At least 91 records · Page 5

Venting through multiple-layer insulation on Space Station Freedom. II - Ascent rate pressure chamber testing

A test was conducted to determine the venting characteristics of the multiple-layer insulation (MLI) to be installed on the Space Station Freedom (SSF). A full MLI blanket with inter-blanket joints was installed onto a model of a section of the SSF pressure wall, support structure, and debris shield. Data were taken from this test and were used to predict the venting of the actual Space Station pressure-wall/MLI/debris-shield assemply during launch and possible re-entry. It was found that the pressure differences across the debris shields and MLI blankets were well within the specified limits in all cases.

Sharp, Jeffrey B.↗

NASA Processes and Requirements for Conducting Human-in-the-Loop Closed Chamber Tests

NASA has specific processes and requirements that must be followed for tests involving human subjects to be conducted in a safe and effective manner. There are five distinct phases of test operations. Phase one, the test request phase, consists of those activities related to initiating, processing, reviewing, and evaluating the test request. Phase two, the test preparation phase consists of those activities related to planning, coordinating, documenting, and building up the test. Phase three, the test readiness phase consists of those activities related to verifying and reviewing the planned test operations. Phase four, the test activity phase, consists of all pretest operations, functional checkouts, emergency drills, and test operations. Phase five, the post test activity phase, consists of those activities performed once the test is completed, including briefings, documentation of anomalies, data reduction and archiving, and reporting. Project management processes must be followed for facility modifications and major test buildup, which include six phases: initiation and assessment, requirements evaluation, preliminary design, detailed design, use readiness review (URR) and acceptance. Compliance with requirements for safety and quality assurance are documented throughout the test buildup and test operation processes. Tests involving human subjects must be reviewed by the applicable Institutional Review Board (IRB).

Barta, Daniel J.↗

Investigation of a Prototype Iroquois Turbojet Engine in an Altitude Test Chamber. COORD. NO. AF-P-6

Operation of the original engine configuration disclosed a severe compressor stall problem at high altitude, which was largely attributed to a radial flow distortion entering the high-pressure compressor. Engine modifications for eliminating or alleviating the stall problem were investigated. These included use of variable high-pressure compressor inlet guide vanes, increased turbine-stator areas, and minor alterations in both the low- and high-pressure compressor rotors.

McAuay, John E.↗

Specialized Environmental Chamber Test Complex: User Test Planning Guide

Test process, milestones and inputs are unknowns to first-time users of the Specialized Environmental Test Complex. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.

Montz, Michael E.↗

Cryogenic Vacuum Chamber Testing of A Conductively-Cooled, High Temperature Superconducting Rotor for a 1.4 MW Electric Machine for Aeronautics Applications

This paper presents the second ever demonstration of a superconducting rotor cooled only via conductive connection to a cryocooler, i.e., without pumped or solid cryogens. The fullscale rotor was operated statically in its intended environment – about 1e-3 torr vacuum with only conductive cooling through mechanical connections to a cryocooler contained on the rotor. Stable operation of the rotor in a representative magnetic environment was demonstrated up to its rated direct current (57.2 A) and the designed temperature limit for the superconductor (62 K). Additional electrical measurements increased confidence that the superconducting coils functioned as intended. A collection of steady state temperature distributions was measured at operating and non-operating conditions. In all but one case, the observed temperature gradient between the cold tip and superconducting coils satisfies the design but with little margin. Opportunities to reduce the gradient are identified.

Electrified aircraft propulsion↗

Cryogenic Vacuum Chamber Testing of A Conductively-Cooled, High Temperature Superconducting Rotor for a 1.4 MW Electric Machine for Aeronautics Applications

This paper presents the first ever demonstration of a superconducting rotor cooled conductively without a cryogenic fluid or solid. The full-scale rotor was operated statically in its intended environment – about 1e-3 torr vacuum with only conductive cooling through mechanical connections to a cryocooler contained on the rotor. Stable operation of the rotor in a representative magnetic environment was demonstrated up to its rated direct current (57.2 A) and the designed temperature limit for the superconductor (62 K). Additional electrical measurements increased confidence that the superconducting coils functioned as intended. A collection of steady state temperature distributions was measured at operating and non-operating conditions. In all but one case, the observed temperature gradient between the cold tip and superconducting coils satisfies the design but with little margin. Opportunities to reduce the gradient are identified.

