Search NASA⌕ Search

SEARCH · Search NASA

Results for “Rated cooling capacity”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Efficient data-driven models for prediction and optimization of geothermal power plant operations

Increasing the capacity of geothermal energy as a renewable resource calls for development and deployment of efficient control and optimization technologies for geothermal power plants. A data-driven prediction and optimization model is presented as a cost-effective and efficient alternative to physics-based approach. The model predicts power output and operational cost by propagating the influence of control and disturbance variables within an artificial neural network (ANN). Numerical experiments with simulated and field data from a real geothermal power plant are first used to demonstrate the prediction performance of the ANN model. The model is then adopted to maximize the net predicted power production by automatically adjusting the working fluid circulation rate. The optimization performance of the model in evaluated using a thermodynamic flowsheet simulation model. The workflow is applied to model and control the effect of ambient temperature on an air-cooled binary cycle power plant, which is complex and costly to perform using a physics-based predictive model. As a result, the performance of the method is demonstrated by applying it to both simulated and field datasets from a binary cycle geothermal power plant.

15 GEOTHERMAL ENERGY↗

Prediction of Thermal Conditions of DED With FEA Metal Additive Simulation

This paper presents the integration of wire-arc additive manufacturing (WAAM) using Gas Metal Arc Welding (GMAW) into a machine tool to create a retrofit hybrid computer numeric control (CNC) machine tool. GMAW, along with other direct energy deposition systems, has the capacity to deposit material faster than the excess thermal energy can dissipate. This results in the need to allow the part to cool between consecutive layers, which is the most time-consuming part of the additive process. Finite element analysis (FEA) was used in conjunction with monitored build plate surface temperatures during deposition samples to improve adequate dwell time prediction and to develop a cooling system. A deposition was completed where no dwell time was used and the build plate along with the machine table temperatures were monitored. A second deposition was completed where only one bead was deposited and the traverse speed was increased. The GMAW welder was mounted on a 3-axis CNC machine where two square deposition samples were completed. A FEA model was designed and verified using the monitored samples. The model will be used to determine improved depositions speeds and whether forced cooling would allow for an increased deposition rate without structural failure. It was determined the FEA software can be used to accurately model and predict the thermal response of WAAM AM components.

Heinrich, Lauren↗

RELAP5-3D Simulation of PG-27 Test at the HTTF Facility

The High Temperature Test Facility (HTTF) at Oregon State University (OSU) is a quarter scaled integral-effect test facility designed to examine the transient phenomena occurring in a Modular Hight Temperature Gas-cooled Reactor (MHTGR). It is specifically designed to handle the pressurized and depressurized conduction cooldown (PCC and DCC) events. The PCC event is an accident scenario in which there is a loss of forced convection of the coolant through the system. However, the pressure boundary remains intact. This study focuses on the Reactor Excursions and Leak Analysis Program (RELAP)5-3D simulation of the PG-27 test (PCC phenomena) and the sensitivity of those simulations from the material properties and primary helium mass flow rate standpoint. The aim is to capture a reasonable one-dimensional picture of a three dimensional phenomena. The simulation will help in the code assessment and in understanding the various unknown parameters involved. The presented results will demonstrate the code is able to capture the detailed one-dimensional physics accurately. However, input parameters to the code (i.e., the primary mass flow rate, refractory material thermal conductivity, and heat capacity at elevated temperatures) impact the fuel temperature the most. This work will discuss the sensitivity of simulations to the identified input parameters.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

