Search NASA⌕ Search

SEARCH · Search NASA

Results for “PROCESS DEVELOPMENT UNITS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Advanced pathways for hydrogen production: a collective view from a technical experts meeting

Hydrogen is an essential fuel and feedstock that can be produced in multiple ways to meet requirements for technological sectors that include energy storage, transportation, petroleum refining, and ammonia synthesis. To consider the future state of hydrogen manufacturing, a team of experts has assembled and examined three emerging hydrogen production technologies – photoelectrochemical, biological, and thermochemical. Each of these emerging technologies holds significant long-term potential for cost reduction while lowering industrial emissions associated with conventional methods of hydrogen manufacture (e.g., steam methane reforming) by using sunlight and renewable resources as primary sources of energy and feedstock, respectively. All three are currently at low technology readiness levels, however their applications, cost reduction opportunities and performance improvement pathways are under active development. In this work, opportunities and outlook for research that can directly advance the technologies are discussed.

08 HYDROGEN↗

Cost impact of hexose-to-pentose sugar ratios for biomanufacturing

Central to the long-term vision for biomanufacturing is the ability to deconstruct plant cell walls to sugars that microbes can convert to products. Aside from glucose, the most abundant sugar in biomass is xylose, a pentose sugar. Industrially relevant microbes have been engineered to co-ferment xylose and glucose. Most nth plant technoeconomic analyses (TEAs) assume similar consumption rates and product yields for both sugars, but in reality, xylose is consumed more slowly. Feedstocks can be selected, or engineered, to alter the glucan-to-xylan ratio (GXR) but no TEAs have quantified the impact of this strategy systematically. This study explores the cost impacts of varying the glucan-to-xylan ratio (GXR) from 1.9 to 6.7 for co-fermenting glucose and xylose to ethanol and bisabolene. The minimum selling prices (MSPs) for both products decrease as the GXR increases, with the largest reductions at shorter residence times. For instance, with an increase in GXR from 1.9 to 6.7, ethanol’s MSP drops by 16 %, 5 %, and 3 % at 24, 72, and 144 h, respectively, while bisabolene’s MSP declines by 23 %, 20 %, and 15 % at 24, 72, and 120 h. Particularly for early-stage commercialization, the results suggest that altering or selecting for feedstocks with higher GXR can minimize capital costs by reducing optimal residence times. Capital-constrained biorefineries operating with shorter residence times can justify paying up to 1.5X to 2X the price for feedstocks with a higher GXR, based on the expected improvements in their product yield and overall process economics.

Delayed xylose utilization↗

Prenol production in a microbial host via the “Repass” Pathways

Prenol and isoprenol are promising advanced biofuels and serve as biosynthetic precursors for pharmaceuticals, fragrances, and other industrially relevant compounds. Despite engineering improvements that circumvent intermediate cytotoxicity and lower energy barriers, achieving high titer ‘mevalonate (MVA)-derived’ prenol has remained elusive. Difficulty in selective prenol production stems from the necessary isomerization of isopentenyl diphosphate (IPP) to dimethylallyl diphosphate (DMAPP) as well as the intrinsic toxicity of these diphosphate precursors. Here, the expression of specific isopentenyl monophosphate kinases with model-guided enzyme substitution of diphosphate isomerases and phosphatases enabled selective cycling of monophosphates and diphosphates, dramatically improving prenol titers and selectivity in Escherichia coli. Pairing this approach with the canonical MVA pathway resulted in 300 mg/L prenol at a 30:1 ratio with isoprenol. Further pairing with the “IPP-Bypass” pathway resulted in 526 mg/L prenol at a 72:1 ratio with isoprenol, the highest and purest MVA-derived prenol titer to date. Additionally, modifying this “IPP-Repass” for DMAPP production and coexpressing the prenyltransferase acPT1 yielded 48.3 mg/L of the potential therapeutic precursor drupanin from p-coumarate. These novel repass pathways establish a unique strategy for tuning diphosphate precursors to drive isoprenoid biosynthesis and prenylation reactions.

