Search NASA⌕ Search

SEARCH · Search NASA

Results for “MITIGATION STRATEGIES”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,009 records · Page 56

Solar Power Satellite (SPS) pilot beam and communication link subsystem investigation study, phase 1

A preliminary engineering model of ionospheric interactions with the pilot beam was established and used to demonstrate that the dual frequency baseline pilot beam system might not be viable in the presence of an unstable transmission path. Alternate approaches to remove this difficulty are described. Although ionospheric fluctuations will not significantly degrade beam pointing or raise the sidelobe levels, they will reduce transmission efficiency by upwards of 25%. Mitigating strategies to substantially reduce this effect are proposed. Based on the Klystron noise spectrum, the pilot beam transmitter power was determined as a function of frequency offset from the power beam carrier frequency. The RFI from the pilot beam, on the ground and at geosynchronous orbit is shown. Noise levels on the earth's surface due to the SPS are presented as a function of frequency and the number of SPS systems. Analysis of the communication subsystem indicates that a standard telemetry line of 1.544 MB/s would satisfy both voice and data link requirements. Additional links would be required for TV and radio transmissions.

Source record↗

Environmental assessment overview

The assessment program has as its objectives: to identify the environmental issues associated with the SPS Reference System; to prepare a preliminary assessment based on existing data; to suggest mitigating strategies and provide environmental data and guidance to other components of the program as required; and to plan long-range research to reduce the uncertainty in the preliminary assessment. The key environmental issues associated with the satellite power system are discussed and include human health and safety, ecosystems, climate, and interaction with electromagnetic systems.

Valentino, A. R.↗

Risk-Assessment Computer Program

RISK D/C is prototype computer program assisting in attempts to do program risk modeling for Space Exploration Initiative (SEI) architectures proposed in Synthesis Group Report. Risk assessment performed with respect to risk events, probabilities, and severities of potential results. Enables ranking, with respect to effectiveness, of risk-mitigation strategies proposed for exploration program architecture. Allows for fact that risk assessment in early phases of planning subjective. Although specific to SEI in present form, also used as software framework for development of risk-assessment programs for other specific uses. Developed for Macintosh(TM) series computer. Requires HyperCard(TM) 2.0 or later, as well as 2 Mb of random-access memory and System 6.0.8 or later.

Dias, William C.↗

Report to Congress on the restructuring of the Earth Observing System

Contents: (1) The Science Objectives of EOS; (2) New Spacecraft Configurations; (3) The Impact of the Restructured EOS on Understanding the Climate; (4) The Impact of EOS on Adaptation and Mitigation Strategies; (5) EOS Data and Information System; (6) Interdisciplinary Investigations; (7) Missions in Advance of EOS; (8) The Role of the Departments of Energy and Defense; (9) Summary of the Mission to Planet Earth; and (10) Funding Requirement.

Source record↗

A risk-based approach to robotic mission requirements

A NASA Risk Team has developed a method for the application of risk management to the definition of robotic mission requirements for the Space Exploration Initiative. These requirements encompass environmental information, infrastructural emplacement in advance, and either technology testing or system/subsystems demonstration. Attention is presently given to a method for step-by-step consideration and analysis of the risk component inherent in mission architecture, followed by a calculation of the subjective risk level. Mitigation strategies are then applied with the same rules, and a comparison is made.

Dias, William C.↗

Environmental monitoring and research at the John F. Kennedy Space Center

The Biomedical Operations and Research Office at the NASA John F. Kennedy Space Center has been supporting environmental monitoring and research since the mid-1970s. Program elements include monitoring of baseline conditions to document natural variability in the ecosystem, assessments of operations and construction of new facilities, and ecological research focusing on wildlife habitat associations. Information management is centered around development of a computerized geographic information system that incorporates remote sensing and digital image processing technologies along with traditional relational data base management capabilities. The proactive program is one in which the initiative is to anticipate potential environmental concerns before they occur and, by utilizing in-house expertise, develop impact minimization or mitigation strategies to reduce environmental risk.

