Search NASA⌕ Search

SEARCH · Search NASA

Results for “firm power”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Computational exploration of DIII-D QH-mode with extended MHD

This work will enable improved understanding of the scientific basis for DIII-D Quiescent H-mode (QH-mode) by leveraging recent computational developments of the NIMROD code. Experimentally, it is established that the QH-mode tokamak operation regime is free of edge-localized modes (ELMs) with good energy confinement. ELMs produce an impulsive heat-flux on the divertor that is unacceptable under burning-plasma conditions. Beyond DIII-D in future high-power-density tokamaks, accommodation of a high heat flux at the divertor represents a key challenge to overcome. Proposed solutions involve operation at high divertor density to achieve divertor detachment, operation with a liquid lithium wall and/or introduction of impurities to enhance radiative losses. Additionally, the first wall material is likely to be a high-Z material such as Tungsten in future devices as materials such as graphite tiles restrict the lifetime of the first wall due to a high erosion rate. While the atomic species composition of the plasma is known to impact the edge-pedestal structure and stability, the specifics of the underlying physics basis for this interaction is not firm. Studying this interaction is the goal of this proposal without focusing specifically on the fine details of the first wall and divertor solution. It is the goal is to lay the ground work to establish the compatibility of the divertor solutions and wall material with pedestal solutions that eliminate ELMs by leveraging present DIII-D experiments.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Beyond ethics: The transformational power of overlapping motivations in implementing strategic sustainability actions

Abstract We develop a methodology to identify patterns between sustainability motivations, actions and engagement. We apply this methodology to analyse a 3 1/2‐year intervention that yielded 151 sustainability actions undertaken by 46 outbound tour operators. We find three aspects that can be explained by the tour operators' motivations to act sustainably, namely, a connection between: (i) the actions taken in the context of the organisation's business model, (ii) the intensity of the approach, measured by the resources invested in it and the operator's commitment level and (iii) the evolution of the response. These patterns demonstrate how ethical motivations are common and a precondition to acting sustainably, but, in themselves, these motivations are not sufficient to integrate sustainability practices into the core business or to maintain commitment over time. It is the combination of a high ethical commitment with clear strategic intent, materialised in commercial and operational motivations, that increases the connectedness, and intensity, of sustainability actions amongst ethically committed firms.

Bonilla‐Priego, Maria Jesus↗

Establishing a Technical Assistance Network to Build Capacity in Southwest Alaska (Southwest Alaska Energy Network - Final Report)

