Search NASA⌕ Search

SEARCH · Search NASA

Results for “COST ESTIMATION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 991 records · Page 55

Considerations for Corridor and Community DC Fast Charging Complex System Design

As auto manufacturers bring vehicles to market with large batteries that provide over 200 miles of driving range, interest in faster charging options for plug-in electric vehicles (PEVs) is intensifying. This report focuses on direct current fast charger (DCFC) systems and how they can be deployed to provide convenient charging for PEV drivers. First, lessons learned from previous DCFC deployment and data collection activities are shared to describe consumer experience with DCFC systems to date. Second, considerations and criteria are established for designing and upgrading DCFC complexes that provide fast-charging opportunities for PEV drivers in urban communities and on rural corridors. Third, cost estimates are shared for hypothetical high-power DCFC complexes that meet simplified design requirements. Finally, results for a business case analysis are presented that shed light on the financial challenges associated with DCFCs.

25 ENERGY STORAGE↗

Biomass supply chain equipment for renewable fuels production: A review

The production of renewable fuels is a critical component of global strategies to reduce greenhouse gas (GHG) emissions. Moreover, the collection of raw materials for its production can provide added benefits such as reduction of wildfire risk, additional income for farmers, and decreased disposal costs. Although there is substantial literature on design and modeling of supply chains, the authors were unable to find a single reference with the information needed for the selection and cost estimation of each type of equipment involved in the supply chain. Therefore, the goal of this research is to gather information necessary for the construction and utilization of models that might drive the identification of a feasible supply chain to produce renewable fuels at a commercial scale. The primary objectives are to 1) understand the supply chain of critical feedstocks for renewable fuels production; 2) identify the equipment commercially available for collection and adequation of feedstock; and 3) consolidate information regarding equipment cost, energy consumption, and efficiency, as well as feedstock storage and transportation systems. This paper provides a compilation for five feedstock types studied for sustainable aviation fuel production: 1) agricultural residues and grasses, 2) forest residues, 3) urban wood waste, 4) oilseeds, 5) fats, oils & greases. All the technologies involved from the field to the gate of the preprocessing or conversion unit were reviewed. The information on fats, oils & greases supply chains and equipment purposely designed for forest thinning and pruning was very limited.

: Feedstock, Collection and Adequation, Renewable ↗

Scope Complexity Options Risks Excursions (SCORE) Factor Mathematical Description.

The purpose of the Scope, Complexity, Options, Risks, Excursions (SCORE) model is to estimate the relative complexity of design variants of future warhead options, resulting in scores. SCORE factors extend this capability by providing estimates of complexity relative to a base system (i.e., all design options are normalized to one weapon system). First, a clearly defined set of scope elements for a warhead option is established. The complexity of each scope element is estimated by Subject Matter Experts (SMEs), including a level of uncertainty, relative to a specific reference system. When determining factors, complexity estimates for a scope element can be directly tied to the base system or chained together via comparable scope elements in a string of reference systems that ends with the base system. The SCORE analysis process is a growing multi-organizational Nuclear Security Enterprise (NSE) effort, under the management of the NA-12 led Enterprise Modeling and Analysis Consortium (EMAC). Historically, it has provided the data elicitation, integration, and computation needed to support the out-year Life Extension Program (LEP) cost estimates included in the Stockpile Stewardship Management Plan (SSMP).

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Safety-Related Instrumentation and Control Pilot Upgrade (Initial Scoping Phase Implementation Report)

This research report (1) describes the process followed and products developed during the SR I&C Pilot Project Initial Scoping Phase, and (2) captures lessons learned. Exelon Generation and LWRS collaborated to develop a Digital Transformation Strategy as part of a larger Advanced Concept of Operations. The proposed SR I&C Pilot Upgrade provides a foundation stone for this Digital Transformation that will improve plant safety, reliability, and operational performance while lowering plant Total Cost of Ownership (TCO). Initial Scoping Phase activities for this Pilot Project have been performed in accordance with industry processes that have been adapted to better support digital upgrades. These processes include IP-ENG-001, Standard Design Process (SDP), NISP-EN-04, Standard Digital Engineering Process (SDEP), and Electric Power Research Institute (EPRI) Report 3002011816, Digital Engineering Guide (DEG). Completing Initial Scoping Phase Engineering and Operations, Licensing, and Project Management Activities was necessary to sufficiently bound the scope, schedule, and estimated cost of the Project to enable utility management to authorize moving into the Conceptual Design Phase. A significant finding of the Business Case Analysis (BCA) methodology developed and applied as part of this effort was that the growth rate of material costs for sustaining the operation of obsolete SR I&C equipment is accelerating. This directly contributed to the Project Economic Analysis created to justify continuing the Project. Project Initial Scoping Phase lessons learned have also been captured to assist the larger industry in understanding the Digital Transformation Strategy and SR I&C Pilot Project Initial Scoping Phase efforts. This is in keeping with the public/private partnership that has been established between the Department of Energy (DOE) and Exelon for this effort with engagement from the NRC. By addressing first-of-a-kind (FOAK) risks and capturing lessons learned, the SR I&C Pilot Upgrade Project addresses technical, regulatory, and business risks to enable subsequent implementers of similar upgrade.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

