Search NASA⌕ Search

SEARCH · Search NASA

Results for “CONSULTANTS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Industry and government perspectives on First Nations' participation in the British Columbia environmental assessment process

Research was conducted with West Moberly First Nations, Halfway First Nation and the Treaty 8 Tribal Association (located in northeastern British Columbia, Canada) on effective engagement in environmental assessment processes. As part of this research, we examined the perspectives of a subset of resource industry proponents and their consultants, as well as staff from the British Columbia Environmental Assessment Office on their experiences with the requirement to consult with Canada's indigenous peoples. Research into the perspectives of industry proponents and consultants is almost non-existent, yet industry and governments are key participants within environmental assessments. This research found that industry proponents were disenfranchised by the British Columbia environmental assessment process and its mechanisms for consulting with First Nations, and that they sought changes to that process. Their concerns and their implications are documented and some recommendations are offered for addressing those concerns. Understanding industry and government views on First Nations engagement could suggest not only potential improvements in EA processes that facilitate all parties but provide common grounds for mutually engaging to resolve challenges.

54 ENVIRONMENTAL SCIENCES↗

Gaps in Radiation Therapy Awareness: Results From an Educational Multi-institutional Survey of US Internal Medicine Residents

Purpose: Internists and primary care providers play a growing role in cancer care. We therefore evaluated the awareness of radiation therapy in general and specifically the clinical utility of stereotactic body radiation therapy (SBRT) for early-stage non-small cell lung cancer (NSCLC) among current US internal medicine residents. Methods and Materials: A web-based institutional review board–approved multi-institutional survey was distributed to US internal medicine residency programs. The survey evaluated trainee demographic characteristics, baseline radiation oncology awareness, knowledge of the role of SBRT for early-stage NSCLC, and whether the survey successfully improved awareness. Results: Thirty US internal medicine programs participated, with an overall participant response rate of 46% (1177 of 2551). Of the trainees, 93% (n=1076) reported no radiation oncology education in their residency, 39% (n=452) reported confidence in knowing when to consult radiation oncology in an oncologic emergency, and 26% (n=293) reported confidence in knowing when to consult radiation oncology in the setting of a newly diagnosed cancer. Of the participants, 76% (n=850) correctly identified that surgical resection is the standard treatment in operable early-stage NSCLC, but only 50% (n=559) of participants would recommend SBRT to a medically inoperable patient, followed by 31% of participants (n=347) who were unsure of the most appropriate treatment, and 10% (n=117) who recommended waiting to offer palliative therapy. Ninety percent of participants (n=1029) agreed that they would benefit from further training on when to consult radiation oncology. Overall, 96% (n=1072) indicated that the survey increased their knowledge and awareness of the role of SBRT. Conclusions: The majority of participating trainees received no education in radiation oncology in their residency, reported a lack of confidence regarding when to consult radiation oncology, and overwhelmingly agreed that they would benefit from further training. These findings should serve as a call to increase the educational collaboration between internal medicine and radiation oncology departments to ensure optimal cancer care.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

LLE Diagnostic Resource Team for Innovative Fusion Concepts (Final Report)

The LLE Diagnostic Resource Team for Innovative Fusion Concepts provided travelling neutron diagnostics, consultancy on neutron diagnostics, and consultancy on tritium handling to fusion companies. An existing neutron detector was recalibrated for low yields and two detectors were built based on designs proven on the Omega Laser Facility. The three detectors allow measurements over a wide range of yields (from 10 to 1E7 incident neutrons). The detectors were calibrated for DD neutrons on a dedicated OMEGA shot day. Neutron detectors from the company MIFTI were also calibrated on OMEGA. MIFTI is currently using their detectors and two of our detectors on staged Z-pinch experiments at UCSD. The Team acted as consultants for the development of a liquid scintillator array to detect neutrons from muon induced fusion by NK Labs. Segments of NK Labs’ detector were tested at the LLE using radioactive sources and a DD neutron generator. The Team also acted as consultants for the design of a tritium handling system for NK Labs. A new type of neutron spectrometer was designed and built, and has completed preliminary testing.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Front-End Engineering and Design: Project Tundra Carbon Capture System (Final Report)

