Search NASA⌕ Search

SEARCH · Search NASA

Results for “Beam Transport”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Single-particle dynamics of microbunching

The mechanism of steady-state microbunching (SSMB) has been proposed [D. F. Ratner and A. W. Chao, Phys. Rev. Lett. 105, 154801 (2010)] to generate high-power coherent radiation at a high repetition rate or in continuous-wave mode using electron storage rings. In this paper, the related single-particle dynamics are theoretically and numerically studied, and important results are presented. The investigated effects are longitudinal quantum radiation excitation, nonlinear momentum compaction, and linear and nonlinear coupling of the transverse and longitudinal motion. Although this analysis is oriented toward SSMB, some of the analyzed effects are also crucial in cases such as coherent harmonic generation, bunch slicing, bunch compression, free-electron laser beam transport lines, and quasi-isochronous rings, which involve precise longitudinal phase-space manipulations.

43 PARTICLE ACCELERATORS↗

Wiggler-based electron beam microbunching amplifier study

The wiggler-based amplifier of the microbunching instability in the electron beam is considered and compared to a longitudinal space charge amplifier consisting of the drifts and chicanes. The gain in the magnitude of a seed perturbation of the electron beam density is evaluated analytically as a function of the period of the perturbation, the electron beam parameters, the wiggler parameters, and the amplifier lattice parameters. The theory is compared with the results of the numerical calculations of the gain based on simulations of the electron beam transport through the amplifier lattice. Published by the American Physical Society 2024

43 PARTICLE ACCELERATORS↗

Shielding Analyses for SNS Accelerator Power Upgrade

The Proton Power Upgrade (PPU) project [1] at Spallation Neutron Source (SNS) is aiming at increasing the neutron beam intensities at the First Target Station (FTS) and advancing accelerator capability to additionally power a future Second Target Station (STS) [2]. PPU will involve upgrading the SNS accelerator complex to double the currently available proton beam power from 1.4 to 2.8 MW, by increasing the proton beam energy from 1 GeV to 1.3 GeV and by increasing the proton beam current.PPU will enable new science capabilities enhancing the experiment throughput of the 19 existing FTS instruments, which are heavily oversubscribed. STS will include 22 additional neutron scattering instruments. Numerous neutronics analyses are performed to support PPU evaluating the FTS systems for higher beam power and for system upgrades. Part of the PPU scope is an extension of the Ring to Target Beam Transport (RTBT) line, a stub out of the accelerator tunnel for the future Ring to STS Transport (RTST) line[3]. As the RTST tunnel will not be built within the PPU project, the stub will be shielded by a plug, which is planned to be made from regular concrete.In order to provide radiation protection safety, analyses are required to design adequate plug thickness for the stub. The thickness of the stub is driven by the criterion that the area downstream of the plug is “unrestricted access area”, demanding the dose rate downstream the stub be below 0.25 mrem/h at 30 cm from the surface at normal operation and below 20 Rem/hr for accident cases. Additionally, analyses verifying the amount of soil for shielding the accelerator tunnel to the above stated requirements are performed.

Popova, Irina I.↗

Bunch Extinction Measurements at PIP-II Injector Test Facility

The PIP2 particle accelerator is a new upgrade to the Fermilab accelerator complex, featuring an 800-MeV H-superconducting linear accelerator that will inject the beam into the present Fermilab Booster. A test accelerator known as PIP-II Injector Test (PIP2IT) has been built to validate the concept of the front-end of such a machine. One of the paramount challenges of PIP2IT was to validate the bunch by bunch chopping system in the Medium Energy Beam Transport (MEBT). This paper aims to present the direct extinction measurements at PIP2IT and their analysis. These measurements have been taken by two Resistive Wall Current Monitors (RWCM) and recorded by a high bandwidth oscilloscope.

43 PARTICLE ACCELERATORS↗

Real-Time Longitudinal Profile Measurement of Operational H⁻ Beam at the SNS Linac Using a Laser Comb

We demonstrate a novel technique to measure the longitudinal profile of an operational hydrogen ion (H⁻) beam in a non intrusive, real-time fashion. The measurement is conducted based on the photo-ionization of the ion beam with a phase modulated laser comb pico-second laser pulses with controllable temporal structure. The measurement technique has been applied to a 1-GeV, 1.4-MW H⁻ beam at the Spallation Neutron Source (SNS) high energy beam transport (HEBT). A stroboscopic photo-graph of H⁻ beamμbunch can be obtained by using a phase modulated laser comb. The entire measurement takes only 700 us.

