dispatch, and flexible dispatch with minimum heat supply requirements. The analysis focuses on an existing pressurized water reactor (PWR) integrated with thermal energy storage (TES). Heat production costs are estimated under these modes for two U.S. electricity markets: the Electric Reliability Council of Texas (ERCOT) and the Pennsylvania–New Jersey–Maryland Interconnection (PJM). A sensitivity analysis examines profitability at varying heat market prices. Results indicate that fixed heat dispatch inflates heat production costs, often rendering projects economically feasible only at higher heat price levels. Fully-flexible dispatch lowers heat production costs by an average of 43 % compared to fixed dispatch. However, the current 30 % thermal dispatch limit may be insufficient to serve high baseline industrial demands cost‐effectively; higher maximum dispatch rates could enhance project economics. Markets with higher and more volatile electricity prices (e.g., ERCOT) offer greater total energy sales potential (i.e., heat and electricity), but also increase opportunity costs when heat production scheduling restrictions are imposed. In contrast, lower-price, less volatile markets (e.g., PJM) experience smaller impacts from such constraints and provide greater flexibility in accommodating varying cogeneration modes. In conclusion, these findings provide a framework to guide nuclear plant operators in aligning cogeneration strategies with industrial process requirements and electricity market conditions.

22 - GENERAL STUDIES OF NUCLEAR REACTORS↗

First-Principles Cost Analysis of Advanced High-Temperature Nuclear Plants

Due to the vast number of recent nuclear reactor innovations, particularly those pertaining to generation IV reactor types like high-temperature gas cooled reactors (HTGRs) and sodium-cooled fast reactors (SFRs), and the newer deployment strategies envisioned, such as use of small modular reactors (SMRs) or even microreactors, reliable, detailed, and complete costs of these nuclear innovations are needed in wide availability. The types of models that generally achieve these objectives are those incorporating the fundamental nature of the real-world systems they aspire to predict, such as first-principles models. Furthermore, first principles models typically offer predictiveness that is not attained by most other types of individual-models. However, detailed, first-principles cost modeling of nuclear reactors and entire nuclear plants is relatively limited. To address this limitation in the availability of detailed, predictive models based on fundamentals, we recently developed a range of cost models, mostly based on first-principles methodologies, to project full lifecycle costs (LCCs) of nuclear power plants (NPPs) based on multiple parallel SM-HTG-pebble bed reactors (PBRs) and SM-SFRs.

Prosser, Jacob H. [Strategic Analysis, Inc., Arlin↗

First-Principles Cost Analysis of Advanced High-Temperature Nuclear Plants

Due to the vast number of recent nuclear reactor innovations, particularly those pertaining to generation IV reactor types like high-temperature gas cooled reactors (HTGRs) and sodium-cooled fast reactors (SFRs), and the newer deployment strategies envisioned, such as use of small modular reactors (SMRs) or even microreactors, reliable, detailed, and complete costs of these nuclear innovations are needed in wide availability. The types of models that generally achieve these objectives are those incorporating the fundamental nature of the real-world systems they aspire to predict, such as first-principles models. Furthermore, first principles models typically offer predictiveness that is not attained by most other types of individual-models. However, detailed, first-principles cost modeling of nuclear reactors and entire nuclear plants is relatively limited. To address this limitation in the availability of detailed, predictive models based on fundamentals, we recently developed a range of cost models, mostly based on first-principles methodologies, to project full lifecycle costs (LCCs) of nuclear power plants (NPPs) based on multiple parallel SM-HTG-pebble bed reactors (PBRs) and SM-SFRs.

