Search NASA⌕ Search

SEARCH · Search NASA

Results for “Nuclear Process Control”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,027 records · Page 57

Advanced Reactor Cyber Analysis and Development Environment (ARCADE) for System-Level Design Analysis

Cybersecurity is a persistent concern to the safety and security of Nuclear Power Plants (NPPs), but has lacked data-driven, evidence-based research. Rigorous cybersecurity analysis is critical for the licensing of advanced reactors using a performance-based approach. One tool that enables cybersecurity analysis is modeling and simulation. The nuclear industry makes extensive use of modeling and simulation throughout the decision process but lacks a method to incorporate cybersecurity analysis with existing models. To meet this need, the Advanced Reactor Cyber Analysis and Development Environment (ARCADE) was developed. ARCADE is a suite of publicly available tools that can be used to develop emulations of industrial control system devices and networks and integrate those emulations with physics simulators. This integration of cyber emulations and physics models enables rigorous cyber-physical analysis of cyber-attacks on NPP systems. This report provides an overview of key considerations for using ARCADE with existing physics models and demonstrates ARCADE’s capabilities for cybersecurity analysis. Using a model of the Small Modular Advanced High Temperature Reactor (SmAHTR), ARCADE was able to determine the sensitivity of the primary heat exchangers (PHX) to coordinated cyber-attacks. The analysis determined that while the PHX’s failures cause disruption to the reactor, they did not cause any safety limits to be exceeded because of the plant design, including passive safety features. Further development of ARCADE will enable rigorous, repeatable, and automated cyber-physical analysis of advanced reactor control systems. These efforts will also help reduce regulatory uncertainty by presenting similar types of cybersecurity analyses in a common format, driving standard approaches and reporting.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Safety Assurance of Software and Machine Learning Development for Nuclear Instrumentation and Controls

Digital instrumentation and control (DI&C) systems monitor and control parameters in nuclear power plants. Ensuring their safety is a critical part of ensuring overall plant safety. Nuclear power plant licensing generates thousands of safety documents that could be organized more effectively using a safety assurance case (SAC). We conducted a literature survey of SACs and created a SAC framework for DI&C software using Goal Structuring Notation (GSN). This framework focuses on four software development processes: management & assurance, pre-developed software (PDS) qualification, the Software Development Life Cycle (SDLC), and the Machine Learning Development Life Cycle (MLDLC). We organized our framework using a novel level structure that can be applied to other SACs to improve their clarity. Finally, we demonstrate how our framework can be incorporated as part of a SAC for a larger reactor system.

46 - INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AN↗

Minimizing Error Potential Using Computer Applications - 18498

Many Savannah River Site (SRS) liquid waste facility operations depend upon repetitive engineering calculations and operator actions. Although these calculations and actions are formalized in technical reports and paper procedures, they can still be vulnerable to data entry errors, calculation errors, equipment alignment errors, and occasional changes caused by different people performing these activities. Savannah River Remediation (SRR) is using computer automation to reduce these error precursors by standardizing repetitive calculations and by performing plant alignment checks for repetitive operation processes. Data entry can be automated, calculation methodologies can be standardized, and computers can check to see that predefined plant conditions exist before equipment operation. In addition to improving quality, the time required for these activities to generate technical reports, to perform independent reviews, and to perform equipment alignment checks can be significantly reduced. In the case of operator-performed calculations, error precursors involve distractions that can occur over a multi-page paper procedure, confusing displays and controls from equipment, mathematical errors, complacency, and unfamiliarity with the procedure among many others. Repetitive engineering calculations suffer from similar error precursors and are often compounded by high workloads, lack of proficiency, lack of standard methodology, mental shortcuts, and biases. Web-based computer applications can eliminate many of these precursors through standardization. Calculation methods are fixed, inputs are fixed, and computer checks can highlight potentially wrong inputs and outputs. Automated calculations are performed almost instantaneously once input is provided. Operators and engineers can spend more time focusing on the results than on the process to achieve the results. Similarly, when operators use repetitive procedures involving equipment manipulation, the same error precursors apply. Automated operation sequences and equipment checks can be programmed into the distributed control system to provide standard operating processes that reduce and eliminate error precursors. This paper describes how SRR incorporates Human Performance Improvement (HPI) principles when automating calculations and operation processes. Computer applications will be reviewed in detail, highlighting the software development life-cycle that includes requirements gathering, prototyping, design, development, testing, and implementation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Fit for Purpose Remote Technology Decommissioning Solutions - 18630

