Search NASA⌕ Search

SEARCH · Search NASA

Results for “Aries”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Microwave-Assisted Hydrogen Generation from Hydrocarbon-Bearing Reservoir Rocks: Stage-Dependent Thermal Runaway and In-Situ Carbonate Engineering

Microwave-assisted hydrogen generation from hydrocarbon-bearing reservoir rocks is strongly influenced by mineralogy, methane activation, carbonate reactions, and thermal runaway behavior. This study investigates a new approach in which carbonate phases are generated in-situ through the reaction of internally produced CO2 with Ca(OH)2 under microwave heating conditions. The objective is to evaluate how rock mineralogy, methane injection, and Ca(OH)2 addition influence hydrogen generation, carbon redistribution, and stage-dependent reaction pathways during microwave exposure. Microwave heating experiments were conducted using Permian Basin reservoir rocks under three experimental conditions: rock-only experiments under Ar atmosphere, CH4–Ar experiments without additive, and CH4–Ar experiments containing 5 wt% Ca(OH)2. Methane-assisted experiments were performed under continuous injection of 30 standard cubic centimeters per minute (sccm) CH4 and 30 sccm Ar. Based on thermal runaway behavior, each experiment was divided into three operational stages: Before Thermal Runaway (BR), After Thermal Runaway–Decrease in Microwave Power (ARD), and After Thermal Runaway– Increase in Microwave Power (ARI). Temperature and gas composition were continuously monitored throughout the experiments. The rock-only experiments demonstrated that hydrogen generation can occur intrinsically from hydrocarbon-bearing rocks under microwave heating, even without externally injected methane. However, hydrogen production did not correlate solely with kerogen content, indicating that mineralogy strongly influences hydrogen-generation pathways. Correlation analyses suggested that kerogen decomposition initially generated CH4, CO, and CO2, followed by secondary hydrocarbon reactions associated with H2 and C2 hydrocarbon formation. Methane-assisted experiments substantially increased hydrogen production; however, identical methane injection rates produced significantly different hydrogen yields among the rock samples, confirming that mineralogical composition controls methaneconversion behavior under microwave heating conditions. The addition of Ca(OH)2 significantly altered carbon evolution behavior in a stage-dependent manner. During the BR stage, Ca(OH)2 reduced gas-phase CO2 production, particularly in carbonate-rich rocks, indicating favorable conditions for in-situ carbonation and carbonate deposition prior to extensive thermal decomposition. The suppression of CO2 during BR became more pronounced with increasing carbonate content of the rock system. After thermal runaway, carbonate-containing systems exhibited enhanced hydrogen generation behavior, suggesting that carbonatederived mineral transformations and carbonate-mediated reactions contribute to high-temperature hydrogen-generation pathways. In carbonate-poor rocks, Ca(OH)2 addition enabled simultaneous URTeC 4493775 2 enhancement of hydrogen production and partial suppression of CO2 release during the post-runaway stages. Overall, the results demonstrate that microwave-assisted hydrogen generation is governed by dynamically evolving interactions among kerogen decomposition, methane activation, mineral transformations, carbonate formation/decomposition, and thermal runaway behavior. This work introduces in-situ carbonate engineering with Ca(OH)2 as a strategy for coupling hydrogen generation with partial insitu carbon management under microwave heating conditions.

03 NATURAL GAS↗

DEVELOPMENT OF PLASMA SIMULATION TOOL FOR THE ACCEL-ERATING CAVITIES

Plasma processing of superconducting radio frequency (SRF) cavities has shown an improvement in accelerating gradient by reducing the radiation due to field emission and multipacting. Plasma processing is a common tech-nique where the free oxygen produced by the plasma breaks down and removes hydrocarbons from surfaces. This increases the work function and reduces the second-ary emission coefficient. The hydrocarbon fragments of H2, CO, CO2, and H2O are removed from the system with the process gas which is flowing through the system. Here, we present COMSOL for the first time to simulate the plasma processing of an SRF cavity. In this work, we use Jefferson Lab's C75 SRF cavities design as our case study. Using simulation, we predict the condition of plasma ignition inside the SRF cavity. The simulation provides information about the optimal rf coupling to the cavity, mode for plasma ignition, choice of gas concen-tration, power, and pressure.

