Search NASA⌕ Search

SEARCH · Search NASA

Results for “CONTRACTOR”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,045 records · Page 58

2021 Idaho National Laboratory Site Environmental Report

The INL Site’s operations, as well as the ongoing cleanup, necessarily involve a commitment to environmental stewardship and full compliance with environmental protection laws. As part of this commitment, the INL Site Environmental Report is prepared annually to inform the public, regulators, stakeholders, and other interested parties of the INL Site’s environmental performance during the year. This report is published for the DOE-ID in compliance with DOE O 231.1B, “Environment, Safety and Health Reporting.” Its purpose is to: • Present the INL Site, mission, and programs • Report compliance status with applicable federal, state, and local regulations • Describe the INL Site environmental programs and activities • Summarize results of environmental monitoring • Discuss potential radiation doses to the public residing in the vicinity of the INL Site • Report on ecological monitoring and research conducted by contractors and affiliated agencies and by independent researchers through the Idaho National Environmental Research Park • Describe quality assurance methods used to ensure confidence in monitoring data • Provide supplemental technical data and reports that support the INL Site Environmental Report (https://idahoeser.inl.gov/publications.html).

99 GENERAL AND MISCELLANEOUS↗

Alternative Technologies Adopters Outreach Survey Report

Brookhaven National Laboratory (BNL), in collaboration with Ioanna Iliopulos and Christopher Boyd (independent contractors), conducted quantitative and qualitative surveys to document views and opinions of scientists and researchers with firsthand experience operating x-ray devices for a wide range of research applications. The goal of the study was to fill critical information gaps and identify misconceptions widely held among the research community regarding the transition from Cesium-137 irradiators to x-ray devices. The survey instrument focused on three distinct yet interrelated areas that impact users' experience: operational impacts, including infrastructure needs, workflow, personnel management, and training, and regulatory compliance; research design and investigation impacts, including calibration, dosimetry, continuity of previous studies, development of new research agendas, and the outcomes for both; and funding impacts, specifically how grant sources and opportunities have responded to the transition.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Sampling and Analysis Plan for Partial Closure of Solid Waste Management Unit #16; Addendum Part I for Delineating BH-056

On July 11, 2022, Sandia National Laboratories in California (SNL/CA) submitted a Response to Regional Water Quality Control Board Comments on Soil Sampling Results for Closure of a Portion of SWMU #16 in response to the February 16,2022 San Francisco Bay Regional Water Quality Control Board’s (SFRWQCB) letter requesting supporting information for the recommended closure of 7,700 linear feet of abandoned sewer lines. On August 18, 2022, SFRWQCB further requested a Sampling and Analysis Plan (SAP) for additional “step-out” sampling to delineate the potential presence of benzidine near borehole BH-056, which is located near the former sewer line. SNL/CA is in the process of contracting Weiss Associates (Weiss) to perform and oversee the boring, sampling, analysis, and report development to determine the potential presence and extent of benzidine. This document outlines the work that is anticipated, including the development of the SAP, to complete the investigation and submit a final report to the SFRWQCB. The work proposed by Weiss provides an estimated schedule for completing the investigation and developing the addendum Part II SAP for the project. In addition, Weiss provided a preliminary estimate of the sample locations (see Attachment A) which serve as addendum Part I of the SAP requested by the SFRWQCB. The contractor will submit the addendum Part II SAP, to satisfy the SFRWQCB requirement, before proceeding with any work.

54 ENVIRONMENTAL SCIENCES↗

FY2023 Site Sustainability Plan

The Sandia National Laboratories site sustainability plan and its associated DOE Sustainability Dashboard data entries encompass Sandia National Laboratories contributions toward meeting the DOE sustainability goals. This site sustainability plan fulfills the contractual requirement for National Technology & Engineering Solutions of Sandia, LLC, the management and operating contractor for Sandia National Laboratories, to deliver an annual sustainability plan to the DOE National Nuclear Security Administration Sandia Field Office.