The Magnox Decommissioning Project is actively progressing clean-up and decommissioning of 12 reactor sites across England, Scotland and Wales. Funded and directed by the United Kingdom's Nuclear Decommissioning Authority (NDA) and managed by the Cavendish Fluor Partnership (CFP), the Magnox Decommissioning Project introduces a wide range of radiological and industrial hazards warranting deployment of remote technologies to safely de-inventory, decontaminate and decommission a vast array of nuclear facilities. The Magnox Decommissioning Project encompasses 22 former Magnox nuclear power production reactors across 10 reactor sites and five research/test reactors at two former research sites. Decommissioning activities have been underway at some sites for nearly 20 years with early focus on retrieving and stabilising wastes and draining and stabilising spent fuel ponds. The Magnox decommissioning strategy invokes a programme perspective to drive consistency in tackling similar decommissioning and waste challenges across multiple sites. Programme central teams have worked with technology suppliers to foster learning from industry experience to develop and deploy tooling and robotics. The programme approach has also facilitated learning from one site to the next. In many cases, this central programme approach has promoted an evolution of technologies resulting in optimisation of simple remote tooling. In other instances, collaboration with suppliers is producing state-of-the-art technologies to tackle more unique challenges including, most recently, early demonstration of laser cutting for reactor vessel dismantling. This paper will outline the programme management approach and the scalable optioneering process Magnox employs to select the engineered controls and technologies used in decommissioning and waste management activities. It will provide an overview of the broad range of remote tooling and robotics deployed across the 12 Magnox sites by exploring some specific examples. Lastly, the paper will summarise key lessons learned in the now extensive history of selecting and using remote technologies to decommission Magnox nuclear facilities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Advanced Outage and Control Center: Strategies for Nuclear Plant Outage Work Status Capabilities

The research effort is a part of the Light Water Reactor Sustainability (LWRS) Program. LWRS is a research and development program sponsored by the Department of Energy, performed in close collaboration with industry to provide the technical foundations for licensing and managing the long-term, safe and economical operation of current nuclear power plants. The LWRS Program serves to help the US nuclear industry adopt new technologies and engineering solutions that facilitate the continued safe operation of the plants and extension of the current operating licenses. The Outage Control Center (OCC) Pilot Project was directed at carrying out the applied research for development and pilot of technology designed to enhance safe outage and maintenance operations, improve human performance and reliability, increase overall operational efficiency, and improve plant status control. Plant outage management is a high priority concern for the nuclear industry from cost and safety perspectives. Unfortunately, many of the underlying technologies supporting outage control are the same as those used in the 1980’s. They depend heavily upon large teams of staff, multiple work and coordination locations, and manual administrative actions that require large amounts of paper. Previous work in human reliability analysis suggests that many repetitive tasks, including paper work tasks, may have a failure rate of 1.0E-3 or higher (Gertman, 1996). With between 10,000 and 45,000 subtasks being performed during an outage (Gomes, 1996), the opportunity for human error of some consequence is a realistic concern. Although a number of factors exist that can make these errors recoverable, reducing and effectively coordinating the sheer number of tasks to be performed, particularly those that are error prone, has the potential to enhance outage efficiency and safety. Additionally, outage management requires precise coordination of work groups that do not always share similar objectives. Outage managers are concerned with schedule and cost, union workers are concerned with performing work that is commensurate with their trade, and support functions (safety, quality assurance, and radiological controls, etc.) are concerned with performing the work within the plants controls and procedures. Approaches to outage management should be designed to increase the active participation of work groups and managers in making decisions that closed the gap between competing objectives and the potential for error and process inefficiency.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Visible, Durable, Enforceable Institutional Controls: Weldon Spring Site - A 10-Year Journey - 13190

