Search NASA⌕ Search

SEARCH · Search NASA

Results for “resource estimates”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Knowledge-based system to assess air crew training requirements

A description is given of a prototype training assessment tool developed as part of a computer-based cockpit design and analysis workstation that estimates the training resources and time imposed by the anticipated mission and cockpit design. Embedding instructional system and training analysis domain knowledge in a production system environment, the tool allows crew station designers to readily determine the training ramifications of their choices for cockpit equipment, mission tasks, and operator qualifications. Initial results have been validated by comparison to an existing training program, demonstrating the tool's utility as a conceptual design aid and illuminating areas for future development.

Smith, Barry R.↗

Computational aeroelasticity

Recent large-scale studies of computational unsteady aerodynamics for aeroelastic applications are reviewed. The variety of fluid dynamic flow models available to address such computations are illustrated in two cases: (1) 2D Navier-Stokes (NS) equations illustrating the highest level of modeling usually employed and (2) the transonic small-disturbance potential equation representing the entry level for nonlinear flow modeling. Estimates of computer resources necessary to produce accurate converged results are given. Application of potential and NS equation codes for flows which are generally at lower angles and high speeds are addressed, including (1) the treatment of wings and configuration details using potential equation codes and (2) recent NS code calculations of complete vehicle configurations. Attention is given to high-angle conditions involving separated vortex-dominated flows. Accuracy requirements for vortex shedding over airfoils is discussed and the calculation of vorticity convected over significant distances is addressed. Steady CFD computations about delta wings at high angles are given, including a discussion of the required level of fluid dynamic flow modeling. Recent results on unsteady 'buffetlike flow' about complete vehicle models are reviewed.

Edwards, John W.↗

Weight and the Future of Space Flight Hardware Cost Modeling

Weight has been used as the primary input variable for cost estimating almost as long as there have been parametric cost models. While there are good reasons for using weight, serious limitations exist. These limitations have been addressed by multi-variable equations and trend analysis in models such as NAFCOM, PRICE, and SEER; however, these models have not be able to address the significant time lags that can occur between the development of similar space flight hardware systems. These time lags make the cost analyst's job difficult because insufficient data exists to perform trend analysis, and the current set of parametric models are not well suited to accommodating process improvements in space flight hardware design, development, build and test. As a result, people of good faith can have serious disagreement over the cost for new systems. To address these shortcomings, new cost modeling approaches are needed. The most promising approach is process based (sometimes called activity) costing. Developing process based models will require a detailed understanding of the functions required to produce space flight hardware combined with innovative approaches to estimating the necessary resources. Particularly challenging will be the lack of data at the process level. One method for developing a model is to combine notional algorithms with a discrete event simulation and model changes to the total cost as perturbations to the program are introduced. Despite these challenges, the potential benefits are such that efforts should be focused on developing process based cost models.

Prince, Frank A.↗

Three-Dimensional Turbulent RANS Adjoint-Based Error Correction

Engineering problems commonly require functional outputs of computational fluid dynamics (CFD) simulations with specified accuracy. These simulations are performed with limited computational resources. Computable error estimates offer the possibility of quantifying accuracy on a given mesh and predicting a fine grid functional on a coarser mesh. Such an estimate can be computed by solving the flow equations and the associated adjoint problem for the functional of interest. An adjoint-based error correction procedure is demonstrated for transonic inviscid and subsonic laminar and turbulent flow. A mesh adaptation procedure is formulated to target uncertainty in the corrected functional and terminate when error remaining in the calculation is less than a user-specified error tolerance. This adaptation scheme is shown to yield anisotropic meshes with corrected functionals that are more accurate for a given number of grid points then isotropic adapted and uniformly refined grids.

