Search NASA⌕ Search

SEARCH · Search NASA

Results for “Fire Protection”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Empirical profiling of cold hydrogen plumes formed from venting of LH 2 storage vessels

Liquid hydrogen (LH 2 ) storage is viewed as a viable approach to assure sufficient hydrogen capacity at commercial fuelling stations. Presently, LH 2 is produced at remote facilities and then transported to the end-use site by road vehicles (i.e., LH 2 tanker trucks). Venting of hydrogen to depressurize the transport storage tank is a routine part of the LH 2 delivery and site transfer process. The behavior of cold hydrogen plumes has not been well characterized because of the sparsity of empirical field data, which can lead to overly conservative safety requirements. Committee members of the National Fire Protection Association (NFPA) Standard 2 [1] formed the Hydrogen Storage Safety Task Group, which consists of hydrogen producers, safety experts, and computational fluid dynamics modellers, has identified the lack of understanding of hydrogen dispersion during LH 2 venting of storage vessels as a critical gap for establishing safety distances at LH 2 facilities, especially commercial hydrogen fuelling stations. To address this need, the National Renewable Energy Laboratory Sensor Laboratory, in collaboration with the NFPA Hydrogen Storage Task Group, developed a prototype Cold Hydrogen Plume Analyzer to empirically characterize the hydrogen plume formed during LH 2 storage tank venting. The prototype analyzer was field deployed during an actual LH 2 venting process. Critical findings included: hydrogen above the lower flammable limit (LFL) was detected as much as 2 m lower than the release point, which is not predicted by existing models; personal monitors detected hydrogen at ground level, although at levels below the LFL; a small but inconsistent correlation was found between oxygen depletion and the hydrogen concentration; a negligible to non-existent correlation was found between in-situ temperature measurements and the hydrogen concentration. The prototype analyzer is being upgraded for enhanced metrological capabilities, including improved real-time spatial and temporal profiling of hydrogen plumes and tracking of prevailing weather conditions. Additional deployments are planned to monitor plume behavior under different wind, humidity, and temperature conditions. The data will be shared with the Hydrogen Storage Task Group and ultimately will be used support theoretical models and code requirements prescribed in NFPA 2.

08 HYDROGEN↗

Sandia National Laboratories, California Chemical Management Program Annual Report

The annual program report provides detailed information about all aspects of the Sandia National Laboratories, California (SNL/CA) Chemical Management Program. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. This program annual report describes the activities undertaken during the calender past year, and activities planned in future years to implement the Chemical Management Program, one of six programs that supports environmental management at SNL/CA. SNL/CA is responsible for tracking chemicals (chemical and biological materials), providing Material Safety Data Sheets (MSDS) and for regulatory compliance reporting according to a variety of chemical regulations. The principal regulations for chemical tracking are the Emergency Planning Community Right-to-Know Act (EPCRA) and the California Right-to-Know regulations. The regulations, the Hazard Communication/Lab Standard of the Occupational Safety and Health Administration (OSHA) are also key to the CM Program. The CM Program is also responsible for supporting chemical safety and information requirements for a variety of Integrated Enabling Services (IMS) programs primarily the Industrial Hygiene, Waste Management, Fire Protection, Air Quality, Emergency Management, Environmental Monitoring and Pollution Prevention programs. The principal program tool is the Chemical Information System (CIS). The system contains two key elements: the MSDS library and the chemical container-tracking database that is readily accessible to all Members of the Sandia Workforce. The primary goal of the CM Program is to ensure safe and effective chemical management at Sandia/CA. This is done by efficiently collecting and managing chemical information for our customers who include Line, regulators, DOE and ES and H programs to ensure compliance with regulations and to streamline customer business processes that require chemical information.

54 ENVIRONMENTAL SCIENCES↗

2012 Emergency Response Capability BNA Compliance Assessment

This document was prepared by John A. Sharry, LLNL Fire Marshal and Division Leader for Fire Protection and was reviewed by LLNL Emergency Management Department Head, James Colson. This document is the second of a two-part analysis of Emergency Response Capabilities of Lawrence Livermore National Laboratory. The first part, 2009 Baseline Needs Assessment Requirements Document established the minimum performance criteria necessary to meet mandatory requirements. This second part analyses the performance of Lawrence Livermore Laboratory Emergency Management Department to the contents of the Requirements Document.