The Southwest Alaska Municipal Conference (SWAMC) is a non-profit regional membership economic development organization that represents the Aleutian/Pribilof Islands, Bristol Bay, and Kodiak regions of southwest Alaska. SWAMC applied for the DOE-OIE Establishment of an Inter-Tribal Technical Assistance Energy Providers Network grant FOA to work with our partners to provide energy planning and project development technical assistance. The project team was made up of SWAMC, three regional organizations, a management consulting firm, and a panel of technical consultants. SWAMC sub-contracted with the three Alaska Native regional non-profit organizations – Aleutian Pribilof Islands Association (APIA), Bristol Bay Native Association (BBNA), and Kodiak Area Native Association (KANA) – to fund full or partial Regional Energy Coordinator (REC) positions. The project period ran from September 2016 to March 2020. The project goal was to help southwest Alaska regional tribal partners and communities to develop efficient and financially sustainable structures for identifying and developing energy projects that enhance community resiliency and energy sustainability. This project established energy coordinators and management structures in the Aleutian, Bristol Bay, and Kodiak regions to expand technical assistance capacity of regional residents; demonstrate this capacity by advancing energy efficiency, heat, and power supply projects; and secure long-term funding commitments to establish a sustained technical assistance structure. The project team expanded technical assistance capacity of energy coordinators and regional stakeholders in several ways: by providing funding for the SWAMC project manager to attend three Office of Indian Energy trainings; for energy coordinators to attend numerous energy conferences; for utility clerks from several villages to receive one-on-one reporting training on Alaska’s Power Cost Equalization electric subsidy program; and for the Kodiak REC to complete the Arctic Remote Energy Networks Academy and NREL’s Executive Energy Leadership Academy. The energy coordinators demonstrated and shared their increased capacity by hosting several public events: SWAMC hosted two full-day energy workshops in February 2017 and 2018; the Kodiak REC hosted seven Energy Committee meetings for Kodiak stakeholders and gave several presentations at other events; and SWAMC and BBNA organized a Bristol Bay Regional Energy Visioning Session in May 2019. The project team created platforms to both share and request information to involve energy stakeholders in this project, including an energy website, a Facebook group, a periodic newsletter, surveys, mass emails, and paper mailers. An increase in regional capacity was demonstrated through several grant awards, including a $1.2 million USDA grant for Akhiok for an electric distribution infrastructure replacement; an AHFC Kickstarter grant for Aleknagik to audit 2 Tribal and 3 City buildings; and installation of an Air Source Heat Pump demonstration project in Atka. Two communities and one region – Ouzinkie (May 2017), Ugashik (July 2017), and the Bristol Bay region (May 2019) – utilized DOE’s technical assistance services to hold Strategic Energy Planning sessions with NREL and DOE facilitation assistance. And in early 2018, SWAMC established a parallel program, funded through a USDA Energy Audit and Renewable Energy Development grant to provide subsidized energy audits for small businesses in the region. SWAMC and partners have now completed energy audits of over 60 businesses (buildings and fishing vessels) and are currently operating a third round of the USDA program. Fifteen of those business owners have now received additional grant funding to cover 25% of the cost of the energy efficiency upgrades identified in the audit. This technical assistance structure will be sustained beyond DOE grant funding in several forms. As a sign of increased grant writing and project management capacity, the Kodiak Regional Energy Coordinator applied for and received a USDA Community Facilities Technical Assistance and Training grant to continue work begun under this program. Energy coordination tasks have been folded into existing economic development positions at SWAMC and at BBNA, ensuring long-term outreach and support in the region.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Storage Futures Study: Key Learnings for the Coming Decades

The Storage Futures Study (SFS) is a multiyear research project that explored the role and impact of energy storage in the evolution and operation of the U.S. power sector. The SFS examined the potential impact of energy storage technology advancement on the deployment of utility-scale storage and the adoption of distributed storage, and the implications for future power system infrastructure investment and operations. The research findings and supporting data were published across a series of six reports, culminating in the final, seventh publication that draws upon findings from across the study, previous work, and additional analysis to identify eight key learnings about the coming decades. This presentation is from an NREL webinar to discuss the eight key learnings.

decarbonization↗

Recognizing Institutions that Prepare Students for 21st Century Building Careers

Buildings play a significant role in reaching the White House's goal of a net-zero emissions economy by 2050, so it is critical that building professionals are prepared to design and construct high-efficiency, low-carbon buildings powered by renewables. The U.S. Department of Energy's Zero Energy Design Designation recognizes post-secondary academic programs that prepare students for 21st century building careers. ZEDD is a three-year designation, and as of 2023 almost 40 programs of study from more than 25 institutions have been recognized and supported by DOE for their great work. The University of Cincinnati received the ZEDD designation for the Net Zero Energy Design Track in Architectural Engineering Program. Tracks, majors, minors, and certificates are all eligible for ZEDD. In recent interviews with faculty from the University of Cincinnati and Appalachian State University about their experiences with ZEDD, many common topics came up. Both faculty members mentioned their students who graduate with ZEDD on their resume are often the only people in their future design firms who understand and can create net zero energy designs.

buildings↗

Cybersecurity Value-at-Risk Framework: Preprint

As more variable renewable energy sources are added to the grid, the critical role of hydropower as a reliable baseline and firming resource is rapidly growing. However, the U.S hydropower fleet is not fully prepared to face modern issues such as cybersecurity threats. Hydropower accounts for 37% of U.S. utility-scale renewable electricity but is challenged by diverse infrastructure and legacy devices that predate modern security practices. While new cybersecurity solutions cannot simply be added to current hydropower generation and operation technologies, custom cybersecurity assessments can reveal system-specific threats and risk probabilities and identify mitigating enhancements.

