Symposium on Space Industrialization, Huntsville, Ala., May 26, 27, 1976, Proceedings

Space habitats are considered, with attention given the evolution of space station systems, space station habitability, space settlement planning methodology, and orbital assembly. Various aspects of the Space Transportation System are discussed, including Shuttle booster/propulsion growth concept, advanced earth orbital transportation systems technology, single-stage-to-orbit vehicles and aeromaneuvering orbit transfer vehicles. Materials processing in space is examined, with emphasis on biological materials, metallurgical materials, the uses of space ultrahigh vacuum, and extraterrestrial mining and industrial processing. Solar space power is investigated, with attention given the potential of satellite solar power stations, thermal engine power satellites and microwave power transmission to earth. Individual items are announced in this issue.

Source record↗

An analysis of the loads applied to a heavy Space Station rack during translation and rotation tasks

To prepare for Space Station Alpha's on-orbit assembly, maintenance, and resupply, NASA requires information about the crew members' ability to move heavy masses on orbit. Ease of movement in microgravity and orbiter stay time constraints may change the Space Station equipment and outfitting design requirements. Therefore, the time and effort required to perform a particular task and how and where the forces and torque should be applied become critical in evaluating the design effort. Thus, the three main objectives of this investigation were to: (1) quantify variables such as force and torque as they relate to heavy mass handling techniques; (2) predict the time required to perform heavy mass handling tasks; and (3) note any differences between males and females in their ability to manipulate a heavy mass.

Stoycos, Lara E.↗

Space power demonstration stations

NASA major planning decisions from 1955 to date are summarized and new concepts connected with the advent of the Space Transportation Systems (STS) are set forth. The future Shuttle utilizations are considered, from 'manned booster' function for space transportation to such operations as deployment of modules and stations and assembly of large structures in space. The permanent occupancy of space will be a major goal of the space systems development in the 1980's with the following main phases: (1) achievement of easy access to earth orbit by means of the Shuttle and Spacelab; (2) achievement of permanent occupancy (Space Stations); (3) self-sufficiency of man in space. New techniques of space operation will become possible, using much larger, complicated satellites and simplified ground stations. Orbital assembly of large stations, using a permanent base in orbit, will enable practical utilization of space systems for everyday needs. Particular attention is given to the space solar power concept, involving the location in space of large satellite systems. Results of the studies on Manned Orbital Systems Concept (MOSC) and some future possibilities of Space Stations are analyzed.

Freitag, R. F.↗

Computer vision for real-time orbital operations. Center directors discretionary fund

Machine vision research is examined as it relates to the NASA Space Station program and its associated Orbital Maneuvering Vehicle (OMV). Initial operation of OMV for orbital assembly, docking, and servicing are manually controlled from the ground by means of an on board TV camera. These orbital operations may be accomplished autonomously by machine vision techniques which use the TV camera as a sensing device. Classical machine vision techniques are described. An alternate method is developed and described which employs a syntactic pattern recognition scheme. It has the potential for substantial reduction of computing and data storage requirements in comparison to the Two-Dimensional Fast Fourier Transform (2D FFT) image analysis. The method embodies powerful heuristic pattern recognition capability by identifying image shapes such as elongation, symmetry, number of appendages, and the relative length of appendages.

Vinz, F. L.↗

Structural assembly demonstration experiment

The experiment is of an operational variety, designed to assess crew capability in Large Space System (LSS) assembly. The six Structural Assembly Demonstration Experiment objectives include: (1) the establishment of a quantitative correlation between LSS neutral buoyancy simulation and on-orbit assembly operations in order to enhance the validity of those assembly simulations; (2) the quantitative study of the capabilities and mechanics of human assembly in an Extravehicular Activity environment; (3) the further corroboration of the LSS Assembly Analysis cost algorithm through the obtainment of hard data base information; (4) the verification of LSS assembly techniques and timeless, as well as the identification of crew imposed loads and assembly aid requirements and concepts; (5) verification of a Launch/Assembly Platform structure concept for other LSS missions; and (6) lastly, to advance thermal control concepts through a flexible heat pipe.

