PRA (Probabilistic Risk Assessments) Participation versus Validation

Probabilistic Risk Assessments (PRAs) are performed for projects or programs where the consequences of failure are highly undesirable. PRAs primarily address the level of risk those projects or programs posed during operations. PRAs are often developed after the design has been completed. Design and operational details used to develop models include approved and accepted design information regarding equipment, components, systems and failure data. This methodology basically validates the risk parameters of the project or system design. For high risk or high dollar projects, using PRA methodologies during the design process provides new opportunities to influence the design early in the project life cycle to identify, eliminate or mitigate potential risks. Identifying risk drivers before the design has been set allows the design engineers to understand the inherent risk of their current design and consider potential risk mitigation changes. This can become an iterative process where the PRA model can be used to determine if the mitigation technique is effective in reducing risk. This can result in more efficient and cost effective design changes. PRA methodology can be used to assess the risk of design alternatives and can demonstrate how major design changes or program modifications impact the overall program or project risk. PRA has been used for the last two decades to validate risk predictions and acceptability. Providing risk information which can positively influence final system and equipment design the PRA tool can also participate in design development, providing a safe and cost effective product.

DeMott, Diana↗

Security Risk Assessment Process for UAS in the NAS CNPC Architecture

This informational paper discusses the risk assessment process conducted to analyze Control and Non-Payload Communications (CNPC) architectures for integrating civil Unmanned Aircraft Systems (UAS) into the National Airspace System (NAS). The assessment employs the National Institute of Standards and Technology (NIST) Risk Management framework to identify threats, vulnerabilities, and risks to these architectures and recommends corresponding mitigating security controls. This process builds upon earlier work performed by RTCA Special Committee (SC) 203 and the Federal Aviation Administration (FAA) to roadmap the risk assessment methodology and to identify categories of information security risks that pose a significant impact to aeronautical communications systems. A description of the deviations from the typical process is described in regards to this aeronautical communications system. Due to the sensitive nature of the information, data resulting from the risk assessment pertaining to threats, vulnerabilities, and risks is beyond the scope of this paper

data links↗

Enhancement of Industry Legacy Probabilistic Risk Assessment Methods and Tools

Probabilistic risk assessments (PRAs) are integral to nuclear power plant (NPP) operations, having tremendously benefitted the safety of the U.S. reactor fleet for decades. Insights obtained from the models have provided perspectives on a variety of applications, both at the plant and for the regulator. While these models are very useful, they are now being asked to represent and analyze aspects of the plant that were never envisioned by the initial PRA practitioners. Furthermore, heightened demands on the PRA models have led to increased computing power requirements. Additionally, as the complexity of the PRA models increased, the difficulty experienced by non-PRA experts in trying to understand these models, grasp the insights they provide, and effectively use that information has become problematic. The need for research to address key issues regarding PRA tools and methods has never been greater. Although the nuclear power industry has largely been well-served by these tools and methods, the underlying science is dated, remaining mostly unchanged for over two decades. Three areas were identified as most beneficial to address to maintain and improve the usefulness of the current practice legacy PRA tools: improvement in quantification speed, increased ability to efficiently model multi-hazard models, and improvement in modeling human action dependency in PRA. This report provides the outcomes from the FY2021 research into these three areas, identifying potential technical gaps and solutions, and charting the next steps forward to address current PRA challenges.

42 ENGINEERING↗

GERMcode: A Stochastic Model for Space Radiation Risk Assessment

A new computer model, the GCR Event-based Risk Model code (GERMcode), was developed to describe biophysical events from high-energy protons and high charge and energy (HZE) particles that have been studied at the NASA Space Radiation Laboratory (NSRL) for the purpose of simulating space radiation biological effects. In the GERMcode, the biophysical description of the passage of HZE particles in tissue and shielding materials is made with a stochastic approach that includes both particle track structure and nuclear interactions. The GERMcode accounts for the major nuclear interaction processes of importance for describing heavy ion beams, including nuclear fragmentation, elastic scattering, and knockout-cascade processes by using the quantum multiple scattering fragmentation (QMSFRG) model. The QMSFRG model has been shown to be in excellent agreement with available experimental data for nuclear fragmentation cross sections. For NSRL applications, the GERMcode evaluates a set of biophysical properties, such as the Poisson distribution of particles or delta-ray hits for a given cellular area and particle dose, the radial dose on tissue, and the frequency distribution of energy deposition in a DNA volume. By utilizing the ProE/Fishbowl ray-tracing analysis, the GERMcode will be used as a bi-directional radiation transport model for future spacecraft shielding analysis in support of Mars mission risk assessments. Recent radiobiological experiments suggest the need for new approaches to risk assessment that include time-dependent biological events due to the signaling times for activation and relaxation of biological processes in cells and tissue. Thus, the tracking of the temporal and spatial distribution of events in tissue is a major goal of the GERMcode in support of the simulation of biological processes important in GCR risk assessments. In order to validate our approach, basic radiobiological responses such as cell survival curves, mutation, chromosomal aberrations, and representative mouse tumor induction curves are implemented into the GERMcode. Extension of these descriptions to other endpoints related to non-targeted effects and biochemical pathway responses will be discussed.

