Search NASA⌕ Search

SEARCH · Search NASA

Results for “electrical infrastructure”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

DOE OE 2021 Strategy White Papers on Microgrids: Program Vision, Objectives, and R&D Targets in 5 and 10 years–Topic Area #1

This white paper describes the program vision, objectives, and R&D targets in 5 to 10 years for the Department of Energy (DOE) Office of Electricity (OE) Microgrid R&D Program. The vision is to facilitate the nation’s transitions to (1) a more resilient and reliable, (2) more decarbonized electricity infrastructure, in which (3) microgrids have a reduced cost to implement. This strategy is developed in the context that the United States’ electricity delivery system is becoming more distributed in nature. The electricity generation capacity in 10 years may be 30-50% distributed energy assets.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Supply Chain Management in Cyber Grid Guard Framework

Grid modernization has impeded innovative power grid applications and energy resources that are increasingly distributed. Blockchain/distributed ledger technology (DLT) has the potential to enhance the resilience of the electric infrastructure, particularly in a decentralized and distributed environment. The benefits of blockchain are to ensure asset information and lifecycle events are secure and traceable and identify potential malicious modification of data. Oak Ridge National Laboratory (ORNL) has developed a framework, Cyber Grid Guard (CGG), incorporating blockchain. The system implements a low-energy, fast, and robust enhancement to system trustworthiness within and across electric grid systems, including substations, control centers, and metering infrastructures. Currently, one of the major concerns is supply chain attacks. There have been several recent attacks that have significantly impacted critical infrastructures and organizations around the world. This document focuses on how CGG can be used to address the supply chain issue.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Electric Vehicle Charging Infrastructure Trends from the Alternative Fueling Station Locator: Third Quarter 2022

Electric vehicle (EV) charging infrastructure continues to rapidly change and grow. Using data from the U.S. Department of Energy's (DOE) Alternative Fueling Station Locator, this report provides a snapshot of the state of EV charging infrastructure in the United States in the third calendar quarter of 2022 (Q3 2022) by charging level, network, and location. Additionally, this report measures the current state of charging infrastructure compared with two different 2030 infrastructure requirement scenarios. This information is intended to help transportation planners, policymakers, researchers, infrastructure developers, and others understand the rapidly changing landscape of EV charging infrastructure. This is the eleventh report in a series. Reports from previous quarters can be found in the Alternative Fuels Data Center (AFDC) and National Renewable Energy Laboratory (NREL) publication databases, as well as the AFDC Charging Infrastructure Trends page (https://afdc.energy.gov/fuels/electricity_infrastructure_trends.html).

33 ADVANCED PROPULSION SYSTEMS↗

Electric Vehicle Charging Infrastructure Trends from the Alternative Fueling Station Locator (Fourth Quarter 2022)

Electric vehicle (EV) charging infrastructure continues to rapidly change and grow. Using data from the U.S. Department of Energy's (DOE) Alternative Fueling Station Locator, this report provides a snapshot of the state of EV charging infrastructure in the United States in the fourth calendar quarter of 2022 (Q4 2022) by charging level, network, and location. Additionally, this report measures the current state of charging infrastructure compared with two different 2030 infrastructure requirement scenarios. This information is intended to help transportation planners, policymakers, researchers, infrastructure developers, and others understand the rapidly changing landscape of EV charging infrastructure. This is the twelfth report in a series. Reports from previous quarters can be found in the Alternative Fuels Data Center (AFDC) and National Renewable Energy Laboratory (NREL) publication databases, as well as the AFDC Charging Infrastructure Trends page (https://afdc.energy.gov/fuels/electricity_infrastructure_trends.html).

33 ADVANCED PROPULSION SYSTEMS↗

Electric Vehicle Charging Infrastructure Trends from the Alternative Fueling Station Locator: Second Quarter 2023

Electric vehicle (EV) charging infrastructure continues to rapidly change and grow. Using data from the U.S. Department of Energy's Alternative Fueling Station Locator, this report provides a snapshot of the state of EV charging infrastructure in the United States in the second calendar quarter of 2023 by charging level, network, and location. Additionally, this report measures the current state of charging infrastructure compared with a 2030 infrastructure requirement scenario. This information is intended to help transportation planners, policymakers, researchers, infrastructure developers, and others understand the rapidly changing landscape of EV charging infrastructure. This is the fourteenth report in a series. Reports from previous quarters can be found in the Alternative Fuels Data Center (AFDC) and National Renewable Energy Laboratory publication databases, as well as the AFDC Charging Infrastructure Trends page (https://afdc.energy.gov/fuels/electricity_infrastructure_trends.html).