99 GENERAL AND MISCELLANEOUS↗

Safety-Class Uninterruptable Power Supply General Contractor for the TA-55 TRP II Project: REQUEST FOR QUALIFICATION No. ADPM-002 - PREQUALIFICATION CRITERIA

LANS is seeking to establish qualified suppliers for the procurement and construction of a Safety-Class Uninterruptable Power Supply (UPS) facility in accordance with ASME NQA-1 2008 and 2009 addenda. This scope includes Work required to construct a new UPS facility at Technical Area (TA)-55 including procurement, construction, installation, and post installation testing of all structures, systems, and equipment (e.g., foundations, concrete, structural steel, building components, HVAC, fire protection, site utilities) excluding the UPS system itself. Design of the facility and associated infrastructure are provided by LANL. Final design of the UPS system will be provided by the UPS Integrator under separate contract. Procurement of all safety-related components (specified by LANL) must be in accordance with NQA-1 and must be purchased from qualified suppliers that have an NQA-1 program or through Commercial Grade Dedication (CGD) in accordance with NQA-1a-2009, Subpart 2.14. The SUBCONTRACTOR shall plan, schedule, coordinate, test, inspect and assure effective performance of all aspects of the Work as described herein.

42 ENGINEERING↗

Safety-Class Uninterruptable Power Supply Integrator for the TA-55 TRP II Project: REQUEST FOR QUALIFICATION No. ADPM-001 - PREQUALIFICATION CRITERIA

LANS is seeking to establish qualified suppliers for the detailed design and installation of a Safety-Class, Class 1E Uninterruptable Power Supply (UPS) system in accordance with ASME NQA-1 2008 and 2009 addenda and IEEE Std. 344, respectively. This scope includes all activities from detailed design of the UPS through procurement, installation, post installation testing, and dedication (as required) at Technical Area (TA)-55. Design, procurement, installation and testing of all safety-related components must be in accordance with NQA-1 and must be purchased from qualified suppliers that have an NQA-1 program or through Commercial Grade Dedication (CGD) in accordance with NQA-1 a-2009, Subpart 2.14. The SUBCONTRACTOR shall plan, schedule, coordinate, test, inspect and assure effective performance of all aspects of the UPS system as described herein. LANL intends to issue a separate RFP (excluding work specified herein) for work to be performed by a General Contractor supporting the UPS Project including procurement and installation of the new UPS building, pre-stressed concrete, structural steel, HVAC, fire protection, site utilities, and other ancillary equipment and components required for the facility.

42 ENGINEERING↗

Evaluation of the 183-D Water Filtration Facility for Bat Roosts and Development of a Mitigation Strategy, 100-D Area, Hanford Site

The 183-D Water Filtration Facility is located in the 100-D Area of the Hanford Site, north of Richland, Washington. It was used to provide filtered water for cooling the 105-D Reactor and supplying fire-protection and drinking water for all facilities in the 100-D Area. The facility has been inactive since the 1980s and is now scheduled for demolition. Therefore, an evaluation was conducted to determine if any part of the facility was being used as roosting habitat by bats.

100 Area↗

Seismic Fire Evaluation

This report describes an approach for modeling the number of ignitions (fires) following an earthquake. It is an update from a previous calculation (March 2012), “Modeling the Number of Ignitions Following an Earthquake: Developing Prediction Limits for Overdispersed Count Data,” performed by Elizabeth Kelly and Raymond Tell. This update incorporates comments from two reviews conducted by Douglas Honneger (March 2011) and Shane Reese (February 2013). Also, a comparison is made here with the Nuclear Regulatory Commission methodology developed by John Lambright for prediction of the likelihood of a seismically-induced fire for the resolution of Generic Issue 57, “Evaluation of Generic Issue 57: Effects of Fire Protection System Actuation on Safety-Related Equipment,” NUREG-5580.

