Search NASA⌕ Search

SEARCH · Search NASA

Results for “project procurement”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Deep Lynx: Digital Engineering Integration Hub

The construction of megaprojects has consistently demonstrated challenges for project managers in regard to meeting cost, schedule, and performance requirements. Megaproject construction challenges are common place within megaprojects with many active projects in the United States failing to meet cost and schedule efforts by significant margins. Currently, engineering teams operate in siloed tools and disparate teams where connections across design, procurement, and construction systems are translated manually or over brittle point-to-point integrations. The manual nature of data exchange increases the risk of silent errors in the reactor design, with each silent error cascading across the design. These cascading errors lead to uncontrollable risk during construction, resulting in significant delays and cost overruns. Deep Lynx allows for an integrated platform during design and operations of mega projects.

Darrington, JohnW↗

2020 Energy Storage Pricing Survey

The annual Energy Storage Pricing Survey (ESPS) series is designed to provide a standardized reference system price for various energy storage technologies across a range of different power and energy ratings. This is an essential first step in comparing systems of the different technologies’ usage costs and total cost of ownership. The final system prices are developed based on data from an extensive set of interviews with representatives across the manufacturing and project development value chain, plus available published data. This information is incorporated into a consistent methodology structure that will allow pricing information to be incorporated at whatever level it was obtained, ranging from component to fully installed system. The ESPS system pricing methodology breaks down the cost of an energy storage system into the following component categories: the storage module; the balance of system; the power conversion system; the energy management system; and the engineering, procurement, and construction costs. By evaluating each of the different component costs separately, a more accurate system cost can be developed that provides internal pricing consistency between different project sizes using the same technology, as well as between different technologies that utilize similar components.

25 ENERGY STORAGE↗

Offshore Wind Electrical Safety Standards Harmonization (Workshop Proceedings)

Offshore wind (OSW) development activity is accelerating in the United States, with over 10 gigawatts (GW) of capacity likely to be installed on the Atlantic coast before 2030. In addition, states have committed to procure over 29 GW of offshore wind. Experienced European offshore wind energy developers are beginning to make large investments into offshore wind projects in American waters, and some U.S. developers have submitted key design documents for regulatory review. European offshore wind developers possess extensive experience in other geographic markets, which greatly increases confidence that the U.S. offshore wind industry will be successful. Nonetheless, existing U.S. electrical standards and European electrical standards are significantly different. If not addressed, these differences could potentially impact worker safety.

17 WIND ENERGY↗

Design of Critical Experiments Targeting Epithermal Cross Sections of Tantalum

Sandia National Laboratories (SNL) and Oak Ridge National Laboratory (ORNL) are collaborating to develop a capability to test the epithermal/intermediate cross sections of tantalum (Ta) at the SNL critical experiments facility using the Seven Percent Critical Experiment (7uPCX) fuel. The Sandia Critical Experiments (SCX) Program provides a specialized facility for performing water moderated and reflected critical experiments with UO 2 fuel rod arrays. A history of safe reactor operations and flexibility in reactor core configuration has resulted in the completion of several benchmark critical experiment evaluations that are published in the International Criticality Safety Benchmark Evaluation Project (ICSBEP) Handbook. The critical experiments described here are scheduled to be performed at SCX in fiscal year 2023. Currently, fabrication details for the needed new equipment are being finalized for completion of the procurement process. The experiments will then be executed and documented for publication consideration by the ICSBEP.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Hydrogen Production, Grid Integration, and Scaling for the Future

The project will explore near and long-term visions towards the commercialization of grid integrated electrolysis systems to inform deployment across the planning, procurement, and operation stages of hydrogen production on the grid. It will leverage NREL's state-of-the-art 1.25 MW polymer electrolyte membrane (PEM) electrolyzer system to characterize system performance in relevant scenarios, also creating a digital twin for emulation in the Advanced Research on Integrated Energy Systems (ARIES) virtual environment and performing hardware-in-the-loop (HIL) testing of pilot scale, decentralized, and centralized hydrogen systems.

