Search NASA⌕ Search

SEARCH · Search NASA

Results for “hardware testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Thermal Performance of a Customized Multilayer Insulation (MLI). Design and Fabrication of Test Facility Hardware

The design, fabrication, and assembly of hardware for testing the performance of a customized multilayer insulation are discussed. System components described include the thermal payload simulator, the modified cryoshroud, and a tank back pressure control device designed to maintain a constant liquid boiling point during the thermal evaluation of the multilayer insulation. The thermal payload simulator will provide a constant temperature surface in the range of 20.5 to 417K (37 to 750R) for the insulated tank to view. The cryoshroud was modified to establish a low temperature black body cavity while limiting liquid hydrogen usage to a minimum feasible rate.

Leonhard, K. E.↗

VEG-01: Veggie Hardware Verification Testing

The Veggie plant/vegetable production system is scheduled to fly on ISS at the end of2013. Since much of the technology associated with Veggie has not been previously tested in microgravity, a hardware validation flight was initiated. This test will allow data to be collected about Veggie hardware functionality on ISS, allow crew interactions to be vetted for future improvements, validate the ability of the hardware to grow and sustain plants, and collect data that will be helpful to future Veggie investigators as they develop their payloads. Additionally, food safety data on the lettuce plants grown will be collected to help support the development of a pathway for the crew to safely consume produce grown on orbit. Significant background research has been performed on the Veggie plant growth system, with early tests focusing on the development of the rooting pillow concept, and the selection of fertilizer, rooting medium and plant species. More recent testing has been conducted to integrate the pillow concept into the Veggie hardware and to ensure that adequate water is provided throughout the growth cycle. Seed sanitation protocols have been established for flight, and hardware sanitation between experiments has been studied. Methods for shipping and storage of rooting pillows and the development of crew procedures and crew training videos for plant activities on-orbit have been established. Science verification testing was conducted and lettuce plants were successfully grown in prototype Veggie hardware, microbial samples were taken, plant were harvested, frozen, stored and later analyzed for microbial growth, nutrients, and A TP levels. An additional verification test, prior to the final payload verification testing, is desired to demonstrate similar growth in the flight hardware and also to test a second set of pillows containing zinnia seeds. Issues with root mat water supply are being resolved, with final testing and flight scheduled for later in 2013.

Massa, Gioia↗

Advances in benchmarking and round robin testing for PEM water electrolysis: Reference protocol and hardware

While the number of publications in the PEM water electrolysis community increases each year, no common ground concerning reference hardware (test cells and test bench) and testing protocols has been yet established. This would, however, be necessary for the comparability of experimental results. First attempts for such reference hardware and procedures have been made in the framework of the Task 30 Electrolysis within the Technology Collaboration Programme on Advanced Fuel Cells (AFC TCP) of the International Energy Agency (IEA). Since then, improvements of both the test hardware (test cell and components) as well as the measurement protocol were identified, and a revised methodology and key results based on a comprehensive measurement series have been obtained. A detailed protocol for testing commercial reference components with a reference laboratory test cell developed in-house by Fraunhofer ISE is presented. For evaluation of the protocol and the hardware, it was tested at three different institutions at the same time. Impedance spectroscopic and polarization data was acquired and analyzed. The obtained differences in performance were calculated to give the community an expectation window to compare own data to. Finally, the importance of a thorough temperature control and the conditioning phase are demonstrated.

08 HYDROGEN↗

Restore-L Satellite Servicing Internship Final Report

This paper reviews the Restore-L mission purpose and the necessary research and simulations to meet mission specification for the Propellant Transfer Subsystem (PTS). It is essential the PTS undergoes functionality testing, environmental testing, and calculations to understand the capabilities of the system. For the testing of components from PTS, a proper test setup is required. It is vital for test hardware, such as hoses and valves, to stay in place while the test is being performed. For the test hardware to operate correctly, positioning, orientation, and alignment are critical as well. In addition to the testing, calculations for pressure drop were explored. To meet requirements for test setups, designs for test hardware mounts were sketched, 3D modeled, and manufactured. Using fluid mechanics for calculations, a pressure drop equation was applied with known variables from mission specification. With the test hardware mounts designed and manufactured, the test setup was assembled with mounts installed. Test hardware mounts met all design requirements. Calculation for pressure drop were concluded and an answer was achieved. Meeting design requirement, mission specification, and calculating correct results allow the Restore-L mission to make further progress and help understand the effectiveness of the Propellant Transfer Subsystem.

