Search NASA⌕ Search

SEARCH · Search NASA

Results for “projects”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 919 records · Page 51

Conclusions of A Mini Technical Interchange Meeting on New Cross Risk Integration Projects Managed By the NASA Space Radiation Element

To enable deep space exploration and sustained human presence in space, the NASA Human Research Program’s (HRP) Space Radiation Element (SRE) funds research to characterize and mitigate adverse health outcomes from exposure to space radiation. Recently, the Space Radiation Element was tasked with supporting multiple HRP Elements with innovative and enabling projects to inform risk characterization, facilitate mitigation activities, and support crew health and performance. These projects, such as precision health initiative, NASA Omics Archive (NOA) and human sample repositories, are agnostic to any HRP Element, hence the name, Cross Risk Integration Projects (CRIP). CRIP serves three broad purposes: Services: Generate samples/data or manage the receipt, inventory, archive and ultimate redistribution of biospecimens created in HRP-funded spaceflight and analog research activities – includes NASA Omics Archive (NOA) project and various human and animal sample repositories. Method Development: Identify and evaluate, new-to-NASA research or analysis methods or techniques – includes TRRaC (Translational Radiation Research and Countermeasures) Project. Enabling Capabilities: Demonstrate real world application by adapting, adopting and/or developing capabilities to benefit crew health & performance and improve risk – includes Precision Health Initiative (Pharmacogenomics) and advanced biological systems and engineered tissue microsystems initiative (tissue chips, organ-on-a-chip). To identify new technologies, future work, and solicitations, the SRE organizes themed sessions at annual HRP Investigators’ Workshops (IWS). These technical interchange meetings (TIMs) provide a venue for the scientific community to present ongoing work and engage in open discussion, limitations of current approaches, and incorporation of novel experimental strategies and other innovative techniques. Here a summary and lessons learned from the SRE-sponsored mini-TIM titled “Space Radiation Cross Risk Integrations Projects” at HRP IWS 2024 will be communicated. The 90-min TIM had 6 speakers who presented impressive novel ideas and work This poster presents the outcomes of the session along with proposed future workshops and other SRE initiatives.

Janapriya Saha↗

Conclusions of a Mini Technical Interchange Meeting on New Cross Risk Integration Projects Managed by the NASA Space Radiation Element

To enable deep space exploration and sustained human presence in space, the NASA Human Research Program’s (HRP) Space Radiation Element (SRE) funds research to characterize and mitigate adverse health outcomes from exposure to space radiation that include risks of carcinogenesis, cardiovascular disease, and central nervous system decrements. Recently, the SRE was tasked with supporting multiple HRP Elements with innovative and enabling projects to inform risk characterization, facilitate mitigation activities, and support crew health and performance. These projects, such as precision health initiative, NASA Omics Archive (NOA) and human sample repositories, are agnostic to any HRP Element, hence the name, Cross-Risk Integration Projects (CRIP). CRIP serves 3 broad purposes: - Services: Generate samples and data and manage the receipt, inventory, archive, and ultimate redistribution of biospecimens created in HRP-funded spaceflight and analog research activities—includes NASA Omics Archive project and various human and animal sample repositories. - Method Development: Identify and evaluate new-to-NASA research or analysis methods or techniques that could fundamentally improve existing or planned research efforts—includes the Translational Radiation Research and Countermeasures Project. - Enabling Capabilities: Demonstrate real-world application by adapting, adopting, and/or developing capabilities to benefit crew health and performance and improve risk mitigation—includes Precision Health Initiative (Pharmacogenomics) and advanced biological systems and engineered tissue microsystems initiative (tissue chips, organ-on-a-chip). To identify new technologies, future work, and solicitations, the SRE organizes themed sessions at annual HRP Investigators’ Workshops (IWS). These technical interchange meetings (TIMs) provide a venue for the scientific community to present ongoing work and engage in open discussion of results, limitations of current approaches, and incorporation of novel experimental strategies, model systems, and other innovative techniques. Here, a summary of the studies presented at the SRE-sponsored mini-TIM at the HRP IWS along with the goals and objectives of the CRIP projects is communicated. The 90-min TIM had 6 speakers who presented impressive novel ideas and work, some of which are funded under CRIP by the Space Radiation Element.

