Search NASA⌕ Search

SEARCH · Search NASA

Results for “Project Management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 919 records · Page 51

Overview of research completed with funding from the SciDAC CSPM project (Final Technical Report)

The Center for the Study of Plasma Microturbulence was a SciDAC project managed by the Office of Fusion Energy Sciences in the US Department of Energy. Funding for the University of Maryland was initially modest (40k/year) for the first two years. The remaining four years were funded at 201k/year, with a single $50k supplemental in 2015, and a no-cost extension that ran through March, 2018. The CSPM involved several institutions whose efforts are documented separately. At UMD, the CSPM supported two graduate students (Kanekar and Wilkie), two post-doctoral fellows (Landreman and TenBarge), and summer salary for the UMD PI (Dorland). The supplemental in 2015 provided additional salary for a sabbatical by Dorland in 2015/16. Landreman and TenBarge both transitioned to separately funded research staff positions at Maryland at the ends of their post-doctoral, CSPM-supported, positions.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Investigations of Dual-Purpose Canister Direct Disposal Feasibility (FY14)

Results reported here continue to support the FY13 conclusion that direct disposal of DPCs is technically feasible, at least for some DPCs, and for some disposal concepts (geologic host media). Much of the work performed has reached a point where site-specific information would be needed for further resolution. Several activities in FY14 have focused on clay/shale media because of potential complications resulting from low thermal conductivity, limited temperature tolerance, and the need to construct hundreds of kilometers of emplacement drifts that will remain stable for at least 50 years. Technologies for rapid excavation and liner installation have significantly advanced in the past 20 years. Tunnel boring machines are the clear choice for large-scale excavation. The first TBM excavations, including some constructed in clay or shale media, are now approaching 50 years of service. Open-type TBMs are a good choice but the repository host formation would need to have sufficient compressive strength for the excavation face to be self-supporting. One way to improve the strength-stress relationship is to reduce the repository depth in soft formations (e.g., 300 m depth). The fastest construction appears to be possible using TBMs with a single-pass liner made of pre-fabricated concrete segments. Major projects have been constructed with prefabricated segmented liner systems, and with cast-in-place concrete liners. Cost comparisons show that differences in project management and financing may be larger cost factors than the choice of liner systems. Costs for large-scale excavation and construction in clay/shale media vary widely but can probably be limited to $10,000 per linear meter, which is similar to previous estimates for repository construction. Concepts for disposal of DPC-based waste packages in clay/shale media are associated with thermal management challenges because of the relatively low thermal conductivity and limited temperature tolerance. Peak temperature limits of 100°C or lower for clay-rich materials have been selected by some international programs, but a limit above 100°C could help to shorten the duration of surface decay storage and repository ventilation. The effects of locally higher peak temperatures on repository performance need to be evaluated (in addition to the effects at lower temperatures). This report describes a modeling approach that couples the TOUGH2 and FLAC3D codes to represent thermally driven THM processes, as a demonstration of the types of models needed.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Big Data Health Physics

This project, in completion of the Illinois Institute of Technology’s Professional Masters of Health Physics program, represents a two part independent study wherein (1) a Statistical Analysis is performed on a new data process implemented at a Los Alamos National Laboratory facility and (2) a Project Management Plan is designed for the successful implementation of this new radiation protection management process.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Oneida Indian Nation Community-Scale Clean Energy Deployment Combined Heat and Power Project. Tribal Renewable Energy (Final Technical Report)

This document reports on the Oneida Indian Nation's to upgrade and improve the operation of the Nation’s Central Utility Plant (CUP) so that previously wasted energy could be captured and utilized to produce electricity. The final technical report contains an overview of the project and the project objectives, which are increased energy efficiency, reduced dependency on fossil fuels, and lower energy costs while maintaining sound environmental stewardship of natural resources. The report describes the specific activities and milestones accomplished, a summary of the current status of the project, including objectives and results achieved, and a description of project management, challenges and lessons learned.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Programmatic Equipment Procurement: An Improved System for Coordinating the Procurement of New Programmatic Equipment