Senevirathne, I.↗

Integrated Mid-Continent Stacked Carbon Storage Hub Project Phase II (Final Summary Report)

The Phase II Integrated Midcontinent Stacked Carbon Storage Hub (IMSCS-HUB) is part of the Carbon Storage Assurance Facility Enterprise (CarbonSAFE) established by the United States Department of Energy (DOE) National Energy Technology Laboratory (NETL). CarbonSAFE is phased to support the development of commercial-scale (50 million metric tonnes [Mt] over a 30-year period) carbon capture, utilization, and storage (CCUS) in the United States. The IMSCS-HUB study area comprises carbon dioxide (CO 2 ) sources in Iowa, Kansas, and Nebraska (the source corridor), and CO 2 sinks in Kansas and Nebraska (the storage corridor), representing the first large-scale project for the Midcontinent region. The stacked storage corridor is characterized by alternating sequences of deep saline formations, oil-bearing reservoirs, shale, and evaporite units that are conducive to vertically stacked CO 2 injection for geologic storage and enhanced oil recovery (EOR). Three sites within the IMSCS-HUB stacked storage corridor were evaluated in Phase II for commercial CCUS feasibility: one in southwest-central Nebraska, Sleepy Hollow Field (SHF), a second in southwestern Nebraska near Madrid (Madrid), and a third in southwestern Kansas, the Patterson Site (composed of the Patterson, Heinitz, Hartland, and Oslo fields). In Phase II, the team assessed the feasibility of storage complexes at the potential storage sites in Nebraska and Kansas to support a commercial-scale storage hub that integrates proven CO 2 capture technology and transport from nearby ethanol sources. Building on lessons learned from the DOE-NETL Regional Carbon Sequestration Partnerships (RCSPs), the Project Team has identified a clear strategy to meet DOE’s 2025 objective of commercial carbon capture and storage (CCS) implementation by developing a CO 2 market and infrastructure that relies on multiple ethanol-based CO 2 sources in the short term and the incorporation of multiple coal-fired power plant CO 2 sources when commercial capture is economically viable. The team also leveraged the updated 45Q tax credit to develop capture and transport infrastructure. Commercial-scale CCUS is feasible at two candidate storage sites studied, the Madrid, Nebraska Site and the Patterson Site in Kearny County, Kansas. The Sleepy Hollow Field in Nebraska was found to be an attractive candidate for stacked storage with CO 2 -EOR (Battelle 2020e). Outreach efforts facilitated engagement from industry, government, and research sectors (Battelle and GPI, 2020) and an outreach plan for future phases of the project was developed to address issues that are of concern in the IMSCS-HUB project area (Battelle, 2020f). All components of a CCUS project were determined to be feasible in the IMSCS-HUB region and Risk Mitigation Plan was developed and includes strategies to mitigate risks associated with each project component (Battelle, 2020j). A roadmap was developed to obtain the required UIC permits for an integrated CCUS project (Battelle, 2020k). The regional storage resource characterization demonstrated significant opportunity for commercial-scale projects in the IMSCS-HUB storage corridor with 577.4 Mt of stacked CO 2 storage capacity and the potential to produce 181.9 MMbbls of oil via EOR across 17 individual storage areas (Battelle and ARI, 2020). The pipeline assessment study found viable pipeline routes that connected 45Q-eligible ethanol plants, coal fired power plants, and other sources in the IMSCS-HUB corridor. The comprehensive results of subsurface characterization, modeling efforts, outreach assessment, and regulatory analysis from were integrated to develop a Detailed Commercial Development Plan for the IMSCS-HUB (Battelle, 2020n). Commercialization efforts will involve obtaining Class VI UIC permits, establishing and finalizing the pipeline route, and evaluating capture projects at participating CO 2 sources. Phases I and II of the IMSCS-HUB CarbonSAFE provide a strong foundation for safely, efficiently, and cost-effectively characterizing and permitting commercial-scale project sites in the region. The plan for implementation of commercial-scale CCUS projects in the IMSCS-HUB is aligned with the objectives of CarbonSAFE Phase III: Site Characterization and CO 2 Capture Assessment.

