Search NASA⌕ Search

SEARCH · Search NASA

Results for “Trigger”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Search for GLAST gamma ray burst triggers due to particle precipitation in the South Atlantic Anomaly

When GLAST is in the South Atlantic Anomaly (SAA), the rate of charged particles is too high to be efficiently filtered out. Moreover the high rate can cause saturation effects in the readout electronics and the sensors must be turned off. The SAA area relative to the total area of GLAST's orbit is approximately 12.5% and GLAST spends 18% of the time in it. In spite of these cares, we show in this work that, due to drift processes, particle precipitation can still trigger GLAST when it is close to the SAA region. Here, we report two GLAST gamma ray burst monitor (GBM) triggers, trigger 239895229 and trigger 239913100, on August, 08, 2008 whose characteristics are similar to the ones observed in the Swift-BAT noise triggers (due to particle precipitation in the SAA region). Both GLAST triggers happened during a plentiful particle precipitation in the SAA region, observed by Tupi telescopes at the ground with their trigger coordinates close to the field of view of the telescopes. Details of these results are reported.

79 ASTRONOMY AND ASTROPHYSICS↗

A 250 MHz Level 1 Trigger and Distribution System for the GlueX experiment

The GlueX detector now under construction at Jefferson Lab will search for exotic mesons though photoproduction (10^8 tagged photons per second) on a liquid hydrogen target. A Level 1 hardware trigger design is being developed to reduce total electromagnetic (>200 MHz) and hadronic (>350 kHz) rates to less than 200 kHz. This trigger is dead timeless and operates on a global synchronized 250 MHz clock. The core of the trigger design is based on a custom pipelined flash ADC board that uses a VXS backplane to collect samples from all ADCs in a VME crate. A custom switch-slot board called a Crate Trigger Processor (CTP) processes this data and passes the crate level data via a multi-lane fiber optic link to the Global Trigger Processing Crate (also VXS). Within this crate detector sub-system processor (SSP) boards can accept all individual crate links. The subsystem data are processed and finally passed to global trigger boards (GTP) where the final L1 decision is made. We present details of the trigger design and report some performance results on current prototype systems.

42 ENGINEERING↗

Design of the Trigger Interface and Distribution Board for TJNAF 12 GeV Upgrade

The design of the Trigger Interface and Distribution (TID) board for the 12 GeV Upgrade at Thomas Jefferson National Accelerator Facility (TJNAF) is described. The TID board distributes a low jitter system clock, synchronized trigger, and synchronized multi-purpose SYNC signal. The TID also initiates readout for the data acquisition front-end crate. With the TID boards, a multi-crate system can be setup for large scale nuclear physics experiments. The TID board can be selectively populated as a Trigger Interface (TI) board, or a Trigger Distribution (TD) board for the 12 GeV upgrade experiments. When the TID is populated as a TI, The TID can be located in the VXS crate and distribute the CLOCK/TRIGGER/SYNC (CTS) through the VXS/P0 connector; it can also be located in the standard VME64 crate, and distribute the CTS through the VME/P2 connector or front panel connectors. It initiates the data acquisition for the front-end crate where the TI is positioned in. When the TID is populated as a TD, it fans out the CTS from the trigger supervisor to the front-end crates through optical fibres. The TD board monitors the trigger processing on the TI boards, and sends feedback to the Trigger Supervisor (TS) board for event readout flow control. A Field Programmable Gate Arrays (FPGA) is utilised on the TID board to provide programmability. The TID board was intensively tested on the bench. The TID production version has been released to industry for contract manufacturing.

Gu, Jianhui W.↗

Understanding the Roles of Convective Trigger Functions in the Diurnal Cycle of Precipitation in the NCAR CAM5

The wrong diurnal cycle of precipitation is a common weakness of current global climate models (GCMs). To improve the simulation of the diurnal cycle of precipitation and understand what physical processes control it, we test a convective trigger function described in Xie et al. (2019) with additional optimizations in the NCAR Community Atmosphere Model version 5 (CAM5). The revised trigger function consists of three modifications: 1) replacing the Convective Available Potential Energy (CAPE) trigger with a dynamic CAPE (dCAPE) trigger, 2) allowing convection to originate above the top of planetary boundary layer (i.e., the unrestricted air parcel launch level - ULL), and 3) optimizing the entrainment rate and threshold value of the dynamic CAPE generation rate for convection onset based on observations. Results from 1°-resolution simulations show that the revised trigger can alleviate the long-standing GCM problem of too early maximum precipitation during the day and missing the nocturnal precipitation peak that is observed in many regions, including the U.S. southern Great Plains (SGP). The revised trigger also improves the simulation of the propagation of precipitation systems downstream of the Rockies and the Amazon region. A further composite analysis over the SGP unravels the mechanisms through which the revised trigger affects convection. Additional sensitivity tests show that both the peak time and the amplitude of the diurnal cycle of precipitation are sensitive to the entrainment rate and dCAPE threshold values.