33 ADVANCED PROPULSION SYSTEMS↗

Electric Vehicle Charging Infrastructure Trends from the Alternative Fueling Station Locator (First Quarter 2023)

Electric vehicle (EV) charging infrastructure continues to rapidly change and grow. Using data from the U.S. Department of Energy's Alternative Fueling Station Locator, this report provides a snapshot of the state of EV charging infrastructure in the United States in the first calendar quarter of 2023 by charging level, network, and location. Additionally, this report measures the current state of charging infrastructure compared with a 2030 infrastructure requirement scenario. This information is intended to help transportation planners, policymakers, researchers, infrastructure developers, and others understand the rapidly changing landscape of EV charging infrastructure. This is the thirteenth report in a series. Reports from previous quarters can be found in the Alternative Fuels Data Center (AFDC) and National Renewable Energy Laboratory publication databases, as well as the AFDC Charging Infrastructure Trends page (https://afdc.energy.gov/fuels/electricity_infrastructure_trends.html).

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Valuing Resilience Benefits of Microgrids for an Interconnected Island Distribution System

Extreme climate-driven events such as hurricanes, floods, and wildfires are becoming more intense in areas exposed to these threats, requiring approaches to improve the resilience of the electrical infrastructure serving these communities. Long-duration outages caused by such high impact events propagate to economic, health, and social consequences for communities. As essential service providers, electric utilities are mandated to provide safe, economical and reliable electricity to their customers. The public is becoming less tolerant to these more frequent disruptions, especially in view of technological advances that are intended to improve power quality, reliability and resilience. One promising solution is state-of-the-art microgrids and the advanced controls employed therein. This paper presents and demonstrates an approach to technoeconomic analysis that can be used to value the avoided economic consequences of grid resilience investments, as applied to the islands of Vieques and Culebra in Puerto Rico. This valuation methodology can support policies to incorporate resilience value into any investment decision-making process, especially those which serve the public interest.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Floating Solar at Lima's Twin Lakes Reservoir

The City of Lima, Ohio is developing a floating photovoltaic (FPV) facility on the surface of Twin Lake Reservoir, adjacent to the City’s water treatment plant. The FPV array is designed with a capacity of 2 megawatts (MW) and will consist of approximately 3,500 solar panels spanning more than four acres of water surface. Based on regional solar conditions, the system will generate 2,000 megawatt-hours (MWh) of electricity annually. While the FPV system will interconnect to the electrical infrastructure serving the water treatment plant, power produced by the system will be net-metered through the utility grid, with energy credits applied to offset the plant’s overall electrical demand rather than directly supplying all plant loads in real time.

14 SOLAR ENERGY↗

Overview of Potential Hazards in Electric Aircraft Charging Infrastructure

With increasing efforts in electrification of Advanced Air Mobility and electric aircraft, there is a growing need to install new infrastructure to support them. This report highlights potential hazards (non exhaustive) that the installation must be aware of and be prepared to mitigate with increased electrical equipment on site. The hazards can be due to natural causes as well as non natural causes. The report aims to provide starting guidelines for awareness of these hazards and to help plan for mitigation of the same.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Time Matters: A Survival Analysis of Public Electric Vehicle Charging Infrastructure Utilization

The rapid adoption of plug-in electric vehicles (PEVs) places significant demands on public charging infrastructure, making it critical to understand and optimize charger utilization. This study provides one of the most comprehensive analyses of charging behavior to date by applying a survival analysis to a dataset of nearly 16 million level 2 (L2) and direct current (DC) fast charger sessions across the United States from 2017 to 2022. Using Kaplan-Meier curves and log rank tests, our analysis reveals statistically significant and distinct duration patterns influenced by charger type, time of day, and day of the week. We find that L2 charging sessions exhibit high variability tied to venue type, whereas DC sessions are more uniform, typically lasting 30-45 min. This study introduces the operational efficiency score (OES), a metric for standardizing the performance evaluation of charging stations. Our findings offer actionable insights for optimizing charger deployment, developing dynamic pricing strategies to reduce vehicle dwell time, and improving load management for grid operators, ultimately enhancing the efficiency and availability of public charging infrastructure.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Characterizing electrical demand and load diversity of low-power water and space heating appliances in US homes

Home renovation and remodeling projects can involve costly and time consuming electrical infrastructure upgrades at the household level. From the grid perspective they also lead to costly replacement of local infrastructure, such as transformers, and can add stress to the grid at peak times. The emergence of innovative, power-efficient household appliances offers a way to minimize these problems. These appliances are designed for lower power consumption, simplifying installation through standard plug-in connections, reducing the need for new electric circuits/panels/service, and minimizing the peak power demand for the home. Key examples include low-power heat pump water heaters (HPWHs) and cold climate window heat pumps that operate on standard 120V outlets. To assess the real-world impact of these solutions, we compiled and analyzed power metering data from several US field studies. This data provides insights into the effects on peak power demand of selecting lower-power appliances. Our analysis focuses on several key metrics, including the maximum power demand of individual appliances, their operational runtime, continuous operation and load diversity. While individual low-power 120V space and water heating appliances offer significant peak demand reductions compared to 240V heat pump or resistance alternatives, their longer runtimes might increase the likelihood of operation during whole-dwelling peak events, albeit at lower power levels.