20 FOSSIL-FUELED POWER PLANTS↗

Establishing an Early CO 2 Storage Complex in Kemper County, Mississippi (ECO 2 S) (CarbonSAFE Phase II, Final Report)

The CarbonSAFE Phase II: Storage Complex Feasibility project, entitled “Establishing an Early CO 2 Storage Complex in Kemper County, Mississippi: Project ECO 2 S,” demonstrates that the subsurface adjacent to the Kemper County energy facility can safely and permanently store commercial-scale volumes of carbon dioxide (CO 2 ). Project ECO 2 S is led by the Southern States Energy Board (SSEB). Mississippi Power Company (MPC) serves as the site host. The project includes technical and field implementation support from Advanced Resources International (ARI) and obtains analytical support from two national laboratories (Los Alamos and Lawrence Berkeley), a host of universities, and other key participants. A 30,000-acre area of interest was established. Three new characterization wells were drilled to facilitate the detailed geologic analyses, characterization, and modeling of three prospective storage reservoirs. The results verify and validate that the subsurface reservoirs examined have gigatonne CO 2 storage potential. This final report documents the achievements of the project team in successfully attaining the goals and objectives set forth for the project and summarizes the results of the feasibility study.

01 COAL, LIGNITE, AND PEAT↗

Examination of the Extreme Cold Weather Event Affecting the Power System in Texas - February 2021 [Slides]

This presentation examines the extreme cold weather event that affected the power system in Texas in February 2021. The Texas load-shedding events were caused by a combination of record-high demand and cold weather issues that reduced the output from all types of generation. While some wind turbines were shutting down due to cold temperatures and icing and a lack of cold-weather packages, hourly wind output was accurately predicted. Extreme weather events historically drive grid reliability. Additional examination of more extreme events is needed to understand their impacts on the power system. As a national lab, NREL has the capabilities and facilities to help the industry address these types of challenges. NREL also has significant simulation and analysis capabilities (such as NAERM) that can help understand the impacts of extreme events. NREL also developed the Advanced Research on Integrated Energy Systems (ARIES) Research Platform, which enables evaluation of technologies that smooth grid operations during events like this.

17 WIND ENERGY↗

Selection of 3013 Containers for Field Surveillance (FY 2021 Update)

This Update is the ninth in a series of reports that document the binning and sample selection of 3013 containers for the Field Surveillance program as part of the Integrated Surveillance Program. The last Update was in 2016. This Update documents changes to the binning and changes to the random and engineering judgment samples since 2016. This Update also documents field surveillance activities since 2016 and describes plans to complete random sampling in 2025. In addition, this Update describes a new effort to collect surveillance data as part of down blending operations and updates assumptions about Advanced Recovery and Integrated Extraction System (ARIES) 3013 containers.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Edge and scrape-off layer modeling for a Fusion Nuclear Science Facility with tungsten walls; a summary report for 2019-21

This report summarizes model development and simulations for the edge/scrape-off layer (SOL) region of a Fusion Nuclear Science Facility (FNSF) as part of the DOE Fusion Energy Systems Studies project. An overview of the FNSF device is given in Ref. 1. Our earlier related modeling of FNSF in the 2015-16 timeframe is reported in Ref. 2, and similar work on the ARIES ACT-1 tokamak device is described in Ref. 3. During 2017-18, we contributed to the analysis of a liquid lithium wall for FNSF [4].

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

AMPP Division Rack Cards [Posters/Cards]

The Actinide Material Processing and Power (AMPP) Division supports plutonium 238 science and manufacturing for NASA exploration, Defense Programs, Advanced Recovery and Integrated Extraction System (ARIES) for nuclear non-proliferation, Materials Recovery & Recycle to enable the future of our operations, and americium production to support well logging for the United States.

99 GENERAL AND MISCELLANEOUS↗

Distributed Energy Resource Visual Emulator: Phase 1

To help federal energy managers assess, monitor, and manage cybersecurity while achieving decarbonization, the National Renewable Energy Laboratory's Distributed Energy Resource Cybersecurity Framework (DER-CF) offers a comprehensive, web-based assessment tool focusing on cyber governance or policies, technical management, and physical security. The DER-CF currently presents users with a series of pertinent cybersecurity questions, which are used to generate a site-specific report and recommendations. This paper outlines a technical approach to integrate the DER-CF with another key asset—NREL's Advanced Research on Integrated Energy Systems (ARIES) Cyber Range—to visualize cybersecurity resilience and compliance and to enhance the usability and accessibility of the DER-CF. The result is a new tool called the Distributed Energy Resource Visual Emulator (DER-VE). Its development will include regular conversations with stakeholders to assess the effectiveness of these efforts, refine the visualization capability, and ensure its value to our partners. Phase 0 of the integration project was concluded in 2021. Phase 1, completed in 2022, has two components: The first is developing a working visualization of system compliance using the DER-CF, and the second is planning the design of a server application that takes input data from the DER-CF and creates a personal emulated environment of the user's system or a selected reference architect. Major components that were addressed in this phase are the DER-CF output, compliance visualization, data model, and compliance server design.