electrolysis systems↗

Voluntary Renewable Energy Procurement Programs in Regulated Utility Markets

Multinational corporations are increasingly purchasing renewable energy (RE) to fulfill international commitments, reduce supply chain emissions, limit environmental impact, and secure stable and affordable electricity. The potential scale of global corporate RE purchasing has been estimated to be nearly 100 GW and growing; however, many markets still lack supportive enabling environments for corporations to access RE through on-site project development or private sector transactions. Even where allowed by law, on-site generation may be insufficient due to space and technical constraints, introducing additional challenges. Utility green pricing and utility green tariff programs backed by renewable energy certificates (RECs), referred to as utility green procurement programs (GPPs) in this report, offer powerful market-based solutions to utilities, regulators, and policymakers to provide corporate and other consumers with RE product options while generating revenue to support RE development. As RE markets expand around the globe, GPPs have proven to be effective mechanisms in market regimes, ranging from fully integrated state-owned utilities to broadly liberalized power markets. GPPs utilize RECs, which are a type of energy attribute certificate and closely resemble guarantees of origin, to track and ultimately monetize RE attributes that corporations and other buyers must procure to demonstrate progress against their RE commitments and make public claims of RE use. Time-tested and transparent REC accounting mechanisms provide market confidence, while at the same time offering flexibility to utilities, regulators, and customers for a range of applications. RECs are used in all types of electricity market structures, as indicated in Figure 1, but REC-based program designs and supporting components differ depending on the type of market. Liberalized markets allow for customers to contract directly with generators for electricity and RECs, while traditionally regulated markets with vertically integrated utility structures may have greater restrictions on generation asset ownership and electricity sales. RE markets can be further defined as being either mandatory or voluntary. Mandatory markets require suppliers to deliver specified amounts of RE to grid customers, such as under a renewable portfolio standard (RPS), while voluntary markets involve no legal mandates, but demand is driven by self-imposed customer goals.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Equipment Procurement and Final Design for the MARVEL High-Grade Heat Extraction System (HGHES)

This summer I worked on the design of a high-grade heat extraction system (HGHES) of the MARVEL Project. The MARVEL project at INL is a first-of-a-kind terrestrial microreactor to help provide a test platform to demonstrate the use of a microreactor to end customers and enable technology developers to test enabling microreactor technologies with a functional nuclear reactor. One of the project's main requirements is the reactors’ ability to deliver high-grade thermal power to end users, both for industrial and commercial use. The project required communication with multiple vendors for custom-made equipment, working with a high-temperature and high-pressure helium coolant system, and research of a Thermal Storage Unit (TSU).

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Status of the LCLS-II-HE Project at Jefferson Lab

The Linac Coherent Light Source II High Energy (LCLS-II-HE) upgrade at the SLAC National Accelerator Laboratory is being constructed in partnership with the Thomas Jefferson National Accelerator Facility (JLab) and the Fermi National Accelerator Laboratory (FNAL). The cryomodule production scope consists of the design, procurement, construction, and acceptance testing of 24 eight-cavity, 1.3 GHz cryomodules, as well as R&D activities necessary to develop the required technology. To achieve this, JLab and FNAL are also contributing to SLAC’s effort to develop the cavity recipe and production processes necessary to meet the LCLS-II-HE goal of 20.8 MV/m and average Q₀ of 2.7·10¹⁰. This paper details the JLab scope, focusing on the project initiation phase, in particular technology development and prototyping, project development and planning, and implementation of lessons learned from LCLS-II.

Wilson, K. M.↗

BESS Digital Assurance, Supply Chain Risk Management, and Emerging Regulation Session One - Abridged

The TADA BESS Supply Chain Workshops are designed to equip participants with the knowledge and tools necessary to address the evolving challenges at the intersection of battery energy storage systems (BESS), cybersecurity, and supply chain vulnerabilities. The workshops emphasize the application of Cyber-Informed Engineering (CIE) principles using INL’s procurement guide and the CIE-BAT tool. Attendees will develop risk-based security strategies and actionable compliance roadmaps tailored to their BESS projects. Additionally, the program fosters a collaborative network of practitioners and provides guidance on navigating emerging regulatory requirements, including FEOC rules under the OBBB framework, to assess and enhance organizational readiness. This is Session 1 of 3.