Less, Brennan↗

Microgrid Tiered Circuits Effects for a Planned Housing Community in Puerto Rico

Puerto Rico faced a double strike from hurricanes Irma and Maria in 2017. The resulting damage required a comprehensive rebuild of electric infrastructure. There are plans and pilot projects to rebuild with microgrids to increase resilience. This paper provides a techno-economic analysis technique and case study of a potential future community in Puerto Rico that combines probabilistic microgrid design analysis with tiered circuits in building energy modeling. Tiered circuits in buildings allow electric load reduction via remote disconnection of non-critical circuits during an emergency. When coupled to a microgrid, tiered circuitry can reduce the chances of a microgrid's storage and generation resources being depleted. The analysis technique is applied to show 1) Approximate cost savings due to a tiered circuit structure and 2) Approximate cost savings gained by simultaneously considering resilience and sustainability constraints in the microgrid optimization. The analysis technique uses a resistive capacitive thermal model with load profiles for four tiers (tier 1-3 and non-critical loads). Three analyses were conducted using: 1) open-source software called Tiered Energy in Buildings and 2) the Microgrid Design Toolkit. For a fossil fuel based microgrid 30% of the total microgrid costs of 1.18 million USD were calculated where the non-tiered case keeps all loads 99.9% available and the tiered case keeps tier 1 at 99.9%, tier 2 at 95%, tier 3 at 80% availability, with no requirement on non-critical loads. The same comparison for a sustainable microgrid showed 8% cost savings on a 5.10 million USD microgrid due to tiered circuits. The results also showed 6-7% cost savings when our analysis technique optimizes sustainability and resilience simultaneously in comparison to doing microgrid resilience analysis and renewables net present value analysis independently. Though highly specific to our case study, similar assessments using our analysis technique can elucidate value of tiered circuits and simultaneous consideration of sustainability and resilience in other locations.

building energy modeling↗

Hybrid geothermal-wind integration in the US energy grid

Here, we combine US wind generation—a cheap yet intermittent source of electricity—with the latest geothermal resource estimates to understand the technoeconomic possibilities of pairing enhanced geothermal systems (EGSs) with existing wind farms to develop a hybrid energy system. Using observed generation data from 583 wind farms, generation gaps are quantified and geographically paired with the latest EGS estimates. Results demonstrate that EGS potential within a 1 km 2 footprint can supplement wind generation at 56% of onshore wind farms. Each wind farm can be supplemented by EGSs when 10% of its surface-occupying footprint is available. The cost of EGSs at wind farms is lowest in the western US and southern Texas border and highest in the central US. While further experiments are warranted, a wind + EGS hybrid system offers an opportunity to increase power output from the same land footprint while maximizing the use of existing electrical infrastructure.

EGS↗

Evolution of Plug-In Electric Vehicle Charging Infrastructure in the United States: Preprint

The U.S. Department of Energy’s Alternative Fuels Data Center (AFDC) has tracked alternative fueling and electric vehicle charging infrastructure in the United States since 1991. This paper explores the history of the AFDC Station Locator, which was launched in 1999, and discusses the growth of electric vehicle supply equipment. It also looks at how electric vehicle drivers access public charging, and evaluates challenges, gaps, and opportunities facing both electric vehicle drivers and the industry as a whole.

ADVANCED PROPULSION SYSTEMS↗

Evaluating system responses to electric vehicle charging infrastructure expansion through data-driven simulation

Understanding the system responses to electric vehicle (EV) charging infrastructure expansion, including vehicle charging needs, station utilization, and energy consumption, is critical for effective planning to meet growing charging demand without unnecessary resource investment. This study evaluates the system responses to EV charging infrastructure expansion, focusing on charging needs, station utilization, and energy consumption. Using trip data from the National Household Travel Survey and origin–destination patterns, we simulated trip chains in downtown Atlanta with 10 % EV penetration. We assessed 32 scenarios involving different charging port power levels and siting strategies. Furthermore, we found that higher-power ports were more sensitive to placement, with concentrated expansion boosting station utilization more than uniform expansion. Adding high-power ports did not always increase peak energy consumption; in some cases, a few 400 kW ports reduced overall consumption compared to 150 kW ports by enabling faster charging and higher vehicle turnover.

