Search NASA⌕ Search

SEARCH · Search NASA

Results for “transit fleet”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Assessment of CTF for Steady-state and Transient Post-CHF Conditions in Support of Time-at-Temperature Modeling Applications

The US nuclear industry is exploring options to improve operational economics and uprate the current fleet of light-water reactors by investigating transitioning to cladding performance–based safety criteria as opposed to the current limit, which requires complete avoidance of critical heat flux (CHF)/dryout. Past experience has shown that not all events leading to a dryout are severe enough to cause fuel performance degradation. Allowing temporary dryout of the fuel—that is, using a time-at-temperature (TaT) strategy—could allow for economic improvements via large power uprates and enhanced operational flexibility for current plants without compromising fuel integrity. To support this effort, the US Department of Energy is executing a comprehensive program that includes generating cladding material data under TaT conditions, developing new mechanistic models, and demonstrating modeling and simulation capabilities for transients of interest. This paper presents work performed to assess the CTF thermal-hydraulics subchannel code. CTF is a package used in the VERA core simulator, which will ultimately be used for TaT analysis. CTF will provide the thermal-hydraulic boundary conditions that will be needed for fuel performance analysis in the BISON code. Quantifying both the accuracy and uncertainty of post-CHF models will therefore be necessary. This paper outlines the strategy for the assessment of TaT and presents the results of using the steady-state and transient dryout experiments of the Boiling Fine-mesh Bundle Tests for CTF validation. The results show that the current model tends to overpredict steady-state critical power. This behavior translates to the transient tests, in which CTF is unable to capture transient dryout behavior. Some discussion of sensitivity analysis work being performed is provided to indicate which models must be further analyzed to properly model transient dryout and its uncertainty.

Salko Jr, Robert [ORNL] (ORCID:0000000253566679)↗

Technical Evaluation of Battery Electric Bus Potential in Mexico City and León, Mexico

The National Renewable Energy Laboratory (NREL) in partnership with USAID Mexico's Low Emissions Development (MLED) II program explored the technical feasibility of transit bus electrification in Mexico City (CDMX) and León. NREL and USAID engaged CDMX and León transit agencies to understand routes of interest and existing fleet fueling and bus specifications.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Meta-Analysis of Advanced Nuclear Reactor Cost Estimations

Supporting Data can be downloaded at: https://gain.inl.gov/content/uploads/4/2024/06/INL-RPT-24-77048-R1.xlsx Nuclear energy is a critical cornerstone of the current United States clean energy supply and may play a larger role in the future in support of a transition to a net-zero economy. The current fleet of nuclear reactors predominantly consists of large light-water reactors (LWRs), while many of the reactor designs under consideration are smaller and/or different technologies. Because these new designs have not yet been built, there is a high degree of uncertainty associated with their cost. This complicates energy-planning efforts because cost projections are not always standardized, consistent, and centralized in an easily accessible location. To help support energy planning in the US, this report provides advanced nuclear cost ranges using a transparent methodology along with other relevant information that can be used to help support decision making and energy planning. The purpose of this work was to conduct a methodical process for cost evaluation using only public information that was vetted with the end-goal to provide reference cost projections for nuclear energy. To provide a solid basis for these values, the approach and assumptions are explicitly laid out throughout the report allowing any user of the data to challenge or reconsider them. Because future US nuclear-reactor costs are still unknown due to little recent observed data, the report opted to compile a comprehensive list of bottom-up estimates and evaluate averages/trends within the data to identify reference ranges. This was deemed preferable to opining on the robustness or validity of one cost estimation versus another. To that end, the work evaluated thousands of lines of cost subaccounts from several bottom-up cost estimates. A wide variety of different reactor types captured in the data are of various sizes and technologies. Some of these reactors will be representative of advanced reactors under development while others will not. Thus, the results here are dependent on the data that are available and the accuracy of the estimates that are used. Each bottom-up estimate was reviewed to determine whether it was complete. Incomplete data sets were corrected to ensure an adequate basis of cross-comparison. The report is not without limitations and should be interpreted as an initial step to develop cost ranges for nuclear technology. Ultimately, future work can build upon the methodology with refined cost estimates to reduce uncertainty. US-based overnight capital cost (OCC) estimates were compiled from extensive data sets into ranges for both large and small reactor sizes for 2030. To project the cost declines over time, learning rates were sampled from literature sources. No SMRs were previously built; hence, learning rates based on bottom-up approaches (e.g., by quantifying the impact stemming from fabrication of different components, modular work, site construction, commissioning) were prioritized. For larger reactors, actual learning rates from deployments were used to project future costs (adjusted to account for standardization or lack thereof between designs). Other costs included are fixed and variable operations and maintenance costs. The final variables were capacity factors and ramp rates to support energy planning.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Energy Cost Analysis and Operational Range Prediction Based on Medium- and Heavy-Duty Electric Vehicle Real-World Deployments across the United States

