Search NASA⌕ Search

SEARCH · Search NASA

Results for “Contingency”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 901 records · Page 50

Tug fleet and ground operations schedules and controls. Volume 1: Executive summary

This study presents Tug Fleet and Ground Operations Schedules and Controls plan. This plan was developed and optimized out of a combination of individual Tug program phased subplans, special emphasis studies, contingency analyses and sensitivity analyses. The subplans cover the Tug program phases: (1) Tug operational, (2) Interim Upper Stage (IUS)/Tug fleet utilization, (3) and IUS/Tug payload integration, (4) Tug site activation, (5) IUS/Tug transition, (6) Tug acquisition. Resource requirements (facility, GSE, TSE, software, manpower, logistics) are provided in each subplan, as are appropriate Tug processing flows, active and total IUS and Tug fleet requirements, fleet management and Tug payload integration concepts, facility selection recommendations, site activation and IUS to Tug transition requirements. The impact of operational concepts on Tug acquisition is assessed and the impact of operating Tugs out of KSC and WTR is analyzed and presented showing WTR as a delta. Finally, cost estimates for fleet management and ground operations of the DDT&E and operational phases of the Tug program are given.

Source record↗

Repair of major system elements on Skylab

In-flight maintenance, as conceived and preplanned for the Skylab mission was limited to simple scheduled and unscheduled replacement tasks and minor contingency repairs. Tools and spares were provided accordingly. However, failures during the mission dictated complicated and sophisticated repairs to major systems so that the mission could continue. These repairs included the release of a large structure that failed to deploy, the assembly and deployment of large mechanical devices, the installation and checkout of precision electronic equipment, troubleshooting and repair of precision electromechanical equipment, and tapping into and recharging a cooling system. The repairs were conducted both inside the spacecraft and during extravehicular activities. Some of the repair tasks required team effort on the part of the crewmen including close procedural coordination between internal and extravehicular crewmen. The Skylab experience indicates that crewmen can, with adequate training, make major system repairs in space using standard or special tools. Design of future spacecraft systems should acknowledge this capability and provide for more extensive in-flight repair and maintenance.

Pace, R. E., Jr.↗

Planning and management of science programs on Skylab

Discussion of the experience gained in experiment operation planning during the Skylab mission. The Skylab flight planning activity allowed the experimenters to interact with the system and provided the flexibility to respond to contingencies both major and minor. Both these aspects contributed to make efficient use of crew time thus helping to increase the science return from the mission. Examples of the need for real time scheduling response and of the tradeoffs considered between conflicting experiment requirements are presented. General management principles derived from this experience are developed. The Skylab mission experiences, together with previous Apollo mission experiences, are shown to provide a good background for Shuttle flight planning.

Parker, R. A. R.↗

Review of extravehicular activity for Shuttle program

Extravehicular activity (EVA) is a baselined Shuttle Orbiter capability. It can provide cost-effective servicing operations for payloads, on-orbit repair, and techniques for meeting various on-orbit contingencies. The basic EVA system planned consists of Orbiter-integral provisions, carry-on life support provisions, and EVA support equipment provisions. The Orbiter-integral provisions include the internal airlock, the EVA Egress module, and the docking module, each of which provides an egress path. The carry-on life support provisions will be two Extravehicular Mobility Units (EMU), composed of an Astronaut Life Support Assembly (ALSA) and a Space Suit Assembly (SSA). The support equipment includes tethers, special tools, translation aids, and workstations. The Shuttle Orbiter EVA requirements and possible tasks, EVA crew rescue equipment and techniques, crew support, EVA training, and EVA timeline activities are described.

Covington, J. H.↗

Repair of major system elements on Skylab

In-flight maintenance, as conceived and pre-planned for the Skylab Mission, was limited to simple scheduled and unscheduled replacement tasks and minor contingency repairs. Failures during the mission dictated complicated and sophisticated repairs to major systems so that the mission could continue. These repairs include the release of a large structure that failed to deploy, the assembly and deployment of large mechanical devices, the installation and checkout of precision electronic equipment, troubleshooting and repair of precision electromechanical equipment and tapping into and recharging a cooling system. The Skylab experience proves conclusively that crewmen can, with adequate training, make major system repairs in space using standard or special tools.