Janapriya Saha↗

Status and specifications of a Project X front-end accelerator test facility at Fermilab

This paper describes the construction and operational status of an accelerator test facility for Project X. The purpose of this facility is for Project X component development activities that benefit from beam tests and any development activities that require 325 MHz or 650 MHz RF power. It presently includes an H- beam line, a 325 MHz superconducting cavity test facility, a 325 MHz (pulsed) RF power source, and a 650 MHz (CW) RF power source. The paper also discusses some specific Project X components that will be tested in the facility. Fermilab's future involves new facilities to advance the intensity frontier. In the early 2000's, the vision was a pulsed, superconducting, 8 GeV linac capable of injecting directly into the Fermilab Main Injector. Prototyping the front-end of such a machine started in 2005 under a program named the High Intensity Neutrino Source (HINS). While the HINS test facility was being constructed, the concept of a new, more versatile accelerator for the intensity frontier, now called Project X, was forming. This accelerator comprises a 3 GeV CW superconducting linac with an associated experimental program, followed by a pulsed 8 GeV superconducting linac to feed the Main Injector synchrotron. The CW Project X design is now the model for Fermilab's future intensity frontier program. Although CW operation is incompatible with the original HINS front-end design, the installation remains useful for development and testing many Project X components.

43 PARTICLE ACCELERATORS↗

An Economic Evaluation Framework for Assessing Renewable Energy Projects

It is becoming increasingly imperative to integrate renewable energy, such as solar and wind, into electricity generation due to increased regulations on air and water pollution and a sociopolitical desire to develop more clean energy sources. This increased spotlight on renewable energy requires evaluating competing projects using either conventional economic analysis techniques or other economics-based models and approaches in order to select a subset of the projects to be funded. Even then, there are reasons to suspect that techniques applied to renewable energy projects may result in decisions that will reject viable projects due to the use of a limited number of quantifiable and tangible attributes about the projects. This paper presents a framework for economic evaluation of renewable energy projects. The framework is based on a systems approach in which the processes within the entire network of the system, from generation to consumption, are accounted for. Furthermore, the framework uses the concept of fuzzy system to calculate the value of information under conditions of uncertainty.

Assessment analysis↗

Projecting Continental U.S. Water Stress Based on Global Datasets

Human populations may be adversely impacted by water stress, a situation which is commonly defined as a per capita water availability of less than 1700 cubic meters of freshwater per person per year. Water stress may result from either overuse of available freshwater resources or a reduction in the amount of available water due to decreases in rainfall and stored water supplies. Analyzing the interrelationship between human populations and water availability is complicated by the uncertainties associated with climate change projections and population projections. We have developed a simple methodology to integrate disparate climate and population data sources and develop first-order per capita water availability projections at the global scale. Simulations from the coupled land-ocean-atmosphere Community Climate System Model version 3 (CCSM3) forced with a range of hypothetical greenhouse gas emissions scenarios have been used to project grid-based changes in precipitation minus evapotranspiration as proxies for changes in runoff, or fresh water supply. Population growth changes, according to Intergovernmental Panel on Climate Change (IPCC) storylines, have been used as proxies for changes in fresh water demand by 2025, 2050 and 2100. These freshwater supply and demand projections have then been combined to yield estimates of per capita water availability aggregated by U.S. watershed. Results suggest that important insights might be extracted from the use of the process developed here, including the identification of potentially vulnerable areas in need of more detailed analysis. This high-level analysis also illustrates the relative importance of population growth versus climate change in in altering future freshwater supplies. However, these are only exemplary insights and, as such, could be considered hypotheses that should be rigorously tested with multiple climate models, multiple observational climate datasets, and more comprehensive population growth projections.

climate change impacts↗

LandCast 2030 High-Resolution Population Projection

The LandCast 2030 data set is an empirically-informed spatial distribution of projected population of the contiguous U.S. for 2030 compiled on a 30" x 30" latitute/longitude grid. Population projections of county level numbers were developed using a modified version of the U.S. Census's projection methodology - with the U.S. Census's official projection as the benchmark. Projected census counts were apportioned to each grid cell based on locally adaptive likelihood coefficients, which are based on land cover, slope, road proximity, distances to larger cities, a moving average of current population, and other data sets. The LandCast 2030 data set was developed as part of Oak Ridge National Laboratory (ORNL) Global Population Project for estimating ambient populations at risk.

Source record↗

LandCast 2050 High-Resolution Population Projection

The LandCast 2050 data set is an empirically-informed spatial distribution of projected population of the contiguous U.S. for 2050 compiled on a 30" x 30" latitude/longitude grid. Population projections of county level numbers were developed using a modified version of the U.S. Census's projection methodology - with the U.S. Census's official projection as the benchmark. Projected census counts were apportioned to each grid cell based on locally adaptive likelihood coefficients, which are based on land cover, slope, road proximity, distances to larger cities, a moving average of current population, and other data sets. The LandCast data set was developed as part of Oak Ridge National Laboratory (ORNL) Global Population Project for estimating ambient populations at risk.

