Search NASA⌕ Search

SEARCH · Search NASA

Results for “subsystem”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 937 records · Page 52

Robotic Refueling Mission 3: Cryogenic Demonstration Subsystem Operations

The Robotic Refueling Mission 3 (RRM3) payload was installed on the International Space Station (ISS) in December 2018. Its Cryogenic Demonstation Subsystem (CDS) was loaded with 19 kilograms of liquid methane, for demonstration of on-orbit storage and transfer. We provide a short description of the design and ground testing of the CDS, and then discuss the on-orbit operations through the first half of 2019.

Cryogenic Fluid Storage↗

NISAR L-SAR Digital Electronics Subsystem - A Multichannel Distributed Processing System with Synchronous Timing Control for Digital Beam Forming and Multiple Echo Tracking

The NASA-ISRO Synthetic Aperture Radar (NISAR) L-band SAR instrument employs multiple digital channels to optimize resolution while keeping a large swath on a single pass. High-speed digitization with fine synchronization and digital beam forming are necessary in order to facilitate this new technique called SweepSAR. An architecture employing multiple FPGA based digital signal processors has been conceived to facilitate digital calibration on an individual channel basis as well as digital signal processing to optimize the receive signal. On-board processing and data compression has been implemented to reduce the volume of data in order to satisfy the operational requirements of near global coverage for the desired science targets. A novel command and timing architecture was developed to manage this complex system while providing detailed control of individual channel receive window timing required for digital beam forming. The NISAR L-band Digital Electronics Subsystem is the combination of the hardware, firmware and software components architected and implemented to operate this radar and return the desired quantity and quality of data for the science community.

Chuang, Chung-Lun↗

Power Subsystem Approach for The Europa Mission

NASA is planning to launch a spacecraft on a mission to the Jovian moon Europa, in order to conduct a detailed reconnaissance and investigation of its habitability. The spacecraft would orbit Jupiter and perform a detailed science investigation of Europa, utilizing a number of science instruments including an ice-penetrating radar to determine the icy shell thickness and presence of subsurface oceans. The spacecraft would be exposed to harsh radiation and extreme temperature environments. To meet mission objectives, the spacecraft power subsystem is being architected and designed to operate efficiently, and with a high degree of reliability.

Ulloa-Severino, Antonio↗

Space Flight LiDARs, Navigation & Science Instrument Implementations: Lasers, Optoelectronics, Integrated Photonics, Fiber Optic Subsystems and Components

For the past 25 years, the National Aeronautics and Space Administration (NASA) Goddard Space Flight Center's Photonics Group in the Engineering Directorate has been substantially contributing to the flight design, development, production, testing and integration of many science and navigational instruments. The Moon to Mars initiative will rely heavily upon utilizing commercial technologies for instrumentation with aggressive schedule deadlines. The group has an extensive background in screening, qualifying, development and integration of commercial components for spaceflight applications. By remaining adaptable and employing a rigorous approach to component and instrument development, they have forged and fostered relationships with industry partners. They have been willing to communicate lessons learned in packaging, part construction, materials selection, testing, and other facets of the design and production process critical to implementation for high-reliability systems. As a result, this successful collaboration with industry vendors and component suppliers has enabled a history of mission success from the Moon to Mars (and beyond) while balancing cost, schedule, and risk postures. In cases where no commercial components exist, the group works closely with other teams at Goddard Space Flight Center and other NASA field centers to fabricate and produce flight hardware for science, remote sensing, and navigation applications. Summarized here is the last ten years of instrumentation development lessons learned and data collected from the subsystems down to the optoelectronic component level.

Detectors↗

NASA's Exploration and In-Space Services (NExIS) Division OSAM-1 Propellant Transfer Subsystem Progress 2020

