Search NASA⌕ Search

SEARCH · Search NASA

Results for “technical evaluation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,045 records · Page 58

Nuclear Resonance Fluorescence to Measure Plutonium Mass in Spent Nuclear Fuel

The Next Generation Safeguard Initiative (NGSI) of the U.S Department of Energy is supporting a multi-lab/university collaboration to quantify the plutonium (Pu) mass in spent nuclear fuel (SNF) assemblies and to detect the diversion of pins with non-destructive assay (NDA) methods. The following 14 NDA techniques are being studied: Delayed Neutrons, Differential Die-Away, Differential Die-Away Self-Interrogation, Lead Slowing Down Spectrometer, Neutron Multiplicity, Passive Neutron Albedo Reactivity, Total Neutron (Gross Neutron), X-Ray Fluorescence, {sup 252}Cf Interrogation with Prompt Neutron Detection, Delayed Gamma, Nuclear Resonance Fluorescence, Passive Prompt Gamma, Self-integration Neutron Resonance Densitometry, and Neutron Resonance Transmission Analysis. Understanding and maturity of the techniques vary greatly, ranging from decades old, well-understood methods to new approaches. Nuclear Resonance Fluorescence (NRF) is a technique that had not previously been studied for SNF assay or similar applications. Since NRF generates isotope-specific signals, the promise and appeal of the technique lies in its potential to directly measure the amount of a specific isotope in an SNF assay target. The objectives of this study were to design and model suitable NRF measurement methods, to quantify capabilities and corresponding instrumentation requirements, and to evaluate prospects and the potential of NRF for SNF assay. The main challenge of the technique is to achieve the sensitivity and precision, i.e., to accumulate sufficient counting statistics, required for quantifying the mass of Pu isotopes in SNF assemblies. Systematic errors, considered a lesser problem for a direct measurement and only briefly discussed in this report, need to be evaluated for specific instrument designs in the future. Also, since the technical capability of using NRF to measure Pu in SNF has not been established, this report does not directly address issues such as cost, size, development time, nor concerns related to the use of Pu in measurement systems. This report discusses basic NRF measurement concepts, i.e., backscatter and transmission methods, and photon source and {gamma}-ray detector options in Section 2. An analytical model for calculating NRF signal strengths is presented in Section 3 together with enhancements to the MCNPX code and descriptions of modeling techniques that were drawn upon in the following sections. Making extensive use of the model and MCNPX simulations, the capabilities of the backscatter and transmission methods based on bremsstrahlung or quasi-monoenergetic photon sources were analyzed as described in Sections 4 and 5. A recent transmission experiment is reported on in Appendix A. While this experiment was not directly part of this project, its results provide an important reference point for our analytical estimates and MCNPX simulations. Used fuel radioactivity calculations, the enhancements to the MCNPX code, and details of the MCNPX simulations are documented in the other appendices.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

2014 Water Power Program Peer Review Report

The Water Power Peer Review Meeting was held February 24-28, 2014 in Arlington, VA. Principle investigators from the Energy Department National Laboratories, academic, and industry representatives presented the progress of their DOE-funded research. This report documents the formal, rigorous evaluation process and findings of nine independent reviewers who examined the technical, scientific, and business results of 96 projects of the Water Power Program, as well as the productivity and management effectiveness of the Water Power Program itself.

13 HYDRO ENERGY↗

2014 Wind Program Peer Review Report

The Wind Program Peer Review Meeting was held March 24-28, 2014 in Arlington, VA. Principle investigators from the Energy Department, National Laboratories, academic, and industry representatives presented the progress of their DOE-funded research. This report documents the formal, rigorous evaluation process and findings of nine independent reviewers who examined the technical, scientific, and business results of Wind Program funded projects, as well as the productivity and management effectiveness of the Wind Program itself.