54 ENVIRONMENTAL SCIENCES↗

Evaluation of AddUp Precision L-PBF Technology for Tooling and Other Industrial Applications

ORNL (Contractor) and AddUp Inc. (Participant) collaborated to enable the adoption of laser powder bed fusion for tooling applications, critical for reshoring the manufacturing sector in the U.S. Most of the work on laser powder bed fusion has focused on high value materials such as Ti-6Al-4V and Inconel 718 for niche applications in aerospace, biomedical and energy sectors. In this collaboration, ORNL and AddUp worked laser powder bed fusion of maraging steels for tooling applications while leveraging the unique ability of the AddUp laser powder bed fusion system to deposit fine powders. We demonstrated that the AddUp technology is capable of depositing complex artifacts and features such as overhangs within desired tolerances. We also showed that direct aging of the deposited parts result in simultaneously higher strength and elongation compared to the conventional two step heat treatments, which could result in significant energy savings. Finally, we developed thermos-kinetic models to enable design of heat treatments for optimal material properties compared to the energy intensive empirical methods currently used. The report summarizes the detailed findings of this collaboration.

36 MATERIALS SCIENCE↗

INL Site ARG-US Implementation – FY22 Activities and FY23 Plans

The Packaging Certification and Life Cycle Management program at Argonne National Laboratory (ANL) developed a suite of monitoring systems collectively referred to here as ARG-US. ARG-US provides necessary data for nuclear facility and system operation and maintenance, and has been previously demonstrated in hot cells, radioactive material (RAM) storage areas, and RAM shipment trucks. It has also been installed directly on RAM storage and shipment containers. ARG-US offers some unique advantages over other commercially available systems by using wireless data connections, battery power supplies, and customizable monitoring methods. Idaho National Laboratory (INL) has been tasked with investigating applications for ARG-US at INL site facilities, which are operated by several different contractors. The initial investigation scope centered on CPP-603 Irradiated Fuel Storage Facility in relation to the upcoming Department of Energy (DOE) Spent Nuclear Fuel (SNF) Packaging Demonstration. The investigation has been led by the Used Fuel Management Department in INL’s Nuclear Science and Technology (NS&T) directorate. This investigation is expected to recommend INL site processes or facilities in which to implement ARG-US systems. INL has engaged local site technical and oversight representatives, security, nuclear safeguards, and program management personnel to identify good candidates for ARG-US test implementations. INL has identified the following high-level goals for any INL site implementation of ARG-US: provide unique testing environments, prompt development of new monitoring methods/techniques for the ARG-US suite, and acquire useful monitoring for the user facility. As a result, INL suggests three program areas for further investigation: CPP-603 Fuel Handling Cave (FHC), legacy mixed waste storage systems at Idaho Nuclear Technology & Engineering Center (INTEC) known as the “Tank Farm,” and periodic and emergency environmental monitoring. This progress report relates activities undertaken in this investigation, describes the preliminary areas of interest for limited scope ARG-US testing or implementation, and relays expected actions for completing the task scope. This report offers an opportunity to the program sponsor, technical leads at ANL, and INL site representatives to give feedback on the initial assessment and make recommendations on the forthcoming activities.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

LANL Workforce Reporting Tool

The LANL Workforce Reporting Tool compiles and analyzes workforce demographics and attributes as presented in the annual Stockpile and Stewardship Management Plan (SSMP) over FY15-21 using MicroStrategy, a data analytics and visualization software. There are three major employee populations included in the tool: 1) LANL’s regular (permanent) employees; 2) LANL’s entire workforce (regular, craft, contractors, students, post doctorate students, limited term employees, and lab associates); 3) The Nuclear Security Enterprise’s (NSE) permanent career employees (combined and site-by-site).

