Search NASA⌕ Search

SEARCH · Search NASA

Results for “LINAC”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,009 records · Page 56

TH-C-BRC-00: Emerging Technologies in SRS/SBRT Delivery

The delivery techniques for SRS/SBRT have been under rapid developments in recent years, which pose new challenges to medical physicists ranging from planning and quality assurance to imaging and motion management. This educational course will provide a general overview of the latest delivery techniques in SRS/SBRT, and discuss the clinical processes to address the challenges of each technique with special emphasis on dedicated gamma-ray based device, robotic x-band linac-based system and conventional C-arm s-band linac-based SRS systems. (1). Gamma-ray based SRS/SRT: This is the gold standard of intracranial SRS. With the advent of precision imaging guidance and frameless patient positioning capabilities, novel stereoscopic CBCT and automatic dose adaption solution are introduced to the Gamma-ray based SRS for the first time. The first North American system has been approved by the US regulatory for patient treatments in the spring of 2016. (2). Robotic SRS/SBRT system: A number of technological milestones have been developed in the past few years, including variable aperture collimator, sequential optimization technique, and the time reduction technique. Recently, a new robotic model allows the option of a multi-leaf collimator. These technological advances have reduced the treatment time and improved dose conformity significantly and could potentially expand the application of radiosurgery for the treatment of targets not previously suitable for robotic SRS/SBRT or fractionated stereotactic radiotherapy. These technological advances have created new demanding mandates on hardware and patient quality assurance (QA) tasks, as well as the need for updating/educating the physicists in the community on these requirements. (3). Conventional Linac based treatments: Modulated arc therapy (MAT) has gained wide popularities in Linac-based treatments in recent years due to its high delivery efficiency and excellent dose conformities. Recently, MAT has been introduced to deliver highly conformal radiosurgery treatments to multiple targets simultaneously via a single isocenter to replace the conventional multi-iso multi-plan treatments. It becomes important to understand the advantages and limitations of this technique, and the pitfalls for implementing this technique in clinical practice. The planning process of single-iso multi-target MAT will be described, and its plan quality and delivery efficiency will be compared with multi-iso plans. The QA process for verifying such complex plans will be illustrated, and pitfalls in imaging and patient set up will be discussed. Overall, this session will focus on the following areas: 1) Update on the emerging technology in current SRS/SBRT delivery. 2) New developments in treatment planning and Quality Assurance program. 3) Imaging guidance and motion management. Learning Objectives: To understand the SRS/SBRT principles and its clinical applications, and gain knowledge on the emerging technologies in SRS/SBRT. To review planning concepts and useful tips in treatment planning. To learn about the imaging guidance procedures and the quality assurance program in SRS/SBRT. National Institutes of Health, Varian Medical System; L. Ren, The presenter is funded by National Institutes of Health and Varian Medical System.