Liu, Yun↗

Progress towards the completion of the proton power upgrade project

The Proton Power Upgrade project at the Spallation Neutron Source at Oak Ridge National Laboratory will increase the proton beam power capability from 1.4 to 2.8 MW. Upon completion in early 2025, 2 MW of beam power will be available for neutron production at the existing first target station (FTS) with the remaining beam power available for the future second target station (STS). The project has installed seven superconducting radio-frequency (RF) cryomodules and supporting RF power systems to increase the beam energy by 30% to 1.3 GeV, and the beam current will be increased by 50%. The injection and extraction region of the accumulator ring are being upgraded, and a new 2 MW mercury target has been developed along with supporting equipment for high-flow gas injection to mitigate cavitation and fatigue stress. The first four cryomodules and supporting systems were commissioned in 2022-2023 and supported neutron production at 1.05 GeV, 1.7 MW with high reliability. The first-article 2 MW target was operated successfully for approximately 4400 MW-Hours over two run periods. The long outage began in August 2023 for installation of the remaining technical equipment and construction of the Ring-to-Target Beam Transport tunnel stub that will enable connection to the STS without interrupting operation of the FTS. The upgrade is proceeding on-schedule and on-budget, and resumption of neutron production for the user program is planned for July 2024.

43 PARTICLE ACCELERATORS↗

Start-to-End Simulation of the Drive-Beam Longitudinal Dynamics for Beam-Driven Wakefield Acceleration

Collinear beam-driven wakefield acceleration (WFA) relies on shaped driver beam to provide higher accelerating gradient at a smaller cost and physical footprint. This acceleration scheme is currently envisioned to accelerate electron beams capable of driving free-electron laser *. Start-to-end simulation of drive-bunch beam dynamics is crucial for the evaluation of the design of accelerators built upon WFA. We report the start-to-end longitudinal beam dynamics simulations of an accelerator beamline capable of producing high charge drive beam. The generated wakefield when it passes through a corrugated waveguide results in a transformer ratio of 5. This paper especially discusses the challenges and criteria associated with the generation of temporally-shaped driver beam, including the beam formation in the photoinjector, and the influence of energy chirp control on beam transport stability.

43 PARTICLE ACCELERATORS↗

WNR Facility Flight Path 90L Advanced Collimation Development

In November 2020, an advanced neutron beam transport and collimation system was installed and commissioned at flight path (FP) 90L within the Weapons Neutron Research (WNR) facility. This new collimation system was developed as a replacement for the legacy neutron collimation present at WNR FP90L. The need for this upgrade, design of this collimation system, installation at the experimental flight path, and results of this recent effort will be detailed.

43 PARTICLE ACCELERATORS↗

Physics Flash (Summer 2021)

The Summer 2021 issue of Physics Flash includes a note from Physics Division Leader Tanja Pietraß, Physics Division staff in the news, LANSCE neutron beam transport, novel application of 'computer vision' techniques and using pRad to visualize electromagnetic fields.

43 PARTICLE ACCELERATORS↗

Start to End Modeling of a LAMP Strawman Design- the MEBT (From exit of RFQ to entrance to DTL)

A strawman design is being put together to exercise the codes that the LAMP group has available to perform a start to end modeling of a system that includes the basic elements of LAMP. In a previous report the Start to End Modeling of a LAMP Strawman Design (From Source to end of RFQ) was presented. In this report we extend the modeling to include the next section of LAMP: the Medium Energy Beam Transport System (MEBT). The last section of LAMP, the DTL is not included in this report.

43 PARTICLE ACCELERATORS↗

Digital Twin Framework for PIP-II Linac: AI-Driven Multi-Scale Modeling from Ion Source to 800 MeV

The PIP-II linac will enable >1.2 MW beam power for DUNE, requiring unprecedented operational reliability across its warm front-end (RFQ, MEBT) and five distinct SRF sections operating at 162.5/325/650 MHz. We present a comprehensive digital twin framework uniquely combining a fully differentiable fast beam transport code with neural network surrogates trained on high-fidelity PIC simulations, capturing space charge and nonlinear dynamics beyond traditional envelope codes while achieving 10⁴ speedup at <1% accuracy. End-to-end differentiability enables gradient-based optimization across 500+ parameters simultaneously previously impossible with conventional tools while the model incorporates static/dynamic errors and serves as a virtual commissioning platform for diverse hardware integration. The framework facilitates reinforcement learning for pulsed/CW mode transitions, predictive maintenance through anomaly detection, and autonomous tuning algorithm development with real-time execution capability. Validation against physics simulations shows excellent agreement for the front-end, with initial results demonstrating potential for 30% commissioning time reduction and proactive fault mitigation, providing a scalable blueprint for operating next-generation high-intensity accelerators.