25 - ENERGY STORAGE↗

BESS Digital Assurance, Supply Chain Risk Management, and Emerging Regulation Session One

The TADA BESS Supply Chain Workshops are designed to equip participants with the knowledge and tools necessary to address the evolving challenges at the intersection of battery energy storage systems (BESS), cybersecurity, and supply chain vulnerabilities. The workshops emphasize the application of Cyber-Informed Engineering (CIE) principles using INL’s procurement guide and the CIE-BAT tool. Attendees will develop risk-based security strategies and actionable compliance roadmaps tailored to their BESS projects. Additionally, the program fosters a collaborative network of practitioners and provides guidance on navigating emerging regulatory requirements, including FEOC rules under the OBBB framework, to assess and enhance organizational readiness. This is Session 1 of 3. (Full Version)

25 - ENERGY STORAGE↗

Sample Preparation Laboratory (SPL) Best Practices: CGD as the Primary Acceptance Method

The traditional paradigm applied to the construction of nuclear safety related systems, structures, and components (SSCs), like SPL, involves an owner/licensee hiring an EPC firm with an NQA 1 program to manage the engineering, procurement, and construction of the desired SSC. This traditional approach would have posed significant barriers to the successful completion of the SPL. As a smaller capital project, in the $\$$100–$\$$200 million range, there was concern that employing one of the larger EPC companies would escalate costs and extend the projected schedule beyond what would be feasible for the Department of Energy (DOE). The traditional acceptance method employed for nuclear facilities with credited safety functions requires the use of an EPC firm applying American Society of Mechanical Engineers (ASME) NQA 1 nuclear quality assurance (NQA) to accept safety SSCs. In lieu of this approach, INL elected to apply its own NQA 1 program to hire an EPC firm operating a commercial quality program. This method used commercial grade dedication (CGD) as outlined in NQA 1 which had not been applied at this scale. Use of the commercial supply chain was identified as a key factor to the successful completion of SPL. Favorable conditions enabling the use of CGD included: • INL serving as both the designer and the design authority • Design created by an NQA 1 qualified source • A mature CGD program • Availability of a CGD subject matter expert (SME) • A strong construction management program. This white paper elaborates on the methodology employed in the construction of the SPL, the successes achieved, and best practices implemented.

42 - ENGINEERING↗

PIP-II SRF Couplers Fabrication Status and Addressing Ceramic Yield Challenges

The PIP-II project requires reliable SRF couplers to deliver high RF power to the cavities. This talk presents the current status of coupler fabrication, including progress on procurement, assembly, and testing. In particular, it focuses on the challenges encountered with ceramic window production, where limited yield has become a concern. Observed issues and inspection results will be discussed, together with the actions taken to improve quality and consistency. The path forward, including ongoing work with vendors and process adjustments, will also be outlined.

Aiazzi, Tommaso [Fermilab] (ORCID:0009000297503407↗

Can section 45Q tax credit foster decarbonization? A case study of geologic carbon storage at Acid Gas Injection wells in the Permian Basin

Carbon capture, utilization, and storage (CCUS) is an important pathway for meeting climate mitigation goals. While the economic viability of CCUS is well understood, previous studies do not evaluate the economic feasibility of carbon capture and storage (CCS) in the Permian Basin specifically regarding the new Section 45Q tax credits. We developed a technoeconomic analysis method, evaluated the economic feasibility of CCS at the acid gas injection (AGI) wells, and assessed the implication of Section 45Q tax credits for CCS at the AGIs. We find that the compressors, well depth, and the permit and monitoring costs drive the facility costs. Compressors are the predominant contributors to capital and operating expenditure driving the levelized cost of CO 2 storage. Strategic cost reduction measures identified include 1) sourcing of low-cost electricity and 2) optimizing operational efficiency in well operations. In evaluating the impact of the tax credits on CCS projects, facility scale proved decisive. We found that facilities with an annual injection rate exceeding 10,000 MT storage capacity demonstrate economic viability contingent upon the procurement of inputs at the least cost. The new construction of AGI wells were found to be economically viable at a storage capacity of 100,000 MT. The basin is heavily focused on CCUS (tax credit – $\$$65/MT CO 2 ), which overshadows CCS ($\$$85/MT CO 2 ) opportunities. Balancing the dual objectives of CCS and CCUS requires planning and coordination for optimal resource and pore space utilization to attain the basin's decarbonization potential. We also found that CCS on AGI is a lower cost CCS option as compared to CCS on other industries.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