AGR-5/6/7 Fuel Fabrication Report

The U.S. Department of Energy Office of Nuclear Energy (DOE NE) and the Idaho National Laboratory (INL) Advanced Reactor Technologies (ART) Advanced Gas Reactor (AGR) Fuel Development and Qualification program (referred to as AGR Fuel program hereafter) are pursuing qualification of tristructural isotropic (TRISO) coated particle fuel for use in high temperature gas cooled reactors (HTGRs). The AGR Fuel program was established to provide a fuel qualification data set in support of the licensing and operation of an HTGR. BWX Technologies Nuclear Operations Group (BWXT-NOG) was subcontracted to fabricate the fuel for the AGR program. Several investments and innovations were realized in preparation to fabricate fuel for the AGR-5/6/7 irradiation experiments that brought fuel fabrication fully out of the laboratory and into engineering-scale operations. These included: • Increased the kernel fabrication line capacity and uniformity • Upgraded ancillary support equipment and processes for the tristructural isotropic (TRISO) coating furnace • Demonstrated efficient production of the matrix precursor powder by dry jet milling of co mingled components • Demonstrated an engineering-scale method for quick and efficient overcoating TRISO particles with the matrix precursor • Demonstrated an automated, multi cavity compacting system with a volumetric feed system • Demonstrated a combined-cycle thermal treatment furnace These changes increased production rates of some of these processes by an order of magnitude or more while eliminating the use of flammable solvents, multiple grinding and sorting operations, and the weighing out of individual die charges. Three fuel kernel lots were fabricated for production of the fuel for AGR-5/6/7. The initial lot (J52R-16-39316) was certified to fuel specifications but was not used because the kernels had a high fraction of internal fissures that caused an unacceptable fraction of the kernels to fragment when charged to the coating furnace where the TRISO coating would be deposited. Fragmented kernels increased the dispersed uranium in the particles and produced a worrisome fraction of dimpled particles with an elevated probability of in-pile failure. After some efforts to identify the cause of the fissure formation, two additional lots were produced with much lower fissure fractions, J52R-16-69317 and 69318. The latter kernel lot was a backup to the first and was not needed. Multiple kernel batches were composited to form each of the lots so as to simulate a commercial-scale operation where kernel batches would also be composited. Multiple TRISO coating runs were performed and the product characterized so that several could be composited into a TRISO lot. TRISO lot J52R-16-98005 conformed to all fuel specifications except the mean outer pyrocarbon (OPyC) layer thickness was thinner than specified. Furthermore, it was determined that the TRISO lot had a dispersed uranium fraction (DUF) that might result in the compacts not meeting the DUF specification. A review of the role of the OPyC layer and consequences of the DUF by the Technical Coordination Team and INL concluded that the fuel was acceptable for use in the AGR-5/6/7 irradiation experiment. The TRISO particles were overcoated with the matrix precursor that had been produced in a jet-milling operation. The overcoating was performed in equipment originally designed to coat pharmaceuticals. The overcoating process performed well; producing highly spherical and uniform overcoats requiring little upgrading and no recycle or rework. TRISO particles were overcoated with the matrix precursor to achieve nominal volumetric packing fractions (PFs) of TRISO particles of 25% and 40% for the irradiation experiments. The 40% PF compacts occupy the first and fifth test capsule in the test train while the inner three capsules are loaded with 25% PF compacts. The resinated graphite matrix precursor powder was a derivative of the German A3-27 matrix formulation, which differs from previous AGR irradiation campaigns that used an A3-3 formulation. Jet milling of the matrix powder precursor produced a finer mean graphite particle size than the milling operations used for the A3-3 matrix powder precursor. Changes made in the matrix formula and equipment yielded compacts with significantly higher matrix density than was attained in previous AGR irradiation campaigns. The changes in the matrix formulation and the means of milling the powders also complicated resolution of the three fuel compact defect fractions, DUF, exposed kernel fraction (EKF), and the silicon carbide defect fraction (SDF). Characterization data from BWXT-NOG had some anomalous results, so samples of the fuel compacts and overcoated TRISO particles were also analyzed by Oak Ridge National Laboratory (ORNL) to ensure that the defect fractions were accurately characterized.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Front-End Engineering Design for Piperazine with the Advanced Stripper