17 WIND ENERGY↗

R-Matrix Codes for Charged-particle Induced Reactionsin the Resolved Resonance Region

A Consultant’s Meeting was held at the IAEA Headquarters, from 5 to 7 December 2016, to discuss the status of R-matrix codes currently used in calculations of charged-particle induced reaction cross sections at low energies. The meeting was a follow-up to the R-matrix Codes meeting held in December 2015, and served the purpose of monitoring progress in: the development of a translation code to enable exchange of input/output parameters between the various codes in different formats, fitting procedures and treatment of uncertainties, the evaluation methodology, and finally dissemination. The details of the presentations and technical discussions, as well as additional actions that were proposed to achieve all the goals of the meeting are summarized in this report.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Report on Hydrogen Isotope Permeability/Hermeticity of SiC-based Cladding

The continuous SiC fiber-reinforced SiC matrix ceramic composites have been perceived as one of the leading candidate materials for accident tolerant fuel cladding in light water reactors. Potential loss of the fission products containment due to penetrating cracking has been identified as one of the most critical technical issues for SiC-based nuclear fuel cladding. As such, evaluation of the hermeticity of SiC/SiC composite cladding subject to ligh water reactor (LWR) relevant environment is critically important. In last two years, we have established the capability to measure the gas permeation flux through tubular samples and reported preliminary results of the hermeticity of unirradiated SiC/SiC composite tubes and one neutron irradiated Chemical Vapor Deposition (CVD) SiC tube. In this study, a permeation testing station was employed to measure the deuterium permeation of as-fabricated and coated SiC/SiC composite tubes following high heat flux neutron irradiation. The results indicate that CVD SiC tubes survived both the high and low heat flux neutron irradiations. SiC/SiC composite tubes with and without coating following high heat flux neutron irradiation lost gas tightness. Coating on SiC/SiC composite tubes helped to reduce the deuterium permeation flux compared to the uncoated samples. Better coating and/or improved architectural design and manufacturing quality is needed to ensure the hermeticity of SiC/SiC composite tubes. A more robust understanding of the correlation between applied gas pressure and measured leak rate is needed.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

A Proposed Forward Silicon Tracker for the Future Electron-Ion Collider and Associated Physics Studies

The future Electron-Ion Collider (EIC) will explore several fundamental questions in a broad Bjorken-x (x BJ ) and Q 2 phase space. Heavy flavor and jet products are ideal probes to precisely study the tomography of nucleon/nuclei structure, help solve the proton spin puzzle and understand the hadronizaton processes in vacuum or in the QCD medium. Due to the asymmetric collisions at the EIC, most of the final state hadrons are produced in the nucleon/nuclei beam going (forward) direction. A silicon vertex/tracking is critical to precisely measure these forward hadrons at the EIC. Details of different conceptual designs of the proposed Forward Silicon Tracker (FST) and the relevant detector performance are presented in this technical note. The associated heavy flavor and jet studies with the evaluated FST performance are discussed as well.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Liquid Air Combined Cycle TM for Power and Storage

Liquid Air Combined Cycle (LACC) is a hybrid liquid air energy storage (LAES) system combining energy storage with a combustion turbine to enable large-scale, long-duration energy storage (LDES) while reducing fuel intensity compared to the current state-of-the-art. The LACC technical approach employs proven equipment (cryogenic refrigeration, storage, tanks, pumps, gas turbines, exhaust heat recovery equipment, and turbines) to limit technical risk to a novel organic Rankine cycle (ORC), which was evaluated during this project and found to be feasible. Moreover, LACC storage is safe and relatively compact, to facilitate siting close to loads and within metropolitan regions. The air storage medium is freely available and eliminates supply chain constraints. LACC uses cryogenic air as a storage medium and a gas turbine as the source of heat to drive the discharge process. LACC is distinguished from other LAES technologies by several factors. The charge and discharge processes are decoupled so that cryogenic liquid air is the only storage medium. Other systems also store the higher temperature thermal energy from the liquefaction process in an additional medium. Subsequently, LACC focuses on maximization of the discharge energy and power. LACC also permits the use of commercially available cryogenic refrigeration and storage technologies to increase competition. This project identified product requirements to support market entry and commercialization of the LACC in modular units of approximately 117 MW, each drawing liquid air from customary cryogenic storage tanks capable of storing 75 GWh of dispatchable energy, more than pumped storage hydro or compressed air energy storage technologies. An economic analysis identified the specific liquid air consumption (quantity of liquid air per unit of discharge energy) as a critical parameter. Minimizing the air consumption reduces the specific capital cost ($\$ $/kW) for charging and discharging equipment by reducing the size of piping and turbomachinery. Likewise, the specific cost of energy capacity ($\$ $/kWh) is reduced by increasing the energy deliverable from a given size tank. The cycle was analyzed to identify the optimal equipment selection and operating conditions, which in turn were combined with quotes and cost estimates to calculate the cost of energy from an LACC system. A substantial effort was focused on the ORC, which draws low-temperature heat from the gas turbine exhaust and condenses at low temperature using the cryogenic liquid air as a heat sink. Alternative turbomachinery arrangements were evaluated for feasibility and cost. A technology maturation plan lays out a low-risk approach to development of the novel ORC components and demonstration of LACC technology at pilot scale.