High Yield Xray Imager Final Design Review

The High Yield Xray Imager (HYXI) is a new NIF target diagnostic system currently under development. The goal of HYXI is to provide high-fidelity, high temporal resolution x-ray imaging capability on high yield NIF implosions at 10MJ and above. The HYXI instrument design concept is based on the combination of two technologies that have been successfully utilized at the NIF on previous instruments, electron pulse-dilation and hybrid-CMOS sensor imaging. The combination of these two techniques will give HYXI sufficient data quality to ascertain differences in hot spot formation dynamics between high and low yield implosions. This information will highlight the critical hot spot conditions needed for ignition and burn. The HYXI design leverages the successful operation of the PDIXI x-ray imager at the NIF on multi MJ yield shots. A new radiation tolerant CMOS imaging array (HYPERION) is being developed to eliminate the significant background noise which limits the data quality of PDIXI. We successfully placed the contract with Advanced hCMOS Systems (AHS) to develop the HYPERION sensor, which fulfils our criteria to place long lead time item procurements by end of FY24. The HYXI Final Design Review was completed at the end of Q4 FY24 (Sep 24 th and Sep 30 th ). The HYXI project is a multi-year effort with a phased approach to be bring up system functionality over time in parallel with the development and fabrication effort of the HYPERION CMOS imaging array. In Phase 1, time-integrated x-ray images on NIF DT experiments will be collected starting in Q3 FY25. In Phase 2 of the project, time-resolved imaging with HYXI utilizing a spare microchannel plate detector back-end will begin in Q3 FY26. Phase 3 concludes the project with the installation of the HYPERION sensor array and the final performance qualification of the HYXI instrument which is scheduled for Q3 FY27 as discussed in the PDR and MRT report on this project in FY23.

42 ENGINEERING↗

SPECs Early-Stage Decision Model: User Manual

The SPECs Early-Stage Decision (ESD) model is central to the SPECs procurement solutions toolkit. The ESD model is an Excel-based spreadsheet model, which provides information about the economic and strategic value of a proposed battery-storage project or solar-plus-storage (solar-plus) project. The model can be used to explore combinations of storage-related project value streams in order to define a potential project, while educating co-op decision-makers about project benefits and costs. A sensitivity analysis function speeds the development of "what-if" scenarios. A gap analysis function solves for top-priority metrics and supports the inclusion of hard-to-monetize strategic values, such as the value of storage to defer costly system upgrades in light of increasing distributed solar and other distributed energy resources (DERs). Model outputs include the utility data, assumptions, and use-case scenarios that are recommended content for the requests for proposals (RFPs). The model may also provide an initial "sanity check" for RFP responses, supporting further discussions among utility staff, vendors and stakeholders. The ESD is not a "finance-grade" modeling tool, and users are cautioned to be mindful of its limitations, but the model has been reviewed by users, who recommend it as a way to drive faster and better project design and planning, as well as to facilitate better communications with vendors, grid partners, and stakeholders.

14 SOLAR ENERGY↗

ePROJECT BUILDER: PROMOTING WIDER ADOPTION OF ENERGY SAVINGS PERFORMANCE CONTRACTS THROUGH STANDARDIZATION AND TRANSPARENCY