While the market for medium- and heavy-duty battery-electric vehicles (MHD EVs) is still nascent, a growing number of these vehicles are being deployed across the U.S. This study used over 2.3 million miles of operational data from multiple types of MHD EVs across various regions and operating conditions to address knowledge gaps in total cost of ownership and operational range. First, real-world energy cost savings were determined: MHD fleets should experience energy cost savings each year from 2021 to 2035, regardless of vehicle platform, with the greatest savings seen in transit buses (up to USD 4459 annually) and HD trucks (up to USD 3284 annually). Second, to help fleets across various geographies throughout the U.S. assess the suitability of EVs for their year-round operating needs, operational range was modeled using the XGBoost algorithm (R2: 70%) given 22 input features relevant to vehicle efficiency. Finally, this paper recommends (1) that MHD fleets apply energy-saving practices to minimize the impacts of cold temperatures and high congestion levels on vehicle efficiency and range, and (2) that local hauling fleets select trucks with a nominal range nearly double the expected maximum daily range to account for range losses under local, urban driving conditions.

Qiu, Yin (ORCID:0009000900948794)↗

Light Water Sustainability Program: Optimizing Information Automation Using a New Method Based on System-Theoretic Process Analysis

This report describes the interim progress for research supporting the design and optimization of information automation systems for nuclear power plants. Much of the domestic nuclear fleet is currently focused on modernizing technologies and processes, including transitioning toward digitalization in the control room and elsewhere throughout the plant, along with a greater use of automation, artificial intelligence, robotics, and other emerging technologies. While there are significant opportunities to apply these technologies toward greater plant safety, efficiency, and overall cost-effectiveness, optimizing their design and avoiding potential safety and performance risks depends on ensuring that human-performance-related organizational and technical design issues are identified and addressed. This report describes modeling tools and techniques, based on sociotechnical system theory, to support these design goals and their application in the current research effort. The report is intended for senior nuclear energy stakeholders, including regulators, corporate management, and senior plant management. We have developed and employed a method to design an optimized information automation ecosystem (IAE) based on the systems-theoretic constructs underlying sociotechnical systems theory in general and the Systems-Theoretic Accident Modeling and Processes (STAMP) approach in particular. We argue that an IAE can be modeled as an interactive information control system whose behavior can be understood in terms of dynamic control and feedback relationships amongst the system’s technical and organizational components. Up to this point, we have employed a Causal Analysis based on STAMP (CAST) technique to examine a performance- and safety-related incident at an industry partner’s plant that involved the unintentional activation of an emergency diesel generator. This analysis provided insight into the behavior of the plant’s current information control structure within the context of a specific, significant event. Our ongoing analysis is focused on identifying near-term process improvements and longer-term design requirements for an optimized IAE system. The latter analyses will employ a second STAMP-derived technique, System-Theoretic Process Analysis (STPA). STPA is a useful modeling tool for generating and analyzing actual or potential information control structures. Finally, we have begun modeling plantwide organizational relationships and processes. Organizational system modeling will supplement our CAST and STPA findings and provide a basis for mapping out a plantwide information control architecture. CAST analysis findings indicate an important underlying contributor to the incident under investigation, and a significant risk to information automation system performance, was perceived schedule pressure, which exposed weaknesses in interdepartmental coordination between and within responsible plant organizations and challenged the resilience of established plant processes, until a human caused the initiating event. These findings are discussed in terms of their risk to overall system performance and their implications for information automation system resilience and brittleness. We present two preliminary information automation models. The proactive issue resolution model is a test case of an information automation concept with significant near-term potential for application and subsequent reduction in significant plant events. The IAE model is a more general representation of a broader, plantwide information automation system. From our results, we have generated a set of preliminary system-level requirements and safety constraints. These requirements will be further developed over the remainder of our project in collaboration with nuclear industry subject matter experts and specialists in the technical systems under consideration. Additionally, we will continue to pursue the system analyses initiated in the first part of our effort, with a particular emphasis on STPA as the main tool to identify weak or weakening control structures that affect the resilience of organizations and programs. Our intent is to broaden the scope of the analysis from an individual use case to a related set of use cases (e.g., maintenance tasks, compliance tasks) with similar human-system performance challenges. This will enable more generalized findings to refine the Proactive Issue Resolution and IAE models, as well as their system-level requirements and safety constraints. We will use organizational system modeling analyses to supplement STPA findings and model development. We conclude the report with a set of summary recommendations and an initial draft list of system-level requirements and safety constraints for optimized information automation systems.