54 ENVIRONMENTAL SCIENCES↗

A Radiation-Triggered Surveillance System for UF6 Cylinder Monitoring

This report provides background information and representative scenarios for testing a prototype radiation-triggered surveillance system at an operating facility that handles uranium hexafluoride (UF 6 ) cylinders. The safeguards objective is to trigger cameras using radiation, or radiation and motion, rather than motion alone, to reduce significantly the number of image files generated by a motion-triggered system. The authors recommend the use of radiation-triggered surveillance at all facilities where cylinder paths are heavily traversed by personnel. The International Atomic Energy Agency (IAEA) has begun using surveillance cameras in the feed and withdrawal areas of gas centrifuge enrichment plants (GCEPs). The cameras generate imagery using elapsed time or motion, but this creates problems in areas occupied 24/7 by personnel. Either motion-or-interval-based triggering generates thousands of review files over the course of a month. Since inspectors must review the files to verify operator material-flow-declarations, a plethora of files significantly extends the review process. The primary advantage of radiation-triggered surveillance is the opportunity to obtain full-time cylinder throughput verification versus what presently amounts to part-time verification. Cost savings should be substantial, as the IAEA presently uses frequent unannounced inspections to verify cylinder-throughput declarations. The use of radiation-triggered surveillance allows the IAEA to implement less frequent unannounced inspections for the purpose of flow verification, but its principal advantage is significantly shorter and more effective inspector video reviews.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Dark Matter and Track Triggering with the CMS Experiment (Final Report)

This report summarizes the progress from DOE Early Career Award entitled “Dark Matter and Track Triggering with the CMS Experiment”. The first major goal of the project was to establish a sensitive Dark Matter (DM) search program for the CMS experiment in Run-2 of the LHC. Two related strategies were developed to accomplish this goal. First, we designed and executed searches for DM produced in association with heavy flavor quark pairs, top/anti-top (ttbar) and bottom/anti-bottom (bbbar). In addition, we sought to maximize the power of Run-2 DM searches through the development of a statistical combination of all major search channels within a consistent theoretical framework. The results of these aspects of the project are detailed in Section 1. The second major goal of the project was to develop a real-time “Level-1” tracking trigger system for the high-luminosity LHC (HL-LHC) CMS upgrade. Charged particle tracking in the first stage of the CMS trigger will be crucial for surviving the high-pileup environment expected at the HL-LHC. The L1 tracking trigger must process all front-end hit data sent from the inner Tracker and will have just 4us to output track primitives to the downstream L1 trigger without data loss. Our development of the CMS tracking trigger is described in Section 2. The team supported by the award is given in Section 3. The project resulted in 10 peer reviewed publications, a graduate student thesis, and contributions to the CMS Phase-2 Tracker Technical Design Report, as is detailed in Section 4. Our development work for the CMS tracking trigger has been integrated in the backend system architecture for the Tracker upgrade.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Force-triggered, Bio-based, Sealants for Prefabricated Building Components: Towards Improved Efficiency, Performance and Sustainability