The DOE Office of Legacy Management's (LM's) mission is to manage the DOE's post-closure responsibilities and ensure the future protection of human health and the environment. LM has control and custody of legacy land, structures, and facilities and is responsible for maintaining them at levels suitable for their long-term use. This includes all engineered and institutional controls (ICs) designed as another level of assurance to prevent exposure to residual contamination and waste. The development and management of ICs has been, and continues to be, a critical component to the success of LM surveillance and maintenance activities. Many major federal laws, Executive Orders, regulations, and various other drivers influence the establishment and use of ICs at LM sites. LM uses a wide range of ICs to appropriately limit access to, or uses of, land, facilities, and other real and personal properties; protect the environment; maintain the physical safety and security of DOE facilities; and prevent or limit inadvertent human and environmental exposure to residual contaminants and other hazards. The ICs at the Weldon Spring, Missouri, Site were developed in close coordination with federal and state regulators. An Explanation of Significant Differences (ESD) was issued in February 2005, which clarified the use restrictions necessary for the remedial actions specified in the Records of Decision for the separate operable units to remain protective over the long-term. The operable units included the Chemical Plant Operable Unit, the Chemical Plant Groundwater Operable Unit, and the Quarry Residuals Operable Unit. The ESD clarified specific requirements for each site area that needed use restrictions and established how DOE would implement, maintain, and monitor the specific requirements. DOE developed the Long-Term Surveillance and Maintenance Plan for the U.S. Department of Energy Weldon Spring, Missouri, Site (LTS and M Plan) that addressed the full scope of the site management activities necessary to ensure that the Weldon Spring Site remains protective over the long-term. The LTS and M Plan is revised periodically to ensure its applicability to changing site, regulatory, or procedural conditions. In addition to addressing such activities as long-term groundwater monitoring and disposal cell maintenance, the LTS and M Plan was developed and issued to ensure that the use restrictions identified in the ESD were properly imposed and maintained. The LTS and M Plan included a detailed IC Implementation Plan, which includes a process for evaluating and identifying specific IC mechanisms that best accomplish the objectives set out in the ESD. Consistent with EPA guidance on selecting ICs, various IC mechanisms were evaluated, including government controls, proprietary controls, enforcement tools, and informational devices. Where appropriate, redundant mechanisms were employed to increase the effectiveness of the ICs. Information in the IC Implementation Plan includes: (1) a discussion of current site conditions (reflecting post-remedial action conditions for the Chemical Plant and Quarry Areas and the risk-basis for why use restrictions are needed); (2) the objectives of, or performance expectations for, the use restrictions; (3) specific ICs already in place and additional mechanisms identified for implementation; (4) a schedule for implementing additional ICs; (5) procedures for maintaining the ICs and for conducting periodic inspections; and (6) general provisions for the implementing ICs for the site. The actual agreements and documentation of the various ICs are included in an appendix of the LTS and M Plan. These documents are also available via the internet from the authorizing agencies (County, Missouri Department of Natural Resources, EPA, etc.) The Weldon Spring Site personnel have been successful in finalizing each of the ICs that were established for the site. The planning, establishment, and implementation of the ICs was a long and detailed process with several lessons-learned that were identified along the way. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Technical Report on Preliminary Methodology for Enhancing Risk Monitors with Integrated Equipment Condition Assessment

Small modular reactors (SMRs) generally include reactors with electric output of ~350 MWe or less (this cutoff varies somewhat but is substantially less than full-size plant output of 700 MWe or more). Advanced SMRs (AdvSMRs) refer to a specific class of SMRs and are based on modularization of advanced reactor concepts. AdvSMRs may provide a longer-term alternative to traditional light-water reactors (LWRs) and SMRs based on integral pressurized water reactor concepts currently being considered. Enhancing affordability of AdvSMRs will be critical to ensuring wider deployment. AdvSMRs suffer from loss of economies of scale inherent in small reactors when compared to large (~greater than 600 MWe output) reactors. Some of this loss can be recovered through reduced capital costs through smaller size, fewer components, modular fabrication processes, and the opportunity for modular construction. However, the controllable day-to-day costs of AdvSMRs will be dominated by operation and maintenance (O&M) costs. Technologies that help characterize real-time risk are important for controlling O&M costs. Risk monitors are used in current nuclear power plants to provide a point-in-time estimate of the system risk given the current plant configuration (e.g., equipment availability, operational regime, and environmental conditions). However, current risk monitors are unable to support the capability requirements listed above as they do not take into account plant-specific normal, abnormal, and deteriorating states of active components and systems. This report documents technology developments that are a step towards enhancing risk monitors that, if integrated with supervisory plant control systems, can provide the capability requirements listed and meet the goals of controlling O&M costs. The report describes research results from an initial methodology for enhanced risk monitors by integrating real-time information about equipment condition and POF into risk monitors.