99 GENERAL AND MISCELLANEOUS↗

Optimizing Information Automation Using a New Method Based on System-Theoretic Process Analysis: Tool Development and Method Evaluation

This report is an update to a prior report that describes progress and findings for a program of research supporting the design and optimization of information automation systems for nuclear power plants. Much of the domestic nuclear fleet is currently focused on modernizing technologies and processes, including transitioning toward digitalization in the control room and throughout the plant, along with a greater interest in the use of automation, artificial intelligence, robotics, and other emerging technologies. While there are significant opportunities to apply these technologies toward greater plant safety, efficiency, and overall cost-effectiveness, optimizing their design and avoiding potential safety and performance risks depends on ensuring that human performance-related organizational and technical design issues are identified and addressed early in the design process. This report describes modeling tools and techniques, based on sociotechnical systems theory, to support these design goals and their application in the current research effort. The report is primarily intended for senior nuclear energy stakeholders, including regulators, corporate management, and senior plant management. We have developed and employed a method to design an optimized information automation ecosystem (IAE) based on the systems-theoretic constructs underlying sociotechnical systems theory in general and the Systems-Theoretic Accident Modeling and Processes (STAMP) approach in particular. We argue that an IAE can be modeled as an interactive information control system whose behavior can be understood in terms of dynamic control, feedback, and communication relationships amongst the system’s technical and organizational components. We have employed two STAMP-based tools in this effort. The first is Causal Analysis based on STAMP (CAST), an accident and incident analysis technique that was used to examine a performance- and safety-related incident at an industry partner’s plant involving the unintentional activation of an emergency diesel generator. This analysis provided insight into the behavior of the plant’s current information control structure within the context of a specific, significant event. The second tool is Systems Theoretic Process Analysis (STPA) which is a proactive risk analysis tool used to examine existing and potential, planned sociotechnical systems. STPA was used to identify risk factors in the current design of a generic nuclear power plant (NPP) preventive maintenance system. Our analyses focused on identifying near-term system improvements and longer-term design requirements for an optimized IAE system. CAST analysis findings indicate an important underlying contributor to the incident under investigation, and a significant risk to information automation system performance, was perceived time and schedule pressure, which exposed weaknesses in interdepartmental coordination between and within responsible plant organizations and challenged the resilience of established plant processes, until a human caused the eventual event. These findings are discussed in terms of their risk to overall system performance and their implications for information automation system resilience and brittleness. STPA findings exposed several areas of concern in the design of current preventive maintenance systems. We also present two preliminary information automation models. The proactive issue resolution (PIR) model is a test case of an information automation concept with significant near-term potential for application and subsequent reduction in significant plant events. The IAE model is a more general representation of a broader, plantwide information automation system and represents an end-state vision for our work. From our results, we have generated an initial set of preliminary system-level requirements and safety constraints for these models. We have also focused on early development of easy to learn, easy to use “transportable” tools for sociotechnical systems analysis. We intend these to be used by NPP personnel as a means of gaining reliable and relatively quick insight into (1) sociotechnical systems factors impacting incidents and accidents, (2) potential sociotechnical risk factors in existing or planned system designs, and (3) potential weaknesses in a system’s safety and/or information control structure. We conclude the report with a set of summary recommendations, a discussion of planned and potential follow-on research and development, and a draft list of system-level requirements and safety constraints for optimized information automation systems.