This Department of Energy (DOE) funded project was executed with the goal of preparing a Front-End Engineering Design (FEED) for the capture and compression of 90% of the CO2 that would normally be emitted from an existing natural gas combined cycle (NGCC) plant. The FEED focused on the application of the piperazine advanced stripper (PZAS) process at Mustang Station of the Golden Spread Electric Cooperative (GSEC), which consists of two gas turbines with common heat recovery steam generator (HRSG). The University of Texas at Austin (UT) served as the prime contractor, and subcontracted AECOM Technical Services and Trimeric Corporation to support FEED development. This project team has worked together to advance PZAS for more than a decade. ExxonMobil, Chevron, and Total provided project co-funding. The objectives of this work included: 1. To advance engineering design such that a comprehensive estimate for the total installed cost of a full-scale PZAS CO2 Capture Plant with CO2 compression can be developed on an existing NGCC power plant. a. These detailed costs can also be used to qualify PZAS and other related second generation (2G) amine scrubbing processes for use on cogeneration facilities in refineries and chemical plants that use gas turbines with HRSGs to produce steam. b. These detailed costs will help qualify 2G amine scrubbing for use on NGCC power plants and establish a more accurate baseline cost to be used as a target by other capture technologies. 2. To provide cost details to be used in the economic optimization of the process features of PZAS and other 2G amine scrubbing processes. 3. To provide DOE with a more detailed understanding of carbon capture costs in a commercial application, enabling DOE to better design its R&D program to improve the economics for carbon capture. 4. To provide the host site and cost share partners with the information necessary to determine whether a commercial project to capture and use CO2 for enhanced oil recovery (EOR) or for sequestration can be justified (when accounting for the 45Q tax credit). A key component of the FEED is the estimated total installed cost, which provides a basis for the likely capital investment necessary to implement the PZAS carbon capture process at this location and scale. In combination with the included economic analysis, which accounts for potential revenue from the produced CO2, potential avenues to profitability are explored. The major findings of the FEED are as follows: The Mustang Station PZAS CO2 Capture Plant estimated total project cost of $698 MM of which $384 MM was direct costs. The annual operating costs were $32.6 MM. The total investment for a PZAS facility at Mustang Station is $725 MM. This estimate includes owner’s cost of $25 million and a contingency of $110 MM. • The study estimated the CO2 capture plant at Mustang Station would generate CO2 at $110/tonne for EOR, assuming a 12% IRR (internal rate of return) and an 85% capacity factor. For CO2 storage, the same case would achieve a 12% IRR at about $114/tonne. At a capacity factor of 52%, the storage and EOR cases would break even when carbon is priced ~$150/tonne. The economic analysis determined that the capacity factor and utility pricing, among other variable factors, had a significant effect on the economics and will need additional studied. • The energy penalty of the PZAS plant would be about 46 MW in connected power and 35 MW in operating load. The natural gas requirement (for the Gas Boiler package) would be about 354 MMBTU/hr. • The FEED revealed no major risks in process maturity. However, some areas were outlined for further engineering during detailed design, which included the Gas Boiler system, general arrangement and site layout, air coolers, schedule development, and optimization of the process for higher CO2 removal. • If PZAS were to be implemented at another host site, additional opportunities for cost reduction for would include cost reduction through use of cooling water and steam extraction.

03 NATURAL GAS↗

Simulations of the fault current limiting operation of a long-length REBCO CORC ® superconducting cable cooled by helium gas

Conductor-on-round-core (CORC®) cables composed of rare-earth-barium-copper-oxide high-temperature superconducting (HTS) tapes are of great interest for power transmission applications due to their many advantages such as high power density, light weight, and low loss. Closed circulation loops of cryogenic helium gas can be used to cool HTS cables down to low temperatures to significantly improve their current-carrying capacity. Coupled circuit-electromagnetic-thermal finite element simulations implemented in the COMSOL Multiphysics package were developed, validated, and then used for simulating the fault current limiting (FCL) performance and the cooling processes of an 8-layer CORC® cable cooled with a flow of cryogenic helium gas. In the simulations, the temperature dependence of the electrical and thermal properties of all component materials is implemented for improved accuracy. To overcome computational challenges caused by the considerable difference in geometrical scales (i.e. few-µm-thick HTS layers versus 10 m-long HTS cable), the model is divided into two separate simulations. The first simulation is performed on the transverse cross-section of the cable to calculate the electric field, heating power and temperature rise in each component of a CORC® cable during FCL operation. The heating power calculated in the first simulation is transferred to the second model to simulate the cooling of a 10 m-long cable after the fault is cleared. The effect of the helium gas flow rate on the cooling process is also investigated to develop strategic approaches for optimizing cooling systems for HTS cables with FCL capability. The simulations indicated that a 40 ms fault with a voltage drop of 20 V m −1 along the cable can result in a temperature increase from 60 K to about 165 K inside the cable, and it takes about 500 s to cool the cable back to nearly 60 K with a flow of cold helium gas at a rate of 5 g s −1 .