As the next phase of Project Tundra, Minnkota Power Cooperative (MPC) completed a front-end engineering and design (FEED) study to install a post-combustion CO 2 capture system (CCS) at the MPC operated (Square Butte Electric Cooperative-owned) Milton R. Young Station (MRYS) Unit 2 (MRY2), a 477-MW power plant fueled by North Dakota lignite. The project team completed the FEED with Fluor’s Econamine FG Plus℠ (EFG+) technology and is taking the next steps leading up to start of construction. Team members included FEED technical lead Fluor Enterprises (Fluor); owner’s engineer and balance of plant (BOP) engineer Burns & McDonnell (BMcD); leading carbon capture consultants (David Greeson Consulting, Hunt International Energy Services); environmental consultants (AECOM, Agora Environmental), other BOP engineering consultants (Golder Associates, Nels); cost-share funding agency, the North Dakota Industrial Commission (NDIC); and the Energy & Environmental Research Center (EERC). Project Tundra’s goal is to implement carbon capture, utilization, and storage (CCUS) in North Dakota, while preserving the use of lignite. Future options could lead to revitalizing legacy oil fields and creating a new CO 2 enhanced oil recovery (EOR) industry. The topic of this report is the FEED study for the carbon dioxide capture portion of Project Tundra. Building on the findings of a pre-FEED study for MRY2, the key deliverables contained in this FEED study are: a) design, costing, and performance data needed to commence project financing activities; b) engineering and material balances required to file for all project permits; and c) a final project schedule. Based on the results of the previous pre-FEED study, MPC and its team evaluated two options to provide the large amount of steam needed to operate the CCS: 1) installation of new natural gas package boilers and a new pipeline to supply natural gas to the facility and 2) extraction of steam from the existing MRYS steam turbine generator. The FEED study was performed using the package boilers option, as it was deemed to have the lowest technical risk, overall cost, and cost uncertainty. A key feature of the design, however, was the mixing the natural gas boilers’ flue gas with the MRY2 flue gas. This increased the size of the CCS system. This design also enabled the tie-in of Unit 1 flue gas for times when Unit 2 is offline. The CCS was designed to capture a combined 12,978 short tons per day (STPD) of CO 2 from the flue gases produced by the existing MRY Unit 2 along with flue gas produced by the new boiler package within the CCS. The 12,978 STPD CO 2 capture is achieved by normally processing 100% of the total available MRY Unit 2 flue gas (considering full load operation) and 100% of the boiler package flue gas, then removing 90% of the CO 2 available from the processed flue gas streams.

01 COAL, LIGNITE, AND PEAT↗

Development of Telemedicine Capabilities for a Joint US-Russian Space Biomedical Center for Training and Research

From the perspective of scheduling, some medical consultations can have asynchronous and synchronous components. Consultations frequently involve the compilation of patient data, its analysis, a consultant's report, and a real-time conference between the referring physician and the consultant. The bandwidth of the Internet with Moscow and advances in the hardware and software of personal computing now make possible telemedicine events with store-and-forward components and real-time components. These are hybrid telemedicine and this paper describes such a case.