Kim, Myung-Hee Y.↗

The Application of Integrated Knowledge-based Systems for the Biomedical Risk Assessment Intelligent Network (BRAIN)

One of NASA's goals for long duration space flight is to maintain acceptable levels of crew health, safety, and performance. One way of meeting this goal is through the Biomedical Risk Assessment Intelligent Network (BRAIN), an integrated network of both human and computer elements. The BRAIN will function as an advisor to flight surgeons by assessing the risk of in-flight biomedical problems and recommending appropriate countermeasures. This paper describes the joint effort among various NASA elements to develop BRAIN and an Infectious Disease Risk Assessment (IDRA) prototype. The implementation of this effort addresses the technological aspects of the following: (1) knowledge acquisition; (2) integration of IDRA components; (3) use of expert systems to automate the biomedical prediction process; (4) development of a user-friendly interface; and (5) integration of the IDRA prototype and Exercise Countermeasures Intelligent System (ExerCISys). Because the C Language, CLIPS (the C Language Integrated Production System), and the X-Window System were portable and easily integrated, they were chosen as the tools for the initial IDRA prototype. The feasibility was tested by developing an IDRA prototype that predicts the individual risk of influenza. The application of knowledge-based systems to risk assessment is of great market value to the medical technology industry.

Loftin, Karin C.↗

Engineering Risk Assessment of Space Thruster Challenge Problem

The Engineering Risk Assessment (ERA) team at NASA Ames Research Center utilizes dynamic models with linked physics-of-failure analyses to produce quantitative risk assessments of space exploration missions. This paper applies the ERA approach to the baseline and extended versions of the PSAM Space Thruster Challenge Problem, which investigates mission risk for a deep space ion propulsion system with time-varying thruster requirements and operations schedules. The dynamic mission is modeled using a combination of discrete and continuous-time reliability elements within the commercially available GoldSim software. Loss-of-mission (LOM) probability results are generated via Monte Carlo sampling performed by the integrated model. Model convergence studies are presented to illustrate the sensitivity of integrated LOM results to the number of Monte Carlo trials. A deterministic risk model was also built for the three baseline and extended missions using the Ames Reliability Tool (ART), and results are compared to the simulation results to evaluate the relative importance of mission dynamics. The ART model did a reasonable job of matching the simulation models for the baseline case, while a hybrid approach using offline dynamic models was required for the extended missions. This study highlighted that state-of-the-art techniques can adequately adapt to a range of dynamic problems.

Assessment↗

Risk Assessment and Management Workflow—An Example of the Southwest Regional Partnership

This paper summarizes the risk assessment and management workflow developed and applied to the Southwest Regional Partnership on Carbon Sequestration (SWP) Phase III Demonstration Project. The risk assessment and management workflow consists of six primary tasks, including management planning, identification, qualitative analysis, quantitative analysis, response planning, and monitoring. Within the workflow, the SWP assembled and iteratively updated a risk registry that identifies risks for all major activities of the project. Risk elements were ranked with respect to the potential impact to the project and the likelihood of occurrence. Both qualitative and quantitative risk analyses were performed. To graphically depict the interactions among risk elements and help building risk scenarios, process influence diagrams were used to represent the interactions. The SWP employed quantitative methods of risk analysis including Response Surface Method (RSM), Polynomial Chaos Expansion (PCE), and the National Risk Assessment Partnership (NRAP) toolset. The SWP also developed risk response planning and performed risk control and monitoring to prevent the risks from affecting the project and ensure the effectiveness of risk management. As part of risk control and monitoring, existing and new risks have been tracked and the response plan was subsequently evaluated. Findings and lessons learned from the SWP’s risk assessment and management efforts will provide valuable information for other commercial geological CO2 storage projects.