60 APPLIED LIFE SCIENCES↗

TH-C-BRC-01: An Overview of Emerging Technologies in SRS/SBRT Delivery

The delivery techniques for SRS/SBRT have been under rapid developments in recent years, which pose new challenges to medical physicists ranging from planning and quality assurance to imaging and motion management. This educational course will provide a general overview of the latest delivery techniques in SRS/SBRT, and discuss the clinical processes to address the challenges of each technique with special emphasis on dedicated gamma-ray based device, robotic x-band linac-based system and conventional C-arm s-band linac-based SRS systems. (1). Gamma-ray based SRS/SRT: This is the gold standard of intracranial SRS. With the advent of precision imaging guidance and frameless patient positioning capabilities, novel stereoscopic CBCT and automatic dose adaption solution are introduced to the Gamma-ray based SRS for the first time. The first North American system has been approved by the US regulatory for patient treatments in the spring of 2016. (2). Robotic SRS/SBRT system: A number of technological milestones have been developed in the past few years, including variable aperture collimator, sequential optimization technique, and the time reduction technique. Recently, a new robotic model allows the option of a multi-leaf collimator. These technological advances have reduced the treatment time and improved dose conformity significantly and could potentially expand the application of radiosurgery for the treatment of targets not previously suitable for robotic SRS/SBRT or fractionated stereotactic radiotherapy. These technological advances have created new demanding mandates on hardware and patient quality assurance (QA) tasks, as well as the need for updating/educating the physicists in the community on these requirements. (3). Conventional Linac based treatments: Modulated arc therapy (MAT) has gained wide popularities in Linac-based treatments in recent years due to its high delivery efficiency and excellent dose conformities. Recently, MAT has been introduced to deliver highly conformal radiosurgery treatments to multiple targets simultaneously via a single isocenter to replace the conventional multi-iso multi-plan treatments. It becomes important to understand the advantages and limitations of this technique, and the pitfalls for implementing this technique in clinical practice. The planning process of single-iso multi-target MAT will be described, and its plan quality and delivery efficiency will be compared with multi-iso plans. The QA process for verifying such complex plans will be illustrated, and pitfalls in imaging and patient set up will be discussed. Overall, this session will focus on the following areas: 1) Update on the emerging technology in current SRS/SBRT delivery. 2) New developments in treatment planning and Quality Assurance program. 3) Imaging guidance and motion management. Learning Objectives: To understand the SRS/SBRT principles and its clinical applications, and gain knowledge on the emerging technologies in SRS/SBRT. To review planning concepts and useful tips in treatment planning. To learn about the imaging guidance procedures and the quality assurance program in SRS/SBRT. National Institutes of Health, Varian Medical System; L. Ren, The presenter is funded by National Institutes of Health and Varian Medical System.

60 APPLIED LIFE SCIENCES↗

TH-C-BRC-02: A Review of Emerging Technologies in Robotic SRS/SBRT Delivery

The delivery techniques for SRS/SBRT have been under rapid developments in recent years, which pose new challenges to medical physicists ranging from planning and quality assurance to imaging and motion management. This educational course will provide a general overview of the latest delivery techniques in SRS/SBRT, and discuss the clinical processes to address the challenges of each technique with special emphasis on dedicated gamma-ray based device, robotic x-band linac-based system and conventional C-arm s-band linac-based SRS systems. (1). Gamma-ray based SRS/SRT: This is the gold standard of intracranial SRS. With the advent of precision imaging guidance and frameless patient positioning capabilities, novel stereoscopic CBCT and automatic dose adaption solution are introduced to the Gamma-ray based SRS for the first time. The first North American system has been approved by the US regulatory for patient treatments in the spring of 2016. (2). Robotic SRS/SBRT system: A number of technological milestones have been developed in the past few years, including variable aperture collimator, sequential optimization technique, and the time reduction technique. Recently, a new robotic model allows the option of a multi-leaf collimator. These technological advances have reduced the treatment time and improved dose conformity significantly and could potentially expand the application of radiosurgery for the treatment of targets not previously suitable for robotic SRS/SBRT or fractionated stereotactic radiotherapy. These technological advances have created new demanding mandates on hardware and patient quality assurance (QA) tasks, as well as the need for updating/educating the physicists in the community on these requirements. (3). Conventional Linac based treatments: Modulated arc therapy (MAT) has gained wide popularities in Linac-based treatments in recent years due to its high delivery efficiency and excellent dose conformities. Recently, MAT has been introduced to deliver highly conformal radiosurgery treatments to multiple targets simultaneously via a single isocenter to replace the conventional multi-iso multi-plan treatments. It becomes important to understand the advantages and limitations of this technique, and the pitfalls for implementing this technique in clinical practice. The planning process of single-iso multi-target MAT will be described, and its plan quality and delivery efficiency will be compared with multi-iso plans. The QA process for verifying such complex plans will be illustrated, and pitfalls in imaging and patient set up will be discussed. Overall, this session will focus on the following areas: 1) Update on the emerging technology in current SRS/SBRT delivery. 2) New developments in treatment planning and Quality Assurance program. 3) Imaging guidance and motion management. Learning Objectives: To understand the SRS/SBRT principles and its clinical applications, and gain knowledge on the emerging technologies in SRS/SBRT. To review planning concepts and useful tips in treatment planning. To learn about the imaging guidance procedures and the quality assurance program in SRS/SBRT. National Institutes of Health, Varian Medical System; L. Ren, The presenter is funded by National Institutes of Health and Varian Medical System.