Park, Michael A.↗

Anisotropic Solution Adaptive Unstructured Grid Generation Using AFLR

An existing volume grid generation procedure, AFLR3, was successfully modified to generate anisotropic tetrahedral elements using a directional metric transformation defined at source nodes. The procedure can be coupled with a solver and an error estimator as part of an overall anisotropic solution adaptation methodology. It is suitable for use with an error estimator based on an adjoint, optimization, sensitivity derivative, or related approach. This offers many advantages, including more efficient point placement along with robust and efficient error estimation. It also serves as a framework for true grid optimization wherein error estimation and computational resources can be used as cost functions to determine the optimal point distribution. Within AFLR3 the metric transformation is implemented using a set of transformation vectors and associated aspect ratios. The modified overall procedure is presented along with details of the anisotropic transformation implementation. Multiple two-and three-dimensional examples are also presented that demonstrate the capability of the modified AFLR procedure to generate anisotropic elements using a set of source nodes with anisotropic transformation metrics. The example cases presented use moderate levels of anisotropy and result in usable element quality. Future testing with various flow solvers and methods for obtaining transformation metric information is needed to determine practical limits and evaluate the efficacy of the overall approach.

Marcum, David L.↗

Exhaustive Versus Randomized Searchers for Nonlinear Optimization in 21st Century Computing: Solar Application

We present a simple multi-dimensional exhaustive search method to obtain, in a reasonable time, the optimal solution of a nonlinear programming problem. It is more relevant in the present day non-mainframe computing scenario where an estimated 95% computing resources remains unutilized and computing speed touches petaflops. While the processor speed is doubling every 18 months, the band width is doubling every 12 months, and the hard disk space is doubling every 9 months. A randomized search algorithm or, equivalently, an evolutionary search method is often used instead of an exhaustive search algorithm. The reason is that a randomized approach is usually polynomial-time, i.e., fast while an exhaustive search method is exponential-time i.e., slow. We discuss the increasing importance of exhaustive search in optimization with the steady increase of computing power for solving many real-world problems of reasonable size. We also discuss the computational error and complexity of the search algorithm focusing on the fact that no measuring device can usually measure a quantity with an accuracy greater than 0.005%. We stress the fact that the quality of solution of the exhaustive search - a deterministic method - is better than that of randomized search. In 21 st century computing environment, exhaustive search cannot be left aside as an untouchable and it is not always exponential. We also describe a possible application of these algorithms in improving the efficiency of solar cells - a real hot topic - in the current energy crisis. These algorithms could be excellent tools in the hands of experimentalists and could save not only large amount of time needed for experiments but also could validate the theory against experimental results fast.

Sen, Syamal K.↗

Making an Informed Decision on Freshwater Management by Integrating Remote Sensing Data with Traditional Data

The US National Research Council (NRC) recommended that: "The U.S. government, working in concert with the private sector, academe, the public, and its international partners, should renew its investment in Earth-observing systems and restore its leadership in Earth science and applications." in response to the NASA Earth Science Division's request to prioritize research areas, observations, and notional missions to make those objectives. In this presentation, we will discuss our approach to connect remote sensing science to decision support applications by establishing a framework to integrate direct measurements, earth system models, inventories, and other information to accurately estimate fresh water resources in global, regional, and local scales. We will discuss our demonstration projects and lessons learned from the experience. Deploying a monitoring system that offers sustained, accurate, transparent and relevant information represents a challenge and opportunity to a broad community spanning earth science, water resource accounting and public policy. An introduction to some of the scientific and technical infrastructure issues associated with monitoring systems is offered here to encourage future treatment of these topics by other contributors as a concluding remark.