Electrified aircraft propulsion↗

Materials screening chamber for testing materials resistance to atomic oxygen

A unique test chamber for exposing material to a known flux of oxygen atoms is described. The capabilities and operating parameters of the apparatus include production of an oxygen atom flux in excess of 5 x 10 to the 16th atoms/sq cm-sec, controlled heating of the sample specimen, RF circuitry to contain the plasma within a small volume, and long exposure times. Flux measurement capabilities include a calorimetric probe and a light titration system. Accuracy and limitations of these techniques are discussed. An extension to the main chamber to allow simultaneous ultraviolet and atomic oxygen exposure is discussed. The oxygen atoms produced are at thermal energies. Sample specimens are maintained at any selected temperature between ambient and 200 C, to within + or - 2 C. A representative example of measurements made using the chamber is presented.

Pippin, H. G.↗

Photoconductivity of high-voltage space insulating materials

The dark and photoconductivities of four high voltage spacecraft insulators, Kapton-H, FEP Teflon, Parylene, and fused quartz, were studied under a variety of conditions intended to simulate a space environment. All measurements were made in a vacuum of less than .00001 torr while the temperature was varied from 22 C to 100 C. Some of the samples used employed conventional deposited metal electrodes--others employed electrodes composed either of an electron beam or a plasma formed by ionization of the residual gas in the test chamber. Test results show: (1) Kapton had unusual conduction properties; it conductivity decreased by more than an order of magnitude when heated at 100 C in a vacuum, but ultimately attained a stable and reproducible value. (2) Both Teflon and fused quartz had high dark resistivities but low photoresistivities when exposed to UV. Optical-density measurements revealed that both materials transmitted UV with little attenuation. (3) Parylene was found to have a low but relatively stable resistivity--comparatively minor changes occurred upon heating or illuminating the sample. Optical-density measurements showed that Parylene was absorbent in the UV and would prevent photoemission from the metal electrode on the back surface.

Coffey, H. T.↗

An Evaluation of the Additional Acoustic Power Needed to Overcome the Effects of a Test-Article's Absorption during Reverberant Chamber Acoustic Testing of Spaceflight Hardware

The exposure of a customers aerospace test-article to a simulated acoustic launch environment is typically performed in a reverberant acoustic test chamber. The acoustic pre-test runs that will ensure that the sound pressure levels of this environment can indeed be met by a test facility are normally performed without a test-article dynamic simulator of representative acoustic absorption and size. If an acoustic test facilitys available acoustic power capability becomes maximized with the test-article installed during the actual test then the customers environment requirement may become compromised. In order to understand the risk of not achieving the customers in-tolerance spectrum requirement with the test-article installed, an acoustic power margin evaluation as a function of frequency may be performed by the test facility. The method for this evaluation of acoustic power will be discussed in this paper. This method was recently applied at the NASA Glenn Research Center Plum Brook Stations Reverberant Acoustic Test Facility for the SpaceX Falcon 9 Payload Fairing acoustic test program.

acoustic↗

An Evaluation of the Additional Acoustic Power Needed to Overcome the Effects of a Test-Article's Absorption During Reverberant Chamber Acoustic Testing of Spaceflight Hardware

The exposure of a customer's aerospace test-article to a simulated acoustic launch environment is typically performed in a reverberant acoustic test chamber. The acoustic pre-test runs that will ensure that the sound pressure levels of this environment can indeed be met by a test facility are normally performed without a test-article dynamic simulator of representative acoustic absorption and size. If an acoustic test facility's available acoustic power capability becomes maximized with the test-article installed during the actual test then the customer's environment requirement may become compromised. In order to understand the risk of not achieving the customer's in-tolerance spectrum requirement with the test-article installed, an acoustic power margin evaluation as a function of frequency may be performed by the test facility. The method for this evaluation of acoustic power will be discussed in this paper. This method was recently applied at the NASA Glenn Research Center Plum Brook Station's Reverberant Acoustic Test Facility for the SpaceX Falcon 9 Payload Fairing acoustic test program.

absorption↗

The Certification of Environmental Chambers for Testing Flight Hardware

The JPL chamber certification process for ensuring that test chambers used to test flight hardware meet a minimum standard is critical to the safety of the hardware and personnel. Past history has demonstrated that this process is important due to the catastrophic incidents that could occur if the chamber is not set up correctly. Environmental testing is one of the last phases in the development of a subsystem, and it typically occurs just before integration of flight hardware into the fully assembled flight system. A seemingly insignificant -miscalculation or missed step can necessitate rebuilding or replacing a subsystem due to over-testing or damage from the test chamber. Conversely, under-testing might fail to detect weaknesses that might cause failure when the hardware is in service. This paper describes the process that identifies the many variables that comprise the testing scenario and screening of as built chambers, the training of qualified operators, and a general "what-to-look-for" in minimum standards.

Vacuum Chamber↗