IN2 Profile: Polyceed Electrochromic Window Technology Expected to Lower Energy Costs

Through the Wells Fargo Innovation Incubator (IN²) program, Polyceed will validate their electrochromic window technology. The technology is expected to provide customers with 75% lower cost than conventional dynamic windows and offer small residences $200 a year of cost savings for energy consumption. The IN² program launched in October 2014 and is part of Wells Fargo’s 2020 Environmental Commitment to provide $100 million to environmentally-focused nonprofits and universities. The goal is to create an ecosystem that fosters and accelerates the commercialization of promising commercial buildings technologies that can provide scalable solutions to reduce the energy impact of buildings. According to the Department of Energy, nearly 40 percent of energy consumption in the U.S. today comes from buildings at an estimated cost of $413 billion.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Safety-Related Instrumentation & Control Pilot Upgrade Initiation Phase Implementation Report

This research report (1) describes the process followed and products developed during the SR I&C Pilot Project Initial Scoping Phase, and (2) captures lessons learned. Exelon Generation and LWRS collaborated to develop a Digital Transformation Strategy as part of a larger Advanced Concept of Operations. The proposed SR I&C Pilot Upgrade provides a foundation stone for this Digital Transformation that will improve plant safety, reliability, and operational performance while lowering plant Total Cost of Ownership (TCO). Initial Scoping Phase activities for this Pilot Project have been performed in accordance with industry processes that have been adapted to better support digital upgrades. These processes include IP-ENG-001, Standard Design Process (SDP) [Reference 2], NISP-EN-04, Standard Digital Engineering Process (SDEP) [Reference 3], and Electric Power Research Institute (EPRI) Report 3002011816, Digital Engineering Guide (DEG). Completing Initial Scoping Phase Engineering and Operations, Licensing, and Project Management Activities was necessary to sufficiently bound the scope, schedule, and estimated cost of the Project to enable utility management to authorize moving into the Conceptual Design Phase. A significant finding of the Business Case Analysis (BCA) methodology developed and applied as part of this effort was that the growth rate of material costs for sustaining the operation of obsolete SR I&C equipment is accelerating. This directly contributed to the Project Economic Analysis created to justify continuing the Project. Project Initial Scoping Phase lessons learned have also been captured to assist the larger industry in understanding the Digital Transformation Strategy and SR I&C Pilot Project Initial Scoping Phase efforts. This is in keeping with the public/private partnership that has been established between the Department of Energy (DOE) and Exelon for this effort with engagement from the NRC. By addressing first-of-a-kind (FOAK) risks and capturing lessons learned, the SR I&C Pilot Upgrade Project addresses technical, regulatory, and business risks to enable subsequent implementers of similar upgrades.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Cost-Disruptive, Low Impact, Modular Form Factor Low-Head Hyropower System