25 ENERGY STORAGE↗

Assessment of Regional Interconnections to Meet Southeast Asia's Renewable Energy Targets: Phase I of the Singapore – U.S. Collaboration

This report summarizes the results of a study of long-distance subsea electrical interconnections in Southeast Asia, conducted under the first phase of the Singapore-U.S. collaboration under the Net Zero World Initiative. In Phase 1, the Net Zero World team evaluated the current state of the renewable energy landscape in Southeast Asia; developed an open-source capacity expansion model using GridPath and evaluated several future scenarios including changes in interregional transmission; explored the technical feasibility of regional subsea interconnectors; and estimated socio-economic benefits of expanded regional transmission.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Corral Summit Pumped Storage Hydropower Hybrid: Site Suitability Assessment

In 2024, Idaho National Laboratory (INL) and Pacific Northwest National Laboratory (PNNL) initiated a technical-assistance project to support Cat Creek Energy, LLC, (CCE) in evaluating site suitability for the proposed Corral Summit Pumped Storage Hydropower (PSH) project in south-central Idaho near Mackay Reservoir. The Corral Summit facility incorporates battery storage and photovoltaic (PV) solar arrays in a Trybrid configuration to deliver large-volume long-duration (LVLD) storage solutions for rural electric cooperatives in eastern Idaho. The evaluation process focused on determining the most-suitable location for the upper reservoir of the PSH system, guided by a comprehensive assessment framework spanning multiple categories, including physical characteristics, environmental constraints, building infrastructure, regulatory constraints, cultural resources and sensitivity, social factors, and power market and grid integration. Each site was analyzed based on a ranking scale (0–1), which scores ranging from “severely disfavored” to “highly favored,” allowing detailed comparisons of site-specific conditions. Categories such as hydraulic head, utilities corridor, land ownership, and transmission-grid limitations emerged as key contributors to the overall assessment. Site 2 (Idaho Trust) demonstrated a slight advantage over Site 1 (Bureau of Land Management) primarily due to favorable outcomes in regulatory constraints, building infrastructure, and power-market integration. However, Site 1 outperformed Site 2 in factors related to physical characteristics and social factors. The report emphasizes the need for further evaluation of both sites before clear determination of which site is preferred, due to the limited information available on either site at the time of this report. Key areas of evaluation to clearly define the preferred site are ecological impacts, cultural-resource surveys, and economic-feasibility assessments. For successful project execution, recommended follow-up actions include seismic and geotechnical surveys, groundwater and habitat monitoring, regulatory reviews of water rights and right-of-way agreements, cultural engagement with local tribal governments, and enhanced stakeholder strategies. These efforts will ensure the Corral Summit Trybrid facility meets local energy needs while balancing environmental, social, and regulatory responsibilities.

13 - HYDRO ENERGY↗

Demonstration of Grid Services Using Mixed Grid-Forming and Grid-Following Technologies at the Wheatridge Renewable Energy Facility (Final Technical Report)

This Final Technical Report summarizes the analytical, modeling, and engineering work performed to evaluate grid-forming (GFM) inverter capabilities within a large hybrid renewable energy facility. The project focused on assessing the ability of advanced inverter-based resources to provide essential reliability services through coordinated operation of grid-forming (GFM) and grid-following (GFL) technologies. During Budget Period 1, the project developed a comprehensive framework of GFM performance metrics, including angle support, voltage regulation, frequency response, damping behavior, and current-limiting performance. Extensive electromagnetic transient (EMT) studies and hardware-in-the-loop (HIL) testing were conducted to validate GFM behavior under a range of operating conditions, including weak-grid scenarios, voltage disturbances, and multi-resource interactions. The project also established validated modeling approaches, plant-level control integration strategies, commissioning frameworks, and high-speed measurement infrastructure to support future field demonstration. Although the project concluded prior to field demonstration, the results provide a utility-scale foundation for evaluating, modeling, and deploying grid-forming technologies. The methodologies and tools developed contribute to industry understanding of inverter-based resource behavior and support future power system reliability under increasing renewable penetration.