60 APPLIED LIFE SCIENCES↗

Real time computations of cryogenic He properties

The Fermilab PIP-II (proton improvement plan - II) project is being constructed at Fermilab to deliver $800\,MeV$ protons of $>1\,MW$ beam power to replace the present LINAC and provide protons to the remainder of the existing accelerator complex. The new LINAC consists of a warm front end, 23 superconducting RF cryomodules, and a beam transfer line to the existing complex. The cryomodules (CMs) are to be tested at Fermilab's CryoModule Test Facility (CMTF).An important measurement in cryogenic testing is the heat load of each CM. Traditionally, at Fermilab, these measurements were made collecting archived data offline and analyzing it. The new control system for PIP-II is being developed with the EPICS (Experimental Physics and Industrial Control System) framework, which allows us to compute the heat load in real time using the HePak library.We are exploring other $He$ properties, such as flow, where flow meters are not available, which can also be calculated in real time and fed back to the cryogenics engineers.This paper details the real time heat load calculation and $He$ flow software developed for CM testing at CMTF, as well as the first results from the prototype HB650 CM. Future plans for 2-phase $LHe$ flow will also be outlined.

Hanlet, Pierrick [Fermilab]↗

Optimization of the cavity heat load and trip rate for CEBAF

The Continuous Electron Beam Accelerator Facility at JLab has 200 RF cavities in the north linac and the south linac respectively after the 12 GeV upgrade. The purpose of this work is to simultaneously optimize the heat load and the trip rate for the cavities and to reconstruct the pareto-optimal front in a timely manner when some of the cavities are turned off. Various optimizers are investigated to find the one with the best efficiency on this specific problem. The derivative information of the heat load is used to effectively create the initial populations. With less than 20 cavities off, the pareto-optimal front can be reestablished within a minute.

Zhang, H.↗

Design of PIP-II Medium Energy Beam Transport

The Proton Improvement Plan-II (PIP-II) is a proposed upgrade for the accelerator complex at Fermilab. The central piece of PIP-II is a superconducting radio frequency (SRF) 800 MeV linac capable of operating in both CW and pulse regimes. The PIP-II linac comprises a warm front-end that includes a H⁻ ion source capable of delivering 15-mA, 30-keV DC or pulsed beam, a Low Energy Beam Transport (LEBT), a 162.5 MHz, CW Radio-Frequency Quadrupole (RFQ) accelerating the ions to 2.1 MeV and, a 14-m Medium Energy Beam Transport (MEBT) before beam is injected into SRF part of the linac. This paper presents the PIP-II MEBT design and, discusses operational features and considerations that lead to existing optics design such as bunch by bunch chopping system, minimization of radiation coming to the warm front-end from the SRF linac using a concrete wall, a robust vacuum protection system etc.