advanced small modular reactor↗

Experimental investigation of elemental and isotopic evaporation processes by laser heating in an aerodynamic levitation furnace

In this report we carried out evaporation experiments on a B-type calcium–aluminium-rich inclusion (CAI) melt in a gas-mixing aerodynamic levitation laser furnace, at 1873 K and an oxygen partial pressure of 10 -9.1 atm, for durations ranging from 60 to 600 s. Evaporation of SiO 2 and MgO follow the same trend as those observed in vacuum furnace experiments at the same temperature and starting composition, showing that their evaporation relative to one another from the melt is independent of pressure, oxygen fugacity, and hydrodynamical regime specific to the furnace. Isotopic ratios of Mg and Si in evaporation residues are used to derive fractionation factors of α 26/24 Mg vap-liq = 0.9906± 0.0004 and α 30/28 Si vap-lip = 0.9943±0.0003, which are both significantly closer to unity than those found for evaporation in a vacuum, which translates to less isotope fractionation. The residues are also less isotopically fractionated than expected for cases in which transport of the gas species away from the melt is diffusion-controlled at 1-atm. By analysing the flow regimes in our furnace, we find that advection by the levitating gas is the primary mode of mass transport away from the melt surface, as opposed to diffusion-limited transport in a vacuum or 1-atm tube furnace. A modified Hertz–Knudsen–Langmuir formulation accounts for this process, and shows that isotopic fractionation of both Si and Mg reflect a saturation factor (ratio of the pressure of the evaporating species to vapour saturation pressure) equal to 0.75. This is in perfect accord with recent measurements of Cu isotopic fractionation using a similar furnace. The fact that three elements (Mg, Si, Cu) with varying equilibrium vapour pressures, activity coefficients in the liquid, and diffusion coefficients in the gas have the same scaling behaviour to saturation pressure is a strong indication that the mechanism controlling evaporation is driven by the hydrodynamical regime imposed in the furnace. Therefore, this class of experiments can be used to constrain processes in which advection dominates over diffusion, such as (but not limited to) planetary ejecta, tektites, giant impacts, nebular condensation in a turbulent flow, or nuclear fallout material. Finally, the possibility to reach high temperatures (in excess of 3500 K) in this furnace allows it to be used to evaluate the activity coefficients of melt components in extreme conditions relevant to molten planetary interiors (i.e., magma oceans), with a specific focus on refractory elements.

58 GEOSCIENCES↗

Bias in Dynamic Monte Carlo Alpha Calculations

A 1/N bias in the estimate of the neutron time-constant (commonly denoted as α) has been seen in dynamic neutronic calculations performed with MCATK. In this paper we show that the bias is most likely caused by taking the logarithm of a stochastic quantity. We also investigate the known bias due to the particle population control method used in MCATK. We conclude that this bias due to the particle population control method is negligible compared to other sources of bias.

42 ENGINEERING↗

Towards a reference numerical scheme using MCNPX for PWR control rod tip fluence estimations

Recent occurrences of cracks and fissures on the cladding tubes of PWR control rod (CR) fingers employed in the Swiss reactors prompted the need to develop more reliable analytical methods for CR tip fluence estimations. To partly address this need, a deterministic methodology based on SIMULATE-3/CASMO-4 was in recent years developed at PSI. Although this methodology has already been applied for independent support to licensing issues related to CR lifetime, two main questions are currently being the center of attention for further enhancements. First, the methodology relies on several assumptions that have so far not been verified. Secondly, an assessment of the achieved accuracy has not been addressed. In an attempt to answer both these open questions, it was considered appropriate to develop an alternative computational scheme based on the stochastic MCNPX code with the objective to provide reference numerical solutions. This paper presents the first steps undertaken in that direction. To start, a methodology for a volumetric neutron source transfer to full core MCNPX models with detailed CR as well as axial reflector representations is established. On this basis, the assumptions of the deterministic methodology are studied for selected CR configurations for two Beginning-of-Life cores by comparing the spatial neutron flux distributions obtained with the two approaches for the entire spectrum. Finally, for the high-energy range (E> 1 MeV) and for a few CRs, the new MCNPX scheme is applied to estimate the accumulated fluence over one real operated cycle and the results are compared with the deterministic approach. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Development of the Mobile Systems for Conditioning of Disused Sealed Radioactive Sources in Serbia - 20105