The prefabricated building construction industry has made extensive progress in expediting the manufacture of prefabricated components at offsite plants. However, this progress has not translated to the assembly of the prefabricated components at the construction site. Case in point, sealing the joints between components to prevent air leaks requires the manual application of tape, caulk, or spray foam at the jobsite, and performance is highly dependent on the skills of the installer. To reduce assembly time and improve the airtightness and waterproofness of prefabricated components, we developed a sealant that can be installed at the plant and have its curing reaction triggered at the jobsite. Additionally, we used this opportunity to explore the use of bio-based feedstocks that are abundant and not used for food. We evaluated a series of force-triggered, bio-based, high strength, and fast curing sealants, consisting of a one-part heterogeneous system. These sealants are derived from formulations with ≥80% of bio-based components, consisting of a cardanol derived diepoxy that is microencapsulated in a polymer shell and embedded in a cardanol derived amine curing agent. The microcapsule shell allows separation of the reactive species in the one-part sealant allowing a fast-curing system to remain unreacted until the right trigger is applied. When the microcapsules are activated and broken by force, the highly reactive species mix and cure, exhibiting peel strengths up to 143 ppi. The open-air shelf stability of the sealant complexes was demonstrated by peel strength values of ~16 ppi when triggering the curing reaction even after being exposed for 8 months to open air and humidity. The successful on-demand triggering of curing reactions and the shelf stability provide efficacy of these force-triggered sealants for installation on prefabricated components, storage for months prior to delivery, and assembly at the jobsite. These force-triggered bio-based sealants for prefabricated buildings could result in lower installation time and cost as well as better performance than tapes and caulks at the jobsite.

Cortes Guzman, Karen [ORNL] (ORCID:000000028793468↗

Implementation and Performance of the Tau Trigger in the ATLAS Experiment

Triggering on hadronic taus at the LHC is a difficult task due to the high rate and occupancy of the events. On the other hand, the tau trigger increases the discovery potential of ATLAS in many physics channels, among others the Standard Model or SuperSymmetric Higgs (charged or neutrals) production. In order to cope with the rate and optimize the efficiency on important physics channels, the results of the current simulation studies indicate that the ATLAS tau trigger should be used either with relatively high transverse momentum thresholds alone, or with more relaxed threshold requirements in combination with other triggers, like the missing transverse energy trigger or a leptonic or jet trigger. In this contribution we describe the ATLAS tau trigger, and we present some of the current results from the simulation studies, focusing both on early physics and on physics at high luminosity.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Trigger Rate of High Energy Electrons in the Mu2e Experiment

aThe Mu2e Collaboration will look for Charged Lepton Flavor Violation (CLFV) decay processes, with a sensitivity goal of 10E-17. The experiment is searching for a 105 MeV electron, which will be detected using a straw tracker solenoid and a crystal calorimeter. With a goal processing time of less than 5 milliseconds per event and a target rejection greater than 100, it is critical that the trigger software is optimized for speed and performance. The trigger is responsible for parsing data from the detector and determining which events to keep. By examining the properties CLFV event helices are expected to have, a specific set of parameters, or cuts, were used to create Mu2e triggering algorithms. The following research is an investigation into the efficiency of the trigger and a calculation of the rate at which these events will be triggered. With the combined contribution of two helix reconstruction algorithms, the trigger will be expected to accept approximately on e CLFV candidate electron event per second, with a triggering rate of .86 Hz.

43 PARTICLE ACCELERATORS↗

Level-1 Trigger and DAQ system of the GlueX experiment

he goal of the GlueX detector at Jefferson Lab is to study fundamental questions of the quantum chromodynamics, i.e., the nature of confinement of gluons and quarks. The detector's design is optimized to measure the spectrum of exotic mesons that are expected to be produced in interactions of 8.4 - 9.0 GeV linearly polarized photons with a liquid hydrogen target. The GlueX trigger and DAQ electronics is based on pipelined TDC boards and FADC boards running at a 250 MHz clock. The trigger logic is implemented on special purpose programmable electronics boards with Field-Programmable Gate Array chips. Two types of boards are used: Crate Trigger Processors and Global Trigger Processors. All trigger electronics is hosted in VXS crates. The Level-1 trigger should reduce the 200 MHz electromagnetic rate and the 400 kHz hadronic rate to 200 kHz total rate. The trigger algorithm makes use of a measurement of the energy deposition in two electromagnetic calorimeters and hit counts in

08 HYDROGEN↗

The level-1 trigger for the SuperCDMS experiment at SNOLAB

The SuperCDMS SNOLAB dark matter search experiment aims to be sensitive to energy depositions down to Script O(1 eV). This imposes requirements on the resolution, signal efficiency, and noise rejection of the trigger system. To accomplish this, the SuperCDMS level-1 trigger system is implemented in an FPGA on a custom PCB. A time-domain optimal filter algorithm realized as a finite impulse response filter provides a baseline resolution of 0.38 times the standard deviation of the noise, σn, and a 99.9% trigger efficiency for signal amplitudes of 1.1 σ n in typical noise conditions. Embedded in a modular architecture, flexible trigger logic enables reliable triggering and vetoing in a dead-time-free manner for a variety of purposes and run conditions. The trigger architecture and performance are detailed in this article.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Fast b -tagging at the high-level trigger of the ATLAS experiment in LHC Run 3