97 MATHEMATICS AND COMPUTING↗

Index of Classified Reports Collection now available Vital resource for Weapons researchers, today’s mission work

The collection is made up of classified technical reports containing weapons data dating back to the start of the nuclear security enterprise. The information is compiled into reports, slides, handbooks and literature. It originated from Los Alamos, Lawrence Livermore, and Sandia Labs, as well as from the Department of Defense and likely every other organization involved in nuclear testing, including contractors and those that are now defunct.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Updated Application of Frequency of Detection Methods for the INL Site Ambient Air Monitoring Network

This report presents a quantitative assessment of the current INL Site air monitoring network using frequency of detection (FD) methods. The first assessment of the INL network was performed in 2015 and made recommendations for improving the network. As a result of changes made in response to the recommendations and the addition of new source locations, the network was modified and reassessed in 2017. Since 2017, administration of the air sampling program has been consolidated under one contractor, which resulted in additional changes to the network (sampler numbers and locations) and changes in radionuclide detection levels. As a result of these changes and others, an updated assessment of the INL Site ambient air monitoring network was performed. The same two exposure scenarios used in previous assessments were used for this assessment: a resident scenario and a shepherd/rancher scenario. The resident was assumed to be continuously present at their residence/business/farm operation outside the INL Site boundary while the shepherd/rancher was assumed to be present 24-hours at the nearest INL grazing allotment boundary in each of the 22.5-degree sectors along the sector centerline from each source. Updates to both the resident and shepherd/rancher receptor locations were included. Other changes include updates to flow rates for stack sources, expansion of the list of important radionuclides based on the most recent National Emission Standards for Hazardous Pollutants (NESHAPs) analysis, and updated dose coefficients. The assessment was conducted to determine whether the current INL monitoring network is capable of detecting releases of important radionuclides from INL Site sources that have the potential to exceed a conservative dose threshold for the two exposure scenarios. The assessment revealed that for the resident scenario, the current network meets the desired performance objective (FD = 95%) for all radionuclides and sources except for Cl-36 from the TRA-770 stack (94.4%). For the shepherd/rancher scenario, the FD performance objective is met for all radionuclides and sources except tritium from MFC-774 and TAN 679 (91% for both). An investigation of reported emissions for the past three years revealed that Cl 36 is not emitted from TRA-770, and routine tritium emissions from MFC-774 and TAN-679 are very small and the sources are likely incapable of emitting enough tritium to cause a release that should be detectable by the monitoring network. This assessment is based on a conservative dose threshold. This coupled with fact that the FD for Cl 36 is only slightly less than the performance objective and Cl-36 is not emitted from TRA-770, modifying the network (i.e. adding another sampler, increasing sampler flow rate, moving samplers) to meet the 95% performance objective for this radionuclide/source/receptor scenario is not warranted. Similarly, because tritium emissions from MFC-774 and TAN-679 are very small and these two sources are likely incapable of causing a dose due to tritium release that should be detectable by the network, modifications to increase tritium detection for these sources is also unwarranted at this time. However, if it is required to meet the performance objective for tritium for all sources and receptor scenarios, additional analysis determined the FD could be raised from 91% to > 99% for both sources by adding two tritium samplers to the network.

61 RADIATION PROTECTION AND DOSIMETRY↗

Waste Isolation Pilot Plant Annual Site Environmental Report for 2016

The purpose of the Waste Isolation Pilot Plant (WIPP) Annual Site Environmental Report for 2016 (ASER) is to provide the information required by U.S. Department of Energy (DOE) Order 231.1B, Environment, Safety, and Health Reporting. The DOE Carlsbad Field Office (CBFO) and the management and operating contractor (MOC) maintain and preserve the environmental resources at the WIPP facility. DOE Order 231.1B; DOE Order 436.1, Departmental Sustainability; and DOE Order 458.1, Radiation Protection of the Public and the Environment, require that the affected environment at and near DOE facilities be monitored to ensure the safety and health of the public and workers, and preservation of the environment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

LLNS Request for Variance from 10 CFR 851 for Construction of LLNL Digital Infrastructure Capabilities Expansion Project

