MER : from landing to six wheels on Mars ... twice

Application of the Pathfinder landing system design to enclose the much larger Mars Exploration Rover required a variety of Rover deployments to achieve the surface driving configuration. The project schedule demanded that software design, engineering model test, and flight hardware build to be accomplished in parallel. This challenge was met through (a) bounding unknown environments against which to design and test, (b) early mechanical prototype testing, (c) constraining the scope of on-board autonomy to survival-critical deployments, (d) executing a balance of nominal and off-nominal test cases, (e) developing off-nominal event mitigation techniques before landing, (f) flexible replanning in response to surprises during operations. Here is discussed several specific events encountered during initial MER surface operations.

Mars Exploration Rover (MER)↗

cFE/CFS (Core Flight Executive/Core Flight System)

This viewgraph presentation describes in detail the requirements and goals of the Core Flight Executive (cFE) and the Core Flight System (CFS). The Core Flight Software System is a mission independent, platform-independent, Flight Software (FSW) environment integrating a reusable core flight executive (cFE). The CFS goals include: 1) Reduce time to deploy high quality flight software; 2) Reduce project schedule and cost uncertainty; 3) Directly facilitate formalized software reuse; 4) Enable collaboration across organizations; 5) Simplify sustaining engineering (AKA. FSW maintenance); 6) Scale from small instruments to System of Systems; 7) Platform for advanced concepts and prototyping; and 7) Common standards and tools across the branch and NASA wide.

Wildermann, Charles P.↗

Applied Meteorology Unit (AMU)

This report summarizes the Applied Meteorology Unit (AMU) activities for the first quarter of Fiscal Year 2010 (October - December 2009). A detailed project schedule is included in the Appendix. Included tasks are: (1) Peak Wind Tool for User Launch Commit Criteria (LCC), (2) Objective Lightning Probability Tool, Phase III, (3) Peak Wind Tool for General Forecasting, Phase II, (4) Upgrade Summer Severe Weather Tool in Meteorological Interactive Data Display System (MIDDS), (5) Advanced Regional Prediction System (ARPS) Data Analysis System (ADAS) Update and Maintainability, (5) Verify 12-km resolution North American Model (MesoNAM) Performance, and (5) Hybrid Single-Particle Lagrangian Integrated Trajectory (HYSPLIT) Graphical User Interface.

Bauman, William↗

HIFIRE Flight 2 Overview and Status Update 2011

A collaborative international effort, the Hypersonic International Flight Research Experimentation (HIFiRE) Program aims to study basic hypersonic phenomena through flight experimentation. HIFiRE Flight 2 teams the United States Air Force Research Lab (AFRL), NASA, and the Australian Defence Science and Technology Organisation (DSTO). Flight 2 will develop an alternative test technique for acquiring high enthalpy scramjet flight test data, allowing exploration of accelerating hydrocarbon-fueled scramjet performance and dual-to-scram mode transition up to and beyond Mach 8 flight. The generic scramjet flowpath is research quality and the test fuel is a simple surrogate for an endothermically cracked liquid hydrocarbon fuel. HIFiRE Flight 2 will be a first of its kind in contribution to scramjets. The HIFiRE program builds upon the HyShot and HYCAUSE programs and aims to leverage the low-cost flight test technique developed in those programs. It will explore suppressed trajectories of a sounding rocket propelled test article and their utility in studying ramjet-scramjet mode transition and flame extinction limits research. This paper describes the overall scramjet flight test experiment mission goals and objectives, flight test approach and strategy, ground test and analysis summary, development status and project schedule. A successful launch and operation will present to the scramjet community valuable flight test data in addition to a new tool, and vehicle, with which to explore high enthalpy scramjet technologies.

Jackson, Kevin R.↗

Applied Meteorology Unit (AMU)

This report summarizes the Applied Meteorology Unit (AMU) activities for the second quarter of Fiscal Year 2005 (January - March 2005). A detailed project schedule is included in the Appendix.

Source record↗

Applied Meteorology Unit (AMU)

This report summarizes the Applied Meteorology Unit (AMU) activities for the third quarter of Fiscal Year 2004 (April - June 2004). A detailed project schedule is included in the Appendix.

Bauman, William↗

Applied Meteorology Unit (AMU)

This report summarizes the Applied Meteorology Unit (AMU) activities for the second quarter of Fiscal Year 2007 (January - March 2007). A detailed project schedule is included in the Appendix.