cybersecurity valuation↗

Cybersecurity Value-at-Risk Framework

As more variable renewable energy sources are added to the grid, the role of hydropower as a reliable baseline and firming resource is growing more critical. However, the U.S hydropower fleet is not fully prepared to face modern issues such as cybersecurity threats. Hydropower accounts for 37% of U.S. utility-scale renewable electricity but is challenged by diverse infrastructure and legacy devices that predate modern security practices. While new cybersecurity solutions cannot simply be added to current hydropower generation and operation technologies, custom cybersecurity assessments can reveal system-specific threats and risk probabilities and identify mitigating enhancements.

cybersecurity valuation methodology↗

Opportunities for Hybrid Wind and Solar PV Plants in India

The share of variable renewable energy (VRE) on India's grid has surpassed 100 GW, and the government has ambitious plans reach 450 GW by 2030. One strategy to increase wind and solar PV deployment is through the co-location of wind and solar PV plants to form a single hybrid power plant. Hybrid plants have the potential to reduce transmission infrastructure costs and variability in the output power profile compared to a standalone plant with a single technology, and this resource analysis aims to take a first step towards quantifying the potential savings from hybridizing wind and solar PV plants in India and the size of this opportunity. We utilize a brute-force optimization to minimize the levelized cost of energy (LCOE) for standalone wind, standalone solar PV, and hybrid wind/solar PV plants across all of India. By comparing these LCOEs, we determine that locations where hybrid plants exhibit potential cost savings and grid benefits exhibit both; a high interconnection cost and; a wind capacity factor between roughly 34% and 38%. However, because our work does not capture the value of the electricity generated by looking at energy prices, nor does it quantify the potential of hybrids to provide other value streams such as firm capacity and reserves. Further, because the work does not compare solar PV and wind hybrids to alternative generation technologies or storage systems, it cannot be considered a holistic cost-benefit analysis.

14 SOLAR ENERGY↗

Electricity Markets and Long-Duration Energy Storage: A Survey of Grid Services and Revenue Streams

Purpose of Review Long Duration Energy Storage (LDES) is increasingly viewed as a potential resource for providing grid services that enhance the stability and flexibility of electricity systems. While some LDES services are integrated into existing market frameworks, traditional mechanisms may not fully account for their operational characteristics, potentially leading to undervaluation. Within this context, this paper reviews the literature and industry practices to assess potential grid services for LDES, evaluates existing compensation mechanisms, and identifies challenges to full market integration. Recent Findings We first review existing literature and identify key grid services unique to LDES, including enhancing grid resilience during extreme weather events, enabling long-term energy shifting, and providing flexible and firm energy in systems with limited dispatchable resources. Here, we also review how LDES services are compensated in current market frameworks and the challenges associated with the full realization of LDES values. Additionally, we summarize market mechanisms for storage technologies across U.S. wholesale markets. We find that some markets are adjusting incentive structures, such as incorporating storage duration in capacity accreditation, to better align with system needs and LDES contributions to the grid. However, further refinements in capacity remuneration and dispatch timeframes may be needed for more effective realization of LDES value. Summary This review evaluates potential grid services for LDES, examines existing compensation mechanisms for LDES technologies, and identifies gaps between these mechanisms and LDES operational characteristics. The review concludes by outlining potential market enhancements for more effective LDES integration and articulating additional research needs to support its efficient participation in future power systems.