42 ENGINEERING↗

MAN-004 Design Standards Manual

At Sandia National Laboratories in New Mexico (SNL/NM), the design, construction, operation, and maintenance of facilities is guided by industry standards, a graded approach, and the systematic analysis of life cycle benefits received for costs incurred. The design of the physical plant must ensure that the facilities are "fit for use," and provide conditions that effectively, efficiently, and safely support current and future mission needs. In addition, SNL/NM applies sustainable design principles, using an integrated whole-building design approach, from site planning to facility design, construction, and operation to ensure building resource efficiency and the health and productivity of occupants. The safety and health of the workforce and the public, any possible effects on the environment, and compliance with building codes take precedence over project issues, such as performance, cost, and schedule. These design standards generally apply to all disciplines on all SNL/NM projects. Architectural and engineering design must be both functional and cost-effective. Facility design must be tailored to fit its intended function, while emphasizing low-maintenance, energy-efficient, and energy-conscious design. Design facilities that can be maintained easily, with readily accessible equipment areas, low maintenance, and quality systems. To promote an orderly and efficient appearance, architectural features of new facilities must complement and enhance the existing architecture at the site. As an Architectural and Engineering (A/E) professional, you must advise the Project Manager when this approach is prohibitively expensive. You are encouraged to use professional judgment and ingenuity to produce a coordinated interdisciplinary design that is cost-effective, easily contractible or buildable, high-performing, aesthetically pleasing, and compliant with applicable building codes. Close coordination and development of civil, landscape, structural, architectural, fire protection, mechanical, electrical, telecommunications, and security features is expected to ensure compatibility with planned functional equipment and to facilitate constructability. If portions of the design are subcontracted to specialists, delivery of the finished design documents must not be considered complete until the subcontracted portions are also submitted for review. You must, along with support consultants, perform functional analyses and programming in developing design solutions. These solutions must reflect coordination of the competing functional, budgetary, and physical requirements for the project. During design phases, meetings between you and the SNL/NM Project Team to discuss and resolve design issues are required. These meetings are a normal part of the design process. For specific design-review requirements, see the project-specific Design Criteria. In addition to the design requirements described in this manual, instructive information is provided to explain the sustainable building practice goals for design, construction, operation, and maintenance of SNL/NM facilities. Please notify SNL/NM personnel of design best practices not included in this manual, so they can be incorporated in future updates.

42 ENGINEERING↗

Sandia National Laboratories Facilities Management and Operations Center Design Standards Manual

At Sandia National Laboratories in New Mexico (SNL/NM), the design, construction, operation, and maintenance of facilities is guided by industry standards, a graded approach, and the systematic analysis of life cycle benefits received for costs incurred. The design of the physical plant must ensure that the facilities are "fit for use," and provide conditions that effectively, efficiently, and safely support current and future mission needs. In addition, SNL/NM applies sustainable design principles, using an integrated whole-building design approach, from site planning to facility design, construction, and operation to ensure building resource efficiency and the health and productivity of occupants. The safety and health of the workforce and the public, any possible effects on the environment, and compliance with building codes take precedence over project issues, such as performance, cost, and schedule. These design standards generally apply to all disciplines on all SNL/NM projects. Architectural and engineering design must be both functional and cost-effective. Facility design must be tailored to fit its intended function, while emphasizing low-maintenance, energy-efficient, and energy-conscious design. Design facilities that can be maintained easily, with readily accessible equipment areas, low maintenance, and quality systems. To promote an orderly and efficient appearance, architectural features of new facilities must complement and enhance the existing architecture at the site. As an Architectural and Engineering (A/E) professional, you must advise the Project Manager when this approach is prohibitively expensive. You are encouraged to use professional judgment and ingenuity to produce a coordinated interdisciplinary design that is cost-effective, easily contractible or buildable, high-performing, aesthetically pleasing, and compliant with applicable building codes. Close coordination and development of civil, landscape, structural, architectural, fire protection, mechanical, electrical, telecommunications, and security features is expected to ensure compatibility with planned functional equipment and to facilitate constructability. If portions of the design are subcontracted to specialists, delivery of the finished design documents must not be considered complete until the subcontracted portions are also submitted for review. You must, along with support consultants, perform functional analyses and programming in developing design solutions. These solutions must reflect coordination of the competing functional, budgetary, and physical requirements for the project. During design phases, meetings between you and the SNL/NM Project Team to discuss and resolve design issues are required. These meetings are a normal part of the design process. For specific design-review requirements, see the project-specific Design Criteria. In addition to the design requirements described in this manual, instructive information is provided to explain the sustainable building practice goals for design, construction, operation, and maintenance of SNL/NM facilities. Please notify SNL/NM personnel of design best practices not included in this manual, so they can be incorporated in future updates. You must convey all documents describing work to the SNL/NM Project Manager in both hard copy and in an electronic format compatible with the SNL/NM-prescribed CADD and other software packages, and in accordance with a SNL/NM approved standard format. Print all hard copy versions of submitted documents (excluding drawings and renderings) double-sided when practical.