24 POWER TRANSMISSION AND DISTRIBUTION↗

CloudZero Phase 2 Technical Report

Expand upon the successful Phase 1 net zero cloud test proof of concept by moving actual OT systems to the cloud and proving cloud feasibility to support various OT technologies such as IoT, Machine Learning, etc. Explore threat analysis when these technologies are moved to the cloud. A detailed analysis in NREL ARIES Cyber Range will be used to conduct deeper analysis of cloud suitability to support OT and net zero system operations in a higher fidelity representative environment. Outputs will identify, quantify, and document the results and cyber security risks associated with the move of these OT technologies in a formal delivered report. Programmatic Benefits: Identify cloud integration challenges for energy systems characterize the cloud threat space, contribute to policy and standards discussions, empower the sector to change their cloud culture where appropriate.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Long-term Moisture Adsorption in Packaged Plutonium Oxide

In 2018, the Department of Energy National Nuclear Security Administration (DOE-NNSA) began implementing dilute and dispose to remove 34 metric tons (MT) of surplus weapons grade plutonium from the US stockpile. Under this plan, surplus plutonium material is converted into plutonium oxide (PuO 2 ) before being stored in metal containers and sent to the DOE Waste Isolation Pilot Plant (WIPP). The dilute and dispose project was implemented as a more cost-effective method for abiding by the Plutonium Management and Disposition Agreement (PMDA) between the USA and Russia, as compared to producing mixed oxide fuel (MOX). The PMDA was originally signed in 2000 and amended in 2010.2 The disassembly of pits and conversion to PuO 2 as part of dilute and dispose is carried out through the Advanced Recovery and Integrated Extraction System (ARIES) developed at Los Alamos National Laboratory (LANL). The dilute portion of dilute and dispose is carried out at Savannah River Site (SRS). With this program in place, it is necessary to ensure the safe, long-term storage of the PuO 2 generated during this process until final disposal at WIPP is accomplished.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

RaDIATE Collaboration Thermal shock studies

As next-generation accelerator target facilities (High Energy Physics, Spallation Sources, ... ) become increasingly more powerful and intense, high power target systems face key technical challenges, such as radiation damage and thermal shock. Those ultimately degrade the performance and lifetime of targets and have been identified as the leading cross-cutting challenges of high-power target facilities. In order to operate reliable beam-intercepting devices in the framework of energy and intensity increase for next generation accelerators, the RaDIATE Collaboration (Radiation Damage In Accelerator Target Environment), established in 2012 and managed by Fermilab, brings together existing expertise in nuclear material and accelerator targets from 20 international institutions, including CERN, to execute a coordinated strategy for high power targetry R&D. In this context, several thermal shock studies were performed at CERN's HiRadMat (High-Radiation to Materials) facility, that took a key step towards improving our knowledge on target damage tolerance. The first experiment HRMT-24, supported by EURCARD2 and completed in 2015, successfully validated the Johnson-Cook strength model developed at SwRI on beryllium S200FH (used for beam window material), providing a better confidence in simulating the thermal shock response of current and future S200FH beryllium components. HRMT-43, supported by ARIES and completed in 2018, tested various materials (Be, C, SiC, Si, Ti and ceramic nanofiber). It was a first and unique test which included pre-irradiated specimens from high energy proton beam irradiation to identify thermal shock response differences between non-irradiated and previously irradiated materials. Real-time measurement of dynamic thermomechanical response of graphite helped to benchmark numerical simulations.