99 GENERAL AND MISCELLANEOUS↗

MC Formula Protocol for H35HF Fueling

A publicly available and verified high-flow fueling protocol for H35 medium-duty (MD) and heavy-duty (HD) hydrogen-powered buses and trucks does not exist. This could lead to transit agencies needing to select suppliers for purchase of new fleet vehicles, and to multiple providers responding with incompatible vehicle designs in the future. With the expansion of MD/HD vehicles using 35 MPa storage, there will be a need for publicly accessible H35HF stations, and these will require the use of a standardized prescriptive fueling protocol. The development of a fully tested and validated H35 high-flow (H35HF) MC Formula fueling protocol for MD and HD buses and trucks can provide guidelines to design H35 stations and vehicles, enable other manufacturers and vehicle original equipment manufacturers (OEMs) to enter this space, and ultimately accelerate to popularize the hydrogen market.

ADVANCED PROPULSION SYSTEMS,ENERGY PLANNING, POLIC↗

Automated Electric Vehicle Fleet Operations for On-Demand Service: Challenges and Opportunities

Automated/autonomous vehicle fleet operations within automated mobility districts have been studied over the past five years by the National Renewable Energy Laboratory, a US Department of Energy federally funded research and development center. This paper extends the analysis in this third phase of research underway to include considerations for electric vehicle operations and charging within a fleet of right-sized automated vehicles providing on-demand public mobility services. The current focus of research is on the operational complexities and associated challenges for automated/autonomous vehicles employing electric drivetrains and the resultant need for an efficient battery charging process while vehicles are operating in an "on-demand" mode of service. The blossoming of microtransit with shared-ride and point-to-point dispatching of each vehicle instills complex operations, with multiple mobility-on-demand transit operating sites being deployed, studied, and analyzed across North America. As a starting point, the authors' experience over the past 20 years with the analysis of automated transit network systems operating on and within dedicated and protected transitways provides initial insights into the system-level operational implications for maintaining a sufficient battery charge for a fleet of automated vehicles. Lessons learned through the prior analyses of automated transit network systems operating in on-demand service are identified, along with the capital cost implications for the requisite operating fleet size and charging station infrastructure for various approaches. These costs are summarized in juxtaposition with the benefits of realizing the higher goals of reducing environmental impacts and energy use within automated mobility districts as automated/autonomous vehicle technology matures. Finally, the discussion addresses key aspects of battery-electric propulsion for managed fleets in fully automated operation that will be studied as the third phase of research continues.

ADVANCED PROPULSION SYSTEMS↗

Supporting Electric Vehicle Supply Equipment Deployment

The U.S. Department of Energy (DOE) Federal Energy Management Program (FEMP) helps federal agencies electrify their fleets and support the deployment of charging infrastructure. To assist agencies with the transition to zero-emission vehicles (ZEVs), including battery electric vehicles (BEVs) and plug-in hybrid electric vehicles (PHEVs), FEMP offers technical guidance on electric vehicle supply equipment (EVSE) installations and site-specific planning through on-site and virtual EVSE Tiger Teams.

ADVANCED PROPULSION SYSTEMS↗

Multifaceted drivers for onshore wind energy repowering and their implications for energy transition

Wind energy is anticipated to become a backbone of the future energy system. Ageing wind turbine fleets, increasing land-use constraints and rising relevance of societal factors make the deployment of land-based (onshore) wind energy ever more complicated. Consequently, repowering is expected to become a rapidly growing point of focus for the wind industry. Here we propose a more holistic and socially informed project-level approach to analyse repowering activity that enables a more robust understanding of the process and potentials. We demonstrate that for wind pioneer in Denmark, only 67% of the capacity removed in repowering projects was related to the physical space needed for a new turbine. Other factors that drive repowering include regulation (for example, noise-related, 8–17%), development principles (for example, aesthetics, 7–20%) and political bargaining (4–13%). The recognition of repowering as a negotiated process between host communities and wind developers will probably be critical to unlock the full potential of wind energy in the future.