Source record↗

W.A. Parish Post Combustion CO 2 Capture and Sequestration Project Final Public Design Report

The Petra Nova Project is a commercial scale post-combustion carbon dioxide capture project that is being developed by a joint venture between NRG Energy (NRG) and JX Nippon Oil and Gas Exploration (JX). The project is designed to separate and capture carbon dioxide from an existing coal-fired unit's flue gas slipstream at NRG's W.A. Parish Generation Station located southwest of Houston, Texas. The captured carbon dioxide will be transported by pipeline and injected into the West Ranch oil field to boost oil production. The project, which is partially funded by financial assistance from the U.S. Department of Energy will use Mitsubishi Heavy Industries of America, Inc.'s Kansai Mitsubishi Carbon Dioxide Recovery (KM-CDR(R)) advanced amine-based carbon dioxide absorption technology to treat and capture at least 90% of the carbon dioxide from a 240 megawatt equivalent flue gas slipstream off of Unit 8 at W.A. Parish. The project will capture approximately 5,000 tons of carbon dioxide per day or 1.5 million tons per year that Unit 8 would otherwise emit, representing the largest commercial scale deployment of post-combustion carbon dioxide capture at a coal power plant to date. The joint venture issued full notice to proceed in July 2014 and when complete, the project is expected to be the world's largest post-combustion carbon dioxide capture facility on an existing coal plant. The detailed engineering is sufficiently complete to prepare and issue the Final Public Design Report.

20 FOSSIL-FUELED POWER PLANTS↗

Projects without a purpose: Why a top down strategy to resilience matters

Energy resilience is a key focus of the current administration and Department of Defense (DoD) leaders, and is in the title of every energy conference session. Most case studies and success stories focus on resilience projects hardening systems or microgriding critical infrastructure. Some case studies focus on unique financing approaches to bring private sector innovation and increased investment to military installations. Many times, what initially look like innovative resilience projects, end as isolated systems or stranded infrastructure. This article will explore how the DoD can make greater strides advancing resilience objectives and ultimately developing projects that support installation mission readiness by first focusing on top down strategies. The Army established energy and water security/resilience requirements, developed a comprehensive measurement framework, is evolving integrated planning approaches in collaboration with local communities, and is supporting project development activities across third-party and appropriated programs. The Army’s multi-year strategic energy and water security planning activities can provide helpful guidance to both the lifecycle of programs or individual projects, and ensure resilience projects both have and achieve a purpose.

Army↗

RESolution Project Management Tool

The Resolution Project Management Tool is designed to provide a light, yet comprehensive, application to facilitate the management of scientific and research and development projects. The approach to the tool is minimalistic in nature; only require the minimum, essential information needed to facilitate the management of a project and display it in a simple, noncomplex format. The simple platform provides for the collaborative identification, monitoring and status of the essential elements of a project: scope, schedule, cost, risks, changes and reporting. Additionally, the tool provides the ability to create and monitor portfolios of projects without complex or over-burdensome user interfaces or data requirements. The novelty of the tool is the unique selectivity of the data required to manage a project combined with the simple and clear user interface.

Capps, Greg↗

Scheduling the Remediation of Port Hope: Logistical and Regulatory Challenges of a Multiple Site Urban Remediation Project - 13119

The Port Hope Project is part of the larger CAN$1.28 billion Port Hope Area Initiative (PHAI), a community-based program for the development and implementation of a safe, local, long-term management solution for historic Low-Level Radioactive Waste (LLRW) in the Municipalities of Port Hope and Clarington, Ontario, Canada. Atomic Energy of Canada (AECL) is the Project Proponent, Public Works and Government Services (PWGSC) is managing the procurement of services and the MMM Group Limited - Conestoga Rovers and Associates Joint Venture (MMM-CRA Joint Venture) is providing detailed design and construction oversight and administration services for the Project. The Port Hope Project includes the construction of a long-term waste management facility (LTWMF) in the Municipality of Port Hope and the remediation of 18 (eighteen) large-scale LLRW, numerous small-scale sites still being identified and industrial sites within the Municipality. The total volume to be remediated is over one million cubic metres and will come from sites that include temporary storage sites, ravines, beaches, parks, private commercial and residential properties and vacant industrial sites all within the urban area of Port Hope. Challenges that will need to be overcome during this 10 year project include: - Requirements stipulated by the Environmental Assessment (EA) that affect Project logistics and schedule. - Coordination of site remediation with the construction schedule at the LTWMF. - Physical constraints on transport routes and at sites affecting production rates. - Despite being an urban undertaking, seasonal constrains for birds and fish (i.e., nesting and spawning seasons). - Municipal considerations. - Site-specific constraints. - Site interdependencies exist requiring consideration in the schedule. Several sites require the use of an adjacent site for staging. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Port Granby Project Overview - 13208