The ATLAS experiment relies on real-time hadronic jet reconstruction and b-tagging to record fully hadronic events containing b-jets. These algorithms require track reconstruction, which is computationally expensive and could overwhelm the high-level-trigger farm, even at the reduced event rate that passes the ATLAS first stage hardware-based trigger. In LHC Run 3, ATLAS has mitigated these computational demands by introducing a fast neural-network-based b-tagger, which acts as a low-precision filter using input from hadronic jets and tracks. It runs after a hardware trigger and before the remaining high-level-trigger reconstruction. This design relies on the negligible cost of neural-network inference as compared to track reconstruction, and the cost reduction from limiting tracking to specific regions of the detector. In the case of Standard Model HH → bb̅bb̅, a key signature relying on b-jet triggers, the filter lowers the input rate to the remaining high-level trigger by a factor of five at the small cost of reducing the overall signal efficiency by roughly 2%.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Design and Performance of the Solid-State Laser Trigger System for HERMES III

The HERMES III accelerator is an 18-20 MeV linear induction accelerator constructed at Sandia National Laboratories in the late 1980s and which continues operation to this day. As part of recent modernization efforts, the laser triggering system on the accelerator has been replaced with a newly designed solid-state system. This system consists of ten Nd:YAG lasers, each having a nominal output energy of 40-45 mJ at a wavelength of 266 nm. The beam from each laser is split such that it triggers two of the Rimfire gas switches on the accelerator. Compared to the previous laser triggering system, this arrangement makes it possible to more readily tailor the final output pulse shape, and overall reliability for the accelerator's operation with these new lasers has increased. The design of this new laser triggering system is presented in this paper, along with details pertaining to the energy budgeting, optical beam paths, and electrical triggering of the lasers. Initial operational data from the HERMES III accelerator using this new triggering system is also presented.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Multiplicity trigger detector for the S π RIT experiment

A multiplicity trigger detector (MTD) was developed for the SπRIT experiment that aims to probe the high- density symmetry energy via heavy-ion collisions (HICs). The MTD is designed to measure the charged-particle multiplicity in HICs to provide a trigger signal that can be used to select high-multiplicity events induced by central collisions. The MTD consists of two side-walls segmented into 30 plastic scintillation paddles, each equipped with a multi-pixel photon counter. A custom board with EASIROC front-end ASIC is used as readout electronics. A multiplicity logic signal is generated by an on-board FPGA that processes the discriminated signals from EASIROCs. The overall latency of the whole detector system for outputting the trigger is less than 100 ns, including 52 ns of electronics latency for processing the signals. During the measurement of 112 Sn + 124 Sn reactions at an incident energy of 270 MeV/nucleon, the minimum multiplicity threshold of the MTD was set to 4, where the overall trigger efficiency was obtained to be about 39 % for inclusive nuclear reactions. Furthermore, a simulation study with a numerical calculation of HICs found that the central collisions of impact parameters of less than 4 fm can be triggered with a high efficiency of more than 95 % by the experimental trigger condition.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Long- and short-term triggering and modulation of mud volcano eruptions by earthquakes

Earthquakes can trigger the eruption of mud. In this study, we use eruptions in Azerbaijan, Italy, Romania, Japan, Andaman Islands, Pakistan, Taiwan, Indonesia, and California to probe the nature of stress changes that induce new eruptions and modulate ongoing eruptions. Dynamic stresses produced by earthquakes are usually inferred to be the dominant triggering mechanism; however static stress changes acting on the feeder systems of mud volcanoes may also play a role. In Azerbaijan, eruptions within 2-10 fault lengths from the epicenter are favored in the year following earthquakes where the static stress changes cause compression of the mud source and unclamp feeder dikes. In Romania, Taiwan, and some Italian sites, increased activity is also favored where the static stress changes act to unclamp feeder dikes, but responses occur within days. The eruption in the Andaman Islands, and those of the Niikappu mud volcanoes, Japan are better correlated with amplitude of dynamic stresses produced by seismic waves. Similarly, a new island that emerged off the coast of Pakistan in 2013 was likely triggered by dynamic stresses, enhanced by directivity. At the southern end of the Salton Sea, California earthquakes increase the gas flux at small mud volcanoes. Responses are best correlated with dynamic stresses. The comparison of responses in these nine settings indicates that dynamic stresses are most often correlated with triggering, although permanent stress changes as small as, and possibly smaller than, 0.1 bar may be sufficient to also influence eruptions. Unclamping stresses with magnitude similar to Earth tides (0.01 bar) persist over time and may play a role in triggering delayed responses. Lastly, unclamping stresses may be important contributors to short-term triggering only if they exceed 0.1-1 bar.