Sealed radioactive sources (SRS) are being used worldwide in the field of medicine, agriculture, industry and research. They can be found in mobile as well as stationary devices. SRS contains radioactive material that is (a) permanently sealed in a capsule or (b) closely bounded and in a solid form. The capsule or material of an SRS should be strong enough to maintain leak tightness under the conditions of use and purpose for which the source was designed, also in case of accidents. In this case only emitted radiation is utilized. Firstly, the hazard from external radiation has to be considered, but the possibility of contamination due to fracture of the capsule should not be disregarded. The radioactive sources are composed of the radiating isotope contained in the filling medium, the single or double isotope holder that partially or totally surrounds the filling medium, the outer cover that contains the parts mentioned above and the capsule closed airtightly by welding or using some other method. The capsule must be tested for leakage periodically. If the SRS is no longer needed (e.g. replaced by a different technique) or it becomes useless for the intended application (e.g. the activity becomes too weak, the equipment containing the source works poorly or becomes obsolete, the source is damaged or leaking) it is considered disused. Disused sealed radioactive sources (DSRS) are typically conditioned and disposed if a facility is available. If the disposal option is not available, conditioned DSRS should be stored under proper conditions. In some cases, the radionuclide(s) in DSRS can be recovered/recycled or the DSRS can be repurposed for other applications. Conditioning of DSRS ensures containment of the radioactive material, provides confinement for leaking sources, provides sufficient radiation shielding, reduces storage/disposal volume by allowing consolidation of multiple sources into a single storage/disposal container, facilitates transport operations and contributes to safety and security as well. Typically, conditioning technologies are deployed either as permanently installed stationary systems in centralized or mobile on-site waste processing facilities, or in a mobile configuration. Centralized stationary facilities provide a single processing location for multiple users that requires transport of the waste to the facility. On the other hand, mobile systems may be provided for the selection and application of the optimum technology for a specific waste stream (such as DSRS) by bringing the process to the point where the waste is generated. In addition, mobile systems could offer additional flexibility by sharing equipment among multiple waste generating sites for processing campaigns that vary in duration, from very short periods to several years. The term 'mobile processing system' refers to any radioactive waste processing system or component which is designed to be transportable and which is not considered permanently installed. Two mobile system for conditioning of disused sealed radioactive sources are developed in the Public Company Nuclear Facilities of Serbia. Development of these mobile systems was supported by SRB9005 national project via Technical Cooperation of the IAEA. The first mobile system, built inside the 20 feet ISO container, will be used for conditioning of DSRS category 3 to 5. The second mobile system, built inside the 7 m long vehicle (Iveco Daily Van), will be used for dismantling of ionizing smoke detectors mostly with Am-241 sources. Designs of the mobile systems were defined in cooperation with two companies from Belgium (Belgoprocess and Leniko) and a Croatian company Ekoteh as well as with the support of the IAEA experts. The generic safety assessment and operational procedures for the mobile systems are developed. Based on safety assessment the acceptance criteria and operational limits and conditions are established. Operational procedures include: (a) equipment and material requirements, (b) assembling procedure of the mobile unit, (c) procedure for acceptance of devices for dismantling and conditioning, (d) dismantling procedure for devices to recover the DSRS, (e) characterization of DSRS, (f) encapsulation procedure of DSRS, (g) disassembling procedure of the mobile unit, and (h) keeping records, identification and traceability. In addition, radiation safety, health safety, security and emergency preparedness plans are prepared. The generic safety assessment and operational procedures could be updated with site specific requirements, DSRS inventory, and different needs for future customers. Developed mobile systems could be used in all situations when it is feasible to perform conditioning of DSRS on the spot in the county and worldwide. Development of these mobile units was just the first step to create the Reference Center for Radioactive Waste Treatment and Disused Radioactive Sources Conditioning for Small Facilities which can become a regional training center in the future, and/or as a tool for comprehensive national search and secure programmes. In the next phases development of e-learning platforms and blended learning packages as well as application for the IAEA Qualified Technical Centre (QTC) for the management of DSRS is foreseen. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Floquet Prethermalization with Lifetime Exceeding 90 s in a Bulk Hyperpolarized Solid