59 BASIC BIOLOGICAL SCIENCES↗

Scale-Up, Production, and Procurement of PEP Simulants

Pacific Northwest National Laboratory has been tasked by Bechtel National Inc. on the River Protection Project-Hanford Tank Waste Treatment and Immobilization Plant (RPP-WTP) project to perform research and development activities to resolve technical issues identified for the Pretreatment Facility. The Pretreatment Engineering Platform (PEP) was designed, constructed, and operated as part of a plan to respond to issue M12, “Undemonstrated Leaching Processes.” The PEP is a 1/4.5-scale test platform designed to simulate the WTP pretreatment caustic leaching, oxidative leaching, ultrafiltration solids concentration, and slurry washing processes. The PEP replicates the WTP leaching processes using prototypic equipment and control strategies. This report provides the lessons learned regarding the manufacture and delivery of simulated feeds for PEP testing.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

PEP Integrated Test D Run Report Caustic and Oxidative Leaching in UFP-VSL-T02A

Pacific Northwest National Laboratory (PNNL) has been tasked by Bechtel National Inc. (BNI) on the River Protection Project-Hanford Tank Waste Treatment and Immobilization Plant (RPP-WTP) project to perform research and development activities to resolve technical issues identified for the Pretreatment Facility (PTF). The Pretreatment Engineering Platform (PEP) was designed, constructed and operated as part of a plan to respond to issue M12, "Undemonstrated Leaching Processes" of the External Flowsheet Review Team (EFRT) issue response plan. The PEP is a 1/4.5-scale test platform designed to simulate the WTP pretreatment caustic leaching, oxidative leaching, ultrafiltration solids concentration, and slurry washing processes. The PEP replicates the WTP leaching processes using prototypic equipment and control strategies. The PEP also includes non-prototypic ancillary equipment to support the core processing. Two operating scenarios are currently being evaluated for the ultrafiltration process (UFP) and leaching operations. The first scenario (Test B and D) has caustic leaching performed in the UFP-2 ultrafiltration feed vessels (i.e., vessel UFP-VSL-T02A in the PEP and vessels UFP-VSL-00002A and B in the WTP PTF). The second scenario (Test A) has caustic leaching conducted in the UFP-1 ultrafiltration feed preparation vessels (i.e., vessels UFP-VSL-T01A and B in the PEP and vessels UFP VSL-00001A and B in the WTP PTF). In Test D, 19M sodium hydroxide (NaOH, caustic) was added to the waste slurry in the UFP VSL T02 vessel after the solids were concentrated to ~20% undissolved solids. The NaOH was added to leach solid aluminum compounds (e.g., gibbsite, boehmite). Caustic addition is followed by heating to 85°C using direct injection of steam to accelerate the leach process. The main difference of Test D compared to Test B is that the leach temperature is 85°C for 24 hrs as compared to 100°C for 12 hours. The other difference is the Test D simulant had Cr in the simulant from the start of processing and Test B had Cr added to adjust the simulant composition after aluminum leaching. Following the caustic leach, the UFP-VSL-T02A vessel contents are cooled using the vessel cooling jacket. The slurry was then concentrated to 17 wt% undissolved solids and washed with inhibited water to remove NaOH and other soluble salts. Next, the slurry was oxidatively leached using sodium permanganate to solubilize chrome. The slurry was then washed to remove the dissolved chrome and concentrated.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Pretreatment Engineering Platform (PEP) Integrated Test B Run Report--Caustic and Oxidative Leaching in UFP-VSL-T02A