A better structured system that outlines the communication required between the Project Manager (PM) and all the Key Stakeholders. This system will help the PM work with the SMEs to define the scope of the equipment to be procured. It will also help the PM confirm that all associated key stakeholders (WCI IT, FPOC, etc.) have been contacted and have reviewed the new equipment being proposed to be procured. This step is crucial in order to confirm that the piece of equipment being procured not only meets the SME requirements but also the security, safety and building requirements on site. This is a step that is currently missed or overlooked and can cause delays in procurement after the piece of equipment has already been decided on. This new system should help mitigate any delays or miscommunication regarding the piece of equipment being procured.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Synthesis of Seismic Methods in Southern Kansas (Milestone G)

We proposed to conduct the following activities in Budget Period 2 with respect to Task 2.1 of the overall project management plan: 1) Local SWS using microseismicity catalog. 2) Continuation of VSM analysis. 3) Synthesis of seismic data and uncertainty analyses. Milestone G: Apply ANT, VSM, and SWS methods to Kansas microseismicity catalog. Calculate 3D model and moment tensor elements and meet milestone E.

58 GEOSCIENCES↗

Novel Techniques for Silicon Doping Profiling (U)

The purpose of this one-year LDRD was to investigate the use of the helium ion microscope (HeIM) for imaging dopant profiles in silicon relevant to integrated circuit technologies. HeIM is a new technology that offers improved spatial resolution over scanning electron microscopy and different beam-solid interaction physics which leads to unique contrast mechanisms. Two parallel thrusts were pursued: 1) traditional imaging via the secondary electron signal and 2) a novel topographical approach. To obtain the experimental details and results, please refer to the classified report from the project manager, Ed Cole, or the Cyber IA lead, Justin Ford.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Targeted Mineral Carbonation to Enhance Wellbore Integrity [Final Report]

This project evaluated the potential to deploy targeted carbonation reactions to the leading edge of leaking CO 2 ganglion as a strategy for mitigating leakage from deep CO 2 injection sites. Tasks that were performed for this objective included (i) Maintaining and revising the project management and planning; (ii) Developing novel stimuli-responsive materials that release mineral silicates only below a target temperature; (iii) Imaging of subsamples from targeted carbonation demonstration experiments in porous media and fractured wellborn-zone environments; and (iv) Building models to best fit the experiment results and confirm the hypothesis driving this work.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Targeted Mineral Carbonation to Enhance Wellbore Integrity

This project evaluated the potential to deploy targeted carbonation reactions to the leading edge of leaking CO 2 ganglion as a strategy for mitigating leakage from deep CO 2 injection sites. Tasks that were performed for this objective included (i) Maintaining and revising the project management and planning; (ii) Developing novel stimuli-responsive materials that release mineral silicates only below a target temperature; (iii) Imaging of subsamples from targeted carbonation demonstration experiments in porous media and fractured wellborn-zone environments; and (iv) Building models to best fit the experiment results and confirm the hypothesis driving this work.

42 ENGINEERING↗

Assessment of Enhanced Oil Recovery Using Carbon Dioxide in Michigan Basin Silurian Pinnacle Reefs

The Midwest Regional Carbon Sequestration Partnership (MRCSP) has incorporated the work of geologic research teams (Geoteams) in its regional characterization, project planning and carbon dioxide (CO 2 ) injection implementation work since the partnership was established by the U.S. Department of Energy (DOE) in 2003. Over this 16-year period, the cohort of Geoteams has grown from five to ten states and has contributed to the characterization of geologic sequestration opportunities, refinement of reservoir and seal data, and supported injection efforts through both predictive and post-injection assessments. The Michigan team at Western Michigan University has provided technical analysis and support of the enhanced oil recovery (EOR) using carbon dioxide (CO 2 ) in the Northern Michigan Silurian Pinnacle reefs. With Core Energy, LLC as the industry partner, this project has assessed the potential for EOR in known fields in the Michigan Pinnacle reefs and the capacity for CO2 storage in the reef reservoirs as they are depleted and after reservoir abandonment. This project managed by Core Energy, LLC, involves the only commercial CO 2 Enhanced Oil Recovery floods within the MRCSP region. The Silurian pinnacle reef trend shows significant potential for CO 2 -EOR: this play is relatively new, with approximately 60% of the wells in the largest Niagaran fields still accessible. Most wells have modern logs and there are many cores, core analyses, pressure tests and produced water analyses available for study from these fields. These carbonate reservoirs in Michigan have produced sufficient oil to warrant evaluation for additional recovery efforts. The role of the Michigan team was to collect and analyze all relevant data about reservoir properties, including lithologic and depositional characteristics of the reservoir formations and porosity and fluid flow properties through different compartments in the reservoir. The team has also developed models that represent the geological and physical characteristics of the reservoir and seal system.