Flexible resources↗

Improvements in the Sample Space for the Backscattering Silicon Spectrometer (BASIS)

The increase in neutron flux at the Oak Ridge National Laboratory (ORNL) Spallation Neutron Source (SNS), currently operating at 2.0 MW proton beam power, has created new opportunities for higher-throughput neutron scattering experiments while also increasing the importance of minimizing background scattering and optimizing sample-environment operations. To address these challenges on the Backscattering Silicon Spectrometer (BA-SIS), several upgrades were developed and evaluated, including boron carbide (B₄C) masking for flat-plate sample containers, multi-cell sample holders used with a vertically translating sample stick, and an automated helium pump and purge (HPP) system for closed-cycle refrigerators. Neutron diffraction measurements demonstrate that B₄C masks reduce background scattering by 49–67%, outperforming both borated aluminum and boron nitride masks while introducing no additional Bragg reflections within the instrument’s accessible Q-range. Commissioning tests of a double-cell flat-plate sample contain-er showed no measurable crosstalk between adjacent sample compartments and con-firmed stable thermal performance, enabling multiple samples to be measured without re-peated temperature cycling. In addition, the automated HPP system provided reproducible sample-space gas handling with approximately ±1 mbar precision while reducing the need for operator intervention and supporting remote operation. Together, these developments improve signal-to-noise performance, increase experimental throughput, and enhance operational efficiency at BASIS, supporting the instrument’s continued operation under higher neutron flux conditions.

Jalarvo, Niina [ORNL] (ORCID:0000000306446866)↗

Managing Solar Photovoltaic Integration in the Western United States: Resource Adequacy Considerations

This study examines the impact of reserve margin-based reliability assessment, as commonly used in capacity expansion models, on planning resource-adequate power systems under high penetrations of solar photovoltaics (PV). As a generation resource, PV is operationally different from the conventional dispatchable resources for which most capacity expansion models were designed. The question this study attempts to answer is whether large amounts of PV on a system (in this case, the Western Interconnection of North America) would bias the results of conventional reserve margin-based capacity expansion modeling towards an over- or under-provisioning of resource adequacy. This analysis used NREL’s Resource Planning Model (RPM) for capacity expansion modeling and NREL’s Probabilistic Resource Adequacy Suite (PRAS) for resource adequacy assessment. RPM uses a reserve margin requirement to enforce resource adequacy. PRAS, a collection of tools for studying the resource adequacy of power systems and the adequacy contributions of individual resources on a probabilistic basis, was used to compute multiple resource adequacy metrics across a number of simulated scenarios and system representations with differing regional detail. In all cases, including high PV penetrations (up to 33% annual generation from PV, interconnection-wide), RPM was able to produce resource-adequate systems as measured by normalized expected unserved energy and loss-of-load expectation results from PRAS. The accuracy of reserve margin approaches depends heavily on the underlying assumptions informing the capacity credit assigned to variable and energy-limited resources, particularly when such resources are abundant in the modeled system. RPM’s standard methodology for estimating variable and flexible resources’ capacity contributions, which is based on the top 100 hours of net load, did not appear to systematically undervalue or overvalue variable generation relative to a more rigorous equivalent firm capacity assessment using PRAS, although both over- and under-valuations were observed in specific scenarios. In the worst cases, the top 100 hour method underestimated the equivalent firm capacity of PV by two percentage points, and overestimated the equivalent firm capacity of PV by five percentage points. Calculating capacity contributions based on the top 10 hours of net load systematically underestimated equivalent firm capacities at more modest PV penetrations, but was often a better approximation of equivalent firm capacity than the existing 100-hour approach in scenarios with higher PV penetrations.

14 SOLAR ENERGY↗

Bio-project “derisking” through development of systematic methodologies and frameworks for risk assessment