Electric vehicle↗

Characterizing peak electricity demand for U.S. households: an assessment of end-use loads and demand factors

Understanding household peak electricity demand is critical to evaluate the technical need for electrical infrastructure upgrades. This study characterizes peak loads for existing and new equipment using metered data from a convenience sample of 11,940 U.S. dwellings from four sources, including 911 from two sources with end-use metering. After standardized data cleaning and labeling, we derived descriptive statistics for key metrics, such as maximum demand and demand factors, and developed predictive models relating 60- to 15-min demand for the National Electrical Code (NEC). Mean 15-min maximum demand was 9.7 kW (median 9.0 kW; IQR 7.0–11.5 kW, 95% CI 9.6–9.8 kW), indicating spare capacity in 98% of homes with hypothetical 100 A panels. Maximum demand increased with floor area and number of high-demand loads. Dwelling maximum demand was driven by higher-power, longer-duration heating appliances and vehicle charging, while most user-operated appliances contributed little. Demand factors are used to account for how most devices contribute less than their rated power to maximum demand. Existing load mean demand factors (28%; median 10%; IQR 0–58%; CI 28–29%) were higher than those for new loads (21%; median 7%; IQR 0–35%; CI 20–21%), because new loads changed the timing and magnitude of maximum demand. New high-demand loads had higher than average demand factors (40–60%). Whole dwelling demand factors support the NEC's 40% assumption, but they challenge its conservative 100% treatment of new HVAC. We propose a data-driven 50% demand factor for new equipment, which would align with metered data, improve affordability, and modernize electrical codes.

Appliances↗

Energy Resilience for Mission Assurance: Agile Co-simulation for Cyber Energy System Security (ACCESS), Model Advancements for Resilience Analysis

Agile Co-simulation for Cyber Energy System Security (ACCESS) is a co-simulation platform developed by Lawrence Livermore National Laboratory (LLNL). The primary high-level use-case for ACCESS is to study existing or new cyber-physical critical infrastructure systems, with a heavy emphasis on 1) systems that utilize communication networks, and 2) studies that seek to understand cyber-related system impacts. ACCESS is currently used for several energy system resilience projects at LLNL. In the Energy Resilience for Mission Assurance (ERMA) project, ACCESS is used in the Modeling for Metric Calculation task (specifically, subtask 4.3, Communications and Cyber Modeling) to model and simulate the cyber and communication system aspects of Defense Critical Electric Infrastructure (DCEI) systems, with a focus on computing specific communication system metrics that can impact system resilience and mission performance. Simulated communication system performance will be fed back to other ERMA system components so that mission performance can be evaluated holistically. This report describes several enhancements to the ACCESS platform that were implemented during the execution of the ERMA project in support of reslience analysis. This includes the addition of new models and subsystems, enhancements to existing models, and integration with external systems. The remainder of this report is structured as follows. In Section 2, a brief background description of the ACCESS platform is provided, including an outline of ACCESS components, example usecases, and a set of communication network resilience metrics that can be computed with ACCESS. Section 3 describes the ACCESS model enhancements for ERMA in detail. Finally, Section 4 briefly outlines future integration opportunities between ACCESS and project participant capabilities identified during the progression of the project.

97 MATHEMATICS AND COMPUTING↗

Energy Resilience for Mission Assurance, Agile Co-simulation for Cyber Energy System Security (ACCESS) Model Advancements for Resilience Analysis (Version 3, July 2023)

Agile Co-simulation for Cyber Energy System Security (ACCESS) is a co-simulation platform developed by Lawrence Livermore National Laboratory (LLNL). The primary high-level use-case for ACCESS is to study existing or new cyber-physical critical infrastructure systems, with a heavy emphasis on 1) systems that utilize communication networks, and 2) studies that seek to understand cyber-related system impacts. ACCESS is currently used for several energy system resilience projects at LLNL. In the Energy Resilience for Mission Assurance (ERMA) project, ACCESS is used in the Mod eling for Metric Calculation task (specifically, subtask 4.3, Communications and Cyber Modeling) to model and simulate the cyber and communication system aspects of Defense Critical Electric Infrastructure (DCEI) systems, with a focus on computing specific communication system metrics that can impact system resilience and mission performance. Simulated communication system per formance will be fed back to other ERMA system components so that mission performance can be evaluated holistically. This report describes several enhancements to the ACCESS platform that were implemented during the execution of the ERMA project in support of reslience analysis. This includes the addition of new models and subsystems, enhancements to existing models, and integration with external systems. The remainder of this report is structured as follows. In Section 2, a brief background description of the ACCESS platform is provided, including an outline of ACCESS components, example use cases, and a set of communication network resilience metrics that can be computed with ACCESS. Section 3 describes the ACCESS model enhancements for ERMA in detail. Finally, Section 4 briefly outlines future integration opportunities between ACCESS and project participant capabilities identified during the progression of the project.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