43 PARTICLE ACCELERATORS↗

CEBAF 22 GeV FFA energy upgrade

Extending the energy reach of CEBAF by increasing the number of recirculations, while using the existing linacs is explored. This energy upgrade is based on the multi-pass acceleration of electrons in a single non-scaling Fixed Field Alternating Gradient (FFA) beam line, using Halbach-style permanent magnets. Encouraged by the recent successful demonstration of CBETA, a proposal was formulated to nearly double the energy of CEBAF from 12 to 22~GeV by replacing the highest energy arcs with FFA transport. The new FFA arcs would support simultaneous transport of an additional 6 passes spanning roughly a factor of two in energy. One of the challenges of the multi-pass (11) linac optics is to assure uniform focusing over a wide range of energies. Here, we propose a triplet lattice that provides a stable periodic solution covering an energy ratio of 1:33. The current CEBAF injection at 123 MeV, makes optical matching in the first linac impossible due to the extremely high energy ratio (1:175). Replacement of the current injector with a 650 MeV recirculating injector will alleviate this issue. Orbital and optical matching from the FFA arcs to the linacs is implemented as a compact non-adiabatic insert. The design presented here is anticipated to deliver a 22 GeV beam with normalized emittance of 76 mm·mrad and a relative energy spread of 1×10\textsuperscript{-3}. Further recirculation beyond 22 GeV is limited by the large (974 MeV per electron) energy loss due to synchrotron radiation.

Benesch, J.↗

Status of 22 GeV CEBAF Upgrade Using FFA Arcs

Jefferson Lab is exploring an upgrade to extend CEBAF’s energy to ~22 GeV within the existing tunnel by incorporating Fixed-Field Alternating-Gradient (FFA) arcs. In this scheme, the two lowest-energy electromagnetic arcs are removed, the remaining arcs are reassigned to lower energies, and a new pair of high-energy FFA arcs enables six additional recirculations using the existing SRF linacs. The non-scaling FFA lattice employs Halbach-derived permanent magnets with provisions for dipole, quadrupole, and higher-order components, offering large momentum acceptance and reduced operating cost. Implementing this concept requires updated linac optics, modifications to the remaining arcs, and a redesigned electromagnetic switchyard. Ongoing beam-dynamics studies address synchrotron-radiation–induced energy loss and emittance growth, along with strategies for their mitigation.

Ogur, S. [Thomas Jefferson National Accelerator Fa↗

Beam Performance of the Positron Transport Line for CEBAF Positron Upgrade

The Low Energy Recirculator Facility (LERF) at Jefferson Lab, formerly operated for the Free-Electron Laser program, has been proposed as the injector complex for the planned 12 GeV CEBAF positron upgrade (Ce+BAF), with an additional pathway to support a potential 22 GeV CEBAF electron upgrade. In this configuration, LERF would generate and pre-accelerate positrons to 123 MeV, matching the present injection energy into the North Linac. Due to the relatively large emittance expected from the positron source, a comprehensive acceptance study has been performed from LERF through the CEBAF recirculating linacs and beam transport lines to the experimental halls. The objective is to establish the positron phase-space acceptance and provide design feedback to the positron production and capture systems. Furthermore, given CEBAF’s capability to deliver highly polarized beams, spin-tracking simulations have been carried out including magnet imperfections, alignment errors, and synchrotron-radiation–induced energy spread. Particular attention is given to the evolution of the spin tune and the corresponding depolarization mechanisms along the beam delivery path, especially for providing longitudinal polarization at the experimental halls. These results inform injector design choices and assess the overall feasibility of delivering high-polarization positron beams in CEBAF.

Ogur, S. [Thomas Jefferson National Accelerator Fa↗

LCLS-II cavity higher order modes coupler tuning optimization and challenges at Jefferson Lab

The Thomas Jefferson National Accelerator Facility is currently engaged, along with several other Department of Energy (DOE) national laboratories, in the Linac Coherent Light Source II project (LCLS II) - a new XFEL linac based on 1.3GHz superconducting linear accelerator. Half of the LCLS-II cryomodules are being produced at Jefferson Lab, other half is made at Fermilab. Each cryomodule contains eight 9-cell cavities with two Higher Order Modes (HOM) loop couplers operating at 1.3 GHz. This paper summarizes the HOM filter tuning challenges at Jefferson Lab and describes optimization of the procedure for a 9-cell Tesla type cavity and its integration into a cryomodule production line.