Prosser, Jacob H. [Strategic Analysis, Inc., Arlin↗

How To Determine and Verify Operations and Maintenance Savings in Energy Savings Performance Contracts

Operations and maintenance (O&M) savings frequently occur in energy savings performance contracts (ESPCs). During FY 2022, 37% of reported annual cost savings for projects awarded under the U.S. Department of Energy (DOE) ESPC indefinite delivery indefinite quantity (IDIQ) contracts and in the performance period were due to O&M or other energy- and/or water-related cost savings, with the balance (63%) from utility cost savings (i.e., energy or water cost savings). Sometimes the energy- and water-related cost savings are acknowledged and included in payments within ESPCs; other times, for various reasons, they are not. As presented in this guide, FEMP recommends including energy- and water-related cost savings that are O&M (including related repair and replacement) savings in the financial aspects of an ESPC, to the extent such savings can be documented. Inclusion of these savings will help augment project scopes and/or lower interest costs (by shortening financing terms). However, there is a burden of proof as to what constitutes acceptability in O&M savings that needs to be carefully considered and documented in individual projects. Beyond promoting a key tenet used in U.S. federal performance contracting—that savings must be from actual budgets and therefore based on the level of O&M that is actually occurring, not what should have been performed—FEMP also recommends good practice in establishing and documenting O&M baselines, formulating the rationale for baseline adjustments during the performance period, and conducting ongoing verification activities. This document concludes with five examples of how O&M savings may be handled, in situations ranging from the partial displacement of O&M contracts to consolidation and “virtualization” of servers in data centers. A key theme that permeates this guide is the importance of thoroughly documenting all conditions and assumptions used in the development of and accounting for O&M costs and savings throughout the ESPC life cycle, from baseline-setting to measurement and verification (M&V) of the savings during each year of the performance period. Doing so not only prevents internal claims of non-performance (especially in the case of staff turnover during the contract term), but also simplifies ordering agency and energy service company (ESCO) response in the event of scrutiny from oversight organizations, such as government audits. While this guide focuses on federal ESPCs, it may also be applicable when O&M savings are included in utility energy service contracts (UESCs) and non-federal ESPCs.

Voss, Phil↗

Low-Cost, High-Performance Carbon Fiber for Compressed Natural Gas Storage Tanks (Final Technical Report – Down Select Report)

The aim of this project is to reduce the cost of Type IV, carbon fiber (CF) composite overwrap compressed gas storage tanks by reducing the cost of CF and CF composites. The project team worked to reduce the cost of CF by exploring and testing opportunities for a low-cost alternative precursor material for CF production to supplant market-dominant and costly polyacrylonitrile (PAN). Concurrently, the team aimed to reduce the cost of the tanks at the composite level by improving the interfacial adhesion between the fibers and the matrix resin through the incorporation of low-cost nanoparticles recycled from waste materials, which would reduce the volume of costly CF required to achieve the same tank performance. At the end of the first year, the project team selected mesophase pitch as the primary precursor candidate from a field of materials based on the superior mechanical performance and cost-saving potential. During the second year, the team produced CFs derived from mesophase pitch achieving an average tensile strength of 365.6 ksi and average tensile modulus of 40.74 Msi. Facility availability for spinning and converting these fibers at greater scale has hindered scale-up demonstration, but the team has identified opportunities to conduct this work in the near term. Cost modeling shows that these mesophase pitch-derived CFs can be up to 40% less expensive than PAN-derived CFs due to the lower cost of the feedstock material, higher throughput, greater conversion yield, and lower cost spinning method and compared to PAN. Additionally, the team has demonstrated at lab-scale that nanoparticle coating CFs can significantly increase the interfacial shear strength and load transfer efficiency of CFs in a matrix. Single filament pull-out testing showed a 27% average increase in max interfacial shear strength due to this coating. A continuous method of applying these coatings to a tow of CF has been developed for scale-up. 26 m tows of coated CFs were produced using this system and formed into composite ring samples for ASTM ring burst testing. Issues with the testing protocol have limited assessment of these results. A prototype Type IV tank was designed to meet ANSI HGV2 standards, and the design criteria set out by DOE, using the CF properties developed by the team paired with a proprietary resin matrix, a polyamide liner, and aluminum end bosses. The tank weighs 153.1 kg and with a total capacity of 5.8 kg H2 (5.6 kg usable), which yields a gravimetric capacity of 1.17 kWh/kg. Cost modeling predicts that the tank will have a projected cost of $15.73/kWh. Tank performance modeling does not include considerations for fiber-matrix load transfer efficiency improvements offered by nanoparticle coating method.