Pace, R. E., Jr.↗

Benefits of advanced space suits for supporting routine extravehicular activity

Technology is available to produce space suits providing a quick-reaction, safe, much more mobile extravehicular activity (EVA) capability than before. Such a capability may be needed during the shuttle era because the great variety of missions and payloads complicates the development of totally automated methods of conducting operations and maintenance and resolving contingencies. Routine EVA now promises to become a cost-effective tool as less complex, serviceable, lower-cost payload designs utilizing this capability become feasible. Adoption of certain advanced space suit technologies is encouraged for reasons of economics as well as performance.

Alton, L. R.↗

A lunar core and the moon's magnetic field

The suggestion that the moon's magnetic field is due to adiabatic magnetohydrodynamic convection of a molten core has been made by a number of recent authors. Considerations based on petrology, mass and rotational inertia limit the size of this hypothetical core to a few hundred kilometers at the most. A proposal has been made that this core is either molten iron or iron sulfide. The properties are known of both molten iron and iron-sulfide at lunar core pressures. No way can be found to maintain circulation in a hypothetical lunar core, as circulation is contingent upon a temperature gradient being greater than the adiabatic gradient, or an internal heat source.

Kennedy, G. C.↗

Electrophysiological measurement of human auditory function

Contingent negative variations in the presence and amplitudes of brain potentials evoked by sound are considered. Evidence is produced that the evoked brain stem response to auditory stimuli is clearly related to brain events associated with cognitive processing of acoustic signals since their properties depend upon where the listener directs his attention, whether the signal is an expected event or a surprise, and when sound that is listened-for is heard at last.

Galambos, R.↗

Additional design studies of the NASA/Navy lift/cruise fan

Additional preliminary design studies were performed for a turbotip lift/cruise fan propulsion system for a Navy multimission aircraft. The LCF459/J97 propulsion system was previously designed for this application. These studies extended the analysis in areas of (1) scroll commonality, (2) increased engine-out contingency ratings, (3) mounting systems, (4) manufacturing cost reductions, and (5) vulnerability.

Source record↗

Study to evaluate the effect of EVA on payload systems. Volume 1: Executive summary

Programmatic benefits to payloads are examined which can result from the routine use of extravehicular activity (EVA) during space missions. Design and operations costs were compared for 13 representative baseline payloads to the costs of those payloads adapted for EVA operations. The EVA-oriented concepts developed in the study were derived from these baseline concepts and maintained mission and program objectives as well as basic configurations. This permitted isolation of cost saving factors associated specifically with incorporation of EVA in a variety of payload designs and operations. The study results were extrapolated to a total of 74 payload programs. Using appropriate complexity and learning factors, net EVA savings were extrapolated to over $551M for NASA and U.S. civil payloads for routine operations. Adding DOD and ESRO payloads increases the net estimated savings of $776M. Planned maintenance by EVA indicated an estimated $168M savings due to elimination of automated service equipment. Contingency problems of payloads were also analyzed to establish expected failure rates for shuttle payloads. The failure information resulted in an estimated potential for EVA savings of $1.9 B.

Patrick, J. W.↗

Cost estimation: An expert-opinion approach

A methodology is outlined which can be used to estimate the costs of research and development projects. The approach uses the Delphi technique a method developed by the Rand Corporation for systematically eliciting and evaluating group judgments in an objective manner. The use of the Delphi allows for the integration of expert opinion into the cost-estimating process in a consistent and rigorous fashion. This approach can also signal potential cost-problem areas. This result can be a useful tool in planning additional cost analysis or in estimating contingency funds. A Monte Carlo approach is also examined.

Buffalano, C.↗

Apollo Experiment Report: Lunar-Sample Processing in the Lunar Receiving Laboratory High-Vacuum Complex

A high-vacuum complex composed of an atmospheric decontamination system, sample-processing chambers, storage chambers, and a transfer system was built to process and examine lunar material while maintaining quarantine status. Problems identified, equipment modifications, and procedure changes made for Apollo 11 and 12 sample processing are presented. The sample processing experiences indicate that only a few operating personnel are required to process the sample efficiently, safely, and rapidly in the high-vacuum complex. The high-vacuum complex was designed to handle the many contingencies, both quarantine and scientific, associated with handling an unknown entity such as the lunar sample. Lunar sample handling necessitated a complex system that could not respond rapidly to changing scientific requirements as the characteristics of the lunar sample were better defined. Although the complex successfully handled the processing of Apollo 11 and 12 lunar samples, the scientific requirement for vacuum samples was deleted after the Apollo 12 mission just as the vacuum system was reaching its full potential.