PTS↗

Veggie Hardware Validation Test Preliminary Results and Lessons Learned

The Veggie hardware validation test, VEG-01, was conducted on the International Space Station during Expeditions 39 and 40 from May through June of 2014. The Veggie hardware and the VEG-01 experiment payload were launched to station aboard the SpaceX-3 resupply mission in April, 2014. Veggie was installed in an Expedite-the-Processing-of-Experiments-to-Space-Station (ExPRESS) rack in the Columbus module, and the VEG-01 validation test was initiated. Veggie installation was successful, and power was supplied to the unit. The hardware was programmed and the root mat reservoir and plant pillows were installed without issue. As expected, a small amount of growth media was observed in the sealed bags which enclosed the plant pillows when they were destowed. Astronaut Steve Swanson used the wet/dry vacuum to clean up the escaped particles. Water insertion or priming the first plant pillow was unsuccessful as an issue prevented water movement through the quick disconnect. All subsequent pillows were successfully primed, and the initial pillow was replaced with a backup pillow and successfully primed. Six pillows were primed, but only five pillows had plants which germinated. After about a week and a half it was observed that plants were not growing well and that pillow wicks were dry. This indicated that the reservoir was not supplying sufficient water to the pillows via wicking, and so the team reverted to an operational fix which added water directly to the plant pillows. Direct watering of the pillows led to a recovery in several of the stressed plants; a couple of which did not recover. An important lesson learned involved Veggie's bellows. The bellows tended to float and interfere with operations when opened, so Steve secured them to the baseplate during plant tending operations. Due to the perceived intensity of the LED lights, the crew found it challenging to both work under the lights and read crew procedures on their computer. Although the lights are not a safety hazard, for visual comfort crewmembers were advised to wear sunglasses when working with the plants and then they can lift glasses to read procedures. Steve Swanson had already trail-blazed this procedure when he initiated VEG-01. The temperature and humidity data logger was relocated mid-experiment to provide measurements on both sides of the unit. Images of the plants were downlinked weekly, and videos of installation and harvest were recorded. This imaging frequency was not sufficient to monitor and respond to changes in plant growth. Plants, samples, and data loggers will be returned on SpaceX-4, scheduled to return the fall of 2014. Lessons learned will be translated into hardware and operational modifications for future Veggie payloads.

International Space Station↗

The Certification of Environmental Chambers for Testing Flight Hardware

The JPL chamber certification process for ensuring that test chambers used to test flight hardware meet a minimum standard is critical to the safety of the hardware and personnel. Past history has demonstrated that this process is important due to the catastrophic incidents that could occur if the chamber is not set up correctly. Environmental testing is one of the last phases in the development of a subsystem, and it typically occurs just before integration of flight hardware into the fully assembled flight system. A seemingly insignificant -miscalculation or missed step can necessitate rebuilding or replacing a subsystem due to over-testing or damage from the test chamber. Conversely, under-testing might fail to detect weaknesses that might cause failure when the hardware is in service. This paper describes the process that identifies the many variables that comprise the testing scenario and screening of as built chambers, the training of qualified operators, and a general "what-to-look-for" in minimum standards.

Vacuum Chamber↗

The Certification of Environmental Chambers for Testing Flight Hardware

The JPL chamber certification process for ensuring that test chambers used to test flight hardware meet a minimum standard is critical to the safety of the hardware and personnel. Past history as demonstrated that this process is important due to the catastrophic incidents that could occur if the chamber is not set up correctly. Environmental testing is one of the last phases in the development of a subsystem, and it typically occurs just before integration of flight hardware into the fully assembled flight system. A seemingly insignificant -miscalculation or missed step can necessitate rebuilding or replacing a subsystem due to over-testing or damage from the test chamber. Conversely, under-testing might fail to detect weaknesses that might cause failure when the hardware is in service. This paper describes the process that identifies the many variables that comprise the testing scenario and screening of as built chambers, the training of qualified operators, and a general "what-to-look-for" in minimum standards.