43 PARTICLE ACCELERATORS↗

Vulcan Test Platform: Demonstrating the Data Center as a Flexible Grid Asset

Explosive data center demand is outpacing grid infrastructure development. AI workloads and hyperscale cloud growth are creating unprecedented power requirements, while traditional grid expansion faces multi-year development timelines, regulatory hurdles, and decarbonization challenges. Sidewalk Infrastructure Partners recognized this impending crisis years ago and founded Verrus to develop an innovative solution: data centers that function as grid assets rather than passive loads. The Verrus approach integrates proprietary grid-aware controls with battery energy storage systems (BESS) in a medium-voltage architecture that delivers three critical capabilities: Fast-responding demand flexibility that can service requests from the utility within 10 seconds, Uninterrupted transition to islanded operation during grid disturbances, Continuous uptime assurance while maintaining all customer service level commitments Through Verrus' strategic partnership with the National Renewable Energy Laboratory (NREL), we validated these capabilities on Vulcan, a 70 MW utility-scale test platform powered by NREL's ARIES Virtual Emulation Environment. This deployment-ready technology has successfully demonstrated that Verrus data centers can deliver meaningful grid services while maintaining mission-critical reliability. This technical report outlines the design, methodology, and results of this emulated deployment, demonstrating that data centers can play a pivotal role in enhancing grid flexibility and reliability, without sacrificing service level guarantees.

24 POWER TRANSMISSION AND DISTRIBUTION↗

CarbonSAFE Phase II: Optimizing Alabama’s CO 2 Storage in Shelby County, Alabama (Project OASIS), Milestone M3 - Site Specific Drilling Report

The Phase II Storage Complex Feasibility project, entitled "Optimizing Alabama's CO 2 Storage in Shelby County, Alabama (Project OASIS)," is a part of the DOE/NETL's CarbonSAFE initiative. The Project is managed by the Southern States Energy Board (SSEB), and includes participation from Advanced Resources International, Inc. (ARI), Crescent Resource Innovation, Southern Company, Alabama A&M University, Auburn University, and Oklahoma State University. Project OASIS is working to establish the foundation for a commercial-scale geologic storage complex for CO 2 captured from Plant Gaston (home of the National Carbon Capture Center) and surrounding industrial sources of CO 2 located in Shelby County, Alabama. The Project objectives are: • Demonstrate that the subsurface saline formations at the storage complex can store commercial volumes of CO 2 safely and permanently. • Develop a comprehensive Community Benefits Plan. • Develop the infrastructure framework for a CO 2 storage hub. • Develop a rigorous risk registry and to conduct a comprehensive risk assessment. • Develop a monitoring plan. • Develop a comprehensive site characterization plan to support an Underground Injection Control Class VI Permit in a future Phase III program. • Evaluate the commercial viability of the project. Project OASIS is about 30 miles southeast of Birmingham, Alabama within a geologic province called the Valley and Ridge (Figure 1.1). The Valley and Ridge Province comprises a sequence of Paleozoic carbonate and clastic rocks that underwent structural deformation during the Alleghanian Orogeny. Storage prospects occur in relatively flat lying structural panels located between thrust faults. Available geologic studies related to hydrocarbon exploration suggest that Cambro-Ordovician carbonates and Cambrian clastic units offer multiple potential storage intervals, and that regional confining systems are present, such as the tectonically thickened Floyd-Parkwood Shale. The surface property is owned by a timber and land stewardship company, The Westervelt Company, Inc., who worked with the Project Team to select and prepare adequate sites for geologic assessment. The purpose of drilling the Westover Stratigraphic Test Well #2 was to collect geologic data to model the feasibility of commercial scale CO 2 injection and storage. This includes geological and geophysical evaluations, reservoir engineering analyses, and risk assessments.