climate↗

Connecting Projects to Complete the In Situ Resource Utilization Paradigm

Terrain Identify specifics such as slope, rockiness, traction parameters Identify what part of ISRU needs each Physical Geotechnical Hardness, density, cohesion, etc. Identify what part of ISRU needs each (e.g., excavation needs to know hardness, density; soil processing needs to know density, cohesion; etc.)Mineral Identify specifics Identify what part of ISRU needs each Volatile Identify specifics Identify what part of ISRU needs each Atmosphere Identify specifics Identify what part of ISRU needs each Environment Identify specifics Identify what part of ISRU needs each Resource Characterization What: Develop an instrument suite to locate and evaluate the physical, mineral, and volatile resources at the lunar poles Neutron Spectrometer Near Infrared (IR) to locate subsurface hydrogen surface water Near IR for mineral identification Auger drill for sample removal down to 1 m Oven with Gas Chromatograph Mass Spectrometer to quantify volatiles present ISRU relevance: Water volatile resource characterization and subsurface material access removal Site Evaluation Resource Mapping What: Develop and utilize new data products and tools for evaluating potential exploration sites for selection and overlay mission data to map terrain, environment, and resource information e.g., New techniques applied to generate Digital Elevation Map (DEMs) at native scale of images (1mpxl)ISRU relevance: Resource mapping and estimation with terrain and environment information is needed for extraction planning Mission Planning and Operations What: Develop and utilize tools and procedures for planning mission operations and real time changes Planning tools include detailed engineering models (e.g., power and data) of surface segment systems allows evaluation of designs ISRU relevance: Allows for iterative engineering as a function of environment and hardware performance.

Paradigm↗

Process-Based Cost Estimation for Ramjet/Scramjet Engines

Process-based cost estimation plays a key role in effecting cultural change that integrates distributed science, technology and engineering teams to rapidly create innovative and affordable products. Working together, NASA Glenn Research Center and Boeing Canoga Park have developed a methodology of process-based cost estimation bridging the methodologies of high-level parametric models and detailed bottoms-up estimation. The NASA GRC/Boeing CP process-based cost model provides a probabilistic structure of layered cost drivers. High-level inputs characterize mission requirements, system performance, and relevant economic factors. Design alternatives are extracted from a standard, product-specific work breakdown structure to pre-load lower-level cost driver inputs and generate the cost-risk analysis. As product design progresses and matures the lower level more detailed cost drivers can be re-accessed and the projected variation of input values narrowed, thereby generating a progressively more accurate estimate of cost-risk. Incorporated into the process-based cost model are techniques for decision analysis, specifically, the analytic hierarchy process (AHP) and functional utility analysis. Design alternatives may then be evaluated not just on cost-risk, but also user defined performance and schedule criteria. This implementation of full-trade study support contributes significantly to the realization of the integrated development environment. The process-based cost estimation model generates development and manufacturing cost estimates. The development team plans to expand the manufacturing process base from approximately 80 manufacturing processes to over 250 processes. Operation and support cost modeling is also envisioned. Process-based estimation considers the materials, resources, and processes in establishing cost-risk and rather depending on weight as an input, actually estimates weight along with cost and schedule.

Singh, Brijendra↗

Blind Validation Study of PRICE TruePlanning and SEER-H

Two of the primary parametric costing tools used to estimate the development and production cost of future spacecraft hardware are PRICE TruePlanning by PRICE Systems, and System Estimation and Evaluation of Resources-Hardware (SEER-H) by Galorath. These are standard tools used by NASA and industry to estimate the cost of new aerospace hardware. This study is an independent verification of the accuracy of these tools and was originally published in 2018. The purpose of this presentation is to circulate the findings of that study among the NASA cost community. Both PRICE Systems and Galorath have completed internal validation studies of their parametric cost estimating tools; however, they only provided the results of the studies and did not detail the exact methods used to perform the validation. In the present study, cost estimators used PRICE TruePlanning and SEER-H to estimate the cost of twelve different past NASA science missions. The estimators were prevented from knowing the actual cost of the missions in an effort to minimize cognitive biases. In the present study, SEER-H had an average error of 23%, median error of -0.3%, with a standard deviation of 43%. PRICE had an average error of 52%, median error of 50%, and standard deviation of 45%. Nine of the twelve mission's actual costs fell within the 80% confidence interval of SEER's probabilistic estimates; however, none of the missions fell within PRICE’s confidence intervals. There were several factors independent of PRICE and SEER-H which may have affected the accuracy of the results in the present study including: uncertainty in the technical data used for the estimates, the methods used to estimate uncertainty in spacecraft component mass and numbers of prototypes, and the experience of the estimators.