Lawrence Livermore National Security, LLC (LLNS) requests variance to 10 CFR 851 (the Rule) for the construction of the Digital Infrastructure Capabilities Expansion (DICE) project. The request isin continued support of the National Nuclear Security Administration (NNSA) “pilot” to streamline the delivery of commercial-like line-item construction projects under $50 million. This pilot is aligned with the approved NA-50 safety approach. Experience gained in the construction of the new Lawrence Livermore National Laboratory (LLNL) Emergency Operations Facility (EOC) under the variance granted in June 2020 is very encouraging. While detailed analysis will be forthcoming after that project is completed, there are strong indicators that a benefit has been realized by the subcontractors executing the work. The variance has permitted local/regional construction businesses contracted to Management & Operation contractor operated facilities and lower tier subcontractors to bid, operate, execute, and comply with safety and health standards they utilize in their business outside of the Department of Energy (DOE) Complex. While compliance to standards that are as safe and healthful as those in 10 CFR 851: confusion, additional cost, and inefficiencies associated with the burden of compliance to an unfamiliar regulatory spectrum has been avoided. Safety and health performance on the EOC construction project including the number of inspection and surveillance issues is comparable to other subcontractors and projects at LLNL executed under 10 CFR 851.

99 GENERAL AND MISCELLANEOUS↗

LLNS Request for Variance From 10 CFR 851 for Construction of LLNL Emergency Operations Center

Lawrence Livermore National Security, LLC (LLNS) is submitting the following variance application requesting the use of the State of California’s Occupational Safety and Health Administration (Cal/OSHA) Regulations in lieu of Title 10 Code of Federal Regulations Part 851 (10 CFR 851, the Rule), Worker Safety and Health Program, Subpart B (Program Requirements), Subpart C (Specific Program Requirements), and Appendix A (Worker Safety and Health Functional Areas), solely with respect to the construction of the new Lawrence Livermore National Laboratory (LLNL) Emergency Operations Center (EOC) facility. The request is in support of the National Nuclear Security Administration (NNSA) “pilot” to streamline the delivery of commercial-like line item construction projects under $50 million. This pilot is aligned with the approved NA-50 safety approach for the projects in the pilot. This pilot is to test and demonstrate innovation leading to a reduced cost of construction for building commercial type structures at Department of Energy (DOE)/NNSA facilities. The variance proposes to permit local/regional construction businesses contracted to Management & Operation contractor operated facilities to bid, operate, execute, and comply with safety and health standards they utilize in their business outside of the DOE Complex. This will permit compliance to standards that are as safe and healthful as those in 10 CFR 851 without confusion, additional cost, and inefficiencies associated with the burden of compliance to an unfamiliar regulatory spectrum.

99 GENERAL AND MISCELLANEOUS↗

Verification of Spent Fuel Inside Dry Storage Casks by Cask Top Fast Neutron Mapping (FY2023 Mid-Year Report)

This project is developing a prototype scanner array verification system for detection of missing fuel assemblies in spent-fuel storage casks. The prototype consists of six fast-neutron scintillator detectors mounted to a linear actuator frame that is placed on the top of a spent fuel cask to scan across all fuel assembly positions. The scanner array was assembled and tested at LLNL in FY2022. A field test schedule has been requested at the Idaho National Laboratory (INL) Cask Farm site for FY2023. Note that the Cask Farm contractor determines this scheduling and not INL directly. Further system automation will be designed and implemented with the goal of obtaining a level of system operation that meets IAEA needs. This includes integration of the scanner array and data-acquisition control software into a single interface for operator use. In addition, commercial operators and the IAEA may have special requirements for portability, shipping, lifting, and installation. Prior to the Field Test at INL, the system will be operated at LLNL to exercise lifting procedure and linear actuators, monitor stability of detector energy and pulse-shape discrimination calibration, and test system software integration efforts. Following the Field Test, we will present results and discuss the technology with the IAEA. We will incorporate additional improvements to the system based on lessons learned from the field test and feedback from the IAEA. If successful, the technology can be transferred to the IAEA or other stakeholders for assessment.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Bishop Paiute Single Family Solar Home Project: Phase 4 (Final Technical Report)

