A Techno-Economic Assessment of Fusion Energy System Supply and Waste Generation and How Fission Energy May Close Operational Gaps
Explore the source record for details and available documents.
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
A new large-volume diamond anvil cell (DAC) has been developed for the Muon-catalyzed Fusion (μCF) Experiment (MuFusE), enabling the compression and heating of deuterium–tritium (d–t) mixtures to pressures and temperatures needed to advance μCF research. The MuFusE DAC achieves the large sample volumes necessary for high-precision fusion measurements while integrating cryogenic loading, all-metal sealing, and flexible bellows to maintain a secure environment during cell compression. Combined with remote pneumatic actuation and secondary containment, the DAC safely managed a 25 Ci tritium inventory while providing a clear optical path for in situ measurements of sample pressure and composition via laser spectroscopy. Utilizing 5 mm diameter diamond anvils oriented in the path of a high-intensity muon beam, the apparatus achieved a stable sample volume of 19.2 mm 3 at liquid density, pressures up to 933 MPa and temperatures up to 400 K—benchmarks that significantly exceed previously reported limits for static d–t targets.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
The High-Granularity Calorimeter (HGCAL), part of the upgrade to the Compact Muon Solenoid (CMS) experiment, employs silicon and scintillator tile modules in the endcaps to maintain detector performance during the High-Luminosity Large Hadron Collider (HL-LHC) era, scheduled to operate from 2030 to 2040. The upgraded calorimeter will provide highly segmented three-dimensional imaging, energy measurements, and precise timing for particle shower reconstruction. Approximately half of the HGCal plastic scintillator tile modules (1,834 total) will be assembled at Fermilab using an automated pick-and-place (PnP) machine. Following assembly, each tile module undergoes quality control (QC) procedures such as electrical validation, thermal testing, and physics validation using cosmic rays. This poster/talk presents the QC procedures and results from the tile module production in 2026, demonstrating the performance and quality of the assembled tile modules.
Traditionally, power system generation sources have been composed of synchronous generators, of which the fault current behavior is understood with minimal differences between generation size and types due to the physics of their construction. Present protection schemes and modeling methods are based upon these understood characteristics. Most renewable generation is composed of inverter-based resources (IBR), in which fault current is determined by switching control software and hardware limitations, each of which can vary between manufacturers and even between models of the same manufacturer. The resulting fault current is low in magnitude, low in negative-sequence current, unpredictable phase angles, and is a challenge to model. These characteristics also result in a challenge to traditional protection schemes and fault simulation software. To address several of these concerns, the project has the following goals: 1. Improve IBR models: Improve IBR models used in short circuit (SC) programs to accurately capture the response of IBRs at the bulk power system (BPS) level for fault and protection studies. 2. Develop automation tool: Develop an automation tool that allows engineers to identify protection coordination and sensitivity issues by performing SC and protection coordination studies in a high IBR-penetrated grid by applying variations to the IBR models, faults, contingencies, etc. 3. Develop schemes: Develop new protection mitigation solution schemes that complement the existing protection systems to ensure safe operation of the BPS with higher IBR penetration levels. The project team did not achieve this final goal, as the Department of Energy (DOE) stopped the project early due to changes in DOE funding priorities. The termination notice came at the beginning of the final project phase, while the team was identifying and beginning to investigate protection issues. It should be noted that the team discussed a 100% penetration scenario. However, this scenario would require the use of grid-forming IBR models that are not presently available. Since developing these models requires additional effort, the 100% penetration scenario was not pursued during this project. In the future, developing the methodology and models for the 100% scenario could benefit the industry.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.