National Aeronautics and Space Administration (NASA)’s Exploration and In-Space Services (NExIS) Division of Goddard Space Flight Center has been developing technology for the On-orbit Servicing, Assembly and Manufacturing Mission 1 (OSAM-1) to robotically refuel heritage and new satellites on-orbit. OSAM-1, formerly known as Restore-L, successfully passed an important NASA milestone called Key Decision Point-C (KDP-C), receiving agency-level approval for its implementation. The decision point also establishes the mission’s official schedule and budget. The OSAM-1 spacecraft, Servicing Payload and the Space Infrastructure Dexterous Robot (SPIDER) payload will refuel a satellite in space, assemble a communications antenna and manufacture a beam. By demonstrating these capabilities, the mission is advancing never-before tested technologies for use in future missions (by NASA and other government organizations and private industry). The mission is funded by the Technology Demonstration Missions program within NASA’s Space Technology Mission Directorate. This paper covers a review of servicing extensibility and critical technologies that are being developed within NExIS with a focus on the fluid transfer refueling technology within the framework of the Propellant Transfer Subsystem (PTS). An overview of the planned initial technology demonstration servicing mission via the OSAM-1 Space Vehicle is provided as an extension of the technology development progress reported in 20181, and 20192. The general objectives, challenges, and key technologies are presented as an introduction to the context of the OSAM-1 mission, and a precursor to the OSAM-1 PTS specific development status. Development and progress of the Hose Management Assembly (HMA) and Propellant Transfer Assembly (PTA) are discussed. HMA risk reduction test results including those of thermal vacuum testing are presented. Important analytical results are discussed and progress of drawings and procedures developed for the fabrication and testing phase are shown. A summary of the PTS overall verification status and design activities prepared for the critical design peer review are presented. Procurement progress is shown with status on long, medium, and short term efforts to acquire the hardware required to support the mission objectives. Technology development, challenges, and testing status are discussed with particular regard to the OSAM-1 specific key assemblies including the PTA and HMA along with the overall integrated flight mockup of the spacecraft to client fluid transfer testing conducted in the servicing testbeds. The paper concludes with key milestones leading to the goal of on-orbit refueling to be demonstrated in 2024. The overall mission Launch Readiness Date (LRD) has been realigned to accommodate budget profiles and incorporation of additional on-orbit assembly and manufacturing demonstration efforts.

Propellant transfer, satellite servicing↗

High Performance Low Cost Power Conditioning Subsystems Using Smart Power/ Power Integrated Circuits in Photovoltaic Power Systems

New technologies like Smart Power, and Power Integrated Circuits are the wave of the future in providing high performance low cost power conditioning subsystem (PCS)in small to large power applications. This paper discusses circuit designs using these devices that are suitable for PCS in photovoltaic and other industrial applications such as electrical appliances, instrumentation, AC motor drives, battery chargers, automobiles, telecommunications, UPS, and switch mode power supplies. It examines the cost of high volume production and current technological barriers asociated with the development of these technologies.

smart↗

Mars 2020 Sampling and Caching Subsystem Environmental Development Testing and Preliminary Results

The Environmental Development Testing program supported the development test efforts of the Mars 2020 Sampling and Caching Subsystem from May to November 2015. The engineering prototype Brassboard Corer was attached to a five degree-of-freedom robotic arm to execute a 96-test matrix of ambient and low pressure tests in the 10 ft. thermal vacuum chamber at the NASA Jet Propulsion Laboratory, California Institute of Technology. The Pretest, Test, and Post Test procedures are described, and some preliminary results are discussed. Data and observations from this test campaign inform the future development of the software and hardware toward the Mars 2020 flight design, including the next iteration of the rock coring drill, the Engineering Development Unit Corer.

Kriechbaum, Kristo↗

Comparative View of Antenna/RF Subsystems between SIR-C and NISAR L-band SAR Systems for Wide-Swath Imaging

In 1994, SIR-C demonstrated ScanSAR, a mode of operating the SAR system that has become the “standard” implementation for wide-swath spaceborne imaging SAR systems. The NISAR SAR instruments introducing a new SAR architecture for wide-swath imaging call SweepSAR which is expected to have similar success. This paper compares the Antenna and RF subsystem design and the technology utilization considerations between the SIR-C planar phased array SAR system using the ScanSAR technique and NISAR off-set reflector with phased array feed using the SweepSAR technique.

Shaffer, Scott↗

Mid Infrared Instrument Cooler Subsystem Test Facility Overview

The Cryocooler for the Mid Infrared Instrument (MIRI) on the James Webb Space Telescope (JWST) provides cooling at 6.2K on the instrument interface. The cooler system design has been incrementally documented in previous publications [1][2][3][4][5]. It has components that traverse three primary thermal regions on JWST: Region 1, approximated by 40K; Region 2, approximated by 100K; and Region 3, which is at the allowable flight temperatures for the spacecraft bus. However, there are several sub-regions that exist in the transition between primary regions and at the heat reject interfaces of the Cooler Compressor Assembly (CCA) and Cooler Control Electronics Assembly (CCEA). The design and performance of the test facility to provide a flight representative thermal environment for acceptance testing and characterization of the complete MIRI cooler subsystem are presented.