The Bishop Paiute Tribe is committed to energy efficiency, renewable energy, and environmental protection and has a vision to install solar energy systems on all buildings on the Reservation where technically feasible. Through completion of the Bishop Paiute Tribe Residential Solar Program – Phase 4, Bishop Paiute Tribe continued its successful model partnering with non-profit solar installer GRID Alternatives to advance its vision and build energy self-sufficiency on the Bishop Paiute Reservation. The Bishop Paiute Tribe Residential Solar Program – Phase IV deployed 67 kW-AC of new clean, renewable energy through grid-tied, net-metered rooftop solar electric systems installed on a total of 20 (one more than the planned 19) existing owner-occupied, single-family homes for low-income families on the Reservation. This represents nearly 14% of the Reservation’s total “unsolarized” homes. These systems were provided at no cost to the homeowners, who will also receive energy efficiency education to further reduce energy consumption and lower electric bills. GRID led a solar installation for three (3) of the homes where Tribal/community members, were given an opportunity in participating in on-the-roof trainings to gain new skills while installing solar for their low-income community members. Subcontractors through GRID Sub Contractor Partnership Program (GRID SPP) led solar installations for seventeen (17) of the homes. Each installation provided paid employment for a solar trainee trainees hired by the SPP subcontractors as entry level solar installers. It is estimated that the installed 67 kW-AC of solar will produce at least 120,000 kWh/year, displacing at least 30-75% of the 20 homes’ total electricity use for a combined system lifetime electricity cost savings for the low-income homeowners of about $\$$500,000. It is further estimated that the installed renewable energy systems installed will prevent greenhouse gases by about 1,000 tons, equivalent to planting approximately 25,000 trees. Following the successful completed installations, it is expected that the Reservation and surrounding communities will benefit from improved air quality via reduced wood stove use for heating. Cumulatively with other initiatives, the project will result in nearly 40% of the Reservation’s solarizable homes being solarized. Overall, the triple impact of the phase 4 of the Bishop Paiute Tribe Residential Solar Program – Phase 4 is: 1) affordable energy for low-income families; 2) on-site clean energy production, 3) hands on training and paid solar installation work for local tribal/community workers. These impacts will support and grow the Tribe’s energy, economic, environmental, and social self-sufficiency and sovereignty amongst the neediest on the Reservation.

14 SOLAR ENERGY↗

A Case Study of Tunable White LED Lighting with Networked Lighting Controls (Emory University Cognitive Empowerment Program)

Emory University and Georgia Institute of Technology (Georgia Tech) partnered to create the Charlie and Harriet Schaffer Cognitive Empowerment Program (CEP) facility in northeast Atlanta. Together with the funders they are building a program to help individuals experiencing mild cognitive impairment (MCI) to maintain their physical and cognitive health, and independence as long as possible. In addition to applying effective strategies and therapies, the two research groups are investigating the responses of the MCI members to treatments that involve acoustical conditions, exercise and movement, and lighting changes that may support retention or relearning of skills. Care partners and family members receive support and instruction to improve home and work life, promoting joy, purpose, and wellness in the family groups. The lighting system uses tunable-white LEDs, employing luminaires with both warm and cool-color emitters that can be dimmed separately to produce any white correlated color temperature (CCT) between 2700 K and 6500 K. All luminaires were dimmable to achieve subdued or lively surroundings for different treatments, time-of-day, and mood. A central networked digital control system was employed to allow tuning of multiple spaces together (for example, bright, cool morning light could be programmed for extra stimulation, or lighting in all spaces at the end of the day could be reduced in both light output and CCT to promote relaxation and not interfere with the melatonin cycle of occupants). Almost all spaces were equipped with individual room control of dimming and color temperature with touch screens to allow users to tune the lighting as desired, but each room’s controls could also be specially programmed through the server in case the research staff were investigating lighting settings on learning, for example. The server incorporates a timeclock, and it is able to send signals to switch off all lighting after occupancy hours, or enable occupancy sensors to control the lighting. The bulk of the construction work was completed in January 2020. It was clear from an initial walk-through that although the lighting system produced the expected high light level with low-glare qualities of light, that there were issues and inconsistencies to be resolved. These were noted in an initial punchlist visit and expected to be resolved when the tech representatives from the agency visited with the electrical contractor in the following few weeks. What followed was 2.5 years of identifying unexpected lighting performance in terms of light output, color, scheduling, and occupancy. This report documents the issues encountered in the effort to get the lighting and controls systems to operate as intended. It concludes with guidance for design professionals and manufacturers to help avoid problematic complexity in future projects.