DeBakey, Michael E.↗

Outreach to Scientists and Engineers at the Hanford Technical Library

Staff at the Hanford Technical Library has developed a suite of programs designed to help busy researchers at the Pacific Northwest National Laboratory (PNNL) make better use of library products and services. Programs include formal training classes, one-on-one consultations, and targeted email messages announcing new materials to researchers in specific fields. A staple of outreach has been to teach classes to library clients covering research tools in their fields. These classes started out in the library classroom and then expanded to other venues around PNNL. Class surveys indicated that many researchers desired a practical approach to learning rather than the traditional lecture format. The library instituted “Library Learning Day” and hosted classes in the PNNL computer training room to provide lab employees with a hands-on learning experience. Classes are generally offered at noon and lab staff attends classes on their lunch hour. Many just do not have time to spend a full hour in training. Library staff added some experimental half-hour mini classes in campus buildings geared to the projects and interests of researchers there to see if this format was more appealing. As other programs have developed librarians are teaching fewer classes but average attendance figures has remained fairly stable from 2005-2007. In summer of 2004 the library began the Traveling Librarian program. Librarians call-on groups and individuals in 24 buildings on the Richland Washington campus. Five full-time and two part-time librarians are involved in the program. Librarians usually send out email announcements prior to visits and encourage scientists and engineers to make appointments for a brief 15 minute consultation in the researcher’s own office. During the meeting lab staff learn about products or product features that can help them work more productively. Librarians also make cold calls to staff that do not request a consultation and may not be making full use of the library. Scientists and engineers who require longer sessions can arrange half-hour training appointments in the researcher’s own office or at the library. Since the program was implemented staff made 165 visits to 1249 laboratory staff including some repeat consultation requests. New acquisitions lists are sent to individuals and groups that would be interested in recent journal, database, and books purchases. These lists are topic specific and targeted to groups and individuals with an interest in the field. For example newly acquired engineering resources are targeted at engineering groups. The new acquisitions list for engineering began mid year in 2005. An analysis of circulation statistics for engineering books in fiscal year 2005, 2006, and 2007 show that circulation increased each year with 2007 circulation nearly double that of 2005. This took place when overall circulation rose in FY06 but fell slightly in FY07. Outreach strategies tailored and individualized can be effective. Offering multiple outreach options offers researchers different ways to interact with library staff and services.

99 GENERAL AND MISCELLANEOUS↗

The Pine Ridge-Mayo National Aeronautics and Space Administration Telemedicine Project: Program Activities and Participant Reactions

OBJECTIVE: To determine the response of participants to the Pine Ridge-Mayo National Aeronautics and Space Administration telemedicine project. DESIGN: We describe a 3-month demonstration project of medical education and clinical consultations conducted by means of satellite transmission. Postparticipation questionnaires and a postproject survey were used to assess the success of the activity. MATERIAL AND METHODS: Patients and employees at the Pine Ridge Indian Health Service Hospital in southwestern South Dakota and employees at Mayo Clinic Rochester participated in a telemedicine project, after which they completed exit surveys and a postproject questionnaire to ascertain the acceptability of this mode of health care. RESULTS: Almost all Pine Ridge and Mayo Clinic participants viewed the project as beneficial. The educational sessions received favorable evaluations, and almost two-thirds of the patients who completed evaluations thought the consultation had contributed to their medical care. More than 90% of the respondents from Pine Ridge and more than 85% of the respondents from Mayo Clinic Rochester said that they would recommend participation in this project to others. More than 90% of respondents from Pine Ridge and 80% of Mayo respondents agreed with the statement that the project should continue. CONCLUSION: These data suggest that a program of clinical consultation services, professional education, and patient education available by telemedicine might be viewed as beneficial.

United States Indian Health Service↗

Interactions between U.S. biofuels policy and the Endangered Species Act

The Renewable Fuel Standard (RFS) is the primary policy governing the use of biofuels in the United States. Following the 2007 enactment of the RFS, there has been substantial expansion in the use of cropland to produce biofuel feedstocks, including corn and soybeans. Both the conversion of land and the ongoing cultivation of these crops can, depending on management practices, lead to negative environmental outcomes including degraded water quality, increased water use, increased greenhouse gas emissions, and loss or degradation of wildlife habitat. These outcomes have the potential to affect threatened and endangered species protected under the U.S. Endangered Species Act (ESA). The ESA requires federal agencies to consult with the U.S. Fish and Wildlife Service or the National Marine Fisheries Service to ensure that an agency's actions are not likely to jeopardize the existence of imperiled species, nor result in the destruction or adverse modification of their habitat. However, formal consultation has not yet been completed between the U.S. Environmental Protection Agency—the agency charged with implementing the RFS—and the wildlife services, thereby hindering mitigation or remediation of potential impacts. This analysis explores the likely effects of the RFS on land use changes and critical habitat, illustrates example pathways by which threatened and endangered species may be affected, and proposes solutions to help redress this harm. The findings suggest a need for further consultation and assessment of the interactions between the RFS and ESA as well as additional research to support the species-conservation and policymaking processes.