Thermal↗

Development of a Self-contained Heat Rejection Module (SHRM), phase 1

The laboratory prototype test hardware and testing of the Self-Contained Heat Rejection Module are discussed. The purpose of the test was to provide operational and design experience for application to a flight prototype design. It also provided test evaluation of several of the actual components which were to be used in the flight prototype hardware. Several changes were made in the flight prototype design due to these tests including simpler line routing, relocation of remote operated valves to a position upstream of the expansion valves, and shock mounting of the compressor. The concept of heat rejection control by compressor speed reduction was verified and the liquid receiver, accumulator, remote control valves, oil separator and power source were demonstrated as acceptable. A procedure for mode changes between pumped fluid and vapor compression was developed.

Fleming, M. L.↗

Veggie and the VEG-01 Hardware Validation Test

This presentation presents a brief overview of KSC plant science hardware for space and then details the Veggie hardware and the VEG-01 hardware validation test. The test results and future plans are discussed.

Massa, Gioia↗

Rotating Detonation Combustion for Gas Turbines: Modeling and System Synthesis to Exceed 65% Efficiency Goal (Phase II)

As of May 2019, all RDE test hardware and test operations were completed for this program. Over 700 hot fire tests were conducted at 4 facilities with 7 RDE assemblies, with the data available for future analysis. In particular, measured static and dynamic pressure and computational fluid dynamics (CFD) provided basis for pressure gain combustion (PGC) analysis of the Engineering Scale RDE. It was demonstrated via measurements and CFD that a carefully designed diffuser can recover some total pressure of the highly oscillatory RDE exhaust. In general, the isolator/injector is largest contributor of pressure losses; however a low loss design was demonstrated that improves significantly on previous natural-gas/air RDEs. Also, a tailored injector and mixing technique was demonstrated that allowed NG-air RDE operation with overall equivalence ratio of less than 0.6. CFD models by AR, the UofM and Purdue University were extensively used throughout the program to refine diffuser design for improved pressure recovery, to simulate injection and mixing, to estimate turbine interaction, to estimate combustor pressure gain anchored with test data and to provide input to other design and analytical tasks. CFD analyses were completed for many of the configurations tested at Purdue with the 13.4” RDE including the shark fin and low area ratio isolators. Results were compared favorably to available hot fire test particle image velocimetry (PIV) measurements and wave speeds. The results of these CFD analyses suggest a modest pressure gain of 33% with a sufficiently low area ratio isolator. A thermodynamic power plant system model was set up which utilizes an RDE combustor. The performance of the RDE combustor module was scaled based on measurements from the Engineering Scale RDE tests with low loss injector and tailored fuel flow. This combined model indicates potential for significant plant efficiency improvement. The successful tailored fuel injection test result with lower than .6 equivalence ratio has implication that a power plant can use a RDE combustor configuration where all the air flows through the combustion zone thereby not requiring a bypass mixer. In this configuration, the results of the natural gas combined cycle (NGCC) plant system indicate net efficiency of 66.4%.

02 PETROLEUM↗

Protoflight photovoltaic power module system-level tests in the space power facility

Work Package Four, which includes the NASA-Lewis and Rocketdyne, has selected an approach for the Space Station Freedom Photovoltaic (PV) Power Module flight certification that combines system level qualification and acceptance testing in the thermal vacuum environment: The protoflight vehicle approach. This approach maximizes ground test verification to assure system level performance and to minimize risk of on-orbit failures. The preliminary plans for system level thermal vacuum environmental testing of the protoflight PV Power Module in the NASA-Lewis Space Power Facility (SPF), are addressed. Details of the facility modifications to refurbish SPF, after 13 years of downtime, are briefly discussed. The results of an evaluation of the effectiveness of system level environmental testing in screening out incipient part and workmanship defects and unique failure modes are discussed. Preliminary test objectives, test hardware configurations, test support equipment, and operations are presented.

Rivera, Juan C.↗

Protoflight photovoltaic power module system-level tests in the Space Power Facility

Work Package Four, which includes the NASA-Lewis and Rocketdyne, has selected an approach for the Space Station Freedom Photovoltaic (PV) Power Module flight certification that combines system level qualification and acceptance testing in the thermal vacuum environment: the 'protoflight' vehicle approach. This approach maximizes ground test verification to assure system level performance and to minimize risk of on-orbit failures. The preliminary plans for system level thermal vacuum environmental testing of the protoflight PV Power Module in the NASA-Lewis Space Power Facility (SPF) are addressed. Details of the facility modifications to refurbish SPF, after 13 years of downtime, are briefly discussed. The results of an evaluation of the effectiveness of system level environmental testing in screening out incipient part and workmanship defects and unique failure modes are discussed. Preliminary test objectives, test hardware configurations, test support equipment, and operations, are presented.