Here, we report the observation of long-lived Floquet prethermal states in a bulk solid composed of dipolar-coupled 13 C nuclei in diamond at room temperature. For precessing nuclear spins prepared in an initial transverse state, we demonstrate pulsed spin-lock Floquet control that prevents their decay over multiple-minute-long periods. We observe Floquet prethermal lifetimes $T^{'}_{2}$≈90.9 s, extended >60 000-fold over the nuclear free induction decay times. The spins themselves are continuously interrogated for ~10 min, corresponding to the application of ≈5.8×10 6 control pulses. The 13 C nuclei are optically hyperpolarized by lattice nitrogen vacancy centers; the combination of hyperpolarization and continuous spin readout yields significant signal-to-noise ratio in the measurements. This allows probing the Floquet thermalization dynamics with unprecedented clarity. We identify four characteristic regimes of the thermalization process, discerning short-time transient processes leading to the prethermal plateau and long-time system heating toward infinite temperature. This Letter points to new opportunities possible via Floquet control in networks of dilute, randomly distributed, low-sensitivity nuclei. In particular, the combination of minutes-long prethermal lifetimes and continuous spin interrogation opens avenues for quantum sensors constructed from hyperpolarized Floquet prethermal nuclei.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Mitigation of Radioactive Waste By Sampling and Analyzing The Affected Area and Efficient Use of Different Detectors - 17400

The paper summarizes the way by which the mitigation of the radioactive waste during events like decommissioning of nuclear power plants, or during a nuclear disaster can be done so that the rehabilitation process for flora and fauna can begin in a natural manner. The paper describes the problems faced during ER operations in the developing countries and need of international committees in these areas. The paper suggests marking of the radioactive areas which can be used for controlled personnel access and which can be useful for monitoring purposes, while also focusing on the need of proper knowledge while handling detectors in ER operations for successful site characterization. It also highlights the importance of bio-indicators in these operations and also gives a description of various detectors used widely and their related significance for ER operations. The paper gives an overview of the planning and site characterization stages that follow in the environmental remediation. Planning stage should consider: 1. The impact on the ecosystem and human beings and the risk of spreading of the radionuclides. 2. The financial aid in hand for detectors, machinery and skilled labor. As the planning stages develop, the very first thing is the survey of the site. Site investigation should be carried out in all aspects including meteorology, geology, and hydrology, seismicity, geomorphology and the other aspects depending on site for a certain period of time. A site characterization should take: 1. The amount of damage occurred to the environment in the nearby region. 2. The distribution, character and the extent to which radioactivity has been dispersed. 3. The amount of risk that will be involved for personnel working in the field. 4. The precision of data collected that is to be used as input for further processes. In the developing countries, the central governmental bodies play a pivotal role in providing funds internally or from international bodies. The paper shows the effect how political issues effect the work progress of ER operations, that hamper the process and make people frustrated, who really work on the field. Paper provides the suggestion for the proper use of detectors in these countries where surveyors lack knowledge on what kind of detectors to be used while taking precision as a parameter. The table beside gives just a small picture of the large variety of detectors available today and tries to summarizes the main detectors with applications. There should also be a proper marking of the areas into different levels of radiation that will be helpful for work access control and monitoring personnel health. The paper also suggests of using bio-indicators in ER operation more often. The paper proposes to use site-specific bio-indicators which are very helpful in knowing the proper effect of the event in the environment. There is no single paved path for every situation that can lead to a successful ER. The planning should be done in such a way that the future work is not disturbed due to technical problems. In developing countries, political issues can hamper the progress of work and time remains a critical issue in such areas. The lack of proper knowledge for the use of detectors can affect the outcome of site characterization. Areas of the survey should be marked with different levels of activity for efficient monitoring of personnel's. The use of bio-indicators should be used more often and should be chosen as per the site. As they are a helpful tool in evaluating the work progress. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Revealing ionization-induced dynamic recovery in ion-irradiated SrTiO 3