White, D. R.↗

Risk Management Technique for design and operation of facilities and equipment

The Risk Management System collects information from engineering, operating, and management personnel to identify potentially hazardous conditions. This information is used in risk analysis, problem resolution, and contingency planning. The resulting hazard accountability system enables management to monitor all identified hazards. Data from this system are examined in project reviews so that management can decide to eliminate or accept these risks. This technique is particularly effective in improving the management of risks in large, complex, high-energy facilities. These improvements are needed for increased cooperation among industry, regulatory agencies, and the public.

Fedor, O. H.↗

Evaluation of ice and frost accumulation on the Space Shuttle external tank

Ice/frost formation on the Space Shuttle cryogenic propellant tanks presents a different problem from that of past launch vehicles. Lift off weight addition has been the primary concern on past launch vehicles. The primary ice/frost concern on the Shuttle vehicle is damage to the Orbiter Thermal Protection System due to ice/frost impact. The approach used to arrive at a solution to this unique Shuttle problem is presented. The launch vehicle configuration selected and its limitations are described, along with contingency ground support equipment.

Rhodes, R. E.↗

Apollo Soyuz mission planning and operations

The paper describes the Apollo Soyuz project from the points of view of working group organization, mission plan definition, joint operations concept, and mission preparation. The concept for joint operations considered contingency situations as well as nominal operations. Preparations for the joint flight included cooperative tracking tests and combined training of the flight crews and mission control personnel.

Frank, M. P., III↗

A procedure used for a ground truth study of a land use map of North Alabama generated from LANDSAT data

A land use map of a five county area in North Alabama was generated from LANDSAT data using a supervised classification algorithm. There was good overall agreement between the land use designated and known conditions, but there were also obvious discrepancies. In ground checking the map, two types of errors were encountered - shift and misclassification - and a method was developed to eliminate or greatly reduce the errors. Randomly selected study areas containing 2,525 pixels were analyzed. Overall, 76.3 percent of the pixels were correctly classified. A contingency coefficient of correlation was calculated to be 0.7 which is significant at the alpha = 0.01 level. The land use maps generated by computers from LANDSAT data are useful for overall land use by regional agencies. However, care must be used when making detailed analysis of small areas. The procedure used for conducting the ground truth study together with data from representative study areas is presented.

Downs, S. W., Jr.↗

Remote servicing of free-flying spacecraft

A ground simulation to demonstrate system compatibility by enacting satellite ground installation, orbit delivery, space servicing, and contingency retrieval with the space shuttle orbiter was conducted. The basic configuration approach adopted for the spacecraft groups the standardized subsystems in the aft portion of the spacecraft and leaves the volume forward of the transition structure available for the mission peculiar equipment and sensors. The version used for this simulation is configured as an earth observatory with multispectral mapping and high resolution imaging sensors. All modules including the propulsion package and the sensor modules are replaceable on orbit in the event of depletion, wearout, malfunction, or the availability of an improved version.

Cepollina, F. J.↗

Electrical power requirements analysis. Single failure tolerant entry

The results of an analysis of the orbiter electrical power system for the case of a single failure tolerant (SFT) entry are presented. The analysis was performed using the shuttle electrical power system analysis computer program. It was performed to permit assessment of the capability of the orbiter systems to support the proposed entry configuration and to provide the data necessary to identify potential constraints and limitations. Three contingency modes have been identified which would require an SFT entry. This analysis addresses an SFT entry resulting from the loss of two fuel cell powerplants, while on orbit. The results of the analysis indicate that, even under near optimum conditions, the fuel cell power demand will exceed the tested operating capacity of 16 kw, and that various electrical components may experience voltages below 24 VDC.

Pipher, M. D.↗