Bauman, William↗

Design for Review - Applying Lessons Learned to Improve the FPGA Review Process

Flight Field Programmable Gate Array (FPGA) designs are required to be independently reviewed. This paper provides recommendations to Flight FPGA designers to properly prepare their designs for review in order to facilitate the review process, and reduce the impact of the review time in the overall project schedule.

Process Improvement↗

Experiences with Extra-Vehicular Activities in Response to Critical ISS Contingencies

Initial "Big 14" work was put to the test for the first time in 2010. Deficiencies were found in some of the planning and approaches to that work; Failure Response Assessment Team created in 2010 to address deficiencies -Identify and perform engineering analysis in operations products prior to failure; incorporate results into operations products -Identify actions for protecting ISS against a Next Worse Failure after the first failure occurs -Better document not only EVA products but also planning products, assumptions, and open actions; Pre-failure investments against critical failures best postures ISS for swift response and recovery -A type of insurance policy -Has proven effective in a number of contingency EVA cases since 2010. Planning for MBSU R&R in 2012, Second PM R&R in 2013, EXT MDM R&R in 2014; Current FRAT schedule projects completion of all analysis in 2018

Van Cise, Edward A.↗

Addressing Thermal Model Run Time Concerns of the Wide Field Infrared Survey Telescope using Astrophysics Focused Telescope Assets (WFIRST-AFTA)

The Wide Field Infrared Survey Telescope using Astrophysics Focused Telescope Assets (WFIRST-AFTA) utilizes an existing 2.4 m diameter Hubble sized telescope donated from elsewhere in the federal government for near-infrared sky surveys and Exoplanet searches to answer crucial questions about the universe and dark energy. The WFIRST design continues to increase in maturity, detail, and complexity with each design cycle leading to a Mission Concept Review and entrance to the Mission Formulation Phase. Each cycle has required a Structural-Thermal-Optical-Performance (STOP) analysis to ensure the design can meet the stringent pointing and stability requirements. As such, the models have also grown in size and complexity leading to increased model run time. This paper addresses efforts to reduce the run time while still maintaining sufficient accuracy for STOP analyses. A technique was developed to identify slews between observing orientations that were sufficiently different to warrant recalculation of the environmental fluxes to reduce the total number of radiation calculation points. The inclusion of a cryocooler fluid loop in the model also forced smaller time-steps than desired, which greatly increases the overall run time. The analysis of this fluid model required mitigation to drive the run time down by solving portions of the model at different time scales. Lastly, investigations were made into the impact of the removal of small radiation couplings on run time and accuracy. Use of these techniques allowed the models to produce meaningful results within reasonable run times to meet project schedule deadlines.

Thermal Analysis↗

A Geosynchronous Orbit Optical Communications Relay Architecture

NASA is planning to fly a Next Generation Tracking and Data Relay Satellite (TDRS) next decade. While the requirements and architecture for that satellite are unknown at this time, NASA is investing in communications technologies that could be deployed on the satellite to provide new communications services. One of those new technologies is optical communications. The Laser Communications Relay Demonstration (LCRD) project, scheduled for launch in December 2017 as a hosted payload on a commercial communications satellite, is a critical pathfinder towards NASA providing optical communications services on the Next Generation TDRS. While it is obvious that a small to medium sized optical communications terminal could be flown on a GEO satellite to provide support to Near Earth missions, it is also possible to deploy a large terminal on the satellite to support Deep Space missions. Onboard data processing and Delay Tolerant Networking (DTN) are two additional technologies that could be used to optimize optical communications link services and enable additional mission and network operations. This paper provides a possible architecture for the optical communications augmentation of a Next Generation TDRS and touches on the critical technology work currently being done at NASA. It will also describe the impact of clouds on such an architecture and possible mitigation techniques.

optics↗

Commercialization and Standardization Progress Towards an Optical Communications Earth Relay

NASA is planning to launch the next generation of a space based Earth relay in 2025 to join the current Space Network, consisting of Tracking and Data Relay Satellites in space and the corresponding infrastructure on Earth. While the requirements and architecture for that relay satellite are unknown at this time, NASA is investing in communications technologies that could be deployed to provide new communications services. One of those new technologies is optical communications. The Laser Communications Relay Demonstration (LCRD) project, scheduled for launch in 2018 as a hosted payload on a commercial communications satellite, is a critical pathfinder towards NASA providing optical communications services on the next generation space based relay. This paper will describe NASA efforts in the on-going commercialization of optical communications and the development of inter-operability standards. Both are seen as critical to making optical communications a reality on future NASA science and exploration missions. Commercialization is important because NASA would like to eventually be able to simply purchase an entire optical communications terminal from a commercial provider. Inter-operability standards are needed to ensure that optical communications terminals developed by one vendor are compatible with the terminals of another. International standards in optical communications would also allow the space missions of one nation to use the infrastructure of another.