42 ENGINEERING↗

SolarAPP+ Performance Review (2022 Data)

The Solar Automated Permit Processing Plus (SolarAPP+) platform is an online portal to facilitate and expedite rooftop solar photovoltaic (PV) permitting processes. SolarAPP+ allows PV contractors to upload system specifications, have those specifications automatically reviewed for code compliance, and receive instant approval for code-compliant systems. SolarAPP+ also provides inspection checklists to verify installation practices and adherence to approved designs. SolarAPP+ is available to authorities having jurisdiction (AHJs) at no cost. This report is part of an ongoing series of reviews of SolarAPP+ performance. Consistent with previous performance reviews, we summarize SolarAPP+ adoption trends to date and compare various metrics for PV systems permitted through SolarAPP+ versus systems permitted through conventional AHJ permitting processes. As of the end of 2022, the National Renewable Energy Laboratory (NREL) had contacted over 1,500 AHJs with significant solar permitting volume regarding SolarAPP+. Of those, 607 AHJs had at least expressed interest in the platform. 16 AHJs had begun piloting the platform and 15 of these had publicly launched the platform by the end of 2022. In 2022, 206 installers submitted 11,092 permits through the SolarAPP+ platform, including 708 permits for solar+storage systems. SolarAPP+ permits accounted for around 37% of all permits issued in participating AHJs. We compare permitting timelines through SolarAPP+ to traditional AHJ permitting processes to assess the platform's performance. Consistent with previous SolarAPP+ performance reviews, we find that permitting timelines are significantly shorter for SolarAPP+ projects. Based on median timelines, a typical SolarAPP+ project is permitted and inspected 8 business days sooner than traditional projects. We estimate that automatic SolarAPP+ permitting saved between 3,500 and 13,900 hours of AHJ staff time in 2022. Finally, we find evidence that SolarAPP+ may improve inspection outcomes, with SolarAPP+ projects failing inspections about 28% less frequently than traditional projects.

14 SOLAR ENERGY↗

Independent Review of Groundwater Remediation Strategy for Hexavalent Chromium and RDX Groundwater Plumes at Los Alamos National Laboratory (Rev. 1)