Rivera, Juan C.↗

SITE project. Phase 1: Continuous data bit-error-rate testing

The Systems Integration, Test, and Evaluation (SITE) Project at NASA LeRC encompasses a number of research and technology areas of satellite communications systems. Phase 1 of this project established a complete satellite link simulator system. The evaluation of proof-of-concept microwave devices, radiofrequency (RF) and bit-error-rate (BER) testing of hardware, testing of remote airlinks, and other tests were performed as part of this first testing phase. This final report covers the test results produced in phase 1 of the SITE Project. The data presented include 20-GHz high-power-amplifier testing, 30-GHz low-noise-receiver testing, amplitude equalization, transponder baseline testing, switch matrix tests, and continuous-wave and modulated interference tests. The report also presents the methods used to measure the RF and BER performance of the complete system. Correlations of the RF and BER data are summarized to note the effects of the RF responses on the BER.

Fujikawa, Gene↗

Desert Research and Technology Studies 2008 Report

During the last two weeks of October 2008, the National Aeronautics and Space Administration (NASA) Johnson Space Center (JSC) Advanced Extravehicular Activity (AEVA) team led the field test portion of the 2008 Desert Research and Technology Studies (D-RATS) near Flagstaff, AZ. The Desert RATS field test activity is the year-long culmination of various individual science and advanced engineering discipline areas technology and operations development efforts into a coordinated field test demonstration under representative (analog) planetary surface terrain conditions. The 2008 Desert RATS was the eleventh RATS field test and was the most focused and successful test to date with participants from six NASA field centers, three research organizations, one university, and one other government agency. The main test objective was to collect Unpressurized Rover (UPR) and Lunar Electric Rover (LER) engineering performance and human factors metrics while under extended periods of representative mission-based scenario test operations involving long drive distances, night-time driving, Extravehicular Activity (EVA) operations, and overnight campover periods. The test was extremely successful with all teams meeting the primary test objective. This paper summarizes Desert RATS 2008 test hardware, detailed test objectives, test operations, and test results.

Romig, Barbara↗

Offshore Wind to Hydrogen - Modeling, Analysis, Testing and International Collaboration Work

This project explores electrolytic hydrogen production from an offshore wind turbine by: Modeling: Simulate an offshore wind turbine and generate power output profiles; Analysis: Analyze offshore conditions and determine operational modes of the stack; Testing: Perform hardware testing to evaluate dynamic characteristics; and International Collaboration Work: Share learnings and publish. Potential Outcomes: Accelerate development of an integrated, in-turbine offshore wind hydrogen system; and Support two DOE Energy Earthshots - Hydrogen and Floating Offshore Wind.

electrolyzer↗

Testing Mars 2020 Flight Software and Hardware in the Surface System Development Environment

The Mars 2020 (M2020) Perseverance Rover is NASA's most advanced planetary rover mission to date. It includes a novel Sample Caching Subsystem (SCS) which will collect rock cores for possible future return to Earth, as well as an improved mobility system with enhanced autonomous navigation which will enable it to traverse faster and farther than prior rovers. The development of both systems required extensive flight software and flight hardware testing. To support this testing, we developed the Surface System Development Environment (SSDEV) and used it for a wide variety of testing. SSDEV is a bundled subset of M2020 Flight Software which runs on commercially available Linux computers and can be combined with multiple backend options for simulation and hardware control. The SSDEV architecture enabled our teams to perform much more testing of flight software and flight hardware than would have otherwise been possible. As a secondary benefit, the SSDEV-based test campaigns also helped our teams enter the operations phase of the mission with greater readiness of operations products and tools. In this paper, we summarize the motivation for SSDEV, provide an overview of the SSDEV architecture, list several examples of how SSDEV was used, and summarize lessons learned. SSDEV is not a substitute for integrated testing with flight-like avionics, but it enabled substantially more testing than would have otherwise been possible and also provided some unique benefits. We recommend architectures like SSDEV to future projects that need to perform extensive hardware and software testing using a limited set of flight-like avionics.

Wai, Dennis↗