Pacific Northwest National Laboratory (PNNL) has been tasked by Bechtel National Inc. (BNI) on the River Protection Project-Hanford Tank Waste Treatment and Immobilization Plant (RPP-WTP) project to perform research and development activities to resolve technical issues identified for the Pretreatment Facility (PTF). The Pretreatment Engineering Platform (PEP) was designed, constructed and operated as part of a plan to respond to issue M12, “Undemonstrated Leaching Processes” of the External Flowsheet Review Team (EFRT) issue response plan.( ) The PEP is a 1/4.5-scale test platform designed to simulate the WTP pretreatment caustic leaching, oxidative leaching, ultrafiltration solids concentration, and slurry washing processes. The PEP replicates the WTP leaching processes using prototypic equipment and control strategies. The PEP also includes non-prototypic ancillary equipment to support the core processing.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

PEP Run Report for Integrated Test A, Caustic Leaching in UFP-VSL-T01A, Oxidative Leaching in UFP-VSL-T02A

Pacific Northwest National Laboratory (PNNL) was tasked by Bechtel National Inc. (BNI) on the River Protection Project-Hanford Tank Waste Treatment and Immobilization Plant (RPP-WTP) project to perform research and development activities to resolve technical issues identified for the Pretreatment Facility (PTF). The Pretreatment Engineering Platform (PEP) was designed and constructed and operated as part of a plan to respond to issue M12, “Undemonstrated Leaching Processes.”(a) The PEP, located in the Process Engineering Laboratory-West (PDLW) located in Richland, Washington, is a 1/4.5-scale test platform designed to simulate the WTP pretreatment caustic leaching, oxidative leaching, ultrafiltration solids concentration, and slurry washing processes. The PEP replicates the WTP leaching processes using prototypic equipment and control strategies. The PEP also includes non-prototypic ancillary equipment to support the core processing.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

PEP Run Report for Simulant Shakedown/Functional Testing

Pacific Northwest National Laboratory (PNNL) has been tasked by Bechtel National Inc. (BNI) on the River Protection Project-Waste Treatment Plant (RPP-WTP) project to perform research and development activities to resolve technical issues identified for the Pretreatment Facility (PTF). The Pretreatment Engineering Platform (PEP) was designed, constructed, and operated as part of a plan to respond to issue M12, "Undemonstrated Leaching Processes." The PEP is a 1/4.5-scale test platform designed to simulate the WTP pretreatment caustic leaching, oxidative leaching, ultrafiltration solids concentration, and slurry washing processes. The PEP replicates the WTP leaching processes using prototypic equipment and control strategies. The PEP also includes non-prototypic ancillary equipment to support the core processing. Two operating scenarios are currently being evaluated for the ultrafiltration process (UFP) and leaching operations. The first scenario has caustic leaching performed in the UFP-2 ultrafiltration feed vessels (i.e., vessel UFP-VSL-T02A in the PEP; and vessels UFP-VSL-00002A and B in the WTP PTF). The second scenario has caustic leaching conducted in the UFP-1 ultrafiltration feed preparation vessels (i.e., vessels UFP-VSL-T01A and B in the PEP; vessels UFP-VSL-00001A and B in the WTP PTF). In both scenarios, 19-M sodium hydroxide solution (NaOH, caustic) is added to the waste slurry in the vessels to leach solid aluminum compounds (e.g., gibbsite, boehmite). Caustic addition is followed by a heating step that uses direct injection of steam to accelerate the leach process. Following the caustic leach, the vessel contents are cooled using vessel cooling jackets and/or external heat exchangers. The main difference between the two scenarios is that for leaching in UFP-1, the 19-M NaOH is added to un-concentrated waste slurry (3-8 wt% solids), while for leaching in UFP-2, the slurry is concentrated to nominally 20 wt% solids using cross-flow ultrafiltration before the addition of caustic. In both scenarios, following the caustic leach, the slurry was then concentrated to 17 wt% and washed with inhibited water to remove NaOH and other soluble salts. Next, the slurry was oxidatively leached using sodium permanganate to solubilize chrome. The slurry was then washed to remove the dissolved chrome and concentrated.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Assessment of Differences in Phase 1 and Phase 2 Test Observations for Waste Treatment Plant Pulse Jet Mixer Tests with Non-Cohesive Solids