Littoral Power Systems, Inc. (LPS) is writing a new story when it comes to turning the natural power of water into electricity. h-Modulor™ is a new way of designing and building hydropower plants that addresses the crucial issues of cost, environmental impact and regulatory time frames. For decades hydropower developers, owners and operators have struggled to build new or expanded facilities that didn’t cost so much, were friendlier to the environment and didn’t take so much time to license or build. The problem is particularly acute in smaller installations. The burdensome regulatory pathway for projects under 10MW in capacity have eased the licensing requirements for small hydro projects. But in small projects are still very hard, because capital costs are a much larger percentage of the generation revenues than they are in large facilities. There is an acute need for a cost effective solution. Understanding this need and opportunity, LPS conceived a new type of hydropower equipment – a kit of standard, pre-fabricated modular parts for dam safety, power generation, spill control and other hydropower facility functions to be used to build and operate a hydro plant at substantially lower costs than are currently achievable. This system of prefabricated parts also showed promise to reduce environmental impacts, reduce engineering time involved in the licensing process, and possibly provide a new way for regulators to think about licensing that could lead to reduced regulatory timeframes. Because of this invention’s compelling and intriguing promise the Department of Energy’s (DOE) Water Power Technology Office (WPTO) awarded funding to LPS through the Office of Energy Efficiency and Renewable Energy (EERE) to develop this new type of hydropower equipment to meet a levelized cost of energy (LCOE) goal and analyze it for dam safety. LPS teamed with professional engineers, PhDs, and geotechnical consultants from GZA GeoEnvironental, Inc. (GZA), Alden Research Laboratory (Alden), University of Massachusetts – Dartmouth (UMass-D), the National Renewable Energy Laboratory (NREL) and AECOM. In collaboration with the engineers and managers at the WPTO and EERE they matured the concepts through substantial design shifts. The project exceeded the original goals and delivered designs beyond the proof-of-concept stage backed up by thorough professional engineering analysis of stability, seepage, and structural integrity. A full-scale section with seals successfully retained water in full-head leakage tests. Construction plans and professional engineering cost estimates indicated an LCOE half of the original LCOE goal. A system of these modules is now on track to be used in a 4.5 MW commercial installation.

13 HYDRO ENERGY↗

Hydropower Capital and O&M Costs: An Exploration of the FERC Form 1 Data

This report explores the potential for using responses from the Federal Energy Regulatory Commission’s (FERC’s) “Electric Utility Annual Report,” also known as FERC Form 1, as a cost database for conventional and pumped storage hydropower (PSH). The report outlines the process used to compile an easy-to-access database from the original FERC Form 1 data and discusses the historical cost/performance data. The steps for developing the database include downloading the annual FoxPro files from the FERC website (FERC, 2020), reading them into an Excel format, and reconciling naming issues across years, repeated entries, and shared assets, among others. The cleaned and compiled Form 1 database is available on Oak Ridge National Laboratory’s (ORNL’s) HydroSource website. For this report, the compiled Form 1 database was linked to two other hydropower databases, the National Inventory of Dams and the ORNL Existing Hydropower Assets, that provide additional information on the characteristics and other features of plants in the Form 1 data. Explorations of the plant characteristics, performance, capital costs, and operation and maintenance (O&M) cost data in the combined database were presented separately for conventional hydropower and PSH projects. Form 1 has several advantages as a hydropower cost database. First, the cost data is reported directly by plant owners. Second, Form 1 provides cost breakdowns of capital and operating costs for large conventional and PSH plants enabling more detailed tracking of hydropower costs compared with typical total cost estimates. Third, although the Form 1 data is not reported by all operational hydropower plants in the United States, the available data represents a wide range of plant characteristics and a sizable proportion of the hydropower fleet (61% of PSH plants and 22% of conventional hydropower plants by capacity). The lower proportion of the conventional hydropower fleet is because Form 1 reporting requirements apply only to private utilities that meet given size thresholds, leaving out federally owned facilities and many smaller hydropower plants. Overall, the Form 1 cost database represents a unique, publicly available database on hydropower asset capital and O&M costs. This report leads to a compiled database for the reporting years 1994 to 2020 that helps resolve issues with accessibility and use of the FERC Form 1 data by hydropower plant owners, project developers, technology developers, and regulators.

13 HYDRO ENERGY↗

Optimizing bioenergy biofuel harvest: a comparative analysis of stepwise and integrated methods for economic and environmental sustainability

Switchgrass is a promising bioenergy feedstock due to its high biomass yield potential, adaptability to marginal lands, and low carbon intensity for feedstock production. However, accurate cost estimation and assessment of greenhouse gas (GHG) emissions for the energy-intensive harvesting process are essential for evaluating the sustainability of bioenergy. This study provides a comparative analysis of two harvesting methods: the Stepwise Method, which separates operations into multiple stages, and the Integrated Method, which combines mowing and raking into a single pass. The analysis was conducted under four scenarios based on field sizes and biomass yields. Using three years of field-scale switchgrass harvest data from 125 sites, GHG emissions, energy consumption, and harvesting costs were quantified using the GREET model and techno-economic analysis. Additionally, regression analysis identified key climate and operational factors affecting fuel consumption. The Stepwise method was the most cost-effective for large fields with high biomass yield, achieving the lowest harvesting costs ($37.70 per ton). In contrast, the Integrated Method performed better in small fields and low-yield conditions, reducing GHG emissions by 9 % and energy use by 5 %. Regression analysis confirmed that a larger field size reduced fuel consumption, while higher biomass yield and longer operational time increased fuel use. Maximum temperature also contributed to a slight increase in fuel consumption. Furthermore, these results provide actionable insights for optimizing harvesting strategies based on field-specific conditions and operational goals, contributing to the economic and environmental sustainability of bioenergy production.