Solopova, Anna D.↗

Design progress for the 22 GeV CEBAF energy upgrade

In this work we examine the progress made in the design of the proposed FFA upgrade to the Continuous Electron Beam Accelerator Facility (CEBAF). This proposed upgrade will double the number of passes through the two linacs by replacing the two highest energy arcs with new Fixed Field Alternating Gradient (FFA) arcs, roughly doubling the energy. These FFA arcs will use permanent magnets in a Halbach configuration to shape their fields. The design involves new optics for the linacs and remaining electromagnetic arcs, as well as new electromagnetic separators. These feed into the permanent magnet FFA arcs. We also report on ongoing studies of the dynamics of the beams, and an experiment to measure the effects of radiation on the permanent magnets.

Accelerator Physics↗

Project X: Accelerator Reference Design

Project X is a high-intensity proton facility being developed to support a world-leading program of Intensity Frontier physics over the next two decades at Fermilab. Project X is an integral part of the U.S. Intensity Frontier Roadmap as described in the P5 report of May 2008 [1] and within the Fermilab Strategic Plan of November 2011 [2]. This document represents Part I of the “Project X Book” describing the Project X accelerator facility and the broad range of physics research opportunities enabled by Project X. Parts II and III provide in-depth descriptions of the physics research program, both within and beyond particle physics [3]. The primary elements of the U.S. program to be supported by Project X include: Neutrino Experiments: Experimental studies of neutrino oscillations and neutrino interaction physics with ultra-intense neutrino beams provided by a high-power proton source with energies up to 120 GeV, utilizing near detectors at the Fermilab site and massive detectors at distant underground laboratories. Goal: At least 2 MW of proton beam power at any energy between 60 to 120 GeV; several hundred kW of proton beam power on target at 8 GeV. Kaon, Muon, Nucleon, and Neutron Precision Experiments: World-leading experiments studying ultra-rare kaon decays, searching for muon-to-electron conversion and nuclear electron dipole moments (EDMs), and exploring neutron properties at very high precision. Goal: MW-class proton beams supporting multiple experiments at 1 and 3 GeV, with flexible capability for providing distinct beam formats to concurrent users while allowing simultaneous operations with the neutrino program. Material Science and Nuclear Energy Applications: High-intensity accelerator, spallation, target and transmutation technology demonstrations will provide critical input into the design of future energy systems, including next generation fission reactors, nuclear waste transmutation systems and future thorium fuel-cycle power systems. Possible applications of muon spin rotation techniques provide sensitive probes of the magnetic structure of materials. Goal: Provide MW-class proton beams at 1 GeV, coupled with novel targets required to support a broad range of materials science and energy applications. Platform for Evolution to Future Frontier Facilities: A high-intensity proton source will strengthen and modernize the Fermilab injector complex, providing a robust platform upon which to build future frontier facilities. The Neutrino Factory and Muon Collider are examples that would provide world-leading capabilities at the Intensity and Energy Frontiers for many decades to come. Goal: Provide a straightforward upgrade path for a 4 MW, low-duty-factor source of protons at energies between 5 and 15 GeV. These four elements are expected to form the basis of the Mission Need statement required for the Department of Energy (DOE) Critical Decision 0 (CD-0), and represent the fundamental design criteria for Project X. The following chapters present the Reference Design for the Project X accelerator facility. The Reference Design is based on a continuous wave (CW) superconducting (SC) linac providing up to 1 and 3 MW of beam power at 1 and 3 GeV respectively. A pulsed linac provides acceleration of roughly 4% of the beam delivered from the CW linac to the 8 GeV injection energy of the existing Recycler/Main Injector complex. Upgrades to the Recycler and Main Injector support a factor of three increase, beyond current capabilities, in proton beam power at 60 to 120 GeV. The Reference Design represents a facility that will be unique in the world with unmatched capabilities for the delivery of very high beam power, with flexible beam formats, to multiple users at multiple energies. The utilization of linacs within the Project X facility enables capabilities beyond what is achievable with circular accelerators. It is anticipated that the final configuration and operating parameters of the complex will be further refined through the R&D program in advance of CD-2.