Hall, C. R.↗

Active adhesion concepts for in-orbit structural construction

The in-orbit assembly of structural elements is presently addressed by means of a continuum-based theory of active-adhesion contact/impact which assumes the manufacturability of active adhesion elements by piezoelectric (and similarly behaving) materials. Block bonding characteristics can furnish an effective alternative to optimal control-based, impact surge force-mitigation strategies, especially in the numerous nonsmooth control problems that are difficult to synthesize and implement. Attention is given to design concepts employing combined serial/parallel-bonded active adhesion elements composed of cascaded piezoelectric devices.

Park, K. C.↗

Earth Sciences Data and Information System (ESDIS) program planning and evaluation methodology development

An Earth Sciences Data and Information System (ESDIS) Project Management Plan (PMP) is prepared. An ESDIS Project Systems Engineering Management Plan (SEMP) consistent with the developed PMP is also prepared. ESDIS and related EOS program requirements developments, management and analysis processes are evaluated. Opportunities to improve the effectiveness of these processes and program/project responsiveness to requirements are identified. Overall ESDIS cost estimation processes are evaluated, and recommendations to improve cost estimating and modeling techniques are developed. ESDIS schedules and scheduling tools are evaluated. Risk assessment, risk mitigation strategies and approaches, and use of risk information in management decision-making are addressed.

Dickinson, William B.↗

Managing Risk on a Technology Development Project/Advanced Mirror System Demonstrator

The risk management study applied to the Advanced Mirror System Demonstrator (AMSD), a precursor mirror technology development for the Next Generation Space Telescope (NGST) is documented. The AMSD will be developed as a segment of a lightweight primary mirror system that can be produced at a low cost and with a short manufacturing schedule. The technology gained from the program will support the risk mitigation strategy for the NGST, as well as other government agency space mirror programs.

Byberg, Alicia↗

Solar Array Arcing Failure Mode and High Voltage Array Testing

In 1998, a new failure mode for space solar arrays was discovered. A flowchart for this failure mode is presented. Since the discovery of this arc failure mode, many tactics have been used to defeat it. The arc thresholds and arc mitigation strategies must be determined in vacuum-plasma tank testing on Earth. Results from these tests must then be extrapolated to the space plasma environment. Thus, the test conditions on Earth must be adequate to reproduce the important aspects of the phenomenon in space. At Glenn Research Center, we have been testing solar arrays for their arc thresholds and sustained arcing thresholds. In this paper, we detail the test conditions for a specific set of tests-those aimed at qualifying the Boeing Solar Tile solar arrays to operate in space at very high voltages (300 V or more).

Ferguson, Dale C.↗

Single-Event Effects Ground Testing and On-Orbit Rate Prediction Methods: The Past, Present and Future

Over the past 27 years, or so, increased concern over single event effects in spacecraft systems has resulted in research, development and engineering activities centered around a better understanding of the space radiation environment, single event effects predictive methods, ground test protocols, and test facility developments. This research has led to fairly well developed methods for assessing the impact of the space radiation environment on systems that contain SEE sensitive devices and the development of mitigation strategies either at the system or device level.

Reed, Robert A.↗

Meteor Outbursts and Storms from the Spacecraft Hazard Perspective

The recent Leonid meteor storms have propelled meteor shower forecasting from an idea into the realm of practical application, invoked several times per year by numerous spacecraft. This paper will describe shower activity predictions, which give zenith hourly rate (ZHR) as a function of time, and how these are translated into spacecraft risks. Common spacecraft meteor shower mitigation strategies will also be discussed, and the important issue as to when to implement such operations considered. It should be noted that, while the recent meteor storms did not result in the loss of a vehicle, there were a few spacecraft anomalies attributed to Leonid strikes, and the nature of these will be commented upon. Finally, we assess the current state of the art in shower forecasting, and take a look "down the road" at some possible outbursts in the near future.