Stokes, J. W.↗

Structural assembly demonstration experiment, phase 1

The goal of this phase of the structural assembly and demonstration experiment (SADE) program was to begin to define a shuttle flight experiment that would yield data to compare on-orbit assembly operations of large space structures with neutral buoyancy simulations. In addition, the experiment would be an early demonstration of structural hardware and human capabilities in extravehicular activity (EVA). The objectives of the MIT study, as listed in the statement of work, were: to provide support in establishing a baseline neutral buoyancy testing data base, to develop a correlation technique between neutral buoyancy test results and on-orbit operations, and to prepare the SADE experiment plan (MSFC-PLAN-913).

Akin, David L.↗

Satellite power system LEO vs GEO assembly issues

A strawman crystal-silicon 5-GW Satellite Power System (SPS) concept formed the basis of a study of construction concepts for building a complete SPS in low earth orbit (LEO) or geosynchronous orbit (GEO). Construction scenarios were evolved, including factory-in-space concepts and operations. Design implications imposed on the SPS satellite as a consequence of in-orbit assembly operations, and related attitude control requirements during assembly in LEO or GEO environments, were also evaluated. Results are presented indicating that complete assembly of an operational SPS in LEO, followed by transport to GEO, does not appear technically desirable. The best mix, however, of LEO versus GEO construction activity remains to be resolved.

Mockovciak, J., Jr.↗

Investigation into the High Voltage Shutdown of the Oxygen Generator System in the International Space Station

The Oxygen Generation System (OGS) Hydrogen Dome Assembly Orbital Replacement Unit (ORU) serial number 00001 suffered a cell stack high-voltage shutdown on July 5, 2010. The Hydrogen Dome Assembly ORU was removed and replaced with the on-board spare ORU serial number 00002 to maintain OGS operation. The Hydrogen Dome Assembly ORU was returned from ISS on STS-133/ULF-5 in March 2011 with test, teardown and evaluation (TT&E) and failure analysis to follow.

Carpenter, Joyce E.↗

Preliminary results Skylab experiment TO27 optical contamination in space

Current results from the TO27 experiment which was performed on the first two Skylab missions are presented. The purpose of the experiment was to determine the change in optical properties of various transmissive windows, mirrors, and diffraction gratings caused by the deposition of contaminants found about the orbital assembly and to measure the sky brightness background caused by solar illumination of particulate contaminants. The sample array system containing 248 optical surfaces and exposed outside the orbital workshop did not collect any significant contaminants. Only trace amounts of surface deposited contaminants have been seen, in all cases the measurement was near the limiting sensitivity of the instrument. Unfortunate performance compromises and the relative cleanliness of the assembly on the anti-solar side appeared to place the amount of available surface contaminants near the limiting sensitivity of the sample array. Mass spectroscopy on the trace contaminants show the presence of high molecular weight species, up to 773 amu. The data suggests the presence of condensed aromatics.

Muscari, J. A.↗

Evolution of the Space Station Robotic Manipulator

The Space Station Remote Manipulator System (SSRMS), Canadarm2, was launched in 2001 and deployed on the International Space Station (ISS). The Canadarm2 has been instrumental in ISS assembly and maintenance. Canadarm2 shares its heritage with the Space Shuttle Arm (Canadarm). This article explores the evolution from the Shuttle Canadarm to the Space Station Canadarm2 design, which incorporates a 7 degree of freedom design, larger joints, and changeable operating base. This article also addresses phased design, redundancy, life and maintainability requirements. The design of Canadarm2 meets unique ISS requirements, including expanded handling capability and the ability to be maintained on orbit. The size of ISS necessitated a mobile manipulator, resulting in the unique capability of Canadarm2 to relocate by performing a walk off to base points located along the Station, and interchanging the tip and base of the manipulator. This provides the manipulator with reach and access to a large part of the Station, enabling on-orbit assembly of the Station and providing support to Extra-Vehicular Activity (EVA). Canadarm2 is evolving based on on-orbit operational experience and new functionality requirements. SSRMS functionality is being developed in phases to support evolving ISS assembly and operation as modules are added and the Station becomes more complex. Changes to sustaining software, hardware architecture, and operations have significantly enhanced SSRMS capability to support ISS mission requirements. As a result of operational experience, SSRMS changes have been implemented for Degraded Joint Operations, Force Moment Sensor Thermal Protection, Enabling Ground Controlled Operations, and Software Commutation. Planned Canadarm2 design modifications include: Force Moment Accommodation, Smart Safing, Separate Safing, and Hot Backup. In summary, Canadarm2 continues to evolve in support of new ISS requirements and improved operations. It is a tribute to the design that this evolution can be accomplished while conducting critical on-orbit operations with minimal hardware changes.