17 WIND ENERGY↗

Report on the Creation and Progress of the Hydrogen Regulatory Research Review Group

The current U.S. nuclear generation fleet is increasingly recognized by governmental, scientific, public policy, and industrial communities as having a strategic role in support of the ongoing national transition to a clean energy future. Federal incentives and actions are aligning to expand the role of nuclear power as a viable and more flexible contributor to the evolving national clean energy mix through programs and initiatives such as nuclear power loan guarantees; the Inflation Reduction Act’s (IRA) clean nuclear electrical, steam, and hydrogen incentives; the Infrastructure Investment and Jobs Act (IIJA, also referred to as the Bipartisan Infrastructure Act or BIL); and near term Department of Energy (DOE) funding opportunities related to nuclear based hydrogen hubs and nuclear integrated hydrogen demonstration projects. . Additionally, leveraging clean nuclear electricity and steam is being explored by industries desiring to transition away from carbon-intensive energy sources. Even with all these emerging enablers, notable barriers remain for the widespread adoption of these opportunities within the U.S. nuclear fleet, including the following: • Assurance of the markets for alternate products needed to support decision-making for large capital modification investments • Electric utility mindset and business history centered solely on producing electricity • Design change complexity and regulatory uncertainty associated with plant modifications needed to support alternate product streams The DOE Light Water Reactor Sustainability (LWRS) Flexible Plant Operations and Generation (FPOG) Pathway is developing options to help U.S. nuclear power plants (NPP) in all these areas to enable NPPs designed for steady baseload operation to integrate with intermittent wind and solar capacity to assure reliable clean energy for the nation. Current and near-term laboratory research is focusing on the technical, regulatory, safety, demonstration, and economic elements in support of improving nuclear plant flexibility through hybrid production of electricity and other non-electric products such as hydrogen and energy arbitrage.

42 ENGINEERING↗

U.S. Hydropower Relicensing and License Surrender Data and Metadata, 2026

The U.S. Hydropower Relicensing and License Surrender Database (2026) provides a comprehensive, nationwide snapshot (as of December 31, 2025) of hydropower projects across the United States that are undergoing Federal Energy Regulatory Commission (FERC) relicensing or license surrender processes. Compiled by Oak Ridge National Laboratory, the dataset includes detailed project-level attributes such as geographic location, ownership type, waterway, project type (hydropower or pumped storage), regulatory milestones (e.g., Notice of Intent, application dates, FERC issuance dates), licensing process type (ILP, TLP, ALP), operational characteristics, capacity changes, settlement agreements, construction or turbine‑generator investments, and project status categories spanning relicensing, surrenders, exemptions, and terminations. Together, the relicensing and surrender records offer a detailed view of regulatory trends, infrastructure transitions, dam removals, and economic drivers influencing the evolution of the U.S. hydropower fleet.

Johnson, Megan [ORNL] (ORCID:0000000290141741)↗

Assessment of Cloud-Based Applications Enabling a Scalable Risk-Informed Predictive Maintenance Strategy Across the Nuclear Fleet

The current light water reactor fleet uses time-based or failure-based maintenance strategies to achieve high-capacity factors. But to make nuclear more competitive in the energy market, these reactors could utilize emerging technologies in terms of artificial intelligence (AI) and cloud computing to enable a cost-effective, predictive maintenance strategy. This report examines the feasibility of cloud computing for the nuclear industry’s needs in terms of the cloud’s computing capabilities, feasibility, and regulatory concerns. The technical viability of cloud computing was analyzed using one year worth of data from a boiling water reactor’s safety relief valve. Models were hosted on a local desktop, Idaho National Laboratory’s high-performance computer, and Microsoft Azure. Data was loaded, processed, and two types of models were trained in an A/B fashion. Based on the speed at which these actions were completed, it was used to determined that cloud computing has adequate computing resources. Additionally, the computing power can scale with the demanded load. To enable cloud computing in the existing fleet, additional sensors, networks, and other requirements must be implemented to ensure a smooth transition from current maintenance strategies. However, there is a benefit as the plant no longer needs manage their own servers, software, cybersecurity, and IT support staff. Many of these features can be offloaded on to the cloud provider. A comprehensive analysis was completed that showed the current annual cost of operating is more expensive than using cloud computing resources. Lastly, the regulatory framework does not explicitly address AI or autonomous control. Currently, the NRC and other regulatory bodies are evaluating providing guidance to address gaps rather than new regulations to address the use of AI and ML. But since many of the AI applications are focused on non-safety related applications, such as balance-of-plant components, they will likely have little or no regulatory restrictions or necessary approvals. Demonstrating how AI can improve maintenance and operation of these non-safety related systems seems like the likely path forward for implementing AI and cloud computing resources inside nuclear power plants (NPPs).