Cooke, William↗

Analysis of Surface Charging for a Candidate Solar Sail Mission Using Nascap-2k

The characterization of the electromagnetic interaction for a solar sail in the solar wind environment, and identification of viable charging mitigation strategies, is a critical solar sail mission design task, as spacecraft charging has important implications both for science applications and for sail lifetime. To that end, we have pexformed some preliminary surface charging calculations of a candidate 150 meter class solar sail spacecraft for the 0.5 AU solar polar orbit and a 1.0 AU L1 orbit. We construct a model of the spacecraft with candidate materials having appropriate electrical properties using Object Toolkit and perform the spacecraft charging analysis using Nascap-2k, the NASA/AFRL sponsored spacecraft charging analysis tool. We use mean and extreme solar wind environments appropriate for the 0.5 AU and 1.0 AU missions to establish current collection of solar wind ions and electrons. In addition, we include a geostationary orbit case to demonstrate a bounding example of extreme (negative) charging of a solar sail spacecraft in the geostationary orbit environment. Results from the charging analysis demonstrate that minimal differential potentials (and resulting threat of electrostatic discharge) occur when the spacecraft is constructed entirely of conducting materials, as expected. Examples with dielectric materials exposed to the space environment exhibit differential potentials ranging from a few volts to extreme potentials in the kilovolt range. Recommendations for further analyses include calculations of wake effects, surface current densities, and environments effects on conductivities.

Neergaard, Linda F.↗

Compositional Investigation of Binary Near-Earth Asteroid 66063 (1998 RO1): A Potentially Undifferentiated Assemblage

It is now thought that approximately 16% of all asteroids among the near-Earth population may be binary objects. Several independent lines of evidence, such as the presence of doublet craters on the Earth and Moon [1, 2], complex lightcurves of near-Earth objects exhibiting mutual events [3], and radar images of near-Earth asteroids revealing distinct primary and secondary objects, have supported this conclusion [4]. To date at least 23 near-Earth objects have been discovered as binary systems with expectations that many more have yet to be identified or recognized. Little is known about the physical characteristics of binary objects except that they seem to have fairly rapid rotation rates, generally have primaries in the approx. 1 km diameter range with smaller secondaries on the order of a few hundred meters, and apart from a few exceptions, are in synchronous orbits [4, 5]. Previously only two of these binary near-Earth asteroids (1998 ST27 and 2003 YT1) have been characterized in terms of detailed mineralogical investigations [6, 7]. Such investigations are required to fully understand the formation mechanisms of these binary objects and their possible source regions. In addition, detailed knowledge of these objects may play an important role for planning future spacecraft missions and for the development of impact mitigation strategies. The work presented here represents a continued effort to characterize this particular sub-group of the near- Earth asteroid population.

Abell, P. A.↗

Analysis Of Surface Charging For A Candidate Solar Sail Mission Using Nascap-2k

The characterization of the electromagnetic interaction for a solar sail in the solar wind environment, and identification of viable charging mitigation strategies, is a critical solar sail mission design task, as spacecraft charging has important implications both for science applications and for sail lifetime. To that end, we have performed surface charging calculations of a candidate 150-meter-class solar sail spacecraft for the 0.5 solar polar orbit and a 1.0 AU L1 orbit. We construct a model of the spacecraft with candidate materials having appropriate electrical properties using Object Toolkit and perform the spacecraft charging analysis using NASCAP-2k, the NASA/AFRL sponsored spacecraft charging analysis tool. We use nominal and atypical solar wind environments appropriate for the 0.5 AU and 1.0 AU missions to establish current collection of solar wind ions and electrons. In addition, we include a geostationary orbit case to demonstrate a bounding example of extreme (negative) charging of a solar sail spacecraft in the geostationary orbit environment. Results form the charging analysis demonstrate that minimal differential potentials (and resulting threat of electrostatic discharge) occur when the spacecraft is constructed entirely of conducting materials, as expected. Examples with dielectric materials exposed to the space environment exhibit differential potentials ranging from a few volts to extreme potentials in the kilovolt range.