One of the primary hindrances to producing a viable, sustainable domestic biomass industry for renewable biofuels, bio-products and bio-power is the lack of understanding and quantification of the risks associated with both the biomass supply chain and preprocessing and conversion technologies. Currently a consistent method for assessing, comparing, and quantifying risks in biomass supply chains does not exist, creating a major investment barrier to bioenergy projects in the U.S. The lack of a standardized approach has resulted in bioenergy stakeholders independently using inconsistent approaches and evaluation criteria, leading to unreliable and incomparable assessments of risks and financing barriers to bio-project development. Along with the challenges of inconsistent risk assessment for supply chain risk, technology specific risks based on variability in biomass properties are not fully understood and can pose significant unforeseen challenges for bioenergy projects. In many cases these properties have not yet been identified and the impacts on the proposed technology and products unquantified. This is particularly challenging for emerging preprocessing and conversion technologies. Without a firm understanding of the preprocessing/conversion technology-specific critical properties, the risk of a proposed bio-project cannot be fully evaluated. To address inconsistent risk evaluation in the biomass supply chain supporting project financing, a Biomass Supply Chain Risk Standards (BSCRS) framework was developed. The BSCRS framework includes a comprehensive list of known and perceived risks (Risk Indicators) to the supply chain developed through 100’s of interviews with bioenergy industry experts spanning from feedstock growers and suppliers to representatives from the financial sector. These risks have been organized into a manageable hierarchy of Risk Categories and Risk Factors that can be practically assessed. This BSCRS framework also provides mitigation strategies for multiple Risk Indicators from best available industry practices and research findings. Additionally, a risk quantification methodology for each Risk Factor, Risk Category, and the bio-project as a whole was developed to enable capital markets to assess feedstock risk more efficiently and more accurately. Multiple case studies representing existing bio-projects have been used to evaluate and verify the BSCRS framework and scoring methodology. To address technological risk along with the supply chain risk captured in the developed BSCRS framework, this work also focuses on development of a systematic criticality assessment tool using well-accepted, quantitative risk analysis methods to evaluate bioenergy feedstock critical properties impacting system unit operations. The proposed Failure Mode and Effect Analysis (FMEA) approach uses a team of subject area experts (SAEs) for each targeted unit operation within a system. Collectively, the team will develop and use a quantitative scoring system to assess the material attributes, process parameters, and quality attributes for key unit operations that have already been identified. The FMEA process generates Risk Priority Numbers (RPNs) for the various failures and predominant causes for each material/process unit/product combination resulting in a semi-quantitative, standardized methodology for assessing technological risk and biomass properties contributing to that risk.

09 BIOMASS FUELS↗

Contributions of Solar + Storage to Future Power Needs

The costs of solar photovoltaics (PV) have been dropping in recent years, leading to increasing installations of solar PV systems and growing interest in how the technology will impact the electric grid. Additionally, as battery costs decline, there is increasing interest in understanding the benefits and limitations of battery storage for the grid as well as potential co-benefits of coupling battery storage and photovoltaics. This paper presents recent methodological developments to more accurately represent the value and limitations of coupled PV and battery systems in capacity expansion models. These are demonstrated using the Resource Planning Model (RPM), which co-optimizes capacity investments, transmission investments, and reduced-order dispatch through 2045. We simulate the evolution of the generation and transmission system in the Western Interconnection both with and without a coupled PV and battery technology option under two core scenarios - a baseline scenario and a high renewable penetration scenario - coupled with sensitivities assuming low and mid PV and battery cost projections. We analyze the degree to which a variety of configurations of coupled PV + Battery systems are able to meet future electricity needs, under which system conditions this coupled technology becomes beneficial to the electric grid and identify the displaced technologies when coupled solar and storage is introduced into the model. We find that capturing the benefits of co-locating these systems becomes increasingly important as the penetration of solar PV rises, and that in particular it is important to accurately capture the ability of these technologies to shift energy, provide firm capacity, and reduce expected curtailment.