09 BIOMASS FUELS↗

Review of potential impacts to sea turtles from underwater explosive removal of offshore structures

The purpose of this study was to collect and synthesize existing information relevant to the explosive removal of offshore structures (EROS) in aquatic environments. Data sources were organized and summarized by topic - explosive removal methods, physics of underwater explosions, sea turtle resources, documented impacts to sea turtles, and mitigation of effects. Information was gathered via electronic database searches and literature source review. Bulk explosive charges are the most commonly used technique in EROS. While the physical principles of underwater detonations and the propagation of pressure and acoustic waves are well understood, there are significant gaps in the application of this knowledge. Impacts to sea turtles from explosive removal operations may range from non-injurious effects (e.g. acoustic annoyance; mild tactile detection or physical discomfort) to varying levels of injury (i.e. non-lethal and lethal injuries). Very little information exists regarding the impacts of underwater explosions on sea turtles. Effects of explosions on turtles often must be inferred from documented effects to other vertebrates with lungs or other gas-containing organs, such as mammals and most fishes. However, a cautious approach should be used when determining impacts to sea turtles based on extrapolations from other vertebrates. The discovery of beached sea turtles and bottlenose dolphins following an explosive platform removal event in 1986 prompted the initiation of formal consultation between the U.S. Department of the Interior, Minerals Management Service (MMS) and the National Marine Fisheries Service (NMFS), authorized through the Endangered Species Act Section 7, to determine a mechanism to minimize potential impacts to listed species. The initial consultation resulted in a requirement for oil and gas companies to obtain a permit (through separate consultations on a case-by-case basis) prior to using explosives in Federal waters. Because many offshore structure removal operations are similar, a 'generic' Incidental Take Statement was established by the NMFS that describes requirements to protect sea turtles when an operator's individual charge weights did not exceed 50 lb (23 kg). Requirements associated with the Incidental Take Permit were revised in 2003 and 2006 to accommodate advances in explosive charge technologies, removals of structures in deeper waters, and adequate protection of deep water marine mammal species in Gulf of Mexico waters. Generally, these requirements include pre- and post-detonation visual monitoring using standard surface and aerial survey methods for sea turtles and marine mammals, and, in some scenarios, passive acoustic survey methods for marine mammals within a specified radius from an offshore structure. The survey program has been successful in mitigating impacts to sea turtles associated with EROS. However, even with these protective measures in place, there have been observations of sea turtles affected by explosive platform removals.

54 ENVIRONMENTAL SCIENCES↗

Design options for a bunsen reactor.

This work is being performed for Matt Channon Consulting as part of the Sandia National Laboratories New Mexico Small Business Assistance Program (NMSBA). Matt Channon Consulting has requested Sandia's assistance in the design of a chemical Bunsen reactor for the reaction of SO2, I2 and H2O to produce H2SO4 and HI with a SO2 feed rate to the reactor of 50 kg/hour. Based on this value, an assumed reactor efficiency of 33%, and kinetic data from the literature, a plug flow reactor approximately 1%E2%80%9D diameter and and 12 inches long would be needed to meet the specification of the project. Because the Bunsen reaction is exothermic, heat in the amount of approximately 128,000 kJ/hr would need to be removed using a cooling jacket placed around the tubular reactor. The available literature information on Bunsen reactor design and operation, certain support equipment needed for process operation and a design that meet the specification of Matt Channon Consulting are presented.