SEER↗

Estimated Probability of a Cervical Spine Injury During an ISS Mission

Introduction: The Integrated Medical Model (IMM) utilizes historical data, cohort data, and external simulations as input factors to provide estimates of crew health, resource utilization and mission outcomes. The Cervical Spine Injury Module (CSIM) is an external simulation designed to provide the IMM with parameter estimates for 1) a probability distribution function (PDF) of the incidence rate, 2) the mean incidence rate, and 3) the standard deviation associated with the mean resulting from injury/trauma of the neck. Methods: An injury mechanism based on an idealized low-velocity blunt impact to the superior posterior thorax of an ISS crewmember was used as the simulated mission environment. As a result of this impact, the cervical spine is inertially loaded from the mass of the head producing an extension-flexion motion deforming the soft tissues of the neck. A multibody biomechanical model was developed to estimate the kinematic and dynamic response of the head-neck system from a prescribed acceleration profile. Logistic regression was performed on a dataset containing AIS1 soft tissue neck injuries from rear-end automobile collisions with published Neck Injury Criterion values producing an injury transfer function (ITF). An injury event scenario (IES) was constructed such that crew 1 is moving through a primary or standard translation path transferring large volume equipment impacting stationary crew 2. The incidence rate for this IES was estimated from in-flight data and used to calculate the probability of occurrence. The uncertainty in the model input factors were estimated from representative datasets and expressed in terms of probability distributions. A Monte Carlo Method utilizing simple random sampling was employed to propagate both aleatory and epistemic uncertain factors. Scatterplots and partial correlation coefficients (PCC) were generated to determine input factor sensitivity. CSIM was developed in the SimMechanics/Simulink environment with a Monte Carlo wrapper (MATLAB) used to integrate the components of the module. Results: The probability of generating an AIS1 soft tissue neck injury from the extension/flexion motion induced by a low-velocity blunt impact to the superior posterior thorax was fitted with a lognormal PDF with mean 0.26409, standard deviation 0.11353, standard error of mean 0.00114, and 95% confidence interval [0.26186, 0.26631]. Combining the probability of an AIS1 injury with the probability of IES occurrence was fitted with a Johnson SI PDF with mean 0.02772, standard deviation 0.02012, standard error of mean 0.00020, and 95% confidence interval [0.02733, 0.02812]. The input factor sensitivity analysis in descending order was IES incidence rate, ITF regression coefficient 1, impactor initial velocity, ITF regression coefficient 2, and all others (equipment mass, crew 1 body mass, crew 2 body mass) insignificant. Verification and Validation (V&V): The IMM V&V, based upon NASA STD 7009, was implemented which included an assessment of the data sets used to build CSIM. The documentation maintained includes source code comments and a technical report. The software code and documentation is under Subversion configuration management. Kinematic validation was performed by comparing the biomechanical model output to established corridors.

Brooker, John E.↗

A model for the cost of doing a cost estimate

A model for estimating the cost required to do a cost estimate for Deep Space Network (DSN) projects that range from $0.1 to $100 million is presented. The cost of the cost estimate in thousands of dollars, C(sub E), is found to be approximately given by C(sub E) = K((C(sub p))(sup 0.35)) where C(sub p) is the cost of the project being estimated in millions of dollars and K is a constant depending on the accuracy of the estimate. For an order-of-magnitude estimate, K = 24; for a budget estimate, K = 60; and for a definitive estimate, K = 115. That is, for a specific project, the cost of doing a budget estimate is about 2.5 times as much as that for an order-of-magnitude estimate, and a definitive estimate costs about twice as much as a budget estimate. Use of this model should help provide the level of resources required for doing cost estimates and, as a result, provide insights towards more accurate estimates with less potential for cost overruns.