14 SOLAR ENERGY↗

Simulations of Interacting Binary Systems—Pathways to Radio-bright Gamma-Ray Burst Progenitors

Although the association of gamma-ray bursts (GRBs) with massive stellar death is on firm footing, the nature of the progenitor system and the key ingredients required for a massive star to produce a GRB remain open questions. Here, we investigate the evolution of a 15–25M ⊙ massive star with a 10–15M ⊙ black hole (BH) using Modules for Experiments in Stellar Astrophysics. We quantify companion-influenced angular-momentum evolution over a stellar lifetime for orbital periods where tides are significant, varying stellar and BH masses, initial stellar spin, and accretion and dynamo prescriptions while tracking mass loss and angular momentum. The final spin is set by tidal torques versus stellar winds. For binaries that initially avoid Roche-lobe overflow, tides can spin up the star, but a late-stage expansion can drive tidal stripping; associated mass and angular-momentum loss can suppress spin-up. We find that massive-star BH binaries at comparable mass ratios may be potential GRB progenitors for short orbital periods (∼20–5 × 10 2 days) and long orbital periods (∼2 × 10 3 –4 × 10 3 days), where our suite of lifetime simulations reveals a favored parameter space with negligible mass loss and enough spin angular momentum to power a GRB jet. For initially nonrotating stars, this provides a lower limit on the final spin above a threshold estimate consistent with forming a postcollapse BH mass of 5–10M ⊙ with a spin parameter ≥ 0.5. For initially rapidly rotating stars, tidal interactions may sustain high spin when mass loss is negligible because the binary is not tidally synchronized.

Hernandez, Angel [Univ. of Colorado, Boulder, CO (↗

Quantifying Capital Cost Reduction Pathways for Advanced Nuclear Reactors

The framework developed in this study is provided both as an excel sheet (https://inl.gov/content/uploads/2023/11/Nuclear-Reactor-Cost-Reduction-Pathway-Spreadsheet-Tool.xlsx) and a Python (Jupyter) Notebook (link: https://github.com/accert-dev/ACCERT/tree/main/Cost%20Reduction). Capital cost considerations are one of the primary inhibitors to the large-scale deployment of nuclear power plants. While it is widely accepted that first units will likely be expensive and relatively uncompetitive, it is reasonable to expect that subsequent units, built in relative quick succession, will be cheaper as they benefit from the so-called “learning effects”. However, the large degree of uncertainty associated with this parameter renders it challenging for first movers to invest in the first few expensive units. To resolve this impasse, the U.S. Department of Energy’s Advanced Nuclear Liftoff study advocated for the formation of large, committed order books of plants of the same technology to spread the costs across several units and kickstart the nuclear supply chain. The study also advocated best practices for avoiding overruns and keeping reactors on budget. This report builds on these key recommendations by attempting to quantify specific pathways toward cost reduction for nuclear energy. A capital cost estimation framework was built to untangle the effect of learning into a subset of key cost drivers, referred to as “levers”. Collectively, the choice of these levers is intended to reflect the decision-making of high-level stakeholders like plant owners and the government. In addition to the size of the firm orderbook, these levers included (a) cost drivers that are most often attributed to cost overruns such as architect/engineering (A/E) proficiency, construction proficiency, procurement service proficiency, design completion prior to the start of construction, and design maturity, and (b) cost reduction strategies such as modular construction, cross-site standardization, safety classification of the reactor building, and of the balance of plant. Two advanced reactor designs were leveraged as use cases and bottom-up cost estimates made with assumptions consistent with a well-executed first-of-a-kind project (WE-FOAK, i.e., almost no overruns) were used as baselines for the models. Cost correlations were surveyed from the literature to determine the impact of important variables on projected timelines and costs.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Advancements Toward ASME Nuclear Code Case for Compact Heat Exchangers