Moore, Robert Charles↗

Targeted Technology Transfer to US Independents

The Petroleum Technology Transfer Council (PTTC) is a unique not-for-profit network that focuses on transferring Exploration and Production (E&P) technology to the domestic oil and natural gas producing industry. PTTC connects producers, technology providers and innovators, academia, research and development (R&D) consortiums and governments. Local affordable workshops delivered by Regional Lead Organizations (RLOs), which are typically a university or geological survey, are a primary tool. PTTC also maintains a website network, issues a national newsletter, provides a column in a major trade publication, and exhibits at major industry events. It also encourages industry to ask technology-related questions, striving to find relevant answers that will save questioners significant time. Working since late 1993, the PTTC network has a proven track record of providing industry with technology insights they can apply. Volunteers at the regional and national level provide key guidance regarding where to focus technical effort and help connect PTTC with industry. At historical funding levels, PTTC had been able to hold well more than 100 workshops per year, drawing 6,000+ attendees. As funding decreased in the early 2000s, the level of activity decreased and PTTC sought a merger with the American Association of Petroleum Geologists (AAPG), becoming an AAPG-managed organization at the start of FY08. This relationship with AAPG was terminated by mutual consent in May 2011 and PTTC once again operates independently. Chris Hall, California continued to serve as Chairman of the Board of Directors until December 2013. At the time PTTC reorganized into a RLO led organization with Mary Carr and Jeremy Viscomi as co-Executive Directors. Jerry Anderson became the Chairman of the PTTC Board of Directors and Chris Hall continues to serve on the Board. Workshop activity stabilized at 55-65 workshops per year averaging 3,100 attendees. FY14 represented the fifth year in a multi-year contract with the Department of Energy (DOE) for providing technology transfer services. This report summarizes activity and results during for five years, FY10 through FY14. In FY12 changes occurred in responsibilities of consultants serving HQ, because funding was reduced below the threshold level of $500,000 audits were no longer required and consultant time was reduced on the primary contract. Contracts for Permian Carbon Capture Utilization and Storage (CCUS) training, and providing tech transfer services to the Research Partnership to Secure Energy for America (RPSEA) provided work that enabled HQ to retain services of regular consultants. Both CCUS and RPSEA were five year contracts with PTTC, and providing services for these DOE funded contracts provided synergy for PTTC and the oil and gas industry. With further decreases in DOE funding the regions conducted workshops with no PTTC funding starting in June FY11. Since 2011 the number of workshops has declined from 79 in FY10 and FY11 to 49 in FY12, and risen to 54 in FY13 and 63 in FY14. The attendee's numbers dipped slightly below 3,000 per year in FY 10, FY12, and FY13, but rose to over 3,800 in FY 11 and 3105 in FY14. Quantitative accomplishments: PTTC has maintained its unique structure of a national organization working through Regional Lead Organizations (RLOs) to deliver local, affordable workshops. During the contract period PTTC consolidated from 10 to five regions to increase efficiency, and because no active RLO's would be maintained in the Central and Eastern Gulf Coast regions. RLO's for the regions are located at: Eastern - West Virginia University, (Illinois Geol. Survey., W. Michigan Univ. FY10-12); Midwest created in FY13 - Illinois Geological Survey, W. Michigan University; Midcontinent - University of Kansas, expanded to Houston, TX (2013-14); Rocky Mountain - Colorado School of Mines; Texas/SE New Mexico (FY10-FY11) - Bureau of Economic Geology, Univ. of Texas at Austin; West Coast - Conservation Committee of California O&G Producers.

02 PETROLEUM↗

Visual Impact Assessment of the Energetic Materials Complex Construction Project on Manhattan Project–Era Historic Properties, the TA-06-0037 Concrete Bowl, and the TA-22-0001 Quonset Hut