lasers↗

Spacecraft Common Deployable Boom Hinge Deploy and Latching Mechanisms

JPL is developing deployable radio frequency (RF) reflector booms for spaceflight usage on two different earth orbiter projects scheduled to launch in the early 2020’s. The static alignment and thermal stability requirements for these RF reflector booms are challenging. A common mechanism design has been developed for the deployment and latching of boom hinges which avoids significant parasitic loads on the alignment critical structures after completion of mechanism function. The mechanism design includes a high-aspect ratio torsion spring with viscous damper for hinge closure as well as an actuator-driven flexured hook and roller latch for joint preloading. This paper describes noteworthy mechanism design details, test results, challenges, and lessons learned during the development effort.

Renson, Marcel↗

X-57 Cruise Motor GVT Using Fixed-Base Correction Technique

The National Aeronautics and Space Administration (NASA) Armstrong Flight Research Center (AFRC) completed a modal survey of the X-57 Maxwell aircraft cruise motor system to help inform cruise motor redesign efforts. X-57 Maxwell was an electric propulsion demonstrator aircraft developed by NASA to inform airworthiness standards for electrified-aircraft. The cruise motor system modal survey was completed in spring of 2023 utilizing the fixed-base correction (FBC) ground vibration test (GVT) technique developed by ATA Engineering, to decouple the motor modes from the aircraft modes. Previously during the full aircraft GVT, a detailed modal assessment of the cruise motors was not performed. Owing to the X-57 project’s phase in the aircraft development cycle when the motor redesign effort occurred, the cruise motor GVT could only be performed with the cruise motor system installed on the aircraft, with most of its installation hardware (wiring, baffling, sensors, etc.) attached. An impact hammer was used to provide excitation input at various locations within the tight confines of the cruise motor installation. To better support motor redesign efforts, the FBC methodology was utilized to fix, separate and de-couple the cruise motor modes from aircraft modal response. During the GVT, this required additional impact tap tests on candidate fixed-boundary points for each degree of freedom (DOF) to be fixed. Additional triaxial accelerometers installed at the candidate points were used to compute frequency response functions (FRFs) in X, Y, and Z directions to enable those DOFs to be numerically fixed. Test data was acquired using Hottinger Brüel & Kjær’s LAN-XI data acquisition hardware and BK Connect software. FBC post-test processing was performed using the Structural Modification Using Frequency Response Functions (SMURF) technique with ATA Engineering’s Interface between MATLAB, Analysis, Test (IMAT) software. Utilizing the FBC technique relieved test engineers from having to instrument the entire aircraft to identify and separate aircraft response from cruise motor modes of interest. The FBC technique also permitted structural analysis engineers to omit secondary components from their finite element model (FEM) of the cruise motor system. This FBC modal survey was successful, and the first time NASA AFRC utilized the FBC method on an aircraft rather than a test fixture, and also using an impact hammer rather than multiple shakers allowing significant project schedule and cost savings

Modal Survey↗

MARVEL Technical Overview: Breakdown of cost and scope growth through 90% Final Design

This report presents a breakdown of cost and scope growth for the Microreactor Applications Research Validation and Evaluation (MARVEL) project through the design phase, and includes observations, lessons learned, and the results from an independent project assessment. It presents the status and history of the project. Technology maturity is considered in high-level, qualitative comparison to other microreactor design efforts. Its purpose is to record MARVEL’s evolution and lessons learned from the planning and design phases through completion of 90% final design. Analyses included a detailed review of project cost, schedule, and periodic project reports and management documents. The Primary Coolant Apparatus Test (PCAT) is specifically highlighted. It was concluded that MARVEL would have benefited from more extensive planning early in the project to better define cost and schedule to provide more certainty in the total project cost and delivery date. Modest cost and schedule improvements may have been possible, but compared qualitatively, MARVEL’s total cost and schedule performance are consistent with that of other efforts currently underway. Better planning would have provided more certainty, improved risk mitigations, and potentially eliminated delays due to funding shortfalls. A recommended path forward is presented that addresses recommendations in the independent project assessment.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