Lee, Si-Yong↗

Security Risk Assessment Process for UAS in the NAS CNPC Architecture

This informational paper discusses the risk assessment process conducted to analyze Control and Non-Payload Communications (CNPC) architectures for integrating civil Unmanned Aircraft Systems (UAS) into the National Airspace System (NAS). The assessment employs the National Institute of Standards and Technology (NIST) Risk Management framework to identify threats, vulnerabilities, and risks to these architectures and recommends corresponding mitigating security controls. This process builds upon earlier work performed by RTCA Special Committee (SC) 203 and the Federal Aviation Administration (FAA) to roadmap the risk assessment methodology and to identify categories of information security risks that pose a significant impact to aeronautical communications systems. A description of the deviations from the typical process is described in regards to this aeronautical communications system. Due to the sensitive nature of the information, data resulting from the risk assessment pertaining to threats, vulnerabilities, and risks is beyond the scope of this paper.

Iannicca, Dennis C.↗

Reliability and risk assessment of structures

Development of reliability and risk assessment of structural components and structures is a major activity at Lewis Research Center. It consists of five program elements: (1) probabilistic loads; (2) probabilistic finite element analysis; (3) probabilistic material behavior; (4) assessment of reliability and risk; and (5) probabilistic structural performance evaluation. Recent progress includes: (1) the evaluation of the various uncertainties in terms of cumulative distribution functions for various structural response variables based on known or assumed uncertainties in primitive structural variables; (2) evaluation of the failure probability; (3) reliability and risk-cost assessment; and (4) an outline of an emerging approach for eventual certification of man-rated structures by computational methods. Collectively, the results demonstrate that the structural durability/reliability of man-rated structural components and structures can be effectively evaluated by using formal probabilistic methods.

Chamis, C. C.↗

Summary of Technical Peer Review on the Risk Assessment Framework proposed in Report INL/RPT-22-68656 for Digital Instrumentation and Control Systems

This report summarizes the peer review activities initiated by Idaho National Laboratory (INL) during fiscal year (FY) 2023 for the evaluation and improvement of the methodology developed under the U.S. Department of Energy (DOE) Light Water Reactor Sustainability (LWRS) Program, Risk Informed Systems Analysis (RISA) Pathway, digital instrumentation and control (DI&C) risk assessment project. In FY 2019, the RISA Pathway initiated a project to develop a risk assessment strategy for delivering a technical basis to support effective and secure DI&C technologies for digital upgrades/designs. A framework was proposed for this strategy, which aims to (1) provide a best-estimate, risk-informed capability to quantitatively and accurately estimate the risk impact of plant modernization, considering the introduction of high safety-significant safety-related (HSSSR) DI&C systems, (2) support and supplement existing risk-informed DI&C design guides by providing quantitative risk information and evidence, (3) offer a capability of design architecture evaluation of various DI&C systems, (4) assure the long-term safety and reliability of HSSSR DI&C systems, and (5) reduce uncertainty in costs and support integration of DI&C systems in the plant. The R&D efforts of this project from FY 2019 through FY 2022 were focused on methodology improvement and demonstration of the proposed framework for the risk assessment and design optimization of safety-critical DI&C systems. Collaborations with the nuclear industry have been initiated to support the reliability and risk assessment of their DI&C systems by using the proposed framework. In FY 2023, the framework has reached to a point for a technical peer review and obtain stakeholder feedback. This peer review activity includes coordination of the reviews performed by a group of industry stakeholders, documentation of the peer review suggestions, providing resolutions and responses to the peer review comments. The objective of this technical peer review is to obtain representative feedback on the proposed framework to improve the technical qualities of its methodology and readiness for deployment to the industry. Feedback may identify potential areas for improvement and further development. The Subject Matter experts were invited to review the latest project report documenting the methodology developed in the project and provide evaluations of the technical qualities of the proposed framework and relevant methods. The reviewed project report is “An Integrated Framework for Risk Assessment of High Safety-significant Safety-related Digital Instrumentation and Control Systems in Nuclear Power Plants: Methodology and Demonstration” INL/RPT-22-68656 (short as “INL/RPT-22-68656” in this report). This peer review report documents the technical questions provided for technical peer review and introduces the technical peer reviewers from the stakeholders including nuclear utilities, regulators, and universities. Comments from technical peer reviewers and the resolutions and responses to these comments are outlined. Insights and lessons learned from the technical peer review are summarized in conclusions and future work. The primary audience of this report are DI&C designers, engineers, and probabilistic risk assessment (PRA) practitioners. This includes stakeholders, such as the nuclear utilities and regulators who consider the deployment and upgrade of DI&C systems, DI&C software developers and reviewers, and cybersecurity specialists.