The Port Granby Project is an integral part of the Port Hope Area Initiative (PHAI), and is located approximately 14 kilometres west of the Municipality of Port Hope in the adjacent Municipality of Clarington, Ontario. The principal objective of the project is the excavation and relocation of low-level radioactive waste (LLRW) and marginally contaminated soils, which were deposited at the Port Granby Waste Management Facility (PGWMF) by Eldorado Nuclear Limited during the period 1955 to 1988, to a new, highly engineered above-ground Long-term Waste Management Facility (LTWMF) to be constructed on a nearby site. The Environmental Assessment for the Project was approved in 2009 August and the required Waste Nuclear Substance License was received in 2011 November. Once the detailed engineering design was completed, in 2011 March, the Port Granby Project was divided into three major contracts for construction implementation purposes. The first of these contracts was completed in late 2012 and the second is planned to start in early 2013. The contracting process for the third major contract is also expected to be completed during 2013. This paper provides an overview of the Port Granby Project as well as discussion on the status of the Project, including the regulatory approvals process, the approach to contracting the construction works and an update of work recently completed and soon to get underway. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Risk-based Prioritization of Facility Decommissioning and Environmental Restoration Projects in the National Nuclear Legacy Liabilities Program at the Chalk River Laboratory - 13564

Chalk River Laboratory (CRL), located in Ontario Canada, has a large number of remediation projects currently in the Nuclear Legacy Liabilities Program (NLLP), including hundreds of facility decommissioning projects and over one hundred environmental remediation projects, all to be executed over the next 70 years. Atomic Energy of Canada Limited (AECL) utilized WorleyParsons to prioritize the NLLP projects at the CRL through a risk-based prioritization and ranking process, using the WorleyParsons Sequencing Unit Prioritization and Estimating Risk Model (SUPERmodel). The prioritization project made use of the SUPERmodel which has been previously used for other large-scale site prioritization and sequencing of facilities at nuclear laboratories in the United States. The process included development and vetting of risk parameter matrices as well as confirmation/validation of project risks. Detailed sensitivity studies were also conducted to understand the impacts that risk parameter weighting and scoring had on prioritization. The repeatable prioritization process yielded an objective, risk-based and technically defendable process for prioritization that gained concurrence from all stakeholders, including Natural Resources Canada (NRCan) who is responsible for the oversight of the NLLP. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Sludge Settling Rate Observations and Projections at the Savannah River Site - 13238

Since 2004, sludge batches have included a high percentage of stored sludge generated from the H- modified (HM) process. The slow-settling nature of HM sludge means that the settling is often the major part of the washing tank quiescent period between required pump runs to maintain flammability control. Reasonable settling projections are needed to wash soluble salts from sludge in an efficient manner, to determine how much sludge can be washed in a batch within flammability limits, and to provide composition projections for batch qualification work done in parallel with field preparation. Challenges to providing reasonably accurate settling projections include (1) large variations in settling behavior from tank-to-tank, (2) accounting for changing initial concentrations, sludge masses, and combinations of different sludge types, (3) changing the settling behavior upon dissolving some sludge compounds, and (4) sludge preparation schedules that do not allow for much data collection for a particular sludge before washing begins. Scaling from laboratory settling tests has provided inconsistent results. Several techniques have been employed to improve settling projections and therefore the overall batch preparation efficiency. Before any observations can be made on a particular sludge mixture, projections can only be made based on historical experience with similar sludge types. However, scaling techniques can be applied to historical settling models to account for different sludge masses, concentrations, and even combinations of types of sludge. After sludge washing/settling cycles begin, the direct measurement of the sludge height, once generally limited to a single turbidity meter measurement per settle period, is now augmented by examining the temperature profile in the settling tank, to help determine the settled sludge height over time. Recently, a settling model examined at PNNL [1,2,3] has been applied to observed thermocouple and turbidity meter readings to quickly provide settling correlations to project settled heights for other conditions. These tools improve the accuracy and adaptability of short and mid-range planning for sludge batch preparation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Pastures to Prairies to Pools: An Update on Natural Resource Damages Settlement Projects at the Fernald Preserve - 13198

