Search NASA⌕ Search

SEARCH · Search NASA

Results for “COST PROGRAM”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Space shuttle phase B. Volume 2: Technical summary, addendum A

A study was conducted to analyze the characteristics and performance data for the booster vehicles to be used with the space shuttle operations. It was determined that the single pressure-fed booster offered the lowest program cost per flight of the pressure-fed booster arrangements studied. The fly back booster required the highest peak annual funding and highest program cost. It was recommended that the pressure-fed booster, series burn with liquid oxygen phase, be continued for further study. The flyback booster study was discontinued. Both solid and liquid propelled booster vehicles with 14 by 45 foot and 15 by 60 foot payload orbiters were considered.

Source record↗

Evaluating technology upgrades as a complement to traditional bill assistance programs

State programs to improve energy affordability and reduce energy burden (the share of income spent on energy) could mitigate concerns about rising electricity prices. Many states offer bill assistance and rebates for weatherization and rooftop solar to income-qualifying households. Here, we analyse how these approaches may complement one another to improve energy affordability. Results illustrate trade offs between program costs and energy burden reduction, as well as between a program’s upfront and ongoing costs. Generally, the three strategies complement one another to improve energy affordability at lower net present cost than bill assistance alone, with varying effects across regions. Weatherization can reduce the solar installation capacity needed, and both together can reduce or eliminate ongoing reliance on bill assistance. Under full uptake among cost-effective households, fully rebated weatherization and solar rebated at $0.48/Watt, combined with bill assistance, yield the same modelled net present cost as bill assistance alone while reducing the share of low-income owner-occupied households with high energy burdens from 66% to 19%, compared with 34% under bill assistance alone. Absent tax credits, weatherization still reduces energy burden and bill assistance program costs, whereas solar may not be cost-competitive.

Forrester, Sydney P↗

Analysis of advanced programs (Study 2.3). Volume 1: Executive summary

An analysis of advanced programs for space missions is presented. The subjects discussed are (1) alternate space shuttle configurations, (2) space transportation systems, (3) computer programs and methodology to estimate program cost implications of space vehicle program uncertainties, (4) vehicle synthesis program, (5) relative effectiveness of various proposals for space vehicles, and (6) cost analysis of solid propellant rocket engine program to support space shuttle vehicle.

Source record↗

Designing for Maintainability and System Availability

The final goal for a delivered system (whether a car, aircraft, avionics box or computer) should be its availability to operate and perform its intended function over its expected design life. Hence, in designing a system, we cannot think in terms of delivering the system and just walking away. The system supplier needs to provide support throughout the operating life of the product. Here, supportability requires an effective combination of reliability, maintainability, logistics and operations engineering (as well as safety engineering) to have a system that is available for its intended use throughout its designated mission lifetime. Maintainability is a key driving element in the effective support and upkeep of the system as well as providing the ability to modify and upgrade the system throughout its lifetime. This paper then, will concentrate on maintainability and its integration into the system engineering and design process. The topics to be covered include elements of maintainability, the total cost of ownership, how system availability, maintenance and logistics costs and spare parts cost effect the overall program costs. System analysis and maintainability will show how maintainability fits into the overall systems approach to project development. Maintainability processes and documents will focus on how maintainability is to be performed and what documents are typically generated for a large scale program. Maintainability analysis shows how trade-offs can be performed for various alternative components. The conclusions summarize the paper and are followed by specific problems for hands-on training.

Lalli, Vincent R.↗

Modular space station Phase B extension NASA administrator's review

The preliminary design, reference program, costs, and sortie and program options for the modular space station are outlined. The Phase B has a barbell configuration baseline with a manipulator. The baseline includes two capability plateaus, a 6-man station followed after five years by growth to a 12-man station. It is concluded that a common development approach is the most cost effective and flexible system. The system includes a module to support automated payload servicing, a set of sortie labs, and the cargo modules, RAMs, and space station modules. These would be developed and operated in conjunction with the space shuttle.

Source record↗

Operations analysis (study 2.1). Volume 1: Executive summary

Subjects related to future STS operations concepts were investigated. The majority of effort was directed at assessing the benefits of automated space servicing concepts as related to improvements in payload procurement and shuttle utilization. Another subject was directed at understanding shuttle upper stage software development and recurring costs relative to total program projections. Space serving of automated payloads is addressed by examining the broad spectrum of payload applications with the belief that shared logistic operations will be a major contributor to reduction of future program costs. However, there are certain requirements for support of payload operations, such as availability of the payload, that may place demands upon the shuttle fleet. Because future projections of the NASA Mission Model are only representative of the payload traffic, it is important to recognize that it is the general character of operations that is significant rather than service to any single payload program.