24 POWER TRANSMISSION AND DISTRIBUTION↗

Optimizing the Orientation of Solar Photovoltaic Systems Considering the Effects of Irradiation and Cell Temperature Models with Dust Accumulation

To cope with the growing installation capacities of solar photovoltaic (PV) systems in desert areas, it is necessary to revisit the energy production models and the optimal angles of PV panels given the significant impacts of ambient temperature, wind speed, dust accumulation, and cleaning frequency. In this study, these four factors are examined for four PV technologies (polycrystalline, microcrystalline, monocrystalline, and thin-film) at three cities in Jordan, Egypt, and Tunisia using precise ground-level meteo-solar measurements. Different models are compared to estimate the diffuse irradiance, as well as account for the effects of operating temperature, wind speed, and dust accumulation on energy production and optimal tilt and azimuth angles of the panels. The results reveal 1.5 % higher energy production estimates using the isotropic model, compared to the anisotropic model in the summer months. Considering the cooling effect of wind speed decreases the operating cell temperature drops by up to 7.05 % for thin film panels. The annually produced energy decreases by 24 % when the panels are cleaned bi-monthly. When the dust accumulation rate doubles, the energy production decreases by ~10 % for all studied cases. Also, the variations in optimal tilt and azimuth angles with dust accumulation rate are within ~3.0 degrees .

14 SOLAR ENERGY↗

Nested Pebble Bed Blanket (NesPeB)

Recent advances in magnetic confinement fusion technology have attracted billions of dollars of investments in startups from venture capitals and corporations, resulting in the development of devices aiming to demonstrate net energy gain in a self-heated burning plasma, such as SPARC (under construction) and others. However, future fusion power plants must operate in regimes that will require technologies far beyond current experience. According to a National Academies of Science, Engineering, and Medicine report, to have nuclear fusion power plants contributing in a timely manner to the planned reduction of atmospheric carbon dioxide, a pilot plant should be built by 2035, and it should demonstrate fusion power production and the performance of the tritium fuel system (requiring a high enough tritium breeding) by 2040. A recognized key technology gap by [26] is the fusion first wall and blanket since no current blanket concept is considered satisfactory or has been built and proven. The first wall and blanket in magnetic fusion reactors form a vital and complex system, as it must satisfy different functions such as power extraction, tritium breeding, plasma containment, radiation shielding, and safety. The list of design requirements is even longer: high enough tritium production for fusion self-sufficiency, low material activation, decay heat and shutdown dose rates, high thermal efficiency, high-capacity factor, high magnets-divertor-vacuum vessel-first wall life, low corrosion, low cost, and intrinsically safe (requiring minimal licensing). Despite fifty-plus years of research, the first wall and blanket concepts proposed suffer from fundamental technical problems and immaturity (TRL=2-3) that jeopardize the timely delivery of a commercial fusion power plant. A fusion first-wall blanket has never been built nor tested, and a "winning", practical functioning design requires enough engineering margins (high enough tritium breeding considering the uncertainty, etc.), manufacturing simplicity, ease of continuous operation, maintenance, and low cost. A new, groundbreaking blanket concept called "Nested Pebble Bed Blanket" (NesPeB) was developed at ORNL under the successful ARPA-E GAMOW FERMI project (patent application allowed by the USPTO). The NesPeB blanket concept addresses current blanket concepts' shortcomings and technical immaturity, paving the way for accelerated delivery of fusion power plants. NesPeB is based on nested pebbles, which are binary-sized lithium-ceramic pebbles enclosed in "Beryllide" perforated and coated spherical shells, which are also binary-sized, stacked on top of each other, forming a "bed" and cooled by Nitrogen gas also "sweeping" the Helium and Tritium generated by the neutron irradiation of Lithium; the vacuum vessel plasma facing material is Molybdenum-96 and -97 with the first wall cooled by Helium while the divertor armor is made of Tungsten. The simulations of the NesPeB blanket using Fusion Reactors Models Integrator (FERMI) are encouraging as they estimate a tritium breeding ratio (TBR) greater than 1.2 using natural Lithium, acceptable pressure drop, and excellent heat transfer properties. Furthermore, the NesPeB blanket is not limited by magneto-hydro-dynamics (MHD) effects, is designed for online refueling, relies on existing tritium extraction technologies, has a simple construction, and limits the corrosion and chemical reactivity problems. NesPeB has the potential to be transformational and disruptive since it can solve all the main, challenging technical problems of fusion device blankets and accelerate a pilot plant delivery for 10 or more years.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

