Search NASA⌕ Search

SEARCH · Search NASA

Results for “Phase 1”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

NASA SBIR abstracts of 1991 phase 1 projects

The objectives of 301 projects placed under contract by the Small Business Innovation Research (SBIR) program of the National Aeronautics and Space Administration (NASA) are described. These projects were selected competitively from among proposals submitted to NASA in response to the 1991 SBIR Program Solicitation. The basic document consists of edited, non-proprietary abstracts of the winning proposals submitted by small businesses. The abstracts are presented under the 15 technical topics within which Phase 1 proposals were solicited. Each project was assigned a sequential identifying number from 001 to 301, in order of its appearance in the body of the report. Appendixes to provide additional information about the SBIR program and permit cross-reference of the 1991 Phase 1 projects by company name, location by state, principal investigator, NASA Field Center responsible for management of each project, and NASA contract number are included.

Schwenk, F. Carl↗

NASA SBIR abstracts of 1992, phase 1 projects

The objectives of 346 projects placed under contract by the Small Business Innovation Research (SBIR) program of the National Aeronautics and Space Administration (NASA) are described. These projects were selected competitively from among proposals submitted to NASA in response to the 1992 SBIR Program Solicitation. The basic document consists of edited, non-proprietary abstracts of the winning proposals submitted by small businesses. The abstracts are presented under the 15 technical topics within which Phase 1 proposals were solicited. Each project was assigned a sequential identifying number from 001 to 346, in order of its appearance in the body of the report. Appendixes to provide additional information about the SBIR program and permit cross-reference of the 1992 Phase 1 projects by company name, location by state, principal investigator, NASA Field Center responsible for management of each project, and NASA contract number are included.

Schwenk, F. C.↗

The NASA broad-specification fuels combustion technology program: An assessment of phase 1 test results

An assessment is made of the results of Phase 1 screening testing of current and advanced combustion system concepts using several broadened-properties fuels. The severity of each of several fuels-properties effects on combustor performance or liner life is discussed, as well as design techniques with the potential to offset these adverse effects. The selection of concepts to be pursued in Phase 2 refinement testing is described. This selection takes into account the relative costs and complexities of the concepts, the current outlook on pollutant emissions control, and practical operational problems.

Fear, J. S.↗

Overview of NASA’s Break the Ice Lunar Challenge Phase 1

As NASA works to extend human exploration of the solar system, a sustained presence on the Moon will be critical for developing and testing the technologies and systems needed for future missions to Mars and beyond. In situ resource utilization (ISRU)—the use of lunar materials for life support, fuel, energy, manufacturing, and construction—is necessary to limit the delivery of supplies from Earth. One of the most important of these resources is water. Water supports all life on Earth and will be critical to supporting human exploration beyond Earth. On the Moon, water is trapped in icy regolith at the lunar poles, including inside permanently dark and cold craters. Novel approaches are needed to excavate the icy regolith and transport it for processing in support of permanent human missions on the Moon. To accelerate the development of such approaches and to seek diverse ideas, NASA’s Centennial Challenges launched the Break the Ice Lunar Challenge in November 2020. Phase 1 of the challenge was focused on stimulating innovative approaches for excavating icy regolith and delivering water in extreme lunar environmental conditions. The challenge sought to incentivize solutions for maximizing water delivery while minimizing energy use and the mass of equipment required to be transported to the lunar surface. Submissions for phase 1 of the challenge were due in June 2021 and winners were announced in August 2021. This paper provides details about the execution of the challenge, solutions received, criteria used to select winning solutions, and status of the phase 2 of the challenge.

Naveen Vetcha↗

Wind Plant Performance Prediction Benchmark Phase 1 (Technical Report)