Wolfe, R. R.↗

Virginia Solar Pathways Project: Economic Study of Utility-Administered Solar Programs: Soft Costs, Community Solar, and Tax Normalization Considerations

This report presents economic considerations for solar development in support of the Virginia Solar Pathways Project (VSPP), an effort funded by the U.S. Department of Energy (DOE) SunShot Initiative that seeks to develop a collaborative utility-administered solar strategy for the Commonwealth of Virginia. The results presented are intended to be considered alongside the results of other studies conducted under the VSPP that evaluate the impacts of solar energy on the electric distribution, transmission, and generation systems in Virginia.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Research Performance Progress Report - DOE Solar Program, Soft Costs, National Lab Projects: Promotion of PV Soft Cost Reductions in the Southeastern US

Beginning in 2014, the installed solar capacity in South Carolina (SC) grew from less than 20 megawatts to more than 300 megawatts today. Concurrently, the number of customer-sited, load-centered solar generation is expected to grow from less than 500 statewide to as many as 10,000 by 2021. This growth is the direct result of a landmark state policy initiative, Act 236, passed by the South Carolina General Assembly and signed into law by the Governor in June of 2014. Today, local policy makers in South Carolina are ill-equipped to handle the onslaught of solar permitting and zoning requests expected to come with such quick growth of an emerging market. Similarly, the state’s building inspectors, first responders, and tax assessors know little about photovoltaic (PV) technology and best practices. Finally, South Carolina’s workforce and workforce trainers continue to be underprepared to benefit from the tremendous opportunity created by the passage of Act 236. Each of these deficits in knowledge of and preparedness for solar PV translates into higher “soft costs” of installed solar PV in South Carolina.

14 SOLAR ENERGY↗

Modular space station Phase B extension

The modular space station concept and preliminary design are outlined. The premission operations, reference programs, baseline program costs, sortie analysis, and program options are covered.

Cole, E. G.↗

Life support system definition for a low cost shuttle launched space station.

Discussion of the tradeoffs and EC/LS definition for a low cost shuttle launched space station to be launched in the late 1970s for use as a long-term manned scientific laboratory. The space station consists of 14-ft-diam modules, clustered together to support a six-man crew at the initial space station (ISS) level and a 12-man crew at the growth space station (GSS) level. Key design guidelines specify low initial cost and low total program cost and require two separate pressurized habitable compartments with independent lift support capability. The methodology used to select the EC/LS design consisted of systematically reducing quantitative parameters to a common denominator of cost. This approach eliminates many of the inconsistencies that can occur in such decision making. The EC/LS system selected is a partially closed system which recovers urine, condensate, and wash water and concentrates crew expired CO2 for use in a low thrust resistojet propulsion system.

Nelson, W. G.↗

Earth Observatory Satellite system definition study. Report 3: Design cost trade-off studies and recommendations

An analysis of the design and cost tradeoff aspects of the Earth Observatory Satellite (EOS) development is presented. The design/cost factors that affect a series of mission/system level concepts are discussed. The subjects considered are as follows: (1) spacecraft subsystem cost tradeoffs, (2) ground system cost tradeoffs, and (3) program cost summary. Tables of data are provided to summarize the results of the analyses. Illustrations of the various spacecraft configurations are included.

Source record↗

Payload specialist station study. Volume 3: Program study cost estimates. Part 1: Work breakdown structure

The work breakdown structure (WBS) for the Payload Specialist Station (PSS) is presented. The WBS is divided into two elements--PSS contractor and mission unique requirements. In accordance with the study ground rules, it is assumed that a single contractor, hereafter referred to as PSS Contractor will perform the following: (1) provide C and D hardware (MFDS and elements of MMSE), except for GFE; (2) identify software requirements; (3) provide GSE and ground test software; and (4) perform systems engineering and integration in support of the Aft Flight Deck (AFD) C and D concept. The PSS Contractor WBS element encompasses a core or standardized PSS concept. Payload peculiar C and D requirements identified by users will originate as a part of the WBS element mission unique requirements; these requirements will be provided to the PSS Contractor for implementation.

Source record↗

NECAP 4.1: NASA's Energy Cost Analysis Program thermal response factor routine

A thermal response factor is described and calculation sequences and flowcharts for RESFAC2 are provided. RESFAC is used by NASA's (NECAP) to calculate hourly heat transfer coefficients (thermal response factors) for each unique delayed surface. NECAP uses these response factors to compute each spaces' hourly heat gain/loss.

Weise, M. R.↗

Beyond Widgets -- Systems Incentive Programs for Utilities

Utility incentive programs remain one of the most significant means of deploying commercialized, but underutilized building technologies to scale. However, these programs have been largely limited to component-based products (e.g., lamps, RTUs). While some utilities do provide ‘custom’ incentive programs with whole building and system level technical assistance, these programs require deeper levels of analysis, resulting in higher program costs. This results in custom programs being restricted to utilities with greater resources, and are typically applied mainly to large or energy-intensive facilities, leaving much of the market without cost effective access and incentives for these solutions. In addition, with increasingly stringent energy codes, cost effective component-based solutions that achieve significant savings are dwindling. Building systems (e.g., integrated façade, HVAC and/or lighting solutions) can deliver higher savings that translate into large sector-wide savings if deployed at the scale of these programs. However, systems application poses a number of challenges – baseline energy use must be defined and measured; the metrics for energy and performance must be defined and tested against; in addition, system savings must be validated under well understood conditions. This paper presents a sample of findings of a project to develop validated utility incentive program packages for three specific integrated building systems, in collaboration with Xcel Energy (CO, MN), ComEd, and a consortium of California Public Owned Utilities (CA POUs) (Northern California Power Agency(NCPA) and the Southern California Public Power Authority(SCPPA)). Furthermore, these program packages consist of system specifications, system performance, M&V protocols, streamlined assessment methods, market assessment and implementation guidance.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