BENEFIT with Northeastern University: HVAC Hardware-in-the-Loop Experimental Testing of a Heat Pump and Air Conditioner

This dataset includes HVAC Hardware-in-the-Loop (HIL) experimental results for a single stage, SEER 16, HSPF 9.5, 3-ton single-speed air source heat pump with 15 kW of backup auxiliary heating tested in both cooling and heating mode, and a two stage, SEER 21, 2-ton central air conditioner tested in cooling mode for a set of outdoor temperatures and indoor setpoint temperatures. In addition to these tests, experimental tests focused on the operation of auxiliary heating for the heat pump for winter condition were also conducted. The laboratory experiments for transient testing of the heat pump and air conditioner were conducted using the two HIL systems in the Systems Performance Laboratory (SPL) at NREL’s Energy Systems Integration Facility (ESIF). Further information on laboratory design and capabilities of the SPL along with the architecture of HVAC HIL system can be found in: Sparn, B. F. 2018. Laboratory Resources and Techniques to Evaluate Smart Home Technology (No. NREL/CP-5500-71696). National Renewable Energy Laboratory (NREL), Golden, CO (United States). https://www.nrel.gov/docs/fy18osti/71696.pdf and the experimental setup and validation of HVAC HIL platform can be found in: Ramaraj, S. and Sparn, B. 2022. Validation of HVAC Hardware-In-the-Loop Simulation for Advanced Control Strategies in Smart Homes (No. NREL/CP-5500-82562). National Renewable Energy Lab (NREL), Golden, CO (United States). https://www.nrel.gov/docs/fy22osti/82562.pdf. These experimental results can be used to validate how we currently model the cycling behavior of heat pumps and air conditioners. Additionally, many demand response programs implement heat pump and air conditioner control by changing the thermostat set point – these data may also be used to verify our models for heat pump and air conditioner demand response control are implemented correctly. The Test_Matrix file describes all the indoor and outdoor test conditions for heat pump and air conditioner and the file names of data sets include information about the test conditions. A wide range of outdoor air temperatures were chosen to accommodate summer and winter conditions. In addition to operating the HVAC equipment with different outdoor temperatures, we also operate the system with different indoor temperature set points to represent different grid signals or different operating conditions. For cooling conditions, the baseline set point is 72°F. To represent Load Up signals, the setpoint is changed to 68°F. The Load Shed set point is 76°F. For heating conditions, the baseline set point was assumed to be 68°F. The Load add set point is 72°F and the Load shed set point is 64°F. The starting indoor temperature for cooling conditions was set ~2°F above the indoor setpoint temperature so that the equipment turned on quickly. Similarly, the initial indoor temperature was set ~2°F lower than setpoint for heating mode tests to ensure that heating began quickly. The return air temperature was assumed to be equal to the indoor setpoint temperature in all cases. The experimental data are sampled at 1-second intervals. The data from ecobee thermostat at 5-minute interval are resampled and added to the corresponding file. The content of each data set is as follows: • T_Return (C): Measured return air temperature [C] • T_Return_SP (C): Return air temperature setpoint from E+ model, sent to HIL [C] • T_Supply (C): Measured supply air temperature at evaporator outlet [C] • T_Outdoor (C): Measured outdoor air temperature [C] • T_Outdoor_SP (C): Outdoor air temperature setpoint from weather file, sent to HIL [C] • T_Indoor (C): Measured indoor air temperature [C] • T_Indoor_SP (C): Indoor air temperature setpoint from E+ model, sent to HIL [C] • Outdoor Unit Power (W): Measured power of the outdoor unit [W] • Indoor Unit Power (W): Measured power of the indoor unit [W] • Evaporator Airflow Rate (CFM): Measured evaporator or indoor unit airflow rate sent to E+ model [CFM] • Cooling/Heating Capacity (kW): Calculated cooling/heating capacity sent to E+ model [kW] • T_SP_Thermostat (C): Thermostat cooling/heating setpoint temperature [C] • T_Indoor_Thermostat (C): Thermostat indoor air temperature [C]