42 ENGINEERING↗

MAQ Analysis_Template

This evaluation is based on the latest information available in the Chemical Information System (CIS). Some of the information contained in CIS may not be accurate, but this evaluation will indicate the overall hazardous material Maximum Allowable Quantity (MAQ) situation in the building. Use this information to author findings in the Building’s Fire Protection Assessment.

99 GENERAL AND MISCELLANEOUS↗

Development of Extended Period Pressure-Dependent Demand Water Distribution Models

Los Alamos National Laboratory (LANL) has used modeling and simulation of water distribution systems for N-1 contingency analyses to assess criticality of water system assets. Critical components considered in these analyses include pumps, tanks, and supply sources, in addition to critical pipes or aqueducts. A contingency represents the complete removal of the asset from system operation. For each contingency, an extended period simulation (EPS) is run using EPANET. An EPS simulates water system behavior over a time period, typically at least 24 hours. It assesses the ability of a system to respond and recover from asset disruption through distributed storage in tanks throughout the system. Contingencies of concern are identified as those in which some portion of the water system has unmet delivery requirements. A delivery requirement is defined as an aggregation of water demands within a service area, similar to an electric power demand. The metric used to identify areas of unmet delivery requirement in these studies is a pressure threshold of 15 pounds per square inch (psi). This pressure threshold is used because it is below the required pressure for fire protection. Any location in the model with pressure that drops below this threshold at any time during an EPS is considered to have unmet service requirements and is used to determine cascading consequences. The outage area for a contingency is the aggregation of all service areas with a pressure below the threshold at any time during the EPS.

42 ENGINEERING↗

H2FIRST Reference Station Design Task: Project Deliverable 2-2

This report presents near-term station cost results and discusses cost trends of different station types. It compares various vehicle rollout scenarios and projects realistic near-term station utilization values using the station infrastructure rollout in California as an example. It describes near-term market demands and matches those to cost-effective station concepts. Finally, the report contains detailed designs for five selected stations, which include piping and instrumentation diagrams, bills of materials, and several site-specific layout studies that incorporate the setbacks required by NFPA 2, the National Fire Protection Association Hydrogen Technologies Code. This work identified those setbacks as a significant factor affecting the ability to site a hydrogen station, particularly liquid stations at existing gasoline stations. For all station types, utilization has a large influence on the financial viability of the station.

30 DIRECT ENERGY CONVERSION↗

FINAL REPORT - Development of High Pressure Hydrogen Storage Tank for Storage and Gaseous Truck Delivery