Financial risk resulting from the uncertainty associated with developing, owning, and operating wind power plants remains a barrier to reducing the levelized cost of energy (LCOE). On average, modern wind power plants in the U.S. underperform their expected annual energy output by 3.5-4.5% , with many underperforming by over 10%. To compensate for this uncertainty, investors require a larger return on investment (ROI) and apply "knock-down" factors that mask much of the underlying sources of uncertainty. Wind energy projects thus have reduced access to low-cost capital. Furthermore, operating wind plants often take a simple approach to estimating operations & maintenance (O&M) costs (e.g. straight-line estimates based on similar plants), which can eat into profits. To overcome these issues, the wind industry must improve the models they use for estimating wind plant performance and operations. An industry consortium (IC) requested that the National Renewable Energy Laboratory (NREL) lead a Department of Energy (DOE) working group to benchmark the accuracy of wind power plant energy predictions against real operational data. The IC was also motivated by DOE and NREL's potential to characterize systematic energy underperformance, identify sources of uncertainty, and explore root causes. The Wind Plant Performance Prediction (WP3) project was created out of this request, and this report represents the successful completion of Phase 1 of the WP3 project. During the project, wind plant owners provided both pre-construction and operational data to NREL. The pre-construction data was provided to wind resource assessment (WRA) consultants so they could conduct energy yield assessments (EYA). NREL took all of the completed EYAs, along with the operational data, and conducted an operational assessment to benchmark the EYA results against actual operational data. Given the large amounts of sensitive data required for this effort, as well as historical opposition to sharing data within industry, successful completion of Phase 1 represents an unprecedented milestone for industry data sharing. To improve the accuracy and confidence of pre-construction EYAs, wind plant owners and investors need better, more certain, energy yield predictions. The WP3 Benchmark Project is an industry-driven response to this reality. For the first time, industry has taken the important step of working together at scale, sharing valuable operational data with DOE and NREL in order to investigate the sources of bias and uncertainty in these energy estimates. This IC provides wind plant preconstruction and operational data to NREL in an organized and documented fashion and provides guidance and feedback as needed. The IC also provides introspection of the design of experiment, key metrics of success, data challenges, analysis best practices, and quality of results.

17 WIND ENERGY↗

Radar Surveillance Volume for Phase 1 UAS's Alerting Timeline

This presentation briefs simulation results for the Phase 1 UAS encounters. Results are broken into four UAS speed ranges and metrics computed include the cumulative distribution curves for range, bearing, and elevation at the first corrective alerts.

unmanned↗

Materials Scorecards, Phase 1: Advanced Materials and Manufacturing Technology

This report presents preliminary material score cards (Phase 1) based on a survey of industry experts and the limited literature available on the state of advanced manufacturing of materials for nuclear applications. Seven reactor types were considered, and the data is presented in tabular form. The caveat is that the scores are based on limited data and expert judgement. Considerable work remains to be done to prioritize materials for advanced manufacturing to support existing and advanced reactors. A central database of processing conditions, resulting microstructure, post processing, properties, and performance of these materials is needed to support the accelerated adoption of advanced manufacturing by the industry.

36 MATERIALS SCIENCE↗

ATD-2 Integrated Arrival/Departure/Surface (IADS) System Phase 1 Evaluations

This document provides an overview of the ATD-2 stakeholder and partner evaluations, also known as Shadow Sessions, held at Charlotte-Douglas International Airport (CLT) in preparation for and during the Phase 1 evaluation period from 9/30/2017 - 9/30/2018. All of the user engagement sessions are listed below, but only a few of the major ones are described in more detail in the rest of this document. This document is comprised of information extracted from the ATD-2 Confluence team collaboration archives.

shadow sessions↗

VECTOR Phase 1 Dataset: CAV Trajectory and Energy Consumption Records

This dataset contains benchmark experimental data from Phase 1 of the VECTOR project, focusing on the energy impact of CAV hardware components. The dataset includes vehicle trajectory data (speed and position) and corresponding energy consumption records collected from a CAV platform equipped with lidar, cameras, onboard computation units, and communication modules. The primary objective is to quantify the baseline energy consumption attributable to sensing and computing systems, independent of any advanced cooperative control strategies. During experiments, the leading vehicle followed a predetermined velocity profile, and the following CAV mirrored this trajectory using a basic car-following control to ensure consistent driving behavior. This setup enables a reliable benchmark for assessing the energy cost introduced by onboard CDA hardware (e.g., lidar and GPU-based processing). The dataset is essential for evaluating energy baselines and supports future comparative studies involving additional cooperative strategies. ![system img](system.png) ![vector img](vector.png)

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

ART/Ada design project, phase 1. Task 3 report: Test plan

The plan is described for the integrated testing and benchmark of Phase Ada based ESBT Design Research Project. The integration testing is divided into two phases: (1) the modules that do not rely on the Ada code generated by the Ada Generator are tested before the Ada Generator is implemented; and (2) all modules are integrated and tested with the Ada code generated by the Ada Generator. Its performance and size as well as its functionality is verified in this phase. The target platform is a DEC Ada compiler on VAX mini-computers and VAX stations running the VMS operating system.

Allen, Bradley P.↗

Advanced Recovery Systems for Advanced Launch Vehicles (ARS) phase 1 study results

The paper documents the work completed during the Advanced Recovery Systems for Advanced Launch Vehicles phase 1 study. Particular attention is given to the definition of the design of a single recovery system for the most likely near-term payload, a propulsion/avionic module (P/AM). A P/AM recovery system for phase 2 demonstration was designed which offers low cost, extremely low weight, good performance, potential for pinpoint loading, and operational flexibility.