24 POWER TRANSMISSION AND DISTRIBUTION↗

Impact of installation faults in air conditioners and heat pumps in single-family homes on U.S. energy usage

To ensure that new residential air conditioners and heat pumps operate optimally, care must be taken during the initial system design and installation to avoid missteps that immediately degrade a system’s performance. Laboratory and simulation studies have quantified the impact that faults can have on capacity and efficiency. Field studies have demonstrated that installation-related faults are commonplace. However, the national impact of installation-related faults cannot be accurately estimated by only simulating a limited number of homes at several fault levels because of the variety of home characteristics and climates involved. In our analysis, we use an improved residential building stock simulation tool to predict the annual energy increase and additional utility costs resulting from two common installation faults: indoor airflow rate and refrigerant charge level. Our method considers the wide range of building characteristics and climate zones of the U.S. housing stock. We use existing field data to develop fault intensity probability distributions to inform our analysis. The study shows that these two faults result in approximately 20.7 TWh/y of additional energy use for central air conditioners and air-source heat pumps in U.S. single-family detached homes, which is a 9% increase over baseline (no-fault) usage, costing homeowners approximately $2.5 billion annually on utility bills. Air-source heat pumps are responsible for a disproportionate fraction of this energy use increase because of the larger number of operating hours compared to central air conditioners and the sensitivity of heating mode performance to the faults analyzed compared to cooling mode.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Design of a prototypical natural circulation water-based reactor cavity cooling system (RCCS) for a pebble-bed generic FHR

A prototypical natural circulation water-based reactor cavity cooling system (RCCS) for the UC Berkeley Mark-1 pebble-bed gFHR is designed based on one-dimensional thermal hydraulics modeling and optimization implemented in an in-house MATLAB code. The model employs a lumped core consisting of fuel pebble and graphite pebble regions, while the graphite reflector, vessel, and RCCS are represented as separate but energy-coupled regions. The model is derived based on steady state energy balance equations accounting for conductive heat transfer from the lumped core to the vessel and subsequent radiative heat transfer to the RCCS and convective heat transfer in the water. Further, mass flow rate is calculated based on momentum and thermal energy balance in the RCCS. Starting with ANL’s water NSTF as baseline, effects of RCCS design parameters such as size of the plate between pipes, pipe diameter, source-to-sink distance, surface emissivity, and pitch from the core are examined in an integral effects framework which accounts for subsequent variation of the mass flow rate, number of pipes, convection coefficient, mean region and surface temperatures, radiative view factors, and water outlet temperature. The importance of including a prototypical reactor design in RCCS design calculations is emphasized as the calculations show that temperature drops from the core to the RCCS fluid to transfer the heat tend to be the limitation not the heat removal capacity of the fluid. A closed-loop design is obtained with capability to safely remove up to 0.72% of the nominal reactor power at maximum estimated peak conditions and 0.40% at shutdown. The design is based on physics calculations and does not account for economic optimization.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Experimental Aging and Lifetime Prediction in Grid Applications for Large-Format Commercial Li-Ion Batteries