The lack of fundamental understanding on the coupled effects of energy deposition to electrons and atomic nuclei on defect processes and irradiation response poses a significant roadblock for the design and control of material properties. In this work, SrTiO 3 has been irradiated with various ion species over a wide range of ion fluences at room temperature with a goal to deposit different amounts of energy to target electrons and atomic nuclei by varying the ratio of electronic to nuclear energy loss. Here, the results unambiguously show a dramatic difference in behavior of SrTiO 3 irradiated with light ions (Ne, O) compared to heavy ions (Ar). While the damage accumulation and amorphization under Ar ion irradiation are consistent with previous observations and existing models, the damage accumulation under Ne irradiation reveals a quasi-saturation state at a fractional disorder of 0.54 at the damage peak for an ion fluence corresponding to a dose of 0.5 dpa; this is followed by further increases in disorder with increasing ion fluence. In the case of O ion irradiation, the damage accumulation at the damage peak closely follows that for Ne ion irradiation up to a fluence corresponding to a dose of 0.5 dpa, where a quasi-saturation of fractional disorder level occurs at about 0.48; however, in this case, the disorder at the damage peak decreases slightly with further increases in fluence. This behavior is associated with changes in kinetics due to irradiation-enhanced diffusional processes that are dependent on electronic energy loss and the ratio of electronic to nuclear energy dissipation. Lastly, these findings are critical for advancing the fundamental understanding of ion-solid interactions and for a large number of applications in oxide electronics where SrTiO 3 is a foundational material.

36 MATERIALS SCIENCE↗

Modeling interconnections of safety and financial performance of nuclear power plants, part 3: Spatiotemporal probabilistic physics-of-failure analysis and its connection to safety and financial performance

Here, this paper is a byproduct of a line of research by the authors to analyze interrelationships of safety and financial performance of nuclear power plants (NPPs). The result of this line of research is summarized in three parts: Part 1 covers a categorical review of relevant literature and the theoretical bases that support the methodological developments in Part 2. Part 2 introduces an Integrated Enterprise Risk Management (I-ERM) methodological framework to quantify the interconnections of safety and financial performance with a focus on operation and maintenance (O&M) of NPPs. Part 2 has also demonstrated the applicability and values of the I-ERM methodology through an NPP case study. This paper is Part 3, where detailed development and implementation of one of the I-ERM modules, i.e., probabilistic physics-of-failure (PPoF) analysis, and its connection with safety and financial performance is reported. In this article, the physical failure modeling for hardware components is advanced by incorporating finite element analysis (FEA) into PPoF analysis and coupling the FEA-based PPoF with the maintenance performance through a renewal process model. This article covers two scientific contributions: (i) first-of-its-kind incorporation of FEA into the PPoF model of thermal fatigue for NPP components; and (ii) advancing the interface between the PPoF analysis and the renewal process model in order to deal with spatiotemporal FEA outputs and to efficiently estimate the physical transition rates even when the PPoF outputs are dominated by success data. Through the incorporation of FEA, the resolution of the PPoF analysis is enhanced as spatiotemporal conditions such as stress and temperature can be considered explicitly instead of relying on simplified assumptions or analytical models with reduced spatiotemporal dimensions. To demonstrate an application of the FEA-based PPoF analysis and its coupling with maintenance through the renewal process model, a case study is conducted using excess letdown elbow piping in the chemical and volume control system of a Pressurized Water Reactor.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Automatic Imagery Data Analysis for Proactive Computer-Based Workflow Management during Nuclear Power Plant Outages