Concern for potential visual effects to historic Manhattan Project–era properties emerged early in the planning and consultation phase for the upcoming Energetic Materials Complex (EMC) construction project. In initial discussions with project managers and design team members, resource managers became aware of the need to consider potential impacts to the viewsheds of two nearby properties that are eligible for inclusion in the Manhattan Project National Historical Park (MAPR). Resource managers recognized that viewshed characteristics important to the integrity of the Concrete Bowl (Technical Area [TA-]06-0037) and the Quonset Hut (TA-22-0001) conceivably faced the prospect of lasting and irreversible visual impacts. A strategy to gather necessary data soon emerged. The approach presented to the New Mexico State Historic Preservation Officer (SHPO) on April 7, 2021, combined gathering baseline information from field visits with a geographic information system (GIS)-supported viewshed analysis. Accordingly, results from the viewshed analysis would help resource managers determine if a more comprehensive visual impact assessment (VIA) would be needed. If necessitated by the outcome of the GIS viewshed analysis, initial consultation with the SHPO specified the production of a VIA that would explore any potential visual adverse impacts to the Concrete Bowl and the Quonset Hut. Cultural resources and GIS specialists with the Laboratory performed a viewshed analysis shortly after consultation with the SHPO. The analysis indicated a high likelihood that at least one of the two Manhattan Project–era properties would experience at least a minimal level of visual impact and that a VIA would be needed. The resulting analysis provides a description of the undertaking, an account of the properties affected along with an evaluation of historical significance, an examination of potential visual impacts, and a determination of effect to the identified historic properties.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

U.S. Department of Energy-National Lab Equity Summit: Grid Planning and Operations (Workshop Report)

This report summarizes the U.S. DOE and national laboratories equity summit that was held on February 5, 2024, and focused on grid planning and operations. The objectives of the summit were to connect DOE and lab researchers working on grid-related equity issues, share information on current and planned grid-related equity projects and initiatives, and inspire and educate participants by hearing from our panelists about solutions and challenges to integrating equity in grid planning and operations. The summit included two panels of industry leaders. The first was a state and community perspectives panel that included representatives from a state public utility commission (Oregon Public Utility Commission), a state energy office (Washington Department of Commerce), a state utility consumer advocate (Connecticut Consumer Counsel), and industry consultants (Elevated Engagement and ArkSpring Consulting). Panelists shared successes they have seen, critical challenges related to equity and grid planning and operations, and other considerations. The second panel addressed utility perspectives and included representatives from two utilities (Commonwealth Edison and Tacoma Power), the National Rural Electric Cooperative (NRECA), and a former utility employee and legal consultant. Panelists discussed the role of the utility concerning equity, the most significant technical and data modeling needs and opportunities, and the role the labs could help advance equity in grid planning and operations. There was also a session on partner organization presentations. Argonne National Laboratory made a short presentation on the Grid Modernization Laboratory Consortium (GMLC) project they are leading on equity-informed power system planning. NARUC, NASEO, and the Clean Energy States Alliance, as partners of the GMLC project also shared updates on relevant activities and resources. During the summit, there were two rounds of lightning presentations by national labs and DOE highlighting research that addresses equity and grid planning and operations (Tables 5 and 6 and slides in the Appendix). The goal of the lightning rounds was to share information between participants to encourage collaboration and leverage ongoing research at labs and DOE. The summit included two interactive exercises where summit participants shared their perspectives on relevant equity projects and initiatives (Table 2), key challenges regarding equity and grid planning and operations (Table 3), and promising innovations or progress (Table 4). At the end of the session, participants were asked to share essential insights from the event (Table 7) and an action they plan to take as a result of the event. Participants agreed that the event was useful in helping them share and learn from each other. The project team plans to use the information from the summit as a starting point to help inform future research and technical assistance. In 2026, another Equity Summit will be held (virtually or in person) as part of the same project to help raise awareness and disseminate research and resources completed during the project's duration.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Determining economic benefits of satellite data in short-range forecasting

The chances of enhanced short term weather predictions and economic benefits from the use of GOES satellite data were examined. Results for a meteorological consulting firm before and after the introduction of GOES data were chosen as the method, and monetary benefits were selected as the measure. Services were provided for use by road and street departments, commodities dealers, and marine clients of the consulting firm. The Man-computer Interactive Data Access Program (McIDAS) was employed to furnish 1/2 hour visual or IR imagery for remote access. The commodities clients reconnected the GOES real-time imagery once the study was completed, while the consulting firm, which was personnel and not equipment intensive, did not. Further development of the flexibility of access to the GOES data and improvements in the projected grids are indicated.