60 APPLIED LIFE SCIENCES↗

Solar Steam on Demand

INTRODUCTION: This Report summarizes the research and development project performed by Sunvapor and the subrecipient National Renewable Energy Laboratory (NREL) during the period of 10/01/2018-9/30/2021. The work was aimed at the economic integration of solar steam with an industrial process, and in particular, the advantages that a novel type of thermal energy storage and collector design could bring to the system. The completed work includes experimental research on the storage material, design of the collector, engineering of a complete solar steam plant, and economic analysis. The plant was, in the end, not constructed, due to COVID-19 impacts to the project host. PURPOSE: The purpose of the project was to test the hypothesis that a levelized cost of heat (LCOH) of 2¢/kWh delivered to a steam-consuming process, including energy discharged from storage, could be feasibly achieved. PROJECT OBJECTIVES: For Budget Period 1 our objectives were to engineer a prototype industrial solar steam generation system, and design and test a Latent Heat Energy Storage (LHES) lab-scale system. For Budget Period 2 our objectives were to construct and test the solar steam prototype plant, and to build and factory-test a full LHES module. For Budget Period 3 our objective was to integrate the storage module with the solar steam generator, show successful long duration energy tests of the combined system, and use the results to project the LCOH of delivered steam to a second-generation plant. PROJECT OUTCOMES: Various phase change materials (PCMs) for the LHES were tested for compatibility with industrial steam uses as measured by phase change temperature, stability of latent heat of fusion, and their corrosive effects on steel (the heat exchanger material). Two of these materials (sodium formate and sodium/ potassium) showed potential to meet the technical criteria. The estimated cost of a complete LHES module with these materials did not meet economic targets. The developmental collector design builds from previous work to exploit the potential cost advantages of a spaceframe of lumber construction. Design improvements were achieved in assembly efficiency and structural performance. A complete engineering package was completed for the solar steam system without storage that included the developmental as well as commercial arrays. The plant was permitted for construction. The storage CAPEX for a reference plant was estimate to be greater than $\$ 57$/kWh. The LCOH of the system without storage and with developmental collectors of lumber construction was projected to be 2¢/kWh, assuming a FCR of 8.2% over thirty years. PROJECT MILESTONES: The Milestones fully achieved in the first Budget Period includes obtaining a Letter of Intent from an industrial steam-consuming project host, issuance of a construction permit, and corrosion resistance. The Milestone that was partly achieved was the degradation in the latent heat of fusion. Milestones associated with Budget Periods 2 and 3, related to the construction and operation of the plant were not achieved as a result of the host shutting down the plant due to COVID-19 impacts. CONCLUSIONS: Sunvapor was able to secure an agreement with a host to build a fully engineered and permitted solar steam plant that met the host’s economic goals. As a basis for comparison, the solar field design was comprised of eight commercial collector arrays and one developmental Green Parabolic Trough Collector (GPTC) array. The projected LCOH with a solar field entirely populated with a second generation GPTC met the goal of 2¢/kWh. The experimental program concerning the PCM indicated the feasibility of meeting their technical requirements for industrial steam uses. The cost of the complete LHES exceeded its $\$ 14$/kWh target, and therefore the inclusion of LHES could not be economically justified. Due to COVID-19 impacts on the host, the solar steam plant was not constructed.

14 SOLAR ENERGY↗

Scope Complexity Options Risks Excursions (SCORE) Version 3.0 Mathematical Description.