Remer, D. S.↗

The cost of doing a cost estimate

A model for estimating the cost required to do a cost estimate for Deep Space Network (DSN) projects that range from $0.1 to $100 million is presented. The cost of the cost estimate in thousands of dollars, C(sub E), is found to be approximately given by C(sub E) = K(/C(sub p)/(sup 0.35)) where C(sub p) is the cost of the project being estimated in millions of dollars and K is a constant depending on the accuracy of the estimate. For an order-of-magnitude estimate, K = 24; for a budget estimate, K = 60; and for a definitive estimate, K = 115. That is, for a specific project, the cost of doing a budget estimate is about 2.5 times as much as that for an order-of-magnitude estimate, and a definitive estimate costs about twice as much as a budget estimate. Use of this model should help provide the level of resources required for doing cost estimates and, as a result, provide insights towards more accurate estimates with less potential for cost overruns.

Remer, Donald S.↗

Integrating O/S models during conceptual design, part 3

Space vehicles, such as the Space Shuttle, require intensive ground support prior to, during, and after each mission. Maintenance is a significant part of that ground support. All space vehicles require scheduled maintenance to ensure operability and performance. In addition, components of any vehicle are not one-hundred percent reliable so they exhibit random failures. Once detected, a failure initiates unscheduled maintenance on the vehicle. Maintenance decreases the number of missions which can be completed by keeping vehicles out of service so that the time between the completion of one mission and the start of the next is increased. Maintenance also requires resources such as people, facilities, tooling, and spare parts. Assessing the mission capability and resource requirements of any new space vehicle, in addition to performance specification, is necessary to predict the life cycle cost and success of the vehicle. Maintenance and logistics support has been modeled by computer simulation to estimate mission capability and resource requirements for evaluation of proposed space vehicles. The simulation was written with Simulation Language for Alternative Modeling II (SLAM II) for execution on a personal computer. For either one or a fleet of space vehicles, the model simulates the preflight maintenance checks, the mission and return to earth, and the post flight maintenance in preparation to be sent back into space. THe model enables prediction of the number of missions possible and vehicle turn-time (the time between completion of one mission and the start of the next) given estimated values for component reliability and maintainability. The model also facilitates study of the manpower and vehicle requirements for the proposed vehicle to meet its desired mission rate. This is the 3rd part of a 3 part technical report.

Ebeling, Charles E.↗

An overview of the energy situation

Beginning with a historical review of the domestic pattern of energy usage, the current dependence of the United States upon dwindling petroleum resources is examined. The possible limit of petroleum usage is discussed, and recent oil production trends are presented. Coupling these with projected analyses of OPEC oil productive capability in the early 1980's indicates a serious worldwide as well as American energy problem in the next decade. The need for conservation and rapid development of application of alternative energy resources is discussed including quantitative projections of significant conservation efforts as well as estimates of domestic alternative energy resource capabilities.

Pitts, D. R.↗

The Use of the Integrated Medical Model for Forecasting and Mitigating Medical Risks for a Near-Earth Asteroid Mission