This report is being submitted for the task “Final Report” of DOE NEUP Project 15-8121 “Automatic Imagery Data Analysis for Proactive Computer-Based Workflow Management during Nuclear Power Plant Outages.” Typical nuclear power plant (NPP) outages always involve thousands of maintenance and refueling activities and a large number of workers in limited workspaces, while having tight schedules and zero-tolerance for accidents. During an outage, thousands of workers will be working in various workspaces across the NPP. High outage costs and expensive delays (approximately 1.5 million dollars of loss per day of delay) in NPP maintenance demand tight outage schedules. In packed workspaces, an automatic system that monitors human behaviors in real-time and provides insights about current and pending schedule deviations from the plan is critical for ensuring: 1) effective collaboration among workers and worker teams from different trades; 2) less waste of time and resources due to the lack of situational awareness; and 3) proactive outage project control. The overall goal of this project is to test the hypothesis that real-time imagery-based object tracking and spatial analysis, as well as human behavior modeling of outage participants, will significantly improve the efficiency of outage control while lowering the rates of accidents and incidents. Three objectives of this project are: 1) Establish real-time object tracking and spatiotemporal analysis methods that automatically assess the productivity of field activities and detect anomalous spatiotemporal relationships among activities that cause inefficiencies and risks; 2) Establish realtime human tracking and human factor modeling methods for automatically diagnosing unexpected actions of and interactions between outage participants, those which cause inefficient collaborations between Advanced Outage Control Center (AOCC), satellite outage centers, NPP workers, and maintenance service providers; and 3) Test the proposed automated object tracking, human behavior modeling, and spatiotemporal analysis methods in outage control case studies in order to characterize the effectiveness of automated imagery-data-driven methods in proactively improving the efficiency and safety of workflows in outage coordination and risk management. Recent studies of detailed human behavior monitoring on construction sites have examined the potential of applying advanced computer vision algorithms in detecting and tracking anomalous workers (i.e., workers who do not wear hard hats or safety vests) for ensuring job site safety. Some studies of human factor studies revealed the importance of modeling detailed interactions between individuals within and across teams in better understanding the impact of human in proactive project control. Other studies in the construction domain have developed computational simulation frameworks that formalize detailed spatiotemporal interactions between tasks in order to simulate the impacts of individual tasks on the performance of workflows. While integrated analyses that combine human factor assessment, as well as image processing and simulation, are in demand for effective decision-making, limited studies have examined the potential of such integrated analyses in NPP outage control. This research project has examined an automatic outage monitoring and control system that integrates human factor analysis, computer vision techniques, and simulation methods in order to enable engineers to better understand the interactions between humans, resources, and workflows during outage processes. The project aims at providing NPP maintenance agencies insights into more efficient use of limited resources in extending the life of a nuclear plant, as well as reducing waste while ensuring sufficient generation of electricity. This study is significant for the safety of nuclear plants, sustainable electricity generation for livable communities, and cost savings for maintaining electricity infrastructures in the United States.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Development and Maintenance of NJOY

NJOY is the leading nuclear data processing code, which is developed at Los Alamos National Laboratory. NJOY21 is the current production version. It replaces the legacy, Fortran-based, NJOY2016 which is a direct descendent of the original version released in 1977. NJOY21 is the next-generation version of NJOY that is being completely modernized. It has been released with an Open Source license and has no export control restrictions. More information about NJOY21 can be found in Section 2. This report serves to document the development and maintenance plan for NJOY-– including legacy NJOY and NJOY21. This document is constantly being updated as the development of NJOY proceeds. The source of this document can be found in a git repository at LANL.

97 MATHEMATICS AND COMPUTING↗

Progress on Resolution of Technical Issues at the Hanford Waste Treatment And Immobilization Plant Project - 16285

The U.S. Department of Energy's (DOE) Waste Treatment and Immobilization Plant (WTP) Pretreatment (PT) Facility has a number of first-of-a-kind technical challenges that have required additional expert analysis and testing activities to resolve. In 2006 an External Flowsheet Review Team identified 28 technical vulnerabilities with the plant design or future operability. Over a period of three months starting in September 2012, a number of top scientists and engineers conducted a review of the major technical issues associated with the design and operability of the WTP. These experts also provided independent advice on some of the broader challenges associated with completing the Hanford tank waste mission - highlighting the linkage between the physical and chemical properties of the tank waste and the PT Facility technical issues. In 2012 and early 2013 DOE's Office of River Protection (ORP) directed the WTP contractor to suspend production work on the Pretreatment Facility until the outstanding technical issues could be resolved and the nuclear safety basis could be updated and brought into alignment with any updates to the facility design and/or process flowsheet. Specific plans for resolving each the technical issues have been developed and significant progress has been made over the past year in identifying solution sets for each of the issues. The eight remaining technical issues (referred to as T1 to T8) are as follows: (T1) Hydrogen Gas Release from Vessel Solids; (T2) Potential Criticality in Pretreatment Facility Vessels; (T3) Hydrogen in Piping and Ancillary Vessels; (T4) Pulse-Jet Mixing and Control; (T5) Erosion and Localized Corrosion in WTP Vessels and Piping; (T6) Design Redundancy in Black Cells/In-Service Inspection; (T7) Black Cell Vessel Structural Integrity; (T8) Facility Ventilation. This paper provides a synopsis of the progress that has been made on resolving the Pretreatment technical issues over the past year, and how resolution of the issues will enable DOE to make an informed decision to resume design and production engineering for the Pretreatment Facility. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