08 HYDROGEN↗

Optimizing Alabama’s CO 2 Storage in Shelby County (OASIS) (Final Report)

Optimizing Alabama’s CO 2 Storage in Shelby County (Project OASIS) is a CarbonSAFE Phase II designed to support the U.S. Department of Energy’s goals of reducing project risks and costs for future carbon dioxide (CO 2 ) capture, utilization, and storage (CCUS) projects, bringing more storage resources into commercial classifications that support business and financial decisions, and encouraging more rapid growth of a vibrant, geographically widespread industry for geologic carbon storage.

01 COAL, LIGNITE, AND PEAT↗

Heliostat sizing methodology for concentrating solar thermal industrial process heat projects

This study presents a method to obtain a heliostat size that minimizes the levelized cost of heat (LCOH) of a heliostat-based concentrating solar thermal system for applications of solar heating for industrial processes at operating temperatures from 565 to 1550°C. The method extends prior work by embedding a routine for system design that obtains near-optimal subsystem sizes, increasing the fidelity of drive cost functions, and adding an optical performance model to supplement the previously developed cost models, which we update to reflect current pricing trends. An illustrative business case is developed for Daggett, California, targeting specified annual thermal energy outputs of 50 to 400 GWh th . Optical performance is modeled using verified estimates from the literature. A surrogate heliostat cost model, derived from commercial heliostat designs and scaled for production volume, installation, and operations and maintenance costs, is used to develop cost functions. Results show that heliostat size strongly affects the LCOH, producing a characteristic U-shaped trend with a robust near-optimal window of 7-20 m 2 ; the heliostat size producing the lowest project cost in our study grows slightly as the project size increases, and is reduced as the operating temperature increases. The findings in this study are consistent with the general trend of smaller heliostats being deployed at existing projects for high-temperature industrial process heat and reflect the significant reduction in power electronics and other per-heliostat costs. The methodology we propose is general and can be tailored to revised cost curves as the technology continues to evolve.

14 SOLAR ENERGY↗

An AI-driven framework for evaluating local and state authorities’ permitting processes

The demand for new energy infrastructure is increasing across the United States, but heterogenous permitting processes and embedded requirements across different local jurisdictions can cause project delays, increase “soft costs,” and hinder developer expansion. This study analyzes the variability in local permitting requirements across the U.S. and develops a quantitative approach to describe their clarity and effectiveness in enabling infrastructure project development. By using an Energy Language Model (ELM), a large language model (LLM) for energy technologies, we systematically gathered permitting information from nearly 300 state-, county-, and city-level documents, creating a structured dataset of requirements and procedures on an unprecedented scale and speed. Our analysis revealed that local (city and county) permitting requirement documents are underrepresented compared to state-level guidance documents, which can impede timely and cost-effective installation of new electric infrastructure. Our validation process showed that the final database has an accuracy of approximately 95%. We, further, created a new quantitative method to score permitting requirements for clarity and efficiency, with electric vehicle supply equipment as an initial use case. The average local permitting document scored a 1.8 out of 5, which we interpret as meaning that half of the requirements developers face when installing electric infrastructure are ambiguous, increasing both cost and time. We also created a “Generalized Permit Process”, highlighting common procedural steps and identifying specific opportunities for municipalities to improve their documentation. This research establishes a systematic and scalable framework for evaluating the complexities of local infrastructure permitting processes by combining LLM-powered data collection and quantitative scoring. The framework enables policymakers and developers to identify and mitigate procedural bottlenecks, with the expectation that these improvements can accelerate application review and approval, reduce project costs, and expedite connection to utility distribution grids. As a foundational approach for streamlining local project development processes, this study’s methods are intended to be extended to a wide range of energy applications.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Scalable Truck Charging Demand Simulation for Cost-Optimized Infrastructure Planning

This project developed a scalable, high-resolution model to simulate medium- and heavy-duty (MHD) electric truck charging demand and assess its impact on grid infrastructure. Using generative modeling, simulation, and cost optimization, the project delivered an end-to-end software pipeline and a library of 96 real-world scenarios for the Dallas–Houston megaregion. We demonstrated a modular architecture for transportation and grid modeling, implemented cost-optimized infrastructure planning methods, and quantified grid capital, operational, and environmental costs across a wide range of truck electrification scenarios. The results have been adopted by major utility stakeholders and contributed to regional planning efforts.