Weilert, M.↗

Demonstration of Deployment Accuracy of the Starshade Inner Disk Subsystem

We present experimental results that demonstrate the required in-plane deployment accuracy of the starshade Inner Disk Subsystem (IDS). This effort was to address Milestone 7C of the Starshade Technology Activity S5, which requires that the in-plane deployment accuracy of the petal interfaces on the IDS be within +/-300um. A full-scale 10m-diameter IDS prototype was constructed. This prototype comprised a medium-fidelity perimeter truss, medium-fidelity spokes, and a low-fidelity optical shield (OS). The testbed also included gravity compensation systems and a laser tracker metrology system. The post-processed measurement uncertainties of the laser tracker were less than 30um at the 3 sigma level. Design, engineering and fabrication of these components was done by JPL, Tendeg, and Roccor. Testing was performed at the Tendeg facility in Louisville, Colorado. The IDS prototype was deployed 22 times and the locations of petal interfaces on the IDS were measured after each deployment. Based on this data, tolerance intervals were calculated that would contain 99.73% of future deployment accuracy errors with 90% confidence. These tolerance intervals are conservative estimates for 3 sigma bounds. The tolerance intervals for the three pertinent error components were found to be within the required allocations, with at least 19% margin.

Turse, Dana↗

The Mars 2020 Watson Imaging Subsystem of the Sherloc Investigation and Anticpated Early Results

In February 2021, the Mars 2020 Perseverance rover is anticipated to touch down in Jezero crater, Mars. Perseverance is unique in that it will conduct in situ science as well as cache samples for eventual return to Earth for analysis in terrestrial laboratories. It will explore the geologic setting within Jezero over a range of scales in order to address fundamental questions about the evolution of Mars and assess whether there is evidence of past or present Martian life. The Wide Angle Topographic Sensor for Operations and eNgineering (WATSON), one of two imaging subsystems within the Scanning Habitable Environments with Raman and Luminescence for Organics and Chemicals (SHERLOC) instrument[1,2], acquires images that support scientific study of Jezero crater and sample acquisition, as well as rover and instrument operations(Fig. 1).WATSON serves a number of roles; it 1) provides color context imaging of SHERLOC and Planetary Instrument for X-Ray Litho chemistry (PIXL)analysis locations, placing the spatial distribution of organics and mineralogy detected by SHERLOC and the elemental maps generated by PIXL within the context of rock texture and structure; 2)acquires stand-alone observations of rock structures and textures from the outcrop to the grain scale; and 3)images rover components and other instruments to monitor their health and condition. We plan to present images acquired within the first ~30 sols of operations.

M E Minitti↗

Sealing Station Mechanisms for the Mars 2020 Rover Sample Caching Subsystem

The Sealing Station is composed of two mechanisms: the Gripper Mechanism, for orientation and support of the Sample Tube during the Hermetic Seal activation activity, as well as ejecting Sample Tubes out of the Rover, and the Ram Mechanism, which produces and applies a high force for seal activation. The Ram Mechanism is a compact high force linear actuator that uses a planetary roller screw (PRS) as the output linear stage, tapered roller bearings (TRB) to support the PRS at the high loads, a set of spur gears supported by cylinder roller bearings, and a brushless motor with a planetary gearhead and magnetic detent brake. This paper describes the role of these mechanisms in the Mars 2020 Rover mission as a part of the Sample Caching Subsystem (SCS) and Adaptive Caching Assembly (ACA) and their interactions with the Hermetic Seal and Sample Tube hardware. We report on development testing performed with the PRS that show it has capability of supporting cross-moment loads, something manufacturers of these components do not rate. Also discussed is the interaction of the passive holding torque from magnetic detent brakes and hardstop preload, setting of a very light preload in the TRB, and the complex linear dyno test equipment used, and how that testing could have been improved.

Grimes-York, Jesse↗

NASA's Low-Cost Optical Terminal (LCOT) Free-Space Optical Subsystem (FSOS): Concept, Design, Build, & Test

We present the status of ongoing work at NASA’s Goddard Space Flight Center (GSFC) to build a prototype, low-cost-of-production, flexibly-configured ground terminal for space optical communication. For laser telecommunication to be cost effective for future missions, a wide-spread global network of operationally responsive optical terminals should be established. There has been a decades-old need for a single modular open systems approach (MOSA) ground terminal architecture capable of supporting multiple space missions ranging from LEO to Lunar distances with 2-way laser communications. At the heart of LCOT’s design concept is the Free-Space Optical Subsystem (FSOS). The major subassemblies of LCOT/FSOS that address most optical common configurations are : (1) Single 700mm F/12 Nasmyth folded Rx R-C Telescope, (2) Four independent 150mm diameter high-power all-reflective Tx beam directors (XOA), (3) Non-coherent direct detection Rx bench on starboard side of telescope (SOB), and (4) Coherent (possibly Quantum) optical communications bench on port side (POB). The Low-Cost Optical Terminal (LCOT) research and development (R&D) prototype is designed to be a generalized system that can be quickly field-reconfigured to support a wide variety of laser communications missions past, present, & future.

COTS↗