Site operations at the Los Alamos National Laboratory (LANL) resulted in the release of oxidized chromium, Cr(VI), into Sandia Canyon from cooling tower effluent from 1956 until 1972. The chromium traveled with the surface water approximately 3 miles downstream before migrating below ground surface. Chromium concentrations exceed 50 μg/L in the upper portion of the aquifer. Another LANL groundwater plume of concern is associated with RDX (Royal Demolition Explosives, 1,3,5-trinitro-1,3,5-triazine). Between 1951 and 1996, RDX was released to the mesa-top facilities' process water outfall, adjacent and underlying soils, and alluvial sediments, along with surface water in Cañon de Valle. Between 2000 and 2010, two remedial actions were deployed, removing much of the near-surface RDX, however, recharge due to precipitation has transported RDX into the perched-intermediate zone and into the regional aquifer. The report documents an independent technical review by scientists from the Department of Energy (DOE) Network of National Laboratories for Environmental Management and Stewardship (NNLEMS) to provide recommendations for potential near term actions to address and optimize remediation for both the Cr(VI) and RDX plumes. The proposed near-term remedial actions include design of pump and treat systems for Cr(VI) and monitoring and study for natural attenuation for RDX. The review assesses existing data, conceptual and numerical modeling, and it recommends a technical integration process to support identifying and implementing strategic, effective and efficient remedies. The DOE Environmental Management Los Alamos Field Office (EM-LA) and their cleanup contractor Newport News Nuclear-BWTX, LLC Los Alamos (N3B) provided the information required for the review. Interviews were also conducted with regulators to obtain the full spectrum of technical, regulatory and scientific perspectives. The independent review team was impressed by the capabilities, experiences, innovativeness, and insightfulness of the technical representatives from both the regulator, the New Mexico Environment Department (NMED) and N3B. Incorporation of vadose zone flow pathways in the conceptual site model (CSM) and configuring the numerical modeling for the site was generally state-of-the-practice (or better). This could be considered state-of-the-art by addressing uncertainties related to spatial extent of hydraulic windows. The reviews from the regulators were thorough and often provided useful concepts for consideration and future/study resolutions. The overarching consensus recommendation of independent review team is that the LANL groundwater plumes should be addressed in context of the emerging "management of complex sites" paradigm.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Analysis of Solids Obtained from 201O, 201P, 202A, and 202B Contactors in the Salt Waste Processing Facility

In December 2022, Savannah River Mission Completion personnel recovered solids samples from four contractors (EXT-001, EXT-007, EXT-031, and EXT-040) employed at the Salt Waste Processing Facility (SWPF). These solids were submitted to Savannah River National Laboratory for analysis and characterization. This Technical Report outlines the analytical findings and observations associated with these samples and explores the potential source of solid generation within the SWPF. The following conclusions are offered as a result of this work: the light color solids recovered from EXT-007 are consistent with crystallized, soluble salt components (such as sodium nitrate, sodium hydroxide, and sodium carbonate), all of which can be easily re-dissolved in process water and do not represent a threat to SWPF CSSX processing. While the light solids from the top of EXT-040 were not analyzed, it is believed that they share similar characteristics to those recovered from EXT-007; The dark color solids recovered from EXT-001, EXT-031, and the inside of EXT-040 appear to be complex, consisting of several different types of solids: High concentrations of mercury (Hg, 40-75% by mass) partially present as elemental Hg are consistent with the precipitation of Hg 0 /Hg 2+ from disproportionation of Hg + species in pH swing conditions; Moderate concentrations of titanium (Ti) (2-7%, by mass) are also present, often co-located with Hg. This is consistent with co-precipitation, entrainment, and/or amalgamation of Ti and Hg; Moderate concentrations of iron (Fe) (1-3%, by mass) are observed in SWPF solids and are likely attributable to erosion of stainless-steel components within the CSSX process; Small concentrations of tungsten (W) and cobalt (Co) (<1%, by mass) are observed in SWPF solids. The presence of these solids is consistent with the erosion of components coated with W and Co (e.g., Stellite); Small concentrations of aluminum (Al) (<1%, by mass) are observed in the form of gibbsite and potentially sodium aluminosilicate. The presence of these compounds is likely attributable to the pH swing observed between the scrub and extraction cycles within the CSSX process. The following recommendations are made as a result of this work: Testing should be performed to determine the chemical drivers, process, and mechanism of Hg precipitation in CSSX processing. Special care should be taken to include titanium in tests to evaluate the potential for co-precipitation, entrainment, and amalgamation; Hg-mitigation options that would minimize or eliminate risks of Hg precipitation and solids accumulation (e.g., Hg-absorption techniques, ion exchange/adsorbents, flowsheet changes, etc.) should be assessed.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