24 POWER TRANSMISSION AND DISTRIBUTION↗

JUSTIFI: Software for Improving Performance Objectives via Energy Efficiency

With growing energy supply concerns and rising costs, energy efficiency is a critical component of industrial energy resilience and competitiveness by directly reducing energy operating costs. Energy efficiency projects in manufacturing also yield valuable benefits to other key metrics, such as improved quality, reduced maintenance costs, improved safety, decreased pollution, and enhanced productivity. However, it is difficult to receive approval for energy efficiency projects, so implementation rates are low, even when meeting capital project payback period criteria. The inclusion and quantification of non-energy benefits (NEBs) in the decision-making process for energy efficiency projects can improve the overall financial payback period while demonstrating a positive impact on the firm's key performance metrics and business strategy. Despite their significant financial and strategic value, NEBs are rarely factored into decision-making due to lack of tools to effectively identify and quantify them. Therefore, a comprehensive and integrative approach is needed for the rapidly evolving energy landscape. To address these challenges, through funding from U.S. Department of Energy, our new assessment methodology integrates common continuous improvement six sigma concepts, such as the DMAIC process, and a protocol of guiding questions, into energy efficiency assessments to identify NEBs. We have also developed open-source software, JUSTIFI, to guide users through this process, data collection, and quantification. It is designed to be used concurrently with DOE energy system analysis software suite, MEASUR. Our methodology and tools inform energy assessors, firm engineering, decision makers, and workforce seeking to increase energy resilience and to maximize benefits aligned with performance metrics.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

JUSTIFI: Software for Improving Performance Objectives via Energy Efficiency

With growing energy supply concerns and rising costs, energy efficiency is a critical component of industrial energy resilience and competitiveness by directly reducing energy operating costs. Energy efficiency projects in manufacturing also yield valuable benefits to other key metrics, such as improved quality, reduced maintenance costs, improved safety, decreased pollution, and enhanced productivity. However, it is difficult to receive approval for energy efficiency projects, so implementation rates are low, even when meeting capital project payback period criteria. The inclusion and quantification of non-energy benefits (NEBs) in the decision-making process for energy efficiency projects can improve the overall financial payback period while demonstrating a positive impact on the firm's key performance metrics and business strategy. Despite their significant financial and strategic value, NEBs are rarely factored into decision-making due to lack of tools to effectively identify and quantify them. Therefore, a comprehensive and integrative approach is needed for the rapidly evolving energy landscape. To address these challenges, through funding from U.S. Department of Energy, our new assessment methodology integrates common continuous improvement six sigma concepts, such as the DMAIC process, and a protocol of guiding questions, into energy efficiency assessments to identify NEBs. We have also developed open-source software, JUSTIFI, to guide users through this process, data collection, and quantification. It is designed to be used concurrently with DOE energy system analysis software suite, MEASUR. Our methodology and tools inform energy assessors, firm engineering, decision makers, and workforce seeking to increase energy resilience and to maximize benefits aligned with performance metrics.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Carbon storage cost modeling for the offshore Gulf of Mexico