99 GENERAL AND MISCELLANEOUS↗

Assessment of Model Outcomes Between the Integrated Medical Model (IMM) and the Medical Extensible Dynamic Probabilistic Risk Assessment Tool (MEDPRAT)

The Medical Extensible Dynamic Probabilistic Risk Assessment Tool (MEDPRAT) is a computational model that provides human health and medical risk predictions for crewed spaceflight missions. MEDPRAT utilizes discrete event modeling and dynamic probabilistic simulation to predict critical mission outcomes (total medical events, crew health index, quality time lost, loss of crew life, removal to definitive care), condition occurrences, and resource consumption. Input parameters for MEDPRAT include crew attributes (e.g., sex), types of mission activities (e.g., whether and where crew members perform an extravehicular activity (EVA)), available resources, treatment information, and probability distributions for medical conditions. As an evolution of the Integrated Medical Model (IMM), MEDPRAT provides enhanced capabilities and higher fidelity, and incorporates more appropriate assumptions for long-duration spaceflight. IMM is the currently accepted standard for quantifying spaceflight mission medical risk in NASA operations that uses a probabilistic risk assessment (PRA) approach. MEDPRAT builds on the same logical foundation as IMM but implements the model architecture through highly optimized Monte Carlo sampling methods. An analysis is performed comparing the outputs from IMM with those from MEDPRAT V1.0 and V2.0 for the same reference missions in order to quantify similarities and differences in the model outcomes. The juxtaposition between IMM and MEDPRAT V1.0 and 2.0 shown in this report demonstrates that these two models generate very similar results; where differences in outcomes are shown, these are in accordance with the underlying assumptions and differences in the model architectures. This validation effort further establishes the credibility and reliability of the MEDPRAT software.

Matthew T Prelich↗

Artemis Missions Probabilistic Risk Assessment (PRA) & Reliability Assessment Overview

To show how NASA’s Moon-to-Mars (M2M) program can use hardware reliability assessments and comprehensive Probabilistic Risk Assessments (PRAs) to estimate risk of future missions and manage risk via safety and mission success requirements from the top down, so that this risk can be balanced with other program metrics like cost and schedule. These PRAs and reliability assessments can be used during the concept, design, and operational phases of development. This presentation also provides some thoughts on how the NASA process can be utilized for a lunar surface power grid development.

PRA↗

Geologic Risk Assessment Activities at SECARB Cranfield, MS Site

Risk Assessment (RA) of RCSP Phase 3 sites is a DOE requirement and valuable to DOE’s program because this process encourage careful consideration of elements that could damage an individual project, or if severe ,damage credibility and public commercial acceptance of the sequestration process. Poor outcomes even from small projects can have negative consequences larger than the cost to the individual project. In addition, practice in risk assessment compared to project evolution is needed as part of the confidence-building toward future large scale, long term industrial activities.

01 COAL, LIGNITE, AND PEAT↗

An Integrated Framework for Risk Assessment of Safety-related Digital Instrumentation and Control Systems in Nuclear Power Plants: Methodology Advancement and Application

This report documents activities performed by Idaho National Laboratory (INL) during fiscal year (FY) 2024 for the U.S. Department of Energy (DOE) Light Water Reactor Sustainability (LWRS) Program, Risk Informed Systems Analysis (RISA) Pathway, Digital Instrumentation and Control (DI&C) Risk Assessment project. The goal of the RISA Pathway is to optimize safety margins and minimize uncertainties to achieve economic efficiencies while maintaining high levels of safety. This is accomplished by providing scientific basis to better represent safety margins and factors that contribute to cost and safety, and by developing new technologies that reduce operating costs. The research efforts for FY 2024 encompass methodology refinement and exploration. The efforts include: (1) The implementation of a natural language processing tool to expedite key aspects of the reliability analysis methods developed by INL; (2) advances to support intersystem CCF analysis by providing guidance for and identification of coupling mechanisms that may contribute to CCF; (3) the investigation of how generative artificial intelligence tools can aid in hazard analysis and diversity and defense in depth (i.e., D3) assessments; (4) Industry collaboration, allowing the demonstration of and INL's risk assessment tools to support risk assessment of DI&C systems at early and late stages of development; (4) a roadmap for the development of a software for each of INL's risk assessment tools; (5) The development of a theory and methodology manual for a risk quantification methodology; (6) the development of a reliability analysis for machine learning (ML)-integrated control systems.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Project Risk Assessment and Monitoring for CarbonSAFE Illinois - Macon County (Task 2)