The United States Federal Government has been conducting guaranteed savings energy savings performance contracts for over 20 years and now relies on ESPC for the majority of its energy efficiency work. Along with a related financed project type, these deals resulted in $4.2 billion of project investment in the five years ending in 2016, a pace that has even accelerated since. Measurement and verification (M&V) on the projects is the key to assuring savings realization and persistence. Perceived as a weakness or burdensome added cost in the early years of the program, M&V has become a strength. All energy conservation measures (ECMs) have some form of measurement – defined as a measured baseline establishment followed by at least one measurement of the main energy-saving parameter taken in the performance period for each ECM. The government’s in-house energy consulting office, the Federal Energy Management Program (FEMP), now recommends measurement of these “Option A” M&V ECMs throughout the contract term, usually annually. Moreover, a significantly higher percentage of projects are now characterized by more ambitious M&V, including Option B (all parameter measurement) for most generation (including renewable) and some efficiency measures, and more frequent Option C (whole facility utility bill analysis) for “deep retrofit” projects with multiple, interactive ECMs. Coincident with this progress in M&V has been a much greater embracing of ESPC by the federal agencies, resulting in the enormous rate of projects now executed. This paper traces the evolution of M&V in federal ESPC and argues that the heightened credibility of the savings has contributed significantly to the procurement vehicle’s long-term viability. This focus on savings integrity via M&V has been learned over two decades for U.S. federal ESPC, but countries with developing ESPC markets would be wise to emphasize it as their markets emerge, allowing them to avoid some of the “growing pains” experienced in the U.S.

Earni, Shankar↗

M&V in ESPC: The U.S. Federal Experience and Implications for Developing ESPC Markets

The United States Federal Government has been conducting guaranteed savings energy savings performance contracts for over 20 years and now relies on ESPC for the majority of its energy efficiency work. Along with a related financed project type, these deals resulted in $4.2 billion of project investment in the five years ending in 2016, a pace that has even accelerated since. Measurement and verification (M&V) on the projects is the key to assuring savings realization and persistence. Perceived as a weakness or burdensome added cost in the early years of the program, M&V has become a strength. All energy conservation measures (ECMs) have some form of measurement – defined as a measured baseline establishment followed by at least one measurement of the main energy-saving parameter taken in the performance period for each ECM. The government’s in-house energy consulting office, the Federal Energy Management Program (FEMP), now recommends measurement of these “Option A” M&V ECMs throughout the contract term, usually annually. Moreover, a significantly higher percentage of projects are now characterized by more ambitious M&V, including Option B (all parameter measurement) for most generation (including renewable) and some efficiency measures, and more frequent Option C (whole facility utility bill analysis) for “deep retrofit” projects with multiple, interactive ECMs. Coincident with this progress in M&V has been a much greater embracing of ESPC by the federal agencies, resulting in the enormous rate of projects now executed. This paper traces the evolution of M&V in federal ESPC and argues that the heightened credibility of the savings has contributed significantly to the procurement vehicle’s long-term viability. This focus on savings integrity via M&V has been learned over two decades for U.S. federal ESPC, but countries with developing ESPC markets would be wise to emphasize it as their markets emerge, allowing them to avoid some of the “growing pains” experienced in the U.S.

Coleman, Philip↗

Supplement to M&V Guidelines: Measurement and Verification for Performance-Based Contracts Version 4.0

Measurement and verification (M&V) are key to determining and confirming the continued operation of, and savings associated with, performance-based contracts. The Federal Energy Management Program (FEMP) updates these guidelines to reflect the evolution of M&V to incorporate industry best practices and ensure that savings from these performance-based projects are properly planned, communicated, and realized. FEMP released M&V Guidelines: Measurement and Verification for Federal Energy Projects Version 3.0 in 2008. This document was developed with input from industry-government working groups, previous M&V guideline authors, and national laboratory subject matter experts. The document provided the methods and guidelines, with a focus on federal energy savings performance contracts (ESPCs). When FEMP released M&V Guidelines: Measurement and Verification for Performance-Based Contracts Version 4.0 in 2015, FEMP expanded the intended audience to include anyone (energy managers, procurement officers, and contractors) involved in implementing performance-based contracts. The streamlined M&V Guidelines Version 4.0 provided the procedures and guidelines needed to quantify savings resulting from installing energy-efficient equipment, water conservation, improved operation and maintenance (O&M), renewable energy, and cogeneration projects with a performance-based contract; however, it removed some of the associated details on topics such as developing regression models and sampling plans. The details and information provided in M&V Guidelines v. 3.0 are still pertinent to M&V for performance-based contracts. The objective is to keep FEMP M&V version 4.0 condensed, providing the reference document for specifying M&V methods and procedures and a resource for developing project-specific M&V plans; this supplement provides additional details. The content of this supplement has been updated to include pertinent revisions between M&V version 3.0 and M&V version 4.0 by providing details and updating the content to ensure relevancy.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