Due to the growth of electric vehicle and stationary energy storage markets, the production and use of lithium-ion batteries has grown exponentially in recent years. For many of these applications, large-format lithium-ion batteries are being utilized, as large cells have less inactive material relative to their energy capacity and require fewer electrical connections to assemble into packs. And especially for stationary energy storage systems, where energy delivered is the only revenue source, the economics of these battery systems is highly dependent on cell lifetime. However, testing of large-format lithium-ion batteries is time consuming and requires high current channels and large testing chambers, making information on the performance of commercial, large-format lithium-ion batteries hard to come by. Here, accelerated aging test data from four commercial large-format lithium-ion batteries is reported. These batteries span both NMC-Gr and LFP-Gr cell chemistries, pouch and prismatic formats, and a range of cell designs with varying power capabilities. Accelerated aging test results are analyzed to examine both cell performance, in terms of efficiency and thermal response under load, as well as cell lifetime. Cell thermal response is characterized by measuring temperature during cycle aging, which is used to calculated a normalized thermal resistance value that may help estimate both cell cooling needs or to help extrapolate aging test results to different thermal environments. Cell lifetime is evaluated qualitatively, considering simply the average calendar and cycle life across a range of conditions, as well as quantitatively, using statistical modeling and machine-learning methods to identify predictive aging models from the accelerated aging data. These predictive aging models are then used to investigate cell sensitivities to stressors, such as cycling temperature, voltage window, and C-rate, as well as to predict cell lifetime in various stationary storage applications. Results from this work show that cell lifetime and sensitivity to aging conditions varies substantially across commercial cells, necessitating testing for specific cell formats to make quantitative lifetime predictions. That being said, all commercial cells tested here are predicted to reach at least 10-year lifetimes for stationary storage applications. Based on the aging test results and modeling, some cells are expected to be relatively insensitive to temperature and use-case, making them suited for simple use cases with little or no thermal management and simple controls, while the lifetime of other cells could be extended to 20+ years if operated with thermal management and degradation-aware controls.

battery↗

Cooling Egypt: Cost and benefits of room air conditioner efficiency improvement in Egypt

Egypt is one of the largest countries in the Middle East and North Africa region with a population of a total of 106 million (as of July 2022). Increasing urbanization, population growth, and increasing temperatures will likely continue to drive demand for electricity from air conditioning, with corresponding negative impacts on the peak load, air quality, and greenhouse gas emissions from refrigerant use and energy consumption. Since 2003, Egypt has adopted a standards and labeling program for various appliances, and has improved its room air conditioner (RAC) energy efficiency requirements in 2016 and 2017. However, its market is still dominated by inefficient fixed-speed drive (FSD) RACs due to a price-sensitive market. Seasonal metrics such as Cooling Season Performance Factor (CSPF) measure the energy efficiency of FSD and variable-speed drive (VSD) RACs on the same scale. Leading markets, most notably China, have already adopted a new MEPS in 2020 and 2022, which align largely with the United for Efficiency (U4E) Model Regulations Guidelines. India has also adopted a CSPF metric. Both India and China are now experiencing (1) increased demand and consumption of higher efficiency VSD RACs, as well as (2) a corresponding drop in prices from the economies of scale of production of these higher efficiency RACs. Because China is a leading manufacturer in the global air conditioner (AC) market, its adoption of the model U4E regulations have effectively raised the energy efficiency of the ACs in the global market. To achieve the benefits of taking a similar approach to Egypt’s market, we offer the following recommendations: 1. Adopt a common metric to measure the efficiency of both FSD and VSD RACs 2. Raise the stringency of MEPS to the level of the U4E Model Regulation Guidelines 3. Restructure the labeling program from the “A++” labeling scheme to a simpler A through E or a star-rating program 4. Strengthen the compliance regime governing the Egyptian AC MEPS 5. Assist small and medium AC manufacturers in Egypt to transition manufacturing lines to produce low-cost, high-efficiency VSD RACs. Adopting these recommendations would reduce Egypt’s electricity consumption to 11 TWh in 2030 and 89 TWh in 2050—with corresponding carbon dioxide (CO2) emissions reductions and avoided generation capacity requirements compared to the baseline.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Combustion Performance and Emissions Optimization through Integration of Miniaturized High Temperature Multi Process Monitoring System

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. The new sensor design, leveraging the existing electrochemical noise-based monitoring system, is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data can be transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, five mMPMS were installed at a full-scale pulverized coal-fired plant, Basin Electric Power Cooperative’s Leland Olds Unit 1. The systems were demonstrated over a 6-week period during typical operation. Sensor measurements of deposit thickness were validated during the demonstration and subsequently leveraged to determine sensor-based boiler cleaning strategies. These strategies have the benefit of reduced thermal stresses on boiler tubes from over-cleaning and improved boiler water management. At the end of the project, continued development of the sensor technology was carried out at PacifiCorp’s Hunter Station. REI leveraged the permanent installation of the mMPMS in Unit 3 made possible by DOE funding on a separate program. The work at Hunter Plant focused on application of machine learning and artificial intelligence-based models for integration of sensor signals into control and optimization of Hunter Unit 3 processes.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