The purpose of this work was to assess the apparent discrepancy in critical suspension velocity (UCS) between M3 Phase 1 (Meyer et al. 2009) and Phase 2 testing conducted by Energy Solutions (ES) at Mid-Columbia Engineering (MCE) and to address the applicability of Phase 1 scale-up laws to Phase 2 test results. Three Phase 2 test sequences were analyzed in detail. Several sources of discrepancy were identified including differences in nominal versus actual velocity, definition of model input parameters, and definition of UCS. A remaining discrepancy was shown to not be solely an artifact of Phase 1 data correlations, but was fundamental to the tests. The non-prototypic aspects of Phase 1 testing were reviewed and assessed. The effects of non-prototypic refill associated with the closed loop operation of the jets, previously known to affect cloud height, can be described in terms of a modified settling velocity. When the modified settling velocity is incorporated into the Phase 1 “new” physical model the adjusted new physical model does a better job of predicting the Phase 2 test results. The adjusted new physical model was bench marked with data taken during three prototypic drive tests. Scale-up behavior of the Phase 1 tests was reviewed. The applicability of the Phase 1 scale-up behavior to Phase 2 prototypic testing was analyzed. The effects of non-prototypic refill caused measured values of UCS to be somewhat reduced at larger scales. Hence the scale-up exponents are believed to be smaller than they would have been had there been prototypic refill. Estimated scale-up exponents for the Phase 2 testing are 0.40 for 8-tube tests and 0.36 for 12-tube tests.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Past Approaches for Spent Nuclear Fuel, Transuranic, and High-Level Waste Disposal in the United States—Part 2: Siting Process, Staged Development, and Public Preferences

This report presents pertinent aspects of the ~50-year United States experience in siting a mined geologic disposal repository for spent nuclear fuel (SNF), transuranic (TRU) waste, and high-level radioactive waste (HLW) as related to site selection and the staged process for site investigations as specified in the Nuclear Waste Policy Act of 1982 and generic and site-specific regulations of the US Department of Energy (DOE), US Environmental Protection Agency (EPA), and US Nuclear Regulatory Commission (NRC). The roles of the Environmental Impact Statement and guidance in international consensus standards by the International Atomic Energy Agency are also mentioned. The focus is on siting and developing the Waste Isolation Pilot Plant, an operating repository for TRU waste from atomic energy defense activities, and the proposed Yucca Mountain repository for commercial SNF and HLW. In the social dimension, the role of institutional stakeholders is described. Past national surveys related to waste management options for storage and disposal provide insight on public preferences of other stakeholders. The descriptions are intended to help other countries more fully understand the stages adopted for siting and developing repositories in the United States.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Silicon material task - Low cost solar array project /JPL/DOE/

The paper describes the silicon material task of the low-cost solar array project, which has the objective of establishing a silicon production capability equivalent to 500 mW per year at a price less than 10 dollars/kg (1975 dollars) in 1986. The task program is divided into four phases: technical feasibility, scale-up studies (the present phase), experimental process system development units, and implementation of large-scale production plants, and it involves the development of processes for two groups of materials, that is, semiconductor grade and solar cell grade. In addition, the effects of impurities on solar cell performance are being investigated. Attention is given to problem areas of the task program, such as environmental protection, material compatibility between the reacting chemicals and materials of construction of the equipment, and waste disposal.

Lutwack, R.↗

Union Carbide Corp. polysilicon status and plans

The status of polysilicon activities is summarized highlighted by moving the silane portion of the experimental process system development unit (EPSDU) to Washougal, Washington. The completion and operation of the silane EPSDU, is discussed along with research on the silane-to-silicon deposition process. Progress on the dichlorosilane process is also reported.