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Assessment of Cloud-based Applications for Enabling a Scalable Riskinformed Predictive Maintenance Strategy

The current light-water reactor fleet uses time-based maintenance strategies to achieve high-capacity factors. But to make nuclear more competitive in the energy market, these reactors could utilize emerging artificial intelligence (AI) and cloud computing technologies to achieve a cost-effective, predictive-maintenance strategy. This paper presents discussion and results on the application of cloud computing in the nuclear industry. The technical viability of cloud computing was analyzed using data from a boiling-water reactor’s safety relief valve. The models were hosted on three different systems: a local personal computer, Idaho National Laboratory’s high-performance computer system, and Microsoft Azure. The data were loaded and processed, and two types of models were trained in an A/B fashion. Based on the speed at which these actions were completed, it was determined that cloud computing affords adequate computing resources. Additionally, the computing power can scale with the demanded load. To enable cloud computing in the existing fleet, additional sensors, networks, and other requirements must be implemented to ensure a smooth transition from current maintenance strategies. However, the benefit is that the plants no longer need to manage their own servers, software, cybersecurity, and information technology support staff for in-house data analytics purpose. Many of these features can be offloaded to the cloud provider for a potential cost savings. Demonstrating how AI can improve the maintenance and operation of non-safety-related systems seems the likely path forward for implementing AI and cloud computing resources inside nuclear power plants.

azure↗

Comprehensive Review of California's Innovative Clean Transit Regulation: Phase I Summary Report

This report–prepared by NREL and UC Berkeley for the California Air Resources Board (CARB)–provides a comprehensive review conducted for implementation of the Innovative Clean Transit (ICT) regulation and deployment of zero-emission transit buses in California. The ICT regulation requires California transit agencies to begin transitioning to zero-emission vehicle technologies, defining an increasing percentage of new bus purchases that must be zero-emission buses (ZEBs) each year. The purchase requirements begin in 2023, increasing to a 100% ZEB purchase requirement beginning in 2029. This schedule is designed to result in 100% ZEB fleets statewide by 2040. The focus of the Phase I study was on implementation progress, status of standard-size transit buses, and the California transit industry's readiness to meet the 2023 ICT purchase requirements.

33 ADVANCED PROPULSION SYSTEMS↗

Technical Assistance 101 - How Can the Joint Office Support You?

The Joint Office of Energy and Transportation (Joint Office), in partnership with the Federal Highway Administration (FHWA), National Renewable Energy Laboratory (NREL), the Federal Transit Administration (FTA), and the Environmental Protection Agency (EPA), provides free technical assistance on the planning, deployment, operation, and maintenance of a national network of electric vehicle chargers, zero-emission fueling infrastructure, and zero-emission transit and school buses. This help sheet shares how technical assistance can support stakeholders.

ADVANCED PROPULSION SYSTEMS,ENERGY PLANNING, POLIC↗

Supercharging Your ZEV Transition: Using the ZEV Ready Planning Process

The ZEV Ready Framework is a step-by-step planning process for federal fleet electrification. The planning phase covers team coordination, training, policies, financial planning, and identifying candidates for zero-emission vehicles and electric vehicle supply equipment.

ADVANCED PROPULSION SYSTEMS,ENERGY PLANNING, POLIC↗

Duluth Transit Authority Battery-Electric Bus Evaluation

Duluth Transit Authority (DTA) collaborated with the U.S. Department of Energy's National Renewable Energy Laboratory (NREL) to evaluate a fleet of seven battery-electric buses (BEBs) in revenue service in Duluth, Minnesota. The focus of the evaluation was to compare performance and cost of the BEBs to that of conventional technology buses in similar service and track progress over time. DTA enlisted the help of the Center for Transportation and the Environment (CTE) to manage the project and provide technical services with the BEB fleet and infrastructure. This report summarizes the results of the BEB evaluation and contains a combination of analyses performed by NREL and by CTE during the overall data collection period of December 2018 through February 2022.

33 ADVANCED PROPULSION SYSTEMS↗