Pathak, Abhishek [Fermilab] (ORCID:000000021704208↗

Automating Orbit Correction In The Main Injector 8 GeV Line

The Main Injector 8 GeV line (MI8 line) transports beam from Fermilab s Booster accelerator to either the Booster Neutrino experiments (BNB), the Recycler or the Main Injector. Often the orbit of the beam through the MI8 line differs depending on the beam destination. The beam is collimated in the MI8 line, so increasing intensities and repetition rates make controlling orbits through the collimators a necessity. The current method of regulating the MI8 line orbit with DC corrector settings is insufficient. A system named MITUNE is being developed to sample and categorize all beams through the MI8 line and automatically calculate and apply proper dipole corrector ramps to maintain desired orbits for pulses to any destination.

Hazelwood, K. J. [Fermilab]↗

Progress on the Proton Power Upgrade at the Spallation Neutron Source

The Proton Power Upgrade Project at the Spallation Neutron Source (SNS) at Oak Ridge National Laboratory will double the proton power capability from 1.4 to 2.8 MW. This will be accomplished through an energy increase from 1.0 to 1.3 GeV and a beam current increase from 26 to 38 mA. The energy increase will be accomplished through the addition of 7 cryomodules to the linear accelerator (Linac). The beam current increase will be supported by upgrading several radio-frequency systems in the normal-conducting section of the Linac. Upgrades to the accumulator ring injection and extraction regions will accommodate the increase in beam energy. A new 2-MW-capable target and supporting systems will be developed and installed. Conventional facility upgrades include build-out of the existing klystron gallery and construction of a tunnel stub to facilitate future beam transport to the second target station. The project received approval to proceed with construction in October 2020. Procurements are in progress, and some installation activities have already occurred. Most of the installation will take place during three outages in 2022-2023. The project early finish is planned for 2025.

Barbier, Charlotte↗

Progress towards the completion of the proton power upgrade project

The Proton Power Upgrade project at the Spallation Neutron Source at Oak Ridge National Laboratory will increase the proton beam power capability from 1.4 to 2.8 MW. Upon completion in early 2025, 2 MW of beam power will be available for neutron production at the existing first target station (FTS) with the remaining beam power available for the future second target station (STS). The project has installed seven superconducting radio-frequency (RF) cryomodules and supporting RF power systems to increase the beam energy by 30% to 1.3 GeV, and the beam current will be increased by 50%. The injection and extraction region of the accumulator ring are being upgraded, and a new 2 MW mercury target has been developed along with supporting equipment for high-flow gas injection to mitigate cavitation and fatigue stress. The first four cryomodules and supporting systems were commissioned in 2022-2023 and supported neutron production at 1.05 GeV, 1.7 MW with high reliability. The first-article 2 MW target was operated successfully for approximately 4400 MW-Hours over two run periods. The long outage began in August 2023 for installation of the remaining technical equipment and construction of the Ring-to-Target Beam Transport tunnel stub that will enable connection to the STS without interrupting operation of the FTS. The upgrade is proceeding on-schedule and on-budget, and resumption of neutron production for the user program is planned for July 2024.

Champion, Mark↗

Digital Twin Framework for PIP-II Linac: AI-Driven Multi-Scale Modeling from Ion Source to 800 MeV

The PIP-II linac will enable >1.2 MW beam power for DUNE, requiring unprecedented operational reliability across its warm front-end (RFQ, MEBT) and five distinct SRF sections operating at 162.5/325/650 MHz. We present a comprehensive digital twin framework uniquely combining a fully differentiable fast beam transport code with neural network surrogates trained on high-fidelity PIC simulations, capturing space charge and nonlinear dynamics beyond traditional envelope codes while achieving 10⁴× speedup at <1% accuracy. End-to-end differentiability enables gradient-based optimization across 500+ parameters simultaneously—previously impossible with conventional tools—while the model incorporates static/dynamic errors and serves as a virtual commissioning platform for diverse hardware integration. The framework facilitates reinforcement learning for pulsed/CW mode transitions, predictive maintenance through anomaly detection, and autonomous tuning algorithm development with real-time execution capability. Validation against physics simulations shows excellent agreement for the front-end, with initial results demonstrating potential for 30% commissioning time reduction and proactive fault mitigation, providing a scalable blueprint for operating next-generation high-intensity accelerators.