14 SOLAR ENERGY↗

Corral Summit Pumped Storage Hydropower Hybrid Site Suitability Assessment (Rev.1)

In 2024, Idaho National Laboratory (INL) and Pacific Northwest National Laboratory (PNNL) initiated a technical-assistance project to support Cat Creek Energy, LLC, (CCE) in evaluating site suitability for the proposed Corral Summit Pumped Storage Hydropower (PSH) project in south-central Idaho near Mackay Reservoir. The Corral Summit facility incorporates battery storage and photovoltaic (PV) solar arrays in a Trybrid configuration to deliver large-volume long-duration (LVLD) storage solutions for rural electric cooperatives in eastern Idaho. The evaluation process focused on determining the most-suitable location for the upper reservoir of the PSH system, guided by a comprehensive assessment framework spanning multiple categories, including physical characteristics, environmental constraints, building infrastructure, regulatory constraints, cultural resources and sensitivity, social factors, and power market and grid integration. Each site was analyzed based on a ranking scale (0–1), which scores ranging from “severely disfavored” to “highly favored,” allowing detailed comparisons of site-specific conditions. Categories such as hydraulic head, utilities corridor, land ownership, and transmission-grid limitations emerged as key contributors to the overall assessment. Site 2 (Idaho Trust) demonstrated a slight advantage over Site 1 (Bureau of Land Management) primarily due to favorable outcomes in regulatory constraints, building infrastructure, and power-market integration. However, Site 1 outperformed Site 2 in factors related to physical characteristics and social factors. The report emphasizes the need for further evaluation of both sites before clear determination of which site is preferred, due to the limited information available on either site at the time of this report. Key areas of evaluation to clearly define the preferred site are ecological impacts, cultural-resource surveys, and economic-feasibility assessments. For successful project execution, recommended follow-up actions include seismic and geotechnical surveys, groundwater and habitat monitoring, regulatory reviews of water rights and right-of-way agreements, cultural engagement with local tribal governments, and enhanced stakeholder strategies. These efforts will ensure the Corral Summit Trybrid facility meets local energy needs while balancing environmental, social, and regulatory responsibilities.

13 - HYDRO ENERGY↗

Geothermal Resource Reporting Metric (GRRM) Developed for the U.S. Department of Energy's Geothermal Technologies Office

This paper reviews a methodology being developed for reporting geothermal resources and project progress. The goal is to provide the U.S. Department of Energy's (DOE) Geothermal Technologies Office (GTO) with a consistent and comprehensible means of evaluating the impacts of its funding programs. This framework will allow the GTO to assess the effectiveness of research, development, and deployment (RD&D) funding, prioritize funding requests, and demonstrate the value of RD&D programs to the U.S. Congress and the public. Standards and reporting codes used in other countries and energy sectors provide guidance to develop the relevant geothermal methodology, but industry feedback and our analysis suggest that the existing models have drawbacks that should be addressed. In order to formulate a comprehensive metric for use by the GTO, we analyzed existing resource assessments and reporting methodologies for the geothermal, mining, and oil and gas industries, and sought input from industry, investors, academia, national labs, and other government agencies. Using this background research as a guide, we describe a methodology for evaluating and reporting on GTO funding according to resource grade (geological, technical and socio-economic) and project progress. This methodology would allow GTO to target funding, measure impact by monitoring the progression of projects, or assess geological potential of targeted areas for development.

15 GEOTHERMAL ENERGY↗

A Proposal for Geologic Radioactive Waste Disposal Environmental Zero-State and Subsequent Monitoring Definition - First Lessons Learned from the French Environment Observatory - 13188

Obtaining a reference state of the environment before the beginning of construction work for a geological repository is essential as it will be useful for further monitoring during operations and beyond, thus keeping a memory of the original environmental state. The area and the compartments of the biosphere to be observed and monitored as well as the choice of the markers (e.g. bio-markers, biodiversity, quality of the environment, etc.) to be followed must be carefully selected. In parallel, the choice and selection of the environmental monitoring systems (i.e. scientific and technical criteria, social requirements) will be of paramount importance for the evaluation of the perturbations that could be induced during the operational phase of the repository exploitation. This paper presents learning points of the French environment observatory located in the Meuse/Haute-Marne that has been selected for studying the feasibility of the underground disposal of high level wastes in France. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Frozen Soil Barrier to Control Groundwater Inflow into Damaged Reactors at the Fukushima Daiichi Nuclear Power Station - 16613