Holmes, Stephen D.↗

Overview of High Power Vacuum Dry RF Load Designs

A specific feature of RF linacs based on the pulsed traveling wave (TW) mode of operation is that only a portion of the RF energy is used for the beam acceleration. The residual RF energy has to be terminated into an RF load. Higher accelerating gradients require higher RF sources and RF loads, which can stably terminate the residual RF power. RF feeders (from the RF source though the accelerating section to the load) are vacuumed to transmit multi-megawatt high power RF. This overview will outline vacuumed RF loads only. A common method to terminate multi-MW RF power is to use circulated water (or other liquid) as an absorbing medium. A solid dielectric interface (a high quality ceramic) is required to separate vacuum and liquid RF absorber mediums. Using such RF load approaches in TW linacs is troubling because there is a fragile ceramic window barrier and a failure could become catastrophic for linac vacuum and RF systems. Traditional loads comprising of a ceramic disk have limited peak and average power handling capability and are therefore not suitable for high gradient TW linacs. This overview will focus on ''vacuum dry'' or ''all-metal'' loads that do not employ any dielectric interface between vacuum and absorber. The first prototype is an original design of RF loads for the Stanford Two-Mile Accelerator.

43 PARTICLE ACCELERATORS↗

Fundamental Power Coupler Technical Development - Final CRADA Report

The SLAC ‘Linac Coherent Light Source -II’ project (LCLS II) is a hard X-ray Free Electron Laser now under construction in support of photon-based material science. LCLS II uses a superconducting linac design based on the twenty year-long TESLA- Technology development effort. The TESLA proposal, the European XFEL (EU-XFEL) project, and the ILC design employ a pulsed superconducting linac with roughly 0.5% duty factor. This aspect was changed for LCLS II so that the FEL could be operated continuous-wave (CW) namely with a 100% duty factor. Several critical changes to the linac design were required including RF power distribution, cryogenic heat-load management and cavity preparation. This note lists the changes required to the fundamental power coupler (FPC). All of these changes were made by the SLAC physics and engineering teams and reviewed by the cryomodule design lead (Fermilab) and international partners. Testing was done by the LCLS II cryomodule teams (Jefferson Lab and Fermilab). The SLAC LCLS II project team managed the design and procurement process. The LCLS II fundamental power coupler design is based upon the DESY TESLA Test Facility (TTF-3) design. DESY shared their drawings with LCLS II and SLAC copied and modified them to meet the LCLS II CW operation power and heat-load requirements. LCLS II had an external reviewer evaluate and compare SLAC drawings to EU-XFEL drawings. SLAC used the same industrial partners that EU-XFEL used.

47 OTHER INSTRUMENTATION↗

EM and beam dynamics modeling of CCL with CST Studio

The 800-MeV proton linac at LANSCE consists of a drift-tube linac, which brings the beam to 100 MeV, followed by a coupled-cavity linac (CCL). Each of 44 CCL modules contain multiple tanks, and it is fed by a single 805-MHz klystron. CCL tanks are multi-cell blocks of identical re-entrant sidecoupled cavities, which are followed by drifts with magnetic quadrupole doublets. Bridge couplers – special cavities displaced from the beam axis – electromagnetically couple CCL tanks over such drifts. We have developed 3D CST models of CCL tanks of the LANSCE linac. Their electromagnetic analysis is performed using MicroWave Studio. Beam dynamics is modeled with Particle Studio for bunch trains with realistic beam distributions using the CST calculated RF fields and quadrupole magnetic fields to determine the output beam parameters.

42 ENGINEERING↗

The MTA primary beamline description and performance [Slides]

The Muon Test Area (2003) was initially constructed to develop, test, and verify muon ionization apparatus using the 400-MeV proton beam from the Fermilab Linac. Since muon facilities involve the capture, collection and cooling of ~10 13 muons at a repetition conclusive tests require ~10 13 protons/pulse (full Linac beam): the original concept/request was for a full Linac capability (~10 14 p/sec). The beamline designed for MTA experiments, however, includes specialized insertions for linac beam diagnostics and beam measurements, greatly enhancing the functionality and complexity of the beamline. Installation of the beamline was complete fall, 2008. It represents the only facility in which experiments have direct access to a primary beam.