Combustion Performance and Emissions Optimization Through Integration of a Miniaturized High-Temperature Multi Process Monitoring System

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. The new sensor design, leveraging the existing electrochemical noise-based monitoring system, is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data can be transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, five mMPMS were installed at a full-scale pulverized coal-fired plant, Basin Electric Power Cooperative’s Leland Olds Unit 1. The systems were demonstrated over a 6-week period during typical operation. Sensor measurements of deposit thickness were validated during the demonstration and subsequently leveraged to determine sensor-based boiler cleaning strategies. These strategies have the benefit of reduced thermal stresses on boiler tubes from over-cleaning and improved boiler water management. At the end of the project, continued development of the sensor technology was carried out at PacifiCorp’s Hunter Station. REI leveraged the permanent installation of the mMPMS in Unit 3 made possible by DOE funding on a separate program. The work at Hunter Plant focused on application of machine learning and artificial intelligence-based models for integration of sensor signals into control and optimization of Hunter Unit 3 processes.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

Combustion Performance and Emissions Optimization Through Integration of a Miniaturized High-Temperature Multi Process Monitoring System

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution of wall conditions in utility boilers. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of a coal-fired utility boiler in this project but can be applied to many other industries and applications as well. The new sensor design, leveraging the existing electrochemical noise-based monitoring system, is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data can be transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, five mMPMS were installed at a full-scale pulverized coal-fired plant, Basin Electric Power Cooperative’s Leland Olds Unit 1. The systems were demonstrated over a 6-week period during typical operation. Sensor measurements of deposit thickness were validated during the demonstration and subsequently leveraged to determine sensor-based boiler cleaning strategies. These strategies have the benefit of reduced thermal stresses on boiler tubes from over-cleaning and improved boiler water management. At the end of the project, continued development of the sensor technology was carried out at PacifiCorp’s Hunter Station. REI leveraged the permanent installation of the mMPMS in Unit 3 made possible by DOE funding on a separate program. The work at Hunter Plant focused on application of machine learning and artificial intelligence-based models for integration of sensor signals into control and optimization of Hunter Unit 3 processes.

42 ENGINEERING↗

High-Temperature Multi-Process Sensor Development and Demonstration at a Full-scale PC Combustion System

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution of wall conditions in utility boilers. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of a coal-fired utility boiler in this project but can be applied to many other industries and applications as well. The new sensor design, leveraging the existing electrochemical noise-based monitoring system, is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data can be transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, five mMPMS were installed at a full-scale pulverized coal-fired plant, Basin Electric Power Cooperative’s Leland Olds Unit 1. The systems were demonstrated over a 6-week period during typical operation. Sensor measurements of deposit thickness were validated during the demonstration and subsequently leveraged to determine sensor-based boiler cleaning strategies. These strategies have the benefit of reduced thermal stresses on boiler tubes from over-cleaning and improved boiler water management. At the end of the project, continued development of the sensor technology was carried out at PacifiCorp’s Hunter Station. REI leveraged the permanent installation of the mMPMS in Unit 3 made possible by DOE funding on a separate program. The work at Hunter Plant focused on application of machine learning and artificial intelligence-based models for integration of sensor signals into control and optimization of Hunter Unit 3 processes.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

Combustion Performance and Emissions Optimization Through Integration of a Miniaturized High-Temperature Multi Process Monitoring System

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. This project leveraged the existing electrochemical noise-based monitoring system and the new sensor design is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data is transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, five mMPMS were installed at a full-scale pulverized coal-fired plant, Basin Electric Power Cooperative’s Leland Olds Unit 1. The systems were demonstrated over a 6-week period during typical operation. Sensor measurements of deposit thickness were validated during the demonstration and subsequently leveraged to determine sensor-based boiler cleaning strategies. These strategies have the benefit of reduced thermal stresses on boiler tubes from over-cleaning and improved boiler water management. At the end of the project, continued development of the sensor technology was carried out at PacifiCorp’s Hunter Station. REI leveraged the permanent installation of the mMPMS in Unit 3 made possible by DOE funding on a separate program. The work at Hunter Plant focused on application of machine learning and artificial intelligence-based models for integration of sensor signals into control and optimization of Hunter Unit 3 processes.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