Reactor buildings and support facilities at the Fukushima Daiichi Nuclear Power Station (F1 Site) were damaged by a March 2011 tsunami. In response, the Tokyo Electric Power Company (TEPCO) is implementing a number of countermeasures to limit the releases and impacts of contaminated water to the surrounding environment. The diverse countermeasures work together in an integrated manner to provide different types, and several levels, of environmental protection. In general, the strategy represents an example of a 'defense in depth' concept that is used for nuclear facilities around the world. One of the key countermeasures is a frozen soil barrier encircling the damaged reactor facilities. The frozen barrier is intended to limit the flow of water into the area, reduce the amount of water entering damaged reactors, and reduce the resulting volume of contaminated water that requires treatment and storage. The frozen soil barrier was designed and installed by a team from TEPCO and Kajima Corporation. A group of scientists and engineers from US Department of Energy National Laboratories provided independent evaluation of the frozen barrier design and operational plans along with technical recommendations to the TEPCO team. The frozen soil barrier design extends to about 30 m depth; the bottom of the barrier is in a low permeability interval, and the total barrier length around the reactors is just over 1.5 km. The barrier required 1927 total boreholes: 1568 for freeze pipes plus 359 for temperature monitoring arrays. Drilling of all of the boreholes was completed November 9, 2015. Construction of the refrigeration plant is complete and all of the above ground piping/manifolds are in the final stages of construction. The DOE laboratory independent assessment of the frozen soil barrier concluded that the technical characteristics of a frozen barrier are relatively well suited to Fukushima-specific hydrogeologic conditions and the need for reducing the inflow of water into damaged reactors at the F1 Site. The scale of the Fukushima barrier is bounded by industry experience and the equipment and infrastructure proposed for the ground freezing is well understood. The on-site pilot test at Fukushima indicated predictable ground freezing and supported the full scale design parameters. These factors increase the confidence in the frozen soil barrier project underway at Fukushima. TEPCO is currently working with the Japanese Nuclear Regulatory Authority (NRA), providing operational plans/strategies for the frozen soil barrier and modeling results of the projected performance. Full scale frozen soil barrier operations are to begin after authorization from NRA. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Efficacy and Safety of a Novel Vascular Closure Device (Glubran 2 Seal) After Diagnostic and Interventional Angiography in Patients with Peripheral Arterial Occlusive Disease

To prospectively evaluate safety and efficacy of a novel vascular closure device (Glubran 2 Seal) after peripheral angiography in patients with peripheral arterial occlusive disease (PAOD). From December 2010 to June 2011, all consecutive patients with PAOD undergoing peripheral angiography were prospectively enrolled onto the study after percutaneous antegrade or retrograde puncture of the common femoral artery. After angiography, the Glubran 2 Seal device was used to achieve hemostasis. The following data were registered: technical success and manual compression duration, patients' discomfort (scale 0-5), operators' technical difficulty (scale 0-5), and vascular complications. The site of hemostasis was evaluated by clinical inspection and color-coded Duplex ultrasound performed 1 day and 1 month after the procedure. One hundred seventy-eight patients were enrolled (112 male, mean age 70.8 years) with a total of 206 puncture sites, including 104 (50.5 %) antegrade accesses. The device was successful in 198(96.1 %) of 206 procedures, with 8 cases of manual compression lasting longer than 5 min (maximum 20 min). No major vascular complications were observed, resulting in 100 % procedural success. Minor complications occurred in seven procedures (3.4 %), including two cases of pseudoaneurysms, successfully treated by ultrasound-guided glue injection. The mean {+-} standard deviation score for patients' discomfort was 0.9 {+-} 0.7, whereas the mean score for operators' difficulty was 1.2 {+-} 0.9. In patients with PAOD, the Glubran 2 Seal represents a simple, painless, and efficient vascular closure device, able to achieve hemostasis both in antegrade and retrograde accesses.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

FY21 Progress of the Oak Ridge Health Physics Research Reactor CAAS Benchmark Evaluation [Slides]