01 COAL, LIGNITE, AND PEAT↗

The ERSDT Software Quality Assurance Plan Practices and Development Environment Setup for RASCAL 5

This document includes the information pertaining to the practices of the Emergency Response Software Development Team (ERSDT) for the RASCAL software project. The content includes information regarding: 1) Software Quality Assurance. 2) Project Management. 3) Configuration Management. 4) Development Standards. 5) Third-Party Software. 6) Verification and Validation. The information contained in this report is considered living documentation. The information contained in this report was assembled from multiple documents and content management systems.

97 MATHEMATICS AND COMPUTING↗

Summary of US DOE R&D Activities on Graphite Oxidation (2006–2021)

The objective of the international collaboration between United States Department of Energy (U.S.-DOE) and Generation IV International Forum (GIF) is the development of the next generation of nuclear energy systems. The current GIF Project Arrangement (PA) on Materials (2018-2022) was revised in 2019 and extended for another 10 years (2020-2030). The Work Package 1 (“Graphite”) of the extended Project Plan (PP) on Materials specifies technical tasks and High Level Deliverables for research and development (R&D) activities related to using graphite in fuel elements, reflectors, and support structures of Very High Temperature Reactors (VHTR). The graphite tasks include specification and acquisition, qualification and development of new grades, characterization of properties, and development of behavior models. Specifically, Task 1.4 (“Graphite Oxidation Behavior”) outlines planned activities related to acute oxidation by air and chronic oxidation by impurities in the helium coolant. A final report on experimental data regarding graphite oxidation behavior is scheduled for 2022 (deliverable 3.1.1.4.a). In preparation of this deliverable, this document summarizes the R&D activities funded by U.S.-DOE from 2006 (the inception of the VHTR system arrangement) through present (2021). This report is being submitted to the GIF Graphite Working Group (GWG) to serve as input for the GWG high-level deliverable to the Project Management Board (PMB) of PA on Materials. Besides U.S.-DOE, other organizations participating to Task 1.4 of the current PA on Materials are: European Commission’s Joint Research Center (JRC), Korea Atomic Energy Research Institute (KAERI), and Japan Atomic Energy Agency (JAEA). U.S.-DOE is the main contributor on graphite oxidation R&D, with 85 % commitment of total funding during 2018-2022.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

A Non-Invasive Approach for Elucidating the Spatial Distribution of In-Situ Stress in Deep Subsurface Geologic Formations Considered for CO 2 Storage (Final Report)

The primary objectives of this project were to: develop a new, non-invasive method to define the orientation and magnitude of in-situ stresses in deep geologic formations (depths that exceed 1500 meters) considered for carbon dioxide (CO 2 ) sequestration; to demonstrate the method at a real field site; and, to extend current technical capabilities and reduce costs of acquiring information about deep-stress fields. This investigation was segmented into five tasks, including Project Management (Task 1) and four technical tasks (Tasks 2 through 5). The results of the technical tasks are described in this document.

