Project Management Framework to Organizational Transitions

This paper describes a project management framework and associated models for organizational transitions. The framework contains an integrated set of steps an organization can take to lead an organizational transition such as downsizing and change in mission or role. The framework is designed to help an organization do the right work the right way with the right people at the right time. The underlying rationale for the steps in the framework is based on a set of findings which include: defining a transition as containing both near-term and long-term actions, designing actions which respond to drivers and achieve desired results, aligning the organization with the external environment, and aligning the internal components of the organization. The framework was developed based on best practices found in the literature, lessons learned from heads of organizations who have completed large-scale organizational changes, and concerns from employees at the Kennedy Space Center (KSC). The framework is described using KSC.

Kotnour, Tim↗

Learning the ABCs (of Project Management)

To lead a project effectively, one has to establish and maintain the flexibility to take appropriate actions when needed. Overconstrained situations should be avoided. To get on top of matters and stay there, a manager needs to anticipate what it will take to successfully complete the job. Physical and financial resources, personnel, and management structure are all important considerations. Carving out the necessary turf up front can make a world of difference to the project's outcome. After the "what," "where," and "when" of a project are nailed down, the next question is "how" to do the job. When I first interviewed for the job of Science Payload Manager on the Advanced Composition (ACE) Explorer mission, Dr. Edward Stone (ACE Principal Investigator) asked, "Al, give me an idea of your management style." It was a question I had not considered before. I thought about it for a few seconds and then answered, "Well, the first descriptive term that comes to mind is the word "tranquility". That seemed to startle him. So I added, "I guess what I mean is, that if the situation is tranquil and the project is running smoothly, then I've anticipated all the problems and taken necessary actions to head them off." He then asked: "Have you ever reached this state?" "No," I admitted, "but I strive for it." That seemed to satisfy him because I got the job.

Frandsen, Allan↗

Risk Analysis Application to Project Management

Oak Ridge National Laboratory staff are performing risk assessments for the Department of Energy Office of Nuclear Materials Integration for use in project management. The goal was to provide tools to help manage Department of Energy projects that require cross-functional teams to implement a project with a variety of drivers or constraints. The methodology is flexible and can be adapted for the level of rigor needed for the project. This paper focuses on risk assessments and risk mitigation planning for projects in their early stage of development when only preliminary project information is likely to be available. The methodology has been successfully used during the planning phases of projects to guide selection of tasks to be performed to reduce risk, lower costs, and improve chances of success.

Robinson, Sharon↗

Agent-Based Simulations for Project Management

Currently, the most common approach used in project planning tools is the Critical Path Method (CPM). While this method was a great improvement over the basic Gantt chart technique being used at the time, it now suffers from three primary flaws: (1) task duration is an input, (2) productivity impacts are not considered , and (3) management corrective actions are not included. Today, computers have exceptional computational power to handle complex simulations of task e)(eculion and project management activities (e.g ., dynamically changing the number of resources assigned to a task when it is behind schedule). Through research under a Department of Defense contract, the author and the ViaSim team have developed a project simulation tool that enables more realistic cost and schedule estimates by using a resource-based model that literally turns the current duration-based CPM approach "on its head." The approach represents a fundamental paradigm shift in estimating projects, managing schedules, and reducing risk through innovative predictive techniques.

White, J. Chris↗

Issues in NASA program and project management

This volume is the sixth in an ongoing series on aerospace project management at NASA. Articles in this volume cover evolution of NASA cost estimating; SAM 2; National Space Science Program: strategies to maximize science return; and human needs, motivation, and results of the NASA culture surveys. A section on resources for NASA managers rounds out the publication.

Hoban, Francis T.↗

Issues in NASA program and project management

This volume is the ninth in an ongoing series on aerospace project management at NASA. Articles in this volume cover evolution of NASA cost estimating; SAM 2; National Space Science Program: strategies to maximize science return; and human needs, motivation, and results of the NASA culture surveys. A section on resources for NASA managers rounds out the publication.

Hoban, Francis T.↗

Issues in NASA program and project management

This new collection of papers on aerospace management issues contains a history of NASA program and project management, some lessons learned in the areas of management and budget from the Space Shuttle Program, an analysis of tools needed to keep large multilayer programs organized and on track, and an update of resources for NASA managers. A wide variety of opinions and techniques are presented.

Hoban, Francis T.↗

Salt Waste Processing Facility Project (SWPF) project management improvements: Working under a cost cap contract - 15523

The Salt Waste Processing Facility (SWPF), located at the Savannah River Site (SRS) in Aiken, South Carolina, is a multi-billion dollar LRW processing facility that represents the keystone for the U.S. Department of Energy (DOE)-EM clean-up mission at SRS. In June 2013, DOE and Parsons agreed to Contract Modification 0116 that definitized the remaining work to achieve Construction Complete with a target schedule and a cost cap contract structure. The SWPF project is currently 85 percent complete with construction, and approximately 10 percent complete with commissioning. To date there have been numerous lessons learned with regard to contract and project management, procurement, construction, safety and quality assurance approaches (both good practices and mistakes). These lessons learned are considered to be of significant value in improving the state of major project execution within the DOE-EM clean-up program as well as to the wider DOE complex. An overview of the current SWPF project status is provided, along with challenges associated with operating under a cost cap environment within a cost-plus contract structure. Key lessons learned will be discussed including contract management, baseline development and acceptance under DOE O 413.3, Program and Project Management for the Acquisition of Capital Assets requirements, cost and schedule control, change management and risk strategies. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Improving Project Management Using Formal Models and Architectures

This talk discusses the advantages formal modeling and architecture brings to project management. These emerging technologies have both great potential and challenges for improving information available for decision-making. The presentation covers standards, tools and cultural issues needing consideration, and includes lessons learned from projects the presenters have worked on.

Kahn, Theodore↗

International Project Management Committee: Overview and Activities

This slide presentation discusses the purpose and composition of the International Project Management Committee (IMPC). The IMPC was established by members of 15 space agencies, companies and professional organizations. The goal of the committee is to establish a means to share experiences and best practices with space project/program management practitioners at the global level. The space agencies that are involved are: AEB, DLR, ESA, ISRO, JAXA, KARI, and NASA. The industrial and professional organizational members are Comau, COSPAR, PMI, and Thales Alenia Space.

Hoffman, Edward↗

MSFC Propulsion Systems Department Knowledge Management Project

This slide presentation reviews the Knowledge Management (KM) project of the Propulsion Systems Department at Marshall Space Flight Center. KM is needed to support knowledge capture, preservation and to support an information sharing culture. The presentation includes the strategic plan for the KM initiative, the system requirements, the technology description, the User Interface and custom features, and a search demonstration.

Caraccioli, Paul A.↗

A critical review of the life sciences project management at Ames Research Center for the Spacelab Mission development test 3

A management study was initiated by ARC (Ames Research Center) to specify Spacelab Mission Development Test 3 activities and problems. This report documents the problems encountered and provides conclusions and recommendations to project management for current and future ARC life sciences projects. An executive summary of the conclusions and recommendations is provided. The report also addresses broader issues relevant to the conduct of future scientific missions under the constraints imposed by the space environment.

Helmreich, R. L.↗