Our research team proposes to advance the state of the ASME section III code (nuclear service) for Compact Heat Exchangers (CHX). This work will improve the technical state of CHXs and lay the foundation necessary for these heat exchangers to be certified for use in nuclear service. During the course of this work, we will advance the understanding of the performance, integrity, and lifetime of the CHXs for use in any industrial application, making their use more attractive and accessible to the industry. We will do this by developing qualification and inspection procedures that utilize Non-destructive evaluation (NDE) and advanced in-service inspection techniques, with insight from the industrial utility leader EPRI. We have enlisted colleagues at MPR Associates (MPR), an elite nuclear code consulting firm, who are experts on the ASME section III code and who, with input from members of the ASME section III committee, will direct the testing and help develop a series of documents that define the rules and regulations for use of the CHX. Colleagues at North Carolina State University (NCSU) and Oregon State University (OSU) will conduct extensive tensile, creep, and fatigue experiments on diffusion bonded samples (manufactured by US-based Vacuum Process engineering) along with modeling using the elastic perfectly plastic assumptions and comprehensive full inelastic finite element analysis (FEA). This work will allow analysis by design and confidence in the strength of different internal structures. To ensure industry acceptance and long term confidence, team members at the University of Wisconsin–Madison (UW), University of Michigan (UM), Georgia Tech (GT), and the University of Idaho (UI) will extensively test prototypic heat exchangers manufactured by US-based manufactures CompRex and Vacuum Process Engineering (VPE), a leader in the development of advanced CHX. This testing will include the use of various working fluids (salt, sodium, helium, and sCO2) to evaluate operational issues as well as structural integrity under the most severe conditions. Post-test analysis of the tested CHXs coupled with pre/in-service/post NDE (ultrasonic and radiography) led by the Electric Power Research Institute (EPRI) will be incorporated into the development of the rules and regulations for their use in nuclear service.

42 ENGINEERING↗

Spatially Adaptive Tunable Lighting Control System with Expanded Wellness and Energy Saving Benefits

Lighting design is becoming increasingly complex, including active dimming for energy savings and spectral tuning for human wellbeing. Modern commercial lighting control systems are already difficult to use, and maintain, and even with so-called Smart Lighting, optimizing light settings is rapidly exceeding the capabilities of direct human control, limiting the adoption of lighting control systems. The growing importance of Occupancy Centric Controls (OCC) for advanced building management systems can be applied to the development of autonomous lighting system controls needed to drive the adoption of advanced lighting controls for improved adaptive “sculpted illumination” for both greater energy savings and broader human wellbeing perspectives. This project, led by Rensselaer Polytechnic Institute, entitled “Spatially adaptive tunable lighting control system with expanded wellness and energy saving benefits” will develop and test an entirely new platform for automated optimized lighting design and control that requires little or no human engagement, yet contours lighting profiles automatically to minimize lighting energy use. We call this approach to lighting control “dynamic light sculpting” since the right amount of illumination is automatically delivered to occupants in real time. Since the system uses new, privacy-preserving occupant position and pose detection technologies developed by Rensselaer for broad OCC building applications, the control system will analyze how to deliver the right amount of the right type of illumination only where and when it is needed based these OCC platforms. To create these powerful autonomous lighting control platforms, the project will integrate evolving augmented reality (AR) and virtual reality (VR) tools with sophisticated lighting and interior design toolkits to create interactive lighting design and control simulators. Using the quickly growing paradigm of digital twins, these tools will integrate light fixture properties, occupancy sensor data, interior design data, and lighting specifications to accurately visualize how various design concepts interact with simulated yet realistic human activities that occur in commercial office buildings of various types. These advanced digital twin design and simulation tools will be combined with a new class of digitally-programmable LED lighting fixtures that can dynamically change the spectral content and direction of light emission. When fully integrated, the new autonomous lighting control system will take all of the guesswork out of optimizing light quality while minimizing energy consumption. Digital twin tools will simplify the design, installation, commissioning, operation, and maintenance of future energy-efficient lighting systems. It should be possible to reduce lighting energy costs from 40% to 70% with OCC based dynamic light sculpting systems. The work will be led by the Center for Lighting Enabled Systems and Applications (LESA) and the Center for Architectural Science and Ecology (CASE), both at Renssealer Polytechnic Institute; Lumileds, a global leader in the development of advanced LED systems; and HKS, a leading global architecture design firm. This interdisciplinary project team’s experience includes all of the design simulation tools, VR/AR digital twin visualization technology, advanced occupancy sensing technology, and complex control system design capabilities that will revolutionize lighting design and control technology to autonomously deliver high-quality lighting that improves human health and wellbeing while simultaneously maximizing lighting energy savings.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