Pathak, Abhishek [Fermilab] (ORCID:000000021704208↗

On the role of ion temperature gradient turbulence in driving ion thermal transport in neutral beam injection-heated L-mode plasmas in a superconducting tokamak

In this paper, we report a detailed experimental study of the role of ion-temperature-gradient driven turbulence in driving ion thermal transport in neutral beam injection (NBI)-heated L-mode plasmas in Experimental Advanced Superconducting Tokamak (EAST) (Wan et al 2000 Nucl. Fusion 40 1057) coupled with linear and nonlinear gyrokinetic simulations. Significant ion-scale turbulence k ⟂ < cm −1 (k ⟂ < 1.5, where k ⟂ where is the perpendicular wavenumber and ρ s is the ion gyroradius calculated using local electron temperature T e ), measured with a microwave reflectometer, is observed in the plasma core at for r/a ≈ 0.265 and 0.5 (where r is half the diameter of the closed flux surface at a given radial position, and a is half the diameter of the last closed flux surface). Local linear stability analysis with experimental equilibrium quantities at these two radial locations using the GS2 gyrokinetic code shows that the most unstable ion-scale micro-instability is the ion temperature gradient (ITG) mode. Since the computed maximum ion-scale linear growth rates are larger than the local Waltz-Miller E × B shearing rate (Waltz and Miller 1999 Phys. Plasmas 6 4265), the E × B shear is unable to suppress ion-scale turbulence, consistent with the experimental observation of ion-scale turbulence. Experimental ion and electron thermal transports, calculated with power balance analysis, are both anomalous with ion thermal transport being the dominant channel. Nonlinear gyrokinetic simulations using the electrostatic global particle-in-cell gyrokinetic tokamak simulation (GTS) code (Weixing Wang et al 2010 Phys. Plasmas 17 072511) show good quantitative agreement between predicted ion thermal transport and that from the power balance analysis. These results demonstrate for the first time the important role of ITG turbulence in driving thermal transport in NBI-heated L-mode plasmas in EAST, showing the effectiveness of GTS code in simulating electrostatic turbulence in EAST and the need of suppressing ITG turbulence to improve energy confinement in EAST.

Sun, P. J. [Chinese Academy of Sciences (CAS), Hef↗

Lattice Design of the Beam Transfer Line (BTL) from PIP-II LINAC to the Booster at Fermilab

PIP-II beam transfer line (BTL) to transport the beam from PIP-II Linac to the Booster ring at Fermilab. The latest design eliminates rolling the dipoles in the beam line to cross over the Tevatron tunnel. Also re-designed is the lattice in the region of the Booster Injection to meet the request of the civil construction needs and accommodate the constrains of the Booster injection request. A beam line to the beam absorber (BAL) is designed based on the request from the results of Mars simulations and ANASYS calculation of the absorber. Simulations with dipole and quadrupole field errors for the Beam Transport Line (BTL) to the Booster, which provides the specifications for all the magnets and Power supplies, will be presented too.

43 PARTICLE ACCELERATORS↗

Transport of kJ-laser-driven relativistic electron beams in cold and shock-heated vitreous carbon and diamond

We report experimental results on relativistic electron beam (REB) transport in a set of cold and shock-heated carbon samples using the high-intensity kilojoule-class OMEGA EP laser. The REB energy distribution and transport were diagnosed using an electron spectrometer and x-ray fluorescence measurements from aCu tracer buried at the rear side of the samples. The measured rear REB density shows brighter and narrower signals when the targets were shock-heated. Hybrid PIC simulations using advanced resistivity models in the target warm-dense-matter (WDM) conditions confirm this observation. We show that the resistivity response of the media, which governs the self generated resistive fields, is of paramount importance to understand and correctly predict the REB transport.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