Wailes, William K.↗

Atom Interferometry for Detection of Gravitational Waves: NASA Institute for Advanced Concepts (NIAC) - Phase 1 Final Report

This report presents the results of the 2012-2013 NASA Institute for Advanced Concepts (NIAC) Phase 1 "Atom Interferometry for Detection of Gravitational Waves" project. The origin of this GW (Gravitational Wave) detection concept using atoms can be traced to theoretical work that first appeared in 2008 and also to a satellite mission-focused followup study that was done in 2011. The goal of the current project was to explore both theoretical and technical issues surrounding the implementation of this idea, as well as to begin performing proof-of-concept experiments to validate critical aspects of the proposal.The top level trade space for the detector design is driven by the strategy employed to mitigate laser frequency noise, which, if uncontrolled, can mask GW signatures. One of the advantages of the atom interferometric approach is the possibility of single baseline detection (Fig. 1.1), even in the presence of laser noise. This is enabled by the differential measurement between the two ensembles of atoms, which can result in substantial laser noise suppression. The details of this suppression depend on the atomic physics techniques used to implement the atom interferometry. Specifically, we considered the effect on noise suppression that results from using traditional two-photon Raman transitions (with alkali atoms) and also single-photon transitions (with alkaline earth-like atoms).The interferometers shown in Fig 1.1(b) take advantage of single-photon transitions (as opposed to traditional Raman transitions) because using light pulses from one direction at a time allows for near perfect common-mode cancellation of laser phase noise, even for long baselines. This calls for the use of atomic transitions with an (ideally large) optical energy level difference with a long (greater than 1 second) lifetime, such as high-transitions routinely used for optical atomic clocks in species like Sr, Ca and Yb. Notably, large momentum transfer (LMT) atom optics - and the sensitivity enhancement they confer – can still be realized by simply adding additional pairs of alternating pulses to each beam splitter process. Section 3 reports on the theoretical work we performed to justify this GW detection protocol using single-photon transitions. This approach represents a new method for GW detection using atoms that is distinct from the original proposal from 2008. At the system level, we evaluated three architectures, each of which implements a different solution to the laser frequency noise issue. The first two designs are based on two-photon Raman transitions with Rb atoms. One of these is a three-satellite, multiple baseline design while the other is a two-satellite, single baseline design. The third proposal is a two-satellite, single baseline design that uses single-photon transitions with Sr atoms. These three architectures are described in more detail in Section 2. There are a number of known technical issues that we have started to address using ground-based experiments. These issues include atom technology development needs such as, for example, lower ensemble temperature requirements and large momentum transfer (LMT) atom optics. To this end, we have built a 10-meter scale atom drop tower, where we can perform proof-of-principle demonstrations of the proposed AGIS detector in an environment that permits more than 2.5 seconds of free-fall time. This facility allows for demonstration of atom interferometry with long interrogation time (seconds) and large atom wavepacket

Saif, Babak N.↗

Commissioning of Phase 1 of the LANL RFQ Test Stand - Beam Characterization

A series of numerical start-to-end simulations of Phase 1 of the 750 keV RFQ Test Stand which includes the ion source (H+ duoplasmatron), a 1-Solenoid LEBT, an emittance scan station and a Faraday cup were performed to find a mechanism for the characterization of the proton beam extracted from the duoplasmatron.

43 PARTICLE ACCELERATORS↗

NASA's UAS Integration into the NAS: A Report on the Human Systems Integration Phase 1 Activities

This presentation summarizes the technical activities undertaken by the UAS in the NAS project's Human-Systems Integration team during during it's first phase. The technical activites are discussed in terms of the project's stated mission, research themes and technical challenges. The talk also covers the simulation research that has been performed by the HSI in Phase 1. The end of the presentation lays out the group's plans for Phase 2.

Fern, Lisa↗

Phase 1 Study of Low-Dose Fractionated Whole Abdominal Radiation Therapy in Combination With Weekly Paclitaxel for Platinum-Resistant Ovarian Cancer (GCGS-01)

Low-dose fractionated whole abdominal radiation therapy (LDFWART) has synergistic activity with paclitaxel in preclinical models. The aim of this phase 1 trial was to determine the recommended phase 2 dose and preliminary activity of weekly paclitaxel (wP) concurrent with LDFWART in patients with platinum-resistant ovarian cancer (PROC).

62 RADIOLOGY AND NUCLEAR MEDICINE↗

NAR/NASA CSM 101 Delta critical design review phase 1

The supplemental CSM 101 Delta Critical Design Review (CDR), as associated with the Block II redefinition changes, will be conducted in two phases. Phase 1 is a software review of the drawings, SCN's, and other appropriate documentation. A mockup review of the crew interfaces (only) related to the redefinition changes will follow the software review.

E. M. Clauser↗

ATD-2 Phase 1 New Features Training

This document is a compilation of the New Releases/New Features training materials accompanying various software releases during ATD-2 Phase 1.

training↗