02 PETROLEUM↗

DARHT : Enduring Lessons from a Technical Project in a National Laboratory Context [Slides]

The Dual-Axis Radiographic Hydrodynamic Test (DARHT) facility at Los Alamos National Laboratory (LANL) is the world’s first flash x-ray facility able to take multiple high-resolution radiographs of the interior features of fast-moving dense objects during a single experiment. DARHT’s radiography and complimentary diagnostics makes it an important diagnostic tool in support of the US Department of Energy’s (DOE)/National Nuclear Security Administration (NNSA)’s stewardship of the US nuclear deterrent. The project to construct DARHT ran from 1988 through 2003. Initial Operating Capability along a single axis began in 1999. A technical issue delayed Critical Decision 4 for the full dual-axis capability until 2008. DARHT was characterized by several directed changes resulting from an environmental impact study, changes to the global security context resulting from the end of underground nuclear testing, and rapid evolution of applicable technology. Conventional building and lab-space construction were part of the project, but the project was dominated by Special Facility Equipment that, together with the mission to support the nuclear weapons program, required the project to be completed by national laboratories. Although the project pre-dated implementation of DOE Order 413.3, several important lessons for national laboratory projects remain applicable today and will be discussed here, including projects appropriate for the national laboratory environment, scope stability, risk acceptance and mitigation, communication, and collaboration. Finally, considerations for DOE contractor project managers are offered based upon the DARHT experience.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

DOE Data Days (Q4 FY2021 Report)

During the FY21Q4 the DOE Data Days (D3) leftover funds from D3 2020 were rolled-over to a new project task and project lead was transferred from Stan Ruppert to Rebecca Rodd. This project will be a continuation of previous DOE Data Day Conferences that were funded through the EOS project. The following are high-level accomplishments: Wrote a draft life-cycle plan for FY22 project for continuation of D3, Sought feedback from previous D3 committees to begin selection of FY22 planning committee, and Project management transitioned from Stan Ruppert to Rebecca Rodd in anticipation of Stan’s retirement at the end of FY21.

99 GENERAL AND MISCELLANEOUS↗

Supply Chain Risk Mitigation for Scientific Facilities and Tools

In November 2021, the U.S. Department of Energy (DOE) Office of Science (SC) convened a roundtable on “Supply Chain Risk Mitigation for Scientific Facilities and Tools” to gather information about current supply chain challenges in key technology areas unique to SC or critical to its mission. The roundtable brought together technical, project management, and procurement experts from DOE national laboratories, industry, academia, and other government agencies. Panelists explored opportunities, possible partnerships, and mechanisms to strengthen the domestic supply chain for critical SC technologies.

99 GENERAL AND MISCELLANEOUS↗

Materials for Advanced Ultra-Supercritical (A-USC) Steam Turbines --- A-USC Component Demonstration