Introduction The Integrated Medical Model (IMM) is a decision support tool that is useful to space flight mission managers and medical system designers in assessing risks and optimizing medical systems. The IMM employs an evidence-based, probabilistic risk assessment (PRA) approach within the operational constraints of space flight. Methods Stochastic computational methods are used to forecast probability distributions of medical events, crew health metrics, medical resource utilization, and probability estimates of medical evacuation and loss of crew life. The IMM can also optimize medical kits within the constraints of mass and volume for specified missions. The IMM was used to forecast medical evacuation and loss of crew life probabilities, as well as crew health metrics for a near-earth asteroid (NEA) mission. An optimized medical kit for this mission was proposed based on the IMM simulation. Discussion The IMM can provide information to the space program regarding medical risks, including crew medical impairment, medical evacuation and loss of crew life. This information is valuable to mission managers and the space medicine community in assessing risk and developing mitigation strategies. Exploration missions such as NEA missions will have significant mass and volume constraints applied to the medical system. Appropriate allocation of medical resources will be critical to mission success. The IMM capability of optimizing medical systems based on specific crew and mission profiles will be advantageous to medical system designers. Conclusion The IMM is a decision support tool that can provide estimates of the impact of medical events on human space flight missions, such as crew impairment, evacuation, and loss of crew life. It can be used to support the development of mitigation strategies and to propose optimized medical systems for specified space flight missions. Learning Objectives The audience will learn how an evidence-based decision support tool can be used to help assess risk, develop mitigation strategies, and optimize medical systems for exploration space flight missions.

Kerstman, Eric↗

NREPS Applications for Water Supply and Management in California and Tennessee

Management of water resources is a balancing act between temporally and spatially limited sources and competitive needs which can often exceed the supply. In order to manage water resources over a region such as the San Joaquin Valley or the Tennessee River Valley, it is pertinent to know the amount of water that has fallen in the watershed and where the water is going within it. Since rain gauge networks are typically sparsely spaced, it is typical that the majority of rainfall on the region may not be measured. To mitigate this under-sampling of rainfall, weather radar has long been employed to provide areal rainfall estimates. The Next-Generation Weather Radars (NEXRAD) make it possible to estimate rainfall over the majority of the conterminous United States. The NEXRAD Rainfall Estimation Processing System (NREPS) was developed specifically for the purpose of using weather radar to estimate rainfall for water resources management. The NREPS is tailored to meet customer needs on spatial and temporal scales relevant to the hydrologic or land-surface models of the end-user. It utilizes several techniques to mitigate artifacts in the NEXRAD data from contaminating the rainfall field. These techniques include clutter filtering, correction for occultation by topography as well as accounting for the vertical profile of reflectivity. This presentation will focus on improvements made to the NREPS system to map rainfall in the San Joaquin Valley for NASA s Water Supply and Management Project in California, but also ongoing rainfall mapping work in the Tennessee River watershed for the Tennessee Valley Authority and possible future applications in other areas of the continent.

Gatlin, P.↗

Comparison of TRMM Ground Validation and Satellite Rain Intensity Estimates

The Tropical Rainfall Measuring Mission (TRMM) Ground Validation (GV) Program began in the late 1980's and has provided a wealth of data and resources for validating TRMM satellite estimates. The TRMM GV program's main operational task is to provide rainfall products for four sites: Darwin, Australia (DARW); Houston, Texas (HSTN); Kwajalein, Republic of the Marshall Islands (KWAJ); and, Melbourne, Florida (MELB). A comparison between TRMM Ground Validation (Version 5) and Satellite (Version 6) rain intensity estimates is presented. The full suite of Version 6 satellite data is currently being generated by the TRMM Science Data and Information System (TSDIS) and should be completed some time near the end of 2005. The gridded satellite product (3G68) will be compared to GV Level II rain-intensity and -type maps (2A53 and 2A54, respectively). The 3G68 product represents a 0.5 deg x 0.5 deg data grid providing estimates of rain intensities from the TRMM Precipitation Radar (PR), Microwave Imager (TMI) and Combined (COM) algorithms. The comparisons will be sub-setted according to geographical type (land, coast and ocean). A bias statistic will be presented that provides quantification of the relative differences between the various estimators. Previous comparisons of an interim satellite product (Version 6a) showed that all of the estimates (GV and satellite) are converging, with some expected discrepancies. The convergence of the GV and satellite estimates bodes well for expectations for the proposed Global Precipitation Measurement (GPM) program and this study and others are being leveraged towards planning GV goals for GPM.

Wolff, David B.↗