Groundbreaking for geologic carbon storage (GCS) projects in the offshore Gulf of Mexico is imminent, and there is great interest in utilizing this region for GCS projects. Offshore saline reservoirs provide a significant and accessible resource for GCS. However, conducting GCS in the offshore environment will pose distinct challenges pertaining to site selection, operations, infrastructure use, and monitoring compared to operating onshore that ultimately affect technoeconomic assessment of offshore GCS projects. Carbon storage and transport costs are critical to project developers looking to deploy carbon storage in the offshore environment. We present CO2_S_COM_Offshore, a model developed by the National Energy Technology Laboratory (NETL) as a screening-level offshore saline GCS cost modeling tool. Based on NETL’s widely used CO2_S_COM cost model for onshore saline CS, CO2_S_COM_Offshore enables technoeconomic analysis of GCS in offshore areas. This model comprehensively incorporates multiple facets of offshore GCS projects, from regional evaluation and site selection to permitting, transport, operations, monitoring, site closure, and decommissioning. In general, the model can explore the cost implications for potential offshore GCS project(s) by enabling the user to change several project operational and financial attribute configurations. Key inputs include offshore storage formation options, CO2 injection rate and duration, infrastructure types, monitoring intensity, project financing, and post-injection site care duration. Supporting cost algorithms within CO2_S_COM_Offshore were compiled utilizing S&P Global’ s QUE$TORTM cost estimation software alongside a variety of open-source scientific literature. In addition to reviewing key model components, we discuss several sensitivity analyses, input variabilities, and results on analysis of break-even CO2 price required by a project based on different regulation/policy and operational scenarios for the offshore Gulf of Mexico. These results indicate the value of modeling offshore GCS specifically, and the potential of offshore GCS within a decarbonization value chain. Presented at the 41st USAEE/IAEE North American Conference, 3-6 November 2024, Baton Rouge, LA, United States.

Mark-Moser, Mackenzie K.↗

Field Validation of MVA Technology for Offshore CCS: Novel Ultra-High-Resolution 3D Marine Seismic Technology (P-Cable) (Final Report)

The objectives of the proposed study were to deploy and validate a specific monitoring technology, high-resolution 3D marine seismic (HR3D), appropriate for large-demonstration and commercial-scale offshore CCS sites. The project accomplished successful acquisition two HR3D seismic surveys. The first HR3D dataset was over the offshore injection site of the Tomakomai, Japan integrated pilot CCS project, which at the time of survey acquisition was actively injecting CO 2 . The first survey also represented a successful international collaboration between the DOE NETL program and Japan’s national CCS program and was the first successful acquisition and use of HR3D over an active CO 2 injection site (Meckel, Feng et al. 2019). The Tomakomai HR3D survey successfully tested a novel 4-streamer HR3D system array in which, for the first time, no cross-cable (aka “P-Cable”) was utilized and only four GeoEel streamers were used instead of the standard 12-streamer configuration. Consequently, this was not, strictly speaking, a deployment of the “P-Cable” system of (Planke and Berndt 2004) but rather a modified version, thereof, and it is the first known demonstration of the modified system configuration. One very positive outcome from the Japanese collaboration earlier in the project was the ability to learn from the Japanese how they used tail buoys with GPS to determine the position of the seismic source and receivers in time and space. Based on that experience, GCCC designed and built six GPS receivers that could be used to position the streamer receivers and the seismic source via tail buoys. A fundamental advance that was made on the original design, was the ability to directly power the tail buoy GPS units and transfer data through the streamers (i.e., vs. the batteries used at Tomakomai). The bulkiness of the GPS batteries caused drag and episodic surging of the buoys, which affected data quality by lifting up the tail end of the streamers so the receivers were not at the same depth. The units were tested onshore for accuracy and functionality, and the design was subsequently and successfully tested in marine acquisition mode during the SLP survey acquisition. The marine acquisition test and survey satisfied Subtasks 2.2.2, Novel Positioning Technology Selection and Subtask 2.2.3, Novel Positioning Technology Deployment. Results of the novel positioning technology selection (Subtask 2.2.2) were considered successful and will be incorporated in future HR3D seismic acquisition projects to reduce costs, improve deployment safety at sea, and integrate both seismic and data recording via a single data transfer through the streamers to the recording system. The project also established a permitting process through NETL NEPA compliance, which included an Environmental Assessment in a marine setting and is required for conducting these types of surveys using Federal funding. The permitting process charted a “boilerplate,” which can allow future surveys related to other funded projects to move forward more expeditiously. Future improvements that could be considered are more robust seals on the GPS module and stronger materials (especially joints) on tail buoy fabrication. These would increase fixed costs, but would be advisable and probably more economic long-term if multiple HR3D surveys are planned. Project Accomplishments include: • Pre-survey Sensitivity Study • Marine geochemistry methods and data analysis • Successful HR3D seismic dataset acquired @ Tomakomai active CO 2 injection marine site • Developed advanced seismic processing techniques • No NRMS anomalies detected in overburden; Demonstration of containment • Repeatability study • Second survey collected @ San Luis Pass, TX • 4D application using positioning techniques developed in the project for monitoring were successful