A risk evaluation performed for CarbonSAFE Macon County included performing a risk assessment for the overall project and the identification of technical project risks. These tasks were accomplished through a combination of risk assessment meetings, workshops, expert solicitation, and identifying and implementing risk mitigation or prevention activities. Information from previous carbon storage projects and from the execution of the project (including drilling a test well and conducting 2D seismic survey) were assessed to identify future risks towards the development of a storage complex.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Probabilistic Risk Assessment Research Needs and Activities

Probabilistic risk assessments (PRAs) have benefitted the safe operation of the U.S. reactor fleet over many decades. Risk insights from these PRAs have provided information from many different perspectives, from what is most important to maintain at a facility to a better understanding of how to address new information regarding safety issues. The methods and tools that have supported the creation and enhancement of PRA models were established through multiple decades of research, from the 1970s starting with the WASH-1400 Reactor Safety Study through comprehensive plant-specific models in use today. Because PRA models are being used to support such a diverse array of plant decisions, they are now being applied to analyze an increasing number and diverse set of aspects of the plant, which are well beyond the initial efforts envisioned in the 1970s. These demands on PRA methods and tools have led to challenges in terms of further expansion of the use of PRA and raised the potential for future research into how to address these challenges to ensure continued nuclear safety. In addition to the PRA needs, the domain of computer science has led to advances in computational approaches that may serve to help nuclear power plant PRA applications. These newer technologies have great potential to improve the effectiveness and economics of PRA and are being considered for exploration of potential benefits to the PRA and nuclear-power communities.

97 MATHEMATICS AND COMPUTING↗

Preliminary Nuclear Containment Vessel Modeling for Multi-Hazard Probabilistic Risk Assessment under Seismic Hazards and Concrete Degradation

The current practice for natural phenomena hazards (NPH) risk assessment of nuclear facilities is to compute the risk for each hazard independently and then compound the total risk as a combination of single hazard risks. This state of practice does not consider correlations between hazards and the cascading impacts to structures, systems, and components (SSCs), and could thus underestimate the NPH risk or overestimate the nuclear facility safety. Events such as the Fukushima Daiichi accident have highlighted the importance of multi-hazard risk considerations to nuclear power plants (NPPs) that quantify the cascading damage effects to SSCs in the risk models. Moreover, the current fleet of NPPs in the United States is aging; these NPPs are now expected to operate well beyond their initially planned design life. Aging-related deterioration can potentially decrease the capacity of critical structures such as containment vessels to withstand NPH. Such aging considerations may not be adequately accounted for by the current NPH risk assessment guidelines. This paper presents a preliminary modeling and simulation of a representative reinforced concrete containment vessel subjected to seismic mainshock and aftershock considering concrete degradation due to alkali silica reaction. The broader aim is to develop multi-hazard time-dependent fragility functions that could be subsequently used in the probabilistic risk assessment (PRA) model. The multi-hazard component comes into play due to the consideration of damage to the containment vessel under seismic loads and concrete degradation. Consideration of concrete degradation also brings into play the time-dependent nature of the containment vessel response. The response of the containment vessel under varying degrees of concrete degradation to seismic loads is investigated. The results presented are simulated using the Multi-hazard Analysis for STOchastic time-DOmaiN phenomena (MASTODON) software for seismic analysis and the Blackbear software for concrete degradation and damage modeling. Both software are open source and developed within the Multiphysics Object-Oriented Simulation Environment (MOOSE).

42 ENGINEERING↗

Evaluating Micrometeoroid and Orbital Debris Risk Assessments Using Anomaly Data

The accuracy of micrometeoroid and orbital debris (MMOD) risk assessments can be difficult to evaluate. A team from the National Aeronautics and Space Administration (NASA) Engineering and Safety Center (NESC) has completed a study that compared MMOD-related failures on operational satellites to predictions of how many of those failures should occur using NASA's TM"s MMOD risk assessment methodology and tools. The study team used the Poisson probability to quantify the degree of inconsistency between the predicted and reported numbers of failures. Many elements go into a risk assessment, and each of those elements represent a possible source of uncertainty or bias that will influence the end result. There are also challenges in obtaining accurate and useful data on MMOD-related failures.

Squire, Michael↗