The “Development of High Pressure Hydrogen Storage Tanks for Storage and Gaseous Truck Delivery” project [DE-FG36-08GO18062] was initiated on 01 July 2008. Hexagon Lincoln (then Lincoln Composites) received grant funding from the U.S. Department of Energy to support the design and development of an improved bulk hauling and storage solution for hydrogen in terms of cost, safety, weight and volumetric efficiency. The development of this capability required parallel development and qualification of large all-composites pressure vessels, a custom ISO container to transport and store said tanks, and performance of trade studies to identify optimal operating pressure for the system. Qualification of the 250 bar TITAN® module was completed in 2009 with supervision from the American Bureau of Shipping [ABS], and the equipment has been used internationally for bulk transportation of fuel gases since 2010. Phase 1 of the project was successfully completed in 2012 with the issuance of USDOT SP 14951, the special permit authorizing the manufacture, marking, sale and use of TITAN® Mobile Pipeline® equipment in the United States. The introduction of tube trailers with light weight composite tankage has meant that 2 to 3 times as much gaseous fuel can be transported with each trip. This increased hauling efficiency offers dramatically reduced operating costs and has enabled a profitable business model for over-the-road compressed natural gas delivery. The economic drivers of this business opportunity vary from country to country and region to region, but in many places gas distribution companies have realized profitable operations. Additional testing was performed in 2015 to characterize hydrogen-specific operating protocols for use of TITAN® systems in CHG service at 250 bar. This program demonstrated that existing compression and decompression methodologies can efficiently and safely fill and unload lightweight bulk hauling systems. Hexagon Lincoln and U.S. DOE agreed to continue into Phase 2 of the project without pursuing the development of higher pressure capabilities as originally planned. At 250 bar, development of equipment for hydrogen transport is supported by strong activity in the adjacent natural gas transportation sector. Trade studies performed since 2011 indicate optimization of hauling efficiency and system cost for hydrogen transport at about 350 bar (5076 psi). However, due to reduced efficiency of compression of natural gas above 250 bar, 350 bar operation is not an attractive option for natural gas transportation. The CHG market is not developed at this time, and it is difficult to forecast the arrival of significant revenues. On the investment side, the cost to fully qualify a large tank module at 350 bar is estimated at $3MM to $5MM. There is insufficient CHG market definition to support a stand-alone business case for this investment without near term revenue in the adjacent CNG transportation market. Therefore development of a 350 bar TITAN® system was deferred and not pursued under this project. Hexagon Lincoln continues to support the development of tankage and equipment for operation at 350 bar and above; with 700 bar vehicle tanks and 950 bar tanks for ground storage applications. Phase 2 activities were focused on reducing system cost, increasing system capacity, increasing system safety and characterization of polymer material performance specific to hydrogen pressure vessel usage. With the successful launch of TITAN® modules and trailers in natural gas transportation, over 600 units have been produced through the end of 2016, resulting in improved purchasing power for raw materials and manufactured components. This has allowed Hexagon Lincoln to approach the current project goals for system cost. At $590/kg of compressed hydrogen delivered, the system cost of the baseline TITAN® module is below the project’s 2015 target of $730/kg H2 delivered, and very close to the project’s 2020 target of $575/kg H2 delivered. [Based on product pricing in 1Q2017.] Emphasis was placed on configuration of larger capacity systems within the vehicle weights and dimensions allowed on federal and state highways in the United States and other countries. These activities resulted in the design and development of integrated tube trailer systems that have increased delivery capacities by 45%. The hydrogen delivery capacity of our largest system is 845 kg, exceeding the project’s 2015 target of 700 kg H2 delivered. Emerging technologies offering improvement of the safety systems used on the equipment were investigated, with particular focus on improving the reliability and cost of the emergency venting system for fire protection. Finally, investment in our materials laboratory improved detection and characterization of hydrogen-induced damage in polymer materials, supporting the development of operational protocols to avoid damage to pressure vessel liners and valve components.

08 HYDROGEN↗

Department of Energy Operational Readiness Review for the Waste Isolation Pilot Plant

The U.S. Department of Energy (DOE) has completed an Operational Readiness Review (ORR) for the restart of Contact Handled (CH) waste emplacement at the Waste Isolation Pilot Plant (WIPP) located near Carlsbad, New Mexico. The ORR team assessed the readiness of Nuclear Waste Partnership, LLC (NWP) to manage and perform receipt through CH waste emplacement, and associated waste handling and management activities, including the ability of the National TRU Program (NTP) to evaluate the waste currently stored at the WIPP site against the revised and enhanced Waste Acceptance Criteria (WAC). Field work for this review began on November 14, 2015 and was completed on November 30, 2016. The DOE ORR was conducted in accordance with the Department of Energy Operational Readiness Review Implementation Plan for the Waste Isolation Pilot Plant, dated November 8, 2016, and DOE Order 425.1D, Verification of Readiness to Start Up or Restart Nuclear Facilities. The review activities included personnel interviews, record reviews, direct observation of operations and maintenance demonstrations, and observation of multiple operational and emergency drills/exercises. The DOE ORR also evaluated the adequacy of the contractor’s ORR (CORR) and the readiness of the DOE Carlsbad field Office (CBFO) to oversee the startup and execution of CH waste emplacement activities at the WIPP facility. The WIPP facility is categorized as a Hazard Category 2 DOE Nonreactor Nuclear Facility for all surface and Underground (UG) operations per DOE-STD-1027-92, Hazard Categorization and Accident Analysis Techniques for Compliance with DOE Order 5480.23, Nuclear Safety Analysis Reports. In addition, the WIPP experienced two events in February, 2014 that resulted in Accident Investigations being performed in accordance with the requirements of DOE Order 225.1B, Accident Investigations. Based upon the results of the accident investigations and hazard categorization of the facility, the team placed significant emphasis on the following areas: fire protection, emergency preparedness, radiological protection, nuclear safety, and operations. The identification of specific focus areas was not intended to diminish the importance of other areas of the review, but to ensure that these areas received a particularly thorough and in-depth evaluation due to their significance with respect to the safe operation of the facility.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hydrogen Quantitative Risk Assessment