3D seismic GPS positioning↗

Planar Transformer Systems for Modular Power Electronics in Long-Haul, Low-Cost PV Systems

This project successfully developed and verified a new approach for medium voltage (MV) planar transformers for use in emerging, utility-scale, modular PV systems. This approach simplifies their manufacture, improves their isolation capability, lowers their cost, and reduces their volume and loss, while also creating flexibility in the materials that can be used.

14 SOLAR ENERGY↗

Future Circular Collider Feasibility Study Report

Volume 3 of the FCC Feasibility Report presents studies related to civil engineering, the development of a project implementation scenario, and environmental and sustainability aspects. The report details the iterative improvements made to the civil engineering concepts since 2018, taking into account subsurface conditions, accelerator and experiment requirements, and territorial considerations. It outlines a technically feasible and economically viable civil engineering configuration that serves as the baseline for detailed subsurface investigations, construction design, cost estimation, and project implementation planning. Additionally, the report highlights ongoing subsurface investigations in key areas to support the development of an improved 3D subsurface model of the region. The report describes the development of the project scenario based on the ‘avoid-reduce-compensate’ iterative optimisation approach. The reference scenario balances optimal physics performance with territorial compatibility, implementation risks, and costs. Environmental field investigations covering almost 600 hectares of terrain—including numerous urban, economic, social, and technical aspects—confirmed the project’s technical feasibility and contributed to the preparation of essential input documents for the formal project authorisation phase. The summary also highlights the initiation of public dialogue as part of the authorisation process. The results of a comprehensive socio-economic impact assessment, which included significant environmental effects, are presented. Even under the most conservative and stringent conditions, a positive benefit-cost ratio for the FCC-ee is obtained. Finally, the report provides a summary of the studies conducted to document the current state of the environment.

Benedikt, M. [European Organization for Nuclear Re↗

Wave energy in season: a comparative approach to feasibility of seasonal deployments for remote coastal communities

Remote coastal communities, which could be early adopters of wave energy projects, have concerns over costs, conflicts, and potential risks of development. Designers and developers are challenged to address these community concerns as they continue to develop wave energy technologies. One potential means of reducing costs, conflicts, and risks, especially for demonstration and pilot-scale projects, could be planning a deployment that operates for only a portion of the year—a seasonal deployment. Here, in this paper, we examine the impacts of a seasonal deployment in terms of cost, electricity production, operations and maintenance, environmental impacts, and community benefits. We take a holistic, comparative approach to feasibility that can be replicated for other comparative studies. We estimate electricity production using a point absorber WEC modeled near Sitka, AK, USA and optimized for the given sea conditions. We determine that, for remote community sized projects, seasonal deployments could result in small cost savings (less than 10 %), but larger decreases in annual energy production (around 30 % for our case study area). Seasonal deployments could be preferable in places with seasonal energy needs, if failures and device access become a major hindrance to wave energy technology development, or as a cautionary approach to introducing new technology to the oceans. We also determine that a highly seasonal wave resource is not necessarily a requirement for seasonal deployments to be considered. Seasonal deployments are an alternative to year-round deployments that can be considered in places where marine spatial conflict is a seasonal concern.

WEC optimizations↗