The U.S. Advanced Ultra-Supercritical (A-USC) Consortium was formed in 2001 as a government/industry program, sponsored by the U.S. Department of Energy (DOE) and the Ohio Coal Development Office (OCDO) and cost shared by industrial and not-for-profit partners. The purpose of the consortium was to advance the state of the art for power generation by evaluating and developing materials that allow the use of advanced steam cycles in coal-based power plants. These advanced cycles, with steam temperatures up to 1400°F (760°C), can increase the efficiency of coal-fired boilers from an average of 35% (current U.S. fleet) to more than 45% higher heating value (HHV) (>49% lower heating value [LHV]). The increase in a plant’s efficiency is limited unless new materials able to withstand these higher operating temperatures and pressures are identified and approved for use. The A-USC Consortium identified these needed materials during earlier phases of the program. It developed the welding and joining techniques along with manufacturing processes for casting and wrought products made from these new high-nickel alloys. It subjected these materials to extensive laboratory and steam loop testing. It then obtained ASME code approval for their use in U.S. boiler systems. The program’s successes leave this last remaining activity (ComTest Phase 2) that the U.S. utility industry has recommended to be accomplished prior to commercialization. The focus of the activity is the evaluation and demonstration of commercial readiness for “full scale” components to be made from these nickel-based alloy materials and provided by a U.S. domestic supply chain that is new to working with these alloys. According to studies completed by the Electric Power Research Institute (EPRI), the cost of an A-USC plant is approximately 20% higher than a non-A-USC plant because of its use of nickel-based alloys needed for the high temperature operating conditions. However, CO 2 reductions of approximately 30% from the current fleet average provide a strong incentive for its consideration. The actual costs and perceived value for CO 2 abatement will determine whether new or retrofitted plants are undertaken, although decisions to build A-USC plants in India would indicate its economic feasibility while also being part of a global carbon emissions strategy. The work by the A-USC Consortium, prior to the start of the ComTest project, has included lab scale and pilot scale materials testing, both in air and oxy-combustion. This testing has included air-cooled and steam-cooled “loops” that were installed into existing operating utility boilers to gain exposure of these materials to realistic conditions of high temperature and corrosion caused by the constituents in the coal ash. The A-USC Consortium also gained ASME Code approval of the Inconel 740 material, has cast and extruded the largest high nickel precipitation hardened alloys, and developed unique welding techniques to avoid problems identified by the competing European program. However, as valuable as these material test loops and accomplishments have been for obtaining information, their scale is below that required to minimize the risk associated for a U.S. utility to build a multibillion-dollar A-USC power plant. To reduce the final identified risk barrier to full-scale commercialization of these advanced materials and systems, the A-USC Consortium (guided by a utility industry advisory committee) has identified the key areas of the technology they desire to see as being capable of full-scale manufacturing and/or fabrication from an identified, capable U.S. domestic supplier base. A significant amount of work was accomplished during Phase 1 to identity the components, as well as the component size, that would be manufactured from advanced alloys such as Inconel 740H or Haynes 282 alloys. Pathways to supply these components for ComTest have been identified, as well as any further development that would be required. The Phase 2 effort used Phase 1 findings for designing these key full-scale components for A-USC boilers and turbines to include large castings; extrusions, forgings, fabrication of water walls and steam loops with headers from advanced materials, raw material (such as pipe extrusion billets) are at the commercial readiness level to permit advancement to a demonstration project. The Phase 2 work scope was addressed by a diverse team, including government, industry, and not-for-profit partners. The work scope under Phase 2 addressed fabrication of components identified as being outside of the proven capabilities of the existing supply chain, including the following: Steam turbine rotor forging and Haynes 282 nozzle carrier casting Superheater and reheater header and tube assemblies Large-diameter pipe extrusions and forgings Test valve articles to support ASME Code approval. In addition, key fabrication steps were completed, including boiler weld overlays and simulated field repairs. Throughout, extensive inspection and quality assurance testing of the components were performed. The team worked to advance ASME Code approval for key components and processes. Although much of the focus of ComTest Phase 2 was the high-temperature nickel-based alloy materials, a broader range of materials were incorporated, which would be representative of the materials used in full-scale A-USC power plant applications and have cross-cutting applicability on other high-temperature power generation options, such as advanced nuclear, supercritical CO 2 cycles, and central solar receivers. This report that has been submitted is organized in the following manner: Section 1 contains an Executive Summary. Section 2 discusses the ComTest project background and organization. Section 3 discusses project management and reporting. Section 4 discusses the procurement of nickel-based alloy and other A-USC materials and components. Section 5 discusses the fabrication of procurement of nickel-based alloy and other A-USC materials and components. Section 6 discusses the fabrication of cast nickel-based A-USC steam turbine components. Section 7 discusses the fabrication of forged nickel-based A-USC steam turbine piping and steam pipe components. Section 8 discusses the qualification of pressure relieve valves (PRVs) for A-USC power plants. Section 9 discusses proposed plans for future evaluation of A-USC components. Section 10 contains the summary and conclusion.

01 COAL, LIGNITE, AND PEAT↗

Light Weight Radioisotope Heater Unit User’s Guide

This user's guide provides an overview of Light Weight Radioisotope Heater Units (LWRHU), including aspects of its physical design and performance under normal operations. This guide also identifies the planning and execution involved in launching a nuclear payload. Physical characteristics, interfaces, and environmental characteristics of the LWRHU are discussed in detail. Information relating to project management interfaces and effort.

07 ISOTOPE AND RADIATION SOURCES↗