DOE has identified consistent safety, codes, and standards as a critical need for the deployment of hydrogen technologies, with key barriers related to the availability and implementation of technical information in the development of regulations, codes, and standards. Advances in codes and standards have been enabled by risk-informed approaches to create and implement revisions to codes, such as National Fire Protection Association (NFPA) 2, NFPA 55, and International Organization for Standardization (ISO) Technical Specification (TS)-19880-1. This project provides the technical basis for these revisions, enabling the assessment of the safety of hydrogen fuel cell systems and infrastructure using QRA and physics-based models of hydrogen behavior. The risk and behavior tools that are developed in this project are motivated by, shared directly with, and used by the committees revising relevant codes and standards, thus forming the scientific basis to ensure that code requirements are consistent, logical, and defensible.

08 HYDROGEN↗

Hydrogen Quantitative Risk Assessment (Annual Progress Report)

DOE has identified consistent safety, codes, and standards as a critical need for the deployment of hydrogen technologies, with key barriers related to the availability and implementation of technical information in the development of regulations, codes, and standards. Advances in codes and standards have been enabled by risk-informed approaches to create and implement revisions to codes, such as National Fire Protection Association (NFPA) 2, NFPA 55, and International Organization for Standardization (ISO) Technical Specification (TS)-19880-1. This project provides the technical basis for these revisions, enabling the assessment of the safety of hydrogen fuel cell systems and infrastructure using QRA and physics-based models of hydrogen behavior. The risk and behavior tools that are developed in this project are motivated by, shared directly with, and used by the committees revising relevant codes and standards, thus forming the scientific basis to ensure that code requirements are consistent, logical, and defensible.

08 HYDROGEN↗

Evaluation of Risk Acceptance Criteria for Transporting Hazardous Materials

This report reviews and offers recommendations from Sandia National transportation of hazardous materials in the U.S. The risk criteria should be used with the results of a quantitative risk assessment (QRA) in risk acceptance decision-making. The QRA for transportation is fundamentally the same as a fixed facility. However, there are differences in calculations of both the probabilities of occurrence and location of hazards. Involuntary individual fatality risk is recommended to be acceptable for annual probabilities of less than 3 x 10 -7 for any population, including vulnerable populations, and may be considered acceptable at the regulators discretion for non-sensitive/non-vulnerable populations if less than 5 x 10 -5 and demonstrated to be as low as reasonably practicable (ALARP). Societal risk is recommended to be acceptable if the annual frequency of events that would result in N or more fatalities is less than 10 -5 /N events per year and may be considered acceptable at the regulators discretion if less than 10 -3 /N events per year and demonstrated to be ALARP. These criteria should be applied to the societal risk over the entire transportation route, not normalized per-distance. These values are adapted from the National Fire Protection Association (NFPA) 59A, a U.S. and international standard for liquefied natural gas (LNG) facility siting.

54 ENVIRONMENTAL SCIENCES↗

Building Fire Consequence Index at Sandia National Laboratories

The intent of the Building Fire Consequence Index (BFCI) at Sandia National Laboratories (SNL) is to provide a method to rank buildings based on the consequence of a fire in that building. This indexing tool will be used to determine the frequency a building's fire protection assessment (FPA) will be performed. Per DOE O 420.1C Chg. 1, Facility Safety, a FPA must be conducted annually (for facilities with a replacement value in excess of $100 million, facilities considered a high hazard, or those in which vital programs are involved), every three years (for remaining low and ordinary hazard facilities), or at a frequency with appropriate justification approved by the Depaitinent of Energy (DOE) head of field element. The BFCI provides a method for a graded approach utilizing a scoring criteria for various categories such as replacement plant value, building content value, hazards, mission dependency index, etc. when assigning FPA frequencies1.

42 ENGINEERING↗