The purpose of the Scope, Complexity, Options, Risks, Excursions (SCORE) model is to estimate the relative complexity of design variants of future warhead options. The results of this model allow those considering these options to understand the complexity tradeoffs between proposed warhead options. The core idea of SCORE is to divide a warhead option into a well- defined set of scope elements and then estimate the complexity of each scope element against a well understood reference system. The uncertainty associated with estimates can also be captured. A weighted summation of the relative complexity of each scope element is used to determine the total complexity of the proposed warhead option or portions of the warhead option (i.e., a National Work Breakdown Structure code). The SCORE analysis process is a growing multi-organizational Nuclear Security Enterprise (NSE) effort, under the management of the NA- 12 led Enterprise Modeling and Analysis Consortium (EMAC), that has provided the data elicitation, integration and computation needed to support the out-year Life Extension Program (LEP) cost estimates included in the Stockpile Stewardship Management Plan (SSMP).

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

IN2 Profile: Go Electric Provides Grid Stabilizing Energy Service Solutions to Utilities

Through the Wells Fargo Innovation Incubator (IN²) program, Go Electric will validate their Link DR technology, which is an advanced, uninterruptable power supply that provides secure power, lowers facility energy costs, integrates renewables, and generates income from utility demand response programs. The IN² program launched in October 2014 and is part of Wells Fargo’s 2020 Environmental Commitment to provide $100 million to environmentally-focused nonprofits and universities. The goal is to create an ecosystem that fosters and accelerates the commercialization of promising commercial buildings technologies that can provide scalable solutions to reduce the energy impact of buildings. According to the Department of Energy, nearly 40 percent of energy consumption in the U.S. today comes from buildings at an estimated cost of $413 billion.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Potential Supply Chain and Cost Reduction Strategies for Advanced Nuclear Reactors

This milestone represents a level of effort to provide recommendations for a supply chain plan and establish relationships between advanced reactor companies and large companies in the oil & gas and chemical industries. It represents a starting point to develop the plan with options, general equipment lists, and rough associated cost estimates of major equipment and the associated systems needed. This effort will provide an opportunity to leverage the experience that oil & gas and chemicals companies possess in large capital equipment procurement, modularization, acquisition and installation. Potential supply chain solutions will be discussed and preliminary options for worldwide manufacturers will be elucidated. The goal of this effort will be to leverage the years of accumulated experience in the oil & gas and chemical industries in the area of capital equipment acquisition to understand the potential supply chain options and to reduce potential acquisition costs by optimizing the supply chain options for advanced nuclear reactor modularization, manufacturing and acquisition.

22 - GENERAL STUDIES OF NUCLEAR REACTORS↗

STS propellant scavenging systems study. Part 2, volume 2: Cost and WBS/dictionary

Presented are the results of the cost analysis performed to update and refine the program phase C/D cost estimates for a Shuttle Derived Vehicle (SDV) tanker. The SDV tanker concept is an unmanned cargo vehicle incorporating a set of propellant tanks in the vehicle's payload module. The tanker will be used to meet the demand for a cryogenic propellant supply in orbit. The propellant tanks are delivered to a low Earth orbit or to an orbit in the vicinity of the Space Station. The intent of the economic analysis is to provide NASA with economic justification for the propellant scavenging concept that minimizes the total Space Transportation System life cycle cost. The detailed costs supporting the concept selection process are presented with descriptive text to aid in forecasting the phase C/D project and program planning. Included are all propellant scavenging costs as well as all SDV, STS and Orbital Maneuvering Vehicle charges to deliver the propellants to the Space Station.

Williams, Frank L.↗

Projections of U. S. GHG Reductions from Nuclear Power New Capacity Based on Historic Levels of Investment

Historical rates of capital investment in nuclear plant construction was used as a guide to estimate the rate of future capacity introduction. The magnitude of nuclear capacity was then used to determine the effect on greenhouse gas (GHG) emissions from electrical production in the U.S. to 2050. Total capital investment in nuclear power plant construction for every U.S. nuclear unit from 1964 to 1990 were obtained and the total investment and divided by their construction period to provide a value for possible rate of investment. The total linear rate of capital expenditure over the entire period was determined as well as that for the period of peak construction from 1973 to 1985, $11.5 billion/y and $17.9 billion/y, respectively in 2004$. These were used with a variety of capital cost estimates for nuclear construction to obtain several scenarios for nuclear capacity additions. Total nuclear generation out to 2050 was calculated assuming current plants would be constrained by 60-year operating licenses (i.e., a single 20-year life extension). The effect on nuclear generating capacity was projected and the resultant impact on GHG emissions determined assuming nuclear would directly replace coal-fired generation. It was concluded that actually reductions in emissions would not be experienced until 2038, yet growth in emissions from electrical production would be slowed up through that point. Nuclear energy, therefore cannot have a dramatic short-term effect on emissions, as likely cannot any energy producing technology due to the significant time to introduce large-scale changes. Nuclear power, however, can have a major longer term impact on emissions, particularly under more favorable cost and investment conditions.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Very High Fuel Economy, Heavy Duty, Constant Speed, Truck Engine Optimized Via Unique Energy Recovery Turbines and Facilitated High Efficiency Continuously Variable Drivetrain