Suchman, D.↗

US Participation in the GOME and SCIAMACHY Projects

This report summarizes research done under NASA Grant NAGW-2541 through September 30, 1997. The research performed under this grant includes development and maintenance of scientific software for the GOME retrieval algorithms, consultation on operational software development for GOME, sensitivity and instrument studies to define GOME and SCIAMACHY instruments, consultation on optical and detector issues for both GOME and SCIAMACHY, consultation and development for SCIAMACHY near-real-time (NRT) and off-line (OL) data products, and development of infrared line-by-line atmospheric modeling and retrieval capability for SCIAMACHY. The European Space Agency selected the SAO to participate in GOME validation and science studies, part of the overall ERS AO. This provided access to all GOME data; The SAO activities that are carried out as a result of selection by ESA were funded by the present grant. The Global Ozone Monitoring Experiment was successfully launched on the ERS- 2 satellite on April 20, 1995, and remains working in normal fashion. SCIAMACHY is currently scheduled for launch in early 2000. The first two European ozone monitoring instruments (OMI), to fly on the q series of operational meteorological satellites being planned by Eumetsat, have been selected to be GOME-type instruments (the first, in fact, will be the refurbished GOME flight spare). K. Chance is the U.S. member of the OMI Users Advisory Group.

Chance, K. V.↗

Aerospace Safety Advisory Panel

This report covers the activities of the Aerospace Safety Advisory Panel (ASAP) for calendar year 1998-a year of sharp contrasts and significant successes at NASA. The year opened with the announcement of large workforce cutbacks. The slip in the schedule for launching the International Space Station (ISS) created a five-month hiatus in Space Shuttle launches. This slack period ended with the successful and highly publicized launch of the STS-95 mission. As the year closed, ISS assembly began with the successful orbiting and joining of the Functional Cargo Block (FGB), Zarya, from Russia and the Unity Node from the United States. Throughout the year, the Panel maintained its scrutiny of NASA's safety processes. Of particular interest were the potential effects on safety of workforce reductions and the continued transition of functions to the Space Flight Operations Contractor. Attention was also given to the risk management plans of the Aero-Space Technology programs, including the X-33, X-34, and X-38. Overall, the Panel concluded that safety is well served for the present. The picture is not as clear for the future. Cutbacks have limited the depth of talent available. In many cases, technical specialties are 'one deep.' The extended hiring freeze has resulted in an older workforce that will inevitably suffer significant departures from retirements in the near future. The resulting 'brain drain' could represent a future safety risk unless appropriate succession planning is started expeditiously. This and other topics are covered in the section addressing workforce. The major NASA programs are also limited in their ability to plan property for the future. This is of particular concern for the Space Shuttle and ISS because these programs are scheduled to operate well into the next century. In the case of the Space Shuttle, beneficial and mandatory safety and operational upgrades are being delayed because of a lack of sufficient present funding. Likewise, the ISS has little flexibility to begin long lead-time items for upgrades or contingency planning. For example, the section on computer hardware and software contains specific findings related to required longer range safety-related actions. NASA can be proud of its accomplishments this past year, but must remain ever vigilant, particularly as ISS assembly begins to accelerate. The Panel will continue to focus on both the short- and long-term aspects of risk management and safety planning. This task continues to be made manageable and productive by the excellent cooperation the Panel receives from both NASA and its contractors. Particular emphasis will continue to be directed to longer term workforce and program planning issues as well as the immediate risks associated with ISS assembly and the initial flights of the X-33 and X-34. Section 2 of this report presents specific findings and recommendations generated by ASAP activities during 1998. Section 3 contains more detailed information in support of these findings and recommendations. Appendix A is a current roster of Panel members, consultants, and staff. Appendix B contains NASA's response to the findings and recommendations from the 1997 ASAP Annual Report. Appendix C details the fact-finding activities of the Panel in 1998. During the year, Mr. Richard D. Blomberg was elected chair of the Panel and Vice Admiral (VADM) Robert F Dunn was elected deputy chair. VADM Bernard M. Kauderer moved from consultant to member. Mr. Charles J. Donlan retired from the Panel after many years of meritorious service. Ms. Shirley C. McCarty and Mr. Robert L. ('Hoot') Gibson joined the Panel as consultants.