58 GEOSCIENCES↗

Force-Triggered, Biobased Sealants for Prefabricated Building Components: Toward Improved Efficiency and Performance

The prefabricated building construction industry has made extensive progress in expediting the manufacture of prefabricated components at off-site plants. However, the sealing of joints between these components, which is crucial to ensuring the weatherproofing of the assembly, still represents a labor-intensive, on-site effort that relies on the manual installation of tapes and caulks. Here, to reduce work at the jobsite and improve the airtightness and waterproofness of building envelopes, we developed a sealant that can be installed at the plant on prefab components and have the curing reaction triggered at the jobsite by using microencapsulation technology to separate the reactive agents. A series of force-triggered, high-strength, and fast-curing sealants derived from biobased feedstocks were developed, which consist of a biobased epoxy agent encapsulated in a polymer shell, embedded in a biobased amine curing agent. The shell of the microcapsules allows an effective separation of the reactive species in the one-part sealant, allowing shelf stability to an otherwise fast-curing system as well as improving the hydrophobicity of the whole system. When force activates and breaks the microcapsules, the highly reactive epoxy and amine mix and cure, exhibiting peel strength values of up to 143 ppi (pounds per inch). The hydrophobicity of the sealants allows them to retain up to 94% of the original peel strength after complete submersion in water for 24 h, showcasing the water resistivity of the sealant system. The open-air shelf stability of the sealant complex is demonstrated by the obtention of peel strength values of ∼16 ppi when triggering the curing reaction even after being exposed 8 months to open air and humidity. The successful on-demand triggering of curing reactions and the shelf stability provide efficacy of these force-triggered sealants for installation on prefabricated components, storage for months prior to delivery, and assembly at a jobsite. These force-triggered biobased sealants for prefabricated buildings can result in lower installation time and cost and better performance than tapes and caulks at the jobsite.

biobased↗

Performance of the CMS Level-1 trigger in proton-proton collisions at $\sqrt{s} =$ 13 TeV

At the start of Run 2 in 2015, the LHC delivered proton-proton collisions at a center-of-mass energy of 13\TeV. During Run 2 (years 2015–2018) the LHC eventually reached a luminosity of 2.1× 1034 cm-2s-1, almost three times that reached during Run 1 (2009–2013) and a factor of two larger than the LHC design value, leading to events with up to a mean of about 50 simultaneous inelastic proton-proton collisions per bunch crossing (pileup). The CMS Level-1 trigger was upgraded prior to 2016 to improve the selection of physics events in the challenging conditions posed by the second run of the LHC. This paper describes the performance of the CMS Level-1 trigger upgrade during the data taking period of 2016–2018. The upgraded trigger implements pattern recognition and boosted decision tree regression techniques for muon reconstruction, includes pileup subtraction for jets and energy sums, and incorporates pileup-dependent isolation requirements for electrons and tau leptons. In addition, the new trigger calculates high-level quantities such as the invariant mass of pairs of reconstructed particles. The upgrade reduces the trigger rate from background processes and improves the trigger efficiency for a wide variety of physics signals.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

ATLAS jet trigger update for the LHC run II

The CERN Large Hadron Collider is the biggest and most powerful particle collider ever built. It produces up to 40 million proton-proton collisions per second at unprecedented energies to explore the fundamental laws and properties of Nature. The ATLAS experiment is one of the detectors that analyses and records these collisions. It generates dozens of GB/s of data that has to be reduced before it can be permanently stored, the event selection is made by the ATLAS trigger system, which reduces the data volume by a factor of 105. The trigger system has to be highly configurable in order to adapt to changing running conditions and maximize the physics output whilst keeping the output rate