43 PARTICLE ACCELERATORS↗

Compact, high-power superconducting radio-frequency accelerators for environmental applications

Electron-beam irradiation has been proven to destructively reduce or eliminate a wide variety of organic chemicals, viruses and bacteria from wastewater, as well as reducing sulfur and nitrous oxides emission from coal-fired power plants. It is estimated that there are approximately 30,000 such particle accelerators in use worldwide for industrial processes including surface and bulk processing of material, medical sterilization, and environmental remediation. Maximum beam power from accelerators used in these applications is currently limited to less than 500 kW, and a higher beam power is needed to reduce treatment costs. The market availability of continuous-wave (CW) electron-beam accelerators with power of the order of ~100 kW is also very limited. Superconducting radio-frequency (SRF) linear accelerators (linacs) are commonly used at basic research laboratories throughout the world due to their exceptionally high efficiency as compared to current industrial varieties. Recent advances in cryogenics, SRF thin films and high-power magnetrons allow for the design of increasingly compact and efficient CW SRF electron linacs in the energy range 1-10 MeV, with up to 1 MW of beam power. A new class of compact, high-efficiency electron-beam accelerators may provide cost-effective solutions for a range of industrial and environmental remediation applications, particularly with respect to tackling one such class of contaminants so-called “forever chemicals”, including per- and polyfluoroalkyl substances (PFASs), which are ubiquitous in a wide range of products and for which there is currently no effective destruction technology. We have recently demonstrated the key technologies required for such accelerators by: 1) operating a Nb3Sn SRF accelerating cavity cooled by commercial cryocoolers up to an accelerating gradient of 12.4 MV/m and 2) demonstrating the phase-locking as well as a high-efficiency power combining scheme for industrial magnetron transmitters. In this presentation, we will introduce the principles and benefits of MW-class SRF linacs, based on the conduction-cooled SRF technology that we have demonstrated for environmental remediation. We propose the development of a 4 MeV, 20 kW prototype to be built at Jefferson Lab as a first accelerator demonstrator unit. We will also present the results from samples study on the effect of electron-beam irradiation on so-called “forever chemicals” such as 1,4-dioxane and PFAS, using an existing multi-purpose 10 MeV, low-power, CW SRF linac at Jefferson Lab.

Ciovati, Gianluigi↗

CEBAF 22 GeV FFA energy upgrade

Extending the energy reach of CEBAF by increasing the number of recirculations, while using the existing linacs is explored. This energy upgrade is based on the multi-pass acceleration of electrons in a single non-scaling Fixed Field Alternating Gradient (FFA) beam line, using Halbach-style permanent magnets. Encouraged by the recent successful demonstration of CBETA, a proposal was formulated to nearly double the energy of CEBAF from 12 to 22~GeV by replacing the highest energy arcs with FFA transport. The new FFA arcs would support simultaneous transport of an additional 6 passes spanning roughly a factor of two in energy. One of the challenges of the multi-pass (11) linac optics is to assure uniform focusing over a wide range of energies. Here, we propose a triplet lattice that provides a stable periodic solution covering an energy ratio of 1:33. The current CEBAF injection at 123 MeV, makes optical matching in the first linac impossible due to the extremely high energy ratio (1:175). Replacement of the current injector with a 650 MeV recirculating injector will alleviate this issue. Orbital and optical matching from the FFA arcs to the linacs is implemented as a compact non-adiabatic insert. The design presented here is anticipated to deliver a 22 GeV beam with normalized emittance of 76 mm·mrad and a relative energy spread of 1×10\textsuperscript{-3}. Further recirculation beyond 22 GeV is limited by the large (974 MeV per electron) energy loss due to synchrotron radiation.

Benesch, J.↗