The DOE Office of Legacy Management oversees implementation and monitoring of two ecological restoration projects at the Fernald Preserve, Fernald, Ohio, that are funded through a CERCLA natural resource damage settlement. Planning and implementation of on-property ecological restoration projects is one component of compensation for natural resource injury. The Paddys Run Tributary Project involves creation of vernal pool wetland habitat with adjacent forest restoration. The Triangle Area Project is a mesic tall-grass prairie establishment, similar to other efforts at the Fernald Preserve. The goal of the Fernald Natural Resource Trustees is to establish habitat for Ambystomatid salamander species, as well as grassland birds. Field implementation of these projects was completed in May 2012. Herbaceous cover and woody vegetation survival was determined in August and September 2012. Results show successful establishment of native vegetation. Additional monitoring will be needed to determine whether project goals have been met. As with the rest of the Fernald Preserve, ecological restoration has helped turn a DOE liability into a community asset. (authors)

54 ENVIRONMENTAL SCIENCES↗

Office of Legacy Management Decision Tree for Solar Photovoltaic Projects - 13317

To support consideration of renewable energy power development as a land reuse option, the DOE Office of Legacy Management (LM) and the National Renewable Energy Laboratory (NREL) established a partnership to conduct an assessment of wind and solar renewable energy resources on LM lands. From a solar capacity perspective, the larger sites in the western United States present opportunities for constructing solar photovoltaic (PV) projects. A detailed analysis and preliminary plan was developed for three large sites in New Mexico, assessing the costs, the conceptual layout of a PV system, and the electric utility interconnection process. As a result of the study, a 1,214-hectare (3,000-acre) site near Grants, New Mexico, was chosen for further study. The state incentives, utility connection process, and transmission line capacity were key factors in assessing the feasibility of the project. LM's Durango, Colorado, Disposal Site was also chosen for consideration because the uranium mill tailings disposal cell is on a hillside facing south, transmission lines cross the property, and the community was very supportive of the project. LM worked with the regulators to demonstrate that the disposal cell's long-term performance would not be impacted by the installation of a PV solar system. A number of LM-unique issues were resolved in making the site available for a private party to lease a portion of the site for a solar PV project. A lease was awarded in September 2012. Using a solar decision tree that was developed and launched by the EPA and NREL, LM has modified and expanded the decision tree structure to address the unique aspects and challenges faced by LM on its multiple sites. The LM solar decision tree covers factors such as land ownership, usable acreage, financial viability of the project, stakeholder involvement, and transmission line capacity. As additional sites are transferred to LM in the future, the decision tree will assist in determining whether a solar PV project is feasible on the new sites. (authors)

14 SOLAR ENERGY↗

Salt Waste Processing Facility project lessons learned: Acquisition through construction - 15518

The Salt Waste Processing Facility (SWPF), located at the Savannah River Site (SRS) in Aiken, South Carolina, is a multi-billion dollar Liquid Radioactive Waste (LRW) processing facility that represents the keystone for the U.S. Department of Energy (DOE)-EM clean-up mission at SRS. The SWPF facilitates DOE-EM clean-up at SRS by decontaminating the salt waste, which is the dominant volumetric component in the LRW tanks, thereby allowing the cleaned salt waste to be removed from the tanks and stabilized into an approved grout-based final waste form. The small volume of removed radionuclides is sent to the Defense Waste Processing Facility (DWPF) for vitrification. Emptied LRW storage tanks are then grouted into an approved configuration for final closure. The SWPF project is currently 100% complete with design, 80% complete with construction, and 10% complete with commissioning. To date there have been numerous lessons learned with regard to project acquisition, design, procurement, construction, and quality assurance (QA) approaches (both good practices and mistakes) that are considered to be of significant value in improving the state of major project execution within the DOE-EM clean-up program as well as to the wider DOE enterprise. An overview of the current SWPF project status is provided and key lessons learned in the aforementioned areas are presented relative to improving future DOE major project execution performance. Specific areas to be addressed include strategies to optimize integration of design and nuclear safety, constructability tools for design and construction synchronization, commercial grade dedication (CGD) approaches to mitigate atrophy in the nuclear supply chain, and QA perspectives to facilitate effective and efficient project execution. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Sharing Lessons Learned 'Across the Pond' on Two Major Construction Projects: Evaporator D and SWPF - 16050

This paper compares and contrasts two projects, the Salt Waste Processing Facility at Savannah River in the US and Evaporator D at Sellafield in the UK, to highlight the similar challenges that each project has experienced since contract award and how these challenges have been addressed. The paper compares the life-cycles of the projects, project strategy, design, construction, and regulatory issues, along with cost and schedule performance. There is also some discussion about the anticipated challenges in the future as the projects move into the startup and commissioning phase. Overall, the paper identifies some of the common areas that have affected these projects and how these similarities have been the subject of sharing and collaborating lessons learned on a broader scale, even though the delivery organizations operate in different countries under different regulatory and Government frameworks. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