20 FOSSIL-FUELED POWER PLANTS↗

Synchronous Machine Governor Upgrade

Conventional generation sources play a critical role in the stability and reliability of the electrical grid, particularly as we transition towards more renewable energy sources. To understand and accurately emulate their behavior for optimizing grid operations and ensuring seamless integration with renewable technologies, it is essential to better emulate the grid- and plant-level impacts of conventional generation sources, such as natural gas (NG) driven heat recovery steam generators (HRSGs) and combustion turbines (CTs). Therefore, a governor model is developed in a programmable logic controller (PLC) to investigate the performance of the conventional generator under various dynamic operating conditions and to identify the impact on grid stability in a controlled environment. The governor model aims to enable the hardware-in-the-loop (HIL) based emulation of these conventional generation sources using the existing 2 MVA synchronous machine/generator that is driven by a flexible 2.5 MW variable speed drive. This setup will allow us to replicate the dynamic characteristics and response behaviors of NG-driven HRSGs and CTs. The controls for the emulated conventional plants follow the industry standard and are adjustable, ensuring they accurately reflect the operational capabilities and limitations of real-world systems. These controls include load-following capabilities, ramp rates, startup and shutdown sequences, and emissions characteristics. By incorporating these adjustable controls, we aim to capture the nuanced impacts of conventional generation, such as their ability to provide ancillary services like frequency regulation, voltage support, and spinning reserve. In this report, we simulate two types of dynamic operations: grid-connected and islanding. For each dynamic operation, representative starting sequences are tested, including turbine purge, ignition, speed ramping up, generator excitation and synchronizing, and breaker close. The HIL based tests provides insights for field deployment, specifically the high-fidelity governor model provides results to predict the potential stability and reliability risk and suggest possible integration measures (e.g., generation and load balancing, tuning of governor control parameters). Ultimately, this enhanced emulation capability will be integrated into our Advanced Research on Integrated Energy Systems (ARIES), enabling us to conduct comprehensive studies on the interactions between conventional and renewable energy sources. By better understanding these interactions, we can develop strategies to optimize the overall performance and reliability of the grid. This will support the deployment of advanced grid management techniques, such as demand response, grid-forming inverters, and energy storage systems. The main contributions are summarized as follows: (1) This report introduces a PLC-based governor model for gas turbines. This model accurately simulates the dynamic behavior of conventional generation sources under various operational scenarios; (2) The model is integrated with an HIL testbed that includes a 2.5 MW variable speed drive and a 2 MVA synchronous machine. This setup enables realistic, real-time emulation of conventional power plants, particularly NG driven HRSGs and CTs; (3) The developed model is adaptable to various gas turbine configurations and allows for precise control over parameters such as MW ramp rates. This flexibility makes it a valuable tool for future research and industry collaboration; and (4) By incorporating the model into the National Renewable Energy Laboratory's Advanced Research on Integrated Energy Systems, the report lays the groundwork for future studies on interactions between conventional and renewable energy sources, enhancing the ability to develop advanced grid management strategies.

24 POWER TRANSMISSION AND DISTRIBUTION↗

NREL Capabilities for TMCES

This is a panel presentation covering NREL's capabilities in the thermal-mechanical energy storage space, including ARIES, component R&D, and modeling tools and datasets.

25 ENERGY STORAGE↗

Hydrogen Dispersion Modeling for Development of Smart Distributed Monitoring

Studying hydrogen dispersion is crucial for ensuring the safe and effective deployment of hydrogen as an energy carrier. This study presents a comprehensive CFD modeling framework for simulating hydrogen dispersion at a real-world hydrogen production, storage, and utilization facility. Utilizing the Hydrogen Research Facility under the Advanced Research on Integrated Energy Systems (ARIES) at the National Renewable Energy Laboratory's (NREL) Flatirons campus, controlled hydrogen releases at 27 kg-H2/hr were simulated. The model incorporated site-specific atmospheric conditions, including hourly wind speeds and temperatures recorded between 8 AM and 8 PM from October to December 2023. To reduce computational demands, a statistical reduction technique was applied to condense the dataset to 100 representative scenarios, validated by statistical tests for wind speeds and power law coefficients. Simulations were conducted using the Reynolds-Averaged Navier-Stokes equations. Results demonstrated that wind speed substantially influences hydrogen dispersion, with low wind conditions forming concentrated clouds and higher wind speeds stretching the plume. Additionally, clustering analysis informed optimal sensor placement at various elevations with up to 10 sensor locations on each elevation. This framework offers a robust approach for understanding hydrogen behavior in ambient conditions and informing detection strategies.

08 HYDROGEN↗

Wind Power as a Virtual Synchronous Generator (WindVSG)

This project investigated the theory, implemented it in hardware, and validated the Wind as a Virtual Isochronous Generator (WindVSG) concept by combining the advantages of modern dynamic inverter technologies with static, dynamic, and transient electromechanical properties of synchronous machines. During this project we demonstrated how to control the inverters of wind turbine generators (wind alone or in parallel with other GFM sources, such battery energy storage) so that wind power behaves like a synchronous machine-based power plant with a conventional prime mover. For this purpose, testing was conducted at NLR ARIES facility with real 2.5 MW wind-turbine generator operating in GFM mode under dynamic and transient conditions. The team also developed models and conducted simulations for GFM wind power to evaluate stability impacts of GFM operation on power grid. This report describes efforts by the NLR team working in collaboration GE Vernova during 3-year project.

17 WIND ENERGY↗