The FY21 version of the evaluation, focusing on element 57 dose at 3 meters, was presented at the ICSBEP Technical Review Group meeting in October 2021 and was not accepted for 2022 publication in the handbook. The main issue was identified and replacement of the element 57 neutron dose benchmark metric by neutron fluence (closer to what was measured) is required. A subgroup was formed, confident for the updated neutron fluence evaluation to be accepted in the ICSBEP handbook. The updated evaluation will be presented again at the 2022 ICSBEP TRG for publication in the 2023 handbook.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Exploring the Potential of Rainwater Harvesting for Cooling Towers: A Systematic Review and Regional Feasibility Assessment

Water scarcity has driven interest in rainwater harvesting, especially for U.S. industries like power and manufacturing, which dedicate a large percentage of their water needs to cooling towers. This paper provides a comprehensive systematic review of studies on the use of rainwater in cooling tower applications, along with an assessment of the regional feasibility of integrating RWH in U.S. manufacturing cooling towers. The systematic review examines the technical, economic, environmental, and policy feasibility of utilizing harvested rainwater, and the regional feasibility analysis evaluates the practical implementation of RWH in manufacturing cooling towers, considering factors such as regional RWH potential, water costs, state policies, and the industrial water use of manufacturing facilities per state. This study supports the hypothesis that RWH for cooling towers is technically feasible, economically viable, and environmentally beneficial. Harvested rainwater is naturally less conductive and soft, and rainwater reuse minimizes the ecological footprint. Supportive state policies, regional RWH potential, and rising water costs across the U.S. are important variables that may impact RWH adoption. The review highlights rooftop RWH as the most studied method and notes that implementing RWH requires infrastructure changes and filtration techniques. While initial investment costs may be high, operational and maintenance costs are low, making RWHS economically feasible over time. Regions with higher water costs and supportive policies are more likely to benefit from RWH adoption. The study provides a foundation for understanding the potential for using RWH in industrial cooling towers.

Cooling towers↗

Final Work Plan: Environmental Site Investigation at Sylvan Grove, Kansas

In 1998, carbon tetrachloride was found above the maximum contaminant level (MCL) of 5 µg/L in groundwater from one private livestock well at Sylvan Grove, Kansas, by the Kansas Department of Health and Environment (KDHE). The 1998 KDHE sampling was conducted under the U.S. Department of Agriculture (USDA) private well sampling program. The Commodity Credit Corporation (CCC), a USDA agency, operated a grain storage facility in Sylvan Grove from 1954 to1966. Carbon tetrachloride is the contaminant of primary concern at sites associated with former CCC/USDA grain storage operations. Sylvan Grove is located in western Lincoln County, approximately 60 mi west of Salina (Figure 1.1). To determine whether the former CCC/USDA facility at Sylvan Grove is a potential contaminant source and its possible relationship to the contamination in groundwater, the CCC/USDA has agreed to conduct an investigation, in accordance with the Intergovernmental Agreement between the KDHE and the Farm Service Agency (FSA) of the USDA. This Work Plan presents historical data related to previous investigations, grain storage operations, local private wells and public water supply (PWS) wells, and local geologic and hydrogeologic conditions at Sylvan Grove. The findings from a review of all available documents are discussed in Section 2. On the basis of the analyses of historical data, the following specific technical objectives are proposed for the site investigation at Sylvan Grove: (1) Evaluate the potential source of carbon tetrachloride at the former CCC/USDA facility; (2) Determine the relationship of potential contamination (if present) at the former CCC/USDA facility to contamination identified in 1998 in groundwater samples from one private well to the west; and (3) Delineate the extent of potential contamination associated with the former CCC/USDA facility. The detailed scope of work is outlined in Section 3. The results of the proposed work will provide the basis for determining what future CCC/USDA actions may be necessary, with the ultimate goal of achieving classification of the Sylvan Grove site at no further action status. The proposed activities are to be performed on behalf of the CCC/USDA by the Environmental Science Division of Argonne National Laboratory, a nonprofit, multidisciplinary research center operated by the UChicago Argonne, LLC, for the U.S. Department of Energy. Argonne provides technical assistance to the CCC/USDA concerning environmental site characterization and remediation at former grain storage facilities. Argonne issued a Master Work Plan (Argonne 2002) that has been approved by the KDHE. The Master Work Plan describes the general scope of all investigations at former CCC/USDA facilities in Kansas and provides guidance for these investigations. That document should be consulted for the complete details of plans for work associated with the former CCC/USDA facility at Sylvan Grove.

54 ENVIRONMENTAL SCIENCES↗