Razvi, Shakeel↗

The space station program plan

The strategy that has been adopted for the NASA permanent manned space station development program is to provide a source of different modular components. Virtually any tactical requirements can then be accommodated through the specification of the appropriate inventory of orbitally assembled modular components. Some of the space station's subsystems are common to several elements, and must therefore be generally compatible, offering consistent interfaces with, for example, the Space Shuttle Orbiter. Tethered systems, including small platforms for controlled micro-g experiments, will be incorporated, and the occasional presence of two docked Space Shuttle Orbiters will be allowed for.

Hodge, J. D.↗

International Space Station Powered Bolt Nut Anomaly and Failure Analysis Summary

A key mechanism used in the on-orbit assembly of the International Space Station (ISS) pressurized elements is the Common Berthing Mechanism (CBM). The mechanism that effects the structural connection of the CBM halves is the Powered Bolt Assembly. There are sixteen Powered Bolt Assemblies per CBM. The CBM has a bolt which engages a self aligning Powered Bolt Nut (PBN) on the mating interface; see Figure 1. The Powered Bolt Assemblies are preloaded to approximately 19 kilo pounds (KIPs) prior to pressurization of the CBM. The PBNs mentioned below, manufactured in 2009, will be used on ISS future missions. An on orbit functional failure of this hardware would be unacceptable and in some instances catastrophic due to the failure of modules to mate and seal the atmosphere, risking loss of crew and ISS functions. The manufacturing processes which create the PBNs need to be strictly controlled. Functional (torque vs. tension) acceptance test failures will be the result of processes not being strictly followed. Without the proper knowledge of thread tolerances, fabrication techniques, and dry film lubricant application processes, PBNs will be, and have been manufactured improperly. The knowledge gained from acceptance test failures and the resolution of those failures, thread fabrication techniques and thread dry film lubrication processes can be applied to many aerospace mechanisms to enhance their performance. Test data and manufactured PBN thread geometry will be discussed for both failed and successfully accepted PBNs.

Sievers, Daniel E.↗

International Space Station Powered Bolt Nut Anomaly and Failure Analysis Summary

A key mechanism used in the on-orbit assembly of the International Space Station (ISS) pressurized elements is the Common Berthing Mechanism. The mechanism that effects the structural connection of the Common Berthing Mechanism halves is the Powered Bolt Assembly. There are sixteen Powered Bolt Assemblies per Common Berthing Mechanism. The Common Berthing Mechanism has a bolt which engages a self aligning Powered Bolt Nut (PBN) on the mating interface (Figure 1). The Powered Bolt Assemblies are preloaded to approximately 84.5 kN (19000 lb) prior to pressurization of the CBM. The PBNs mentioned below, manufactured in 2009, will be used on ISS future missions. An on orbit functional failure of this hardware would be unacceptable and in some instances catastrophic due to the failure of modules to mate and seal the atmosphere, risking loss of crew and ISS functions. The manufacturing processes that create the PBNs need to be strictly controlled. Functional (torque vs. tension) acceptance test failures will be the result of processes not being strictly followed. Without the proper knowledge of thread tolerances, fabrication techniques, and dry film lubricant application processes, PBNs will be, and have been manufactured improperly. The knowledge gained from acceptance test failures and the resolution of those failures, thread fabrication techniques and thread dry film lubrication processes can be applied to many aerospace mechanisms to enhance their performance. Test data and manufactured PBN thread geometry will be discussed for both failed and successfully accepted PBNs.

Sievers, Daniel E.↗

Versatile Nuclear Thermal Propulsion (NTP)

A study was initiated to investigate propulsion stage and mission architecture options potentially enabled by fission energy. One initial concept is a versatile Nuclear Thermal Propulsion (NTP) system with a maximum specific impulse of 900 s and a maximum thrust (per engine) of 15 klbf. The system assumes a monopropellant stage (hydrogen), and is designed to also provide 300 lbf of thrust (potentially split between multiple thrusters) at an Isp > 500 s for orbital maneuvering and station keeping. Boost pumps are used to assist with engine decay heat removal and low thrust engine burns, and to compensate for partial tank depressurization during full thrust engine burns. Potential stage assembly orbits that take full advantage of launch vehicle payload mass and volume capabilities are being assessed. The potential for using NTP engines to also generate a small to moderate amount of electrical power is also being evaluated. A first generation versatile NTP stage could enable 8 of 9 upcoming opportunities for short (less than 24 month) round trip human missions to Mars. A second generation versatile NTP is under consideration that could potentially provide a maximum specific impulse of 1800 s at 15 klbf, and enable ambitious missions throughout the solar system. The second generation NTP system under consideration would also allow a choice of volatiles to be used as propellant. This would potentially allow in-situ resources such as water, ammonia, methane, or other compounds to be used directly as propellant by the second generation engine.

Houts, Michael G.↗

Versatile Nuclear Thermal Propulsion (NTP)

A study was initiated to investigate propulsion stage and mission architecture options potentially enabled by fission energy. One initial concept is a versatile Nuclear Thermal Propulsion (NTP) system with a maximum specific impulse of 900 s and a maximum thrust (per engine) of 15 klbf. The system assumes a monopropellant stage (hydrogen), and is designed to also provide 300 lbf of thrust (potentially split between multiple thrusters) at an Isp > 500 s for orbital maneuvering and station keeping. Boost pumps are used to assist with engine decay heat removal and low thrust engine burns, and to compensate for partial tank depressurization during full thrust engine burns. Potential stage assembly orbits that take full advantage of launch vehicle payload mass and volume capabilities are being assessed. The potential for using NTP engines to also generate a small to moderate amount of electrical power is also being evaluated. A first generation versatile NTP stage could enable 8 of 9 upcoming opportunities for short (less than 24 month) round trip human missions to Mars. A second generation versatile NTP is under consideration that could potentially provide a maximum specific impulse of 1800 s at 15 klbf, and enable ambitious missions throughout the solar system. The second generation NTP system under consideration would also allow a choice of volatiles to be used as propellant. This would potentially allow in-situ resources such as water, ammonia, methane, or other compounds to be used directly as propellant by the second generation engine.

Houts, Mike↗

Satellite Power Systems (SPS) concept definition study. Volume 5: Transportation and operations analysis

The development of transportation systems to support the operations required for the orbital assembly of a 5-gigawatt satellite is discussed as well as the construction of a ground receiving antenna (rectenna). Topics covered include heavy lift launch vehicle configurations for Earth-to LEO transport; the use of chemical, nuclear, and electric orbit transfer vehicles for LEO to GEO operations; personnel transport systems; ground operations; end-to-end analysis of the construction, operation, and maintenance of the satellite and rectenna; propellant production and storage; and payload packaging.

Hanley, G.↗

Mission requirements: Skylab rescue mission SL-R

The Skylab Program includes three low earth orbit missions. These missions are designated SL-1/SL-2,SL-3 and SL-4. In addition to the three nominal Skylab missions, the program includes the Skylab Rescue Mission (SL-R). The SL-R mission is designed to provide a safe return of the Skylab crew in the event the Command Service Module (CSM) becomes disabled while docked to the Saturn Workshop (SWS). Mission requirements for the SL-R mission only are presented. SL-R mission configuration will be a CSM (modified with a field installed kit) manned by two crewmen launched on a Saturn IB Launch Vechicle. The SL-R CSM will rendezvous and dock with the SWS (or Orbital Assembly (OA), consisting of the SWS and disabled CSM, if the disabled CSM has not previously been jettisoned). The SWS configuration includes a Multiple Docking Adapter (MDA), Apollo Telescope Mount (ATM), Airlock Module (AM), and an S-IVB stage (modified as an Orbital Workshop (OWS), previously launched and inserted into orbit on a two-stage Saturn V Launch Vehicle for the SL-1/SL-2 mission.

Source record↗

Planetary mission departures from Space Station orbit

The concept of orbital assembly and launch of oversized planetary (or lunar) spacecraft from a Space Station is rapidly coming of age. This prospect raises a host of new problems demanding timely resolution. The one most serious issue involved in launch from a rapidly precessing Space Station orbit (about -7.2 deg/day) is the need to cope with the generally out-of-plane orientation of the V-infinity departure vector. Methods dealing with single or multiple injection maneuvers, deep space plane changes, nodal shift caused by reboost strategy modifications, and departure window duration analysis are discussed.

Sergeyevsky, Andrey B.↗