Minow, Joseph↗

Analysis of Surface Charging for a Candidate Solar Sail Mission Using NASCAP-2K

The characterization of the electromagnetic interaction for a solar sail in the solar wind environment, and identification of viable charging mitigation strategies, is a critical solar sail mission design task, as spacecraft charging has important implications both for science applications and for sail lifetime. To that end, we have performed surface charging calculations of a candidate 150-meter-class solar sail spacecraft for the 0.5 AU solar polar orbit and a 1.0 AU L1 orbit. We construct a model of the spacecraft with candidate materials having appropriate electrical properties using Object Toolkit and perform the spacecraft charging analysis using NASCAP-2k, the NASA/AFRL sponsored spacecraft charging analysis tool. We use nominal and atypical solar wind environments appropriate for the 0.5 AU and 1.0 AU missions to establish current collection of solar wind ions and electrons. In addition, we include a geostationary orbit case to demonstrate a bounding example of extreme (negative) charging of a solar sail spacecraft in the geostationary orbit environment. Results from the charging analysis demonstrate that minimal differential potentials (and resulting threat of electrostatic discharge) occur when the spacecraft is constructed entirely of conducting materials, as expected. Examples with dielectric materials exposed to the space environment exhibit differential potentials ranging from a few volts to extreme potentials in the kilovolt range.

Parker, Linda Neergaard↗

Space Plasma Shown to Make Satellite Solar Arrays Fail

In 1997, scientists and engineers of the Photovoltaic and Space Environments Branch of the NASA Lewis Research Center, Maxwell Technologies, and Space Systems/Loral discovered a new failure mechanism for solar arrays on communications satellites in orbit. Sustained electrical arcs, initiated by the space plasma and powered by the solar arrays themselves, were found to have destroyed solar array substrates on some Space Systems/Loral satellites, leading to array failure. The mechanism was tested at Lewis, and mitigation strategies were developed to prevent such disastrous occurrences on-orbit in the future. Deep Space 1 is a solar-electric-powered space mission to a comet, launched on October 24, 1998. Early in 1998, scientists at Lewis and Ballistic Missile Defense Organization (BMDO) realized that some aspects of the Deep Space 1 solar arrays were nearly identical to those that had led to the failure of solar arrays on Space Systems/Loral satellites. They decided to modify the Deep Space 1 arrays to prevent catastrophic failure in space. The arrays were suitably modified and are now performing optimally in outer space. Finally, the Earth Observing System (EOS) AM1, scheduled for launch in mid-1999, is a NASA mission managed by the Goddard Space Flight Center. Realizing the importance of Lewis testing on the Loral arrays, EOS-AM1 management asked Lewis scientists to test their solar arrays to show that they would not fail in the same way. The first phase of plasma testing showed that sustained arcing would occur on the unmodified EOS-AM1 arrays, so the arrays were removed from the spacecraft and fixed. Now, Lewis scientists have finished plasma testing of the modified array configuration to ensure that EOS-AM1 will have no sustained arcing problems on-orbit.

Ferguson, Dale C.↗

Causes and Mitigation of Fuel Pilot Operated Valve Pilot Seal Extrusion in Space Shuttle Orbiter Primary RCS Thrusters

Extrusion of a polytetrafluoroethylene (PTFE) pilot seal located in the Space Shuttle Orbiter Primary Reaction Control Subsystem (PRCS) thruster fuel valve has been implicated in 68 ground and on-orbit fuel valve failures. A rash of six extrusion-related in-flight anomalies over a six-mission span from December 2001 to October 2002 led to heightened activity at various NASA centers, and the formation of a multidisciplinary team to solve the problem. Empirical and theoretical approaches were used. For example, thermomechanical analysis (TMA) and exposure tests showed that some extrusion is produced by thermal cycling; however, a review of thruster service histories did not reveal a strong link between thermal cycling and extrusion. Calculations showed that the amount of observed extrusion often exceeded the amount allowed by thermally-induced stress relief. Failure analysis of failed hardware also revealed the presence of fuel-oxidizer reaction product (FORP) inside the fuel valve pilot seal cavity, and differential scanning calorimetry (DSC) showed that the FORP was intimately associated with the pilot seal material. Component-level exposure tests showed that FORP of similar composition could be produced by adjacent oxidizer valve leakage in the absence of thruster firing. Specific gravity data showed that extruded fuel valve pilot seals were less dense than new pilot seals or oxidizer valve pilot seals, indicating permanent modification of the PTFE occurred during service. It is concluded that some thermally-induced extrusion is unavoidable; however, oxidizer leakage-induced extrusion is mostly avoidable and can be mitigated. Several engineering level mitigation strategies are discussed.

Waller, Jess M.↗