Source record↗

The Center Master Plan For NASA Glenn Research Center

The Center Master Plan for NASA Glenn Research Center is a comprehensive survey of NASA Glenn's current facility assets and a vision of how we see the facilities will change over the next 20 years in order to support the changing NASA Mission. This Center Master Plan is a vital management tool used by all organizations for making near term decisions and in future planning. During the summer of 2004, I worked with Joseph Morris, the Chief Architect in the Facilities Division, on beginning this Center Master Planning Process. The previous Master Plan was completed by the Center in 1985 and contained general information on the background of the facility as well as maps detailing environmental and historic records, land use, utilities, etc. The new Master Plan is required for the Center by NASA headquarters and will include similar types of information as used in the past. The new study will provide additional features including showing how individual buildings are linked to the programs and missions that they serve. The Master Plan will show practical future options for the facility s assets with a twenty year look ahead. The Plan will be electronically retrievable so that it becomes a communications tool for Center personnel. A Center Master Plan, although required, is very beneficial to NASA Glenn Research Center in aiding management with the future direction of the campus. Keeping up-to-date information and future plans readily available to all of NASA Glenn will insure that future real property development efficiently and effectively supports the missions camed out and supported by the Center. A Center Master Plan will also facilitate coordination with Center supported programs, stakeholders, and customers. In addition, it will provide a basis for cooperative planning with local and other governmental organizations and ultimately ensure that future budgets include the Center program needs described in the plan. This will ensure that development plans are safe, practical, and cost effective. To properly formulate any future plans, background information and research are required. Before bringing in a consultant to tackle the three year process anticipated to prepare a Center Master Plan, my job was to gather information on different organizations contributions to the NASA mission, their facility needs, consistent trends they observe, etc. I conducted numerous interviews with personnel such as Directorate Representatives, Division Chiefs, Branch Chiefs, System Managers and Building Managers. I documented the information I received from them for future use. I used the information to create various color-coded maps layering the different data. This was done with the ending objective being to collect the information and place it in a database that will be linked with Aperture (a computer program that generates color-coded map layers from database information) and made electronically retrievable to the Planning Consultant, NASA personnel, program stakeholders, and other governmental agencies. My goal this summer was to gather information and ideas appropriate for use in NASA Glenn Research Center s Master Plan and organize them for future application by the Planning Consultant. By the end of the summer, after completion of my goal, I will utilize my knowledge and create an array of preliminary future plans for the facility that can be passed along as a guidance tool.

Bigach, Kristin M.↗

The NASA Engineering and Safety Center (NESC) GN and C Technical Discipline Team (TDT): Its Purpose, Practices and Experiences

This paper will briefly define the vision, mission, and purpose of the NESC organization. The role of the GN&C TDT will then be described in detail along with an overview of how this team operates and engages in its objective engineering and safety assessments of critical NASA projects. This paper will then describe key issues and findings from several of the recent GN&C-related independent assessments and consultations performed and/or supported by the NESC GN&C TDT. Among the examples of the GN&C TDT s work that will be addressed in this paper are the following: the Space Shuttle Orbiter Repair Maneuver (ORM) assessment, the ISS CMG failure root cause assessment, the Demonstration of Autonomous Rendezvous Technologies (DART) spacecraft mishap consultation, the Phoenix Mars lander thruster-based controllability consultation, the NASA in-house Crew Exploration Vehicle (CEV) Smart Buyer assessment and the assessment of key engineering considerations for the Design, Development, Test & Evaluation (DDT&E) of robust and reliable GN&C systems for human-rated spacecraft.

Dennehy, Cornelius J.↗