The project began under a corporative agreement between Mack Trucks, Inc and the Department of Energy starting from September 1, 2005. The major objective of the four year project is to demonstrate a 10% efficiency gain by operating a Volvo 13 Litre heavy-duty diesel engine at a constant or narrow speed and coupled to a continuously variable transmission. The simulation work on the Constant Speed Engine started on October 1st. The initial simulations are aimed to give a basic engine model for the VTEC vehicle simulations. Compressor and turbine maps are based upon existing maps and/or qualified, realistic estimations. The reference engine is a MD 13 US07 475 Hp. Phase I was completed in May 2006 which determined that an increase in fuel efficiency for the engine of 10.5% over the OICA cycle, and 8.2% over a road cycle was possible. The net increase in fuel efficiency would be 5% when coupled to a CVT and operated over simulated highway conditions. In Phase II an economic analysis was performed on the engine with turbocompound (TC) and a Continuously Variable Transmission (CVT). The system was analyzed to determine the payback time needed for the added cost of the TC and CVT system. The analysis was performed by considering two different production scenarios of 10,000 and 60,000 units annually. The cost estimate includes the turbocharger, the turbocompound unit, the interstage duct diffuser and installation details, the modifications necessary on the engine and the CVT. Even with the cheapest fuel and the lowest improvement, the pay back time is only slightly more than 12 months. A gear train is necessary between the engine crankshaft and turbocompound unit. This is considered to be relatively straight forward with no design problems.

33 ADVANCED PROPULSION SYSTEMS↗

Variability in Diurnal and Seasonal Ambient Conditions on Geothermal Plant Performance and Cost: Preprint

Geothermal plant performance is bounded by the second law efficiency, which accounts for the quantity of exergy that can be converted into useful work. This in turn is dependent on the geothermal resource temperature and the temperature of the heat sink (i.e., the ambient temperature). In this study we show that ambient temperature variability on a diurnal and seasonal basis can affect performance and cost estimations for geothermal plants. We have utilized the updated System Advisor Model (SAM) to assess nine geothermal sites with existing resource capacities across three climate zones. Our analysis shows that both evaporatively-cooled flash and air-cooled binary cycle plants are affected by temperature, with a slightly higher effect in EGS binary sites. By assuming an ambient (wet bulb) temperature baseline of 15.6 degrees C (60 degrees F) and comparing baseline results to those from site-specific data we observe up to 15% underestimation of plant performance and up to 20% overestimation of cost.

ambient temperature↗

Fission Power System Technology for NASA Exploration Missions

Under the NASA Exploration Technology Development Program, and in partnership with the Department of Energy (DOE), NASA is conducting a project to mature Fission Power System (FPS) technology. A primary project goal is to develop viable system options to support future NASA mission needs for nuclear power. The main FPS project objectives are as follows: 1) Develop FPS concepts that meet expected NASA mission power requirements at reasonable cost with added benefits over other options. 2) Establish a hardware-based technical foundation for FPS design concepts and reduce overall development risk. 3) Reduce the cost uncertainties for FPS and establish greater credibility for flight system cost estimates. 4) Generate the key products to allow NASA decisionmakers to consider FPS as a preferred option for flight development. In order to achieve these goals, the FPS project has two main thrusts: concept definition and risk reduction. Under concept definition, NASA and DOE are performing trade studies, defining requirements, developing analytical tools, and formulating system concepts. A typical FPS consists of the reactor, shield, power conversion, heat rejection, and power management and distribution (PMAD). Studies are performed to identify the desired design parameters for each subsystem that allow the system to meet the requirements with reasonable cost and development risk. Risk reduction provides the means to evaluate technologies in a laboratory test environment. Non-nuclear hardware prototypes are built and tested to verify performance expectations, gain operating experience, and resolve design uncertainties.

Mason, Lee↗