Leipold, M. H.↗

Multikilowatt Power Module Designed and Fabricated for High-Power Hall Thrusters

Previous efforts to develop power processing units (PPUs) for Hall thruster systems were targeted for the 1- to 5-kW power range and an output voltage of approximately 300 V. The NASA Glenn Research Center is developing new high-power Hall thrusters with a favorable combination of thrust, specific impulse, and efficiency to enable Earth-orbiting and Mars missions. These thrusters require up to 100 kW of power and a discharge voltage in excess of 800 V.

Pinero, Luis R.↗

A pilot-scale continuous-jet hydrate reactor

A three-phase, pilot-scale continuous-jet hydrate reactor (CJHR) has been developed for the production of gas hydrates. The reactor receives water and a hydrate-forming species to produce the solid gas hydrate. The CJHR has been tested for the production of CO{sub 2} hydrate for the purpose of ocean carbon sequestration. Formation of CO{sub 2} hydrate was investigated using various reactor/injector designs in a 72-l high-pressure vessel. Designs of the CJHR varied from single-capillary to multiple-capillary injectors that dispersed (1) liquid CO{sub 2} into water or (2) water into liquid CO{sub 2}. The novel injector is designed to improve the dispersion of one reactant into the other and, thus, eliminate mass transfer barriers that negatively affect conversion. An additional goal was an increase in production rates of two orders of magnitude. The designed injectors were tested in both distilled and saline water. Hydrate production experiments were conducted at different CO{sub 2} and water flow rates and for pressures and temperatures equivalent to intermediate ocean depths (1100-1700 m). The pilot-scale reactor with the novel injection system successfully increased hydrate production rates and efficiency.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Evaluation of Selected Chemical Processes for Production of Low-cost Silicon, Phase 3

Refinements of the design of the 50 MT/year Experimental Process System Development Unit were made and competitive bids were received from mechanical, electrical, and structural contractors. Bids on most of the equipment were received and cataloged. Emergency procedures were defined to counter a variety of contingencies disclosed in operations and safety reviews. Experimental work with an electrolytic cell for zinc chloride disclosed no significant increase in power efficiency by steps taken to increase electrolyte circulation. On the basis of materials compatibility and permeability tests, 310 stainless steel was chosen for the shell of the fluidized-bed reactor and SiC-coated graphite for the liner.

Blocher, J. M.↗

Low-cost solar array progress and plans

It is pointed out that significant redirection has occurred in the U.S. Department of Energy (DOE) Photovoltaics Program, and thus in the Flat-Plate Solar Array Project (FSA), since the 3rd European Communities Conference. The Silicon Materials Task has now the objective to sponsor theoretical and experimental research on silicon material refinement technology suitable for photovoltaic flat-plate solar arrays. With respect to the hydrochlorination reaction, a process proof of concept was completed through definition of reaction kinetics, catalyst, and reaction characteristics. In connection with the dichlorosilane chemical vapor desposition process, a preliminary design was completed of an experimental process system development unit with a capacity of 100 to 200 MT/yr of Si.Attention is also given to the silicon-sheet formation research area, environmental isolation research, the cell and module formation task, the engineering sciences area, and the module performance and failure analysis area.

Callaghan, W. T.↗

Development Status of a Power Processing Unit for Low Power Ion Thrusters

An advanced breadboard Power Processing Unit (PPU) for a low power ion propulsion system incorporating mass reduction techniques was designed and fabricated. As a result of similar output current requirements, the discharge supply was also used to provide the neutralizer heater and discharge heater functions by using three relays to switch the output connections. This multi-function supply reduces to four the number of power converters needed to produce the required six electrical outputs. Switching frequencies of 20 and 50 kHz were chosen as a compromise between the size of the magnetic components and switching losses. The advanced breadboard PPU is capable of a maximum total output power of 0.47 kW. Its component mass is 0.65 kg and its total mass 1.9 kg. The total efficiency at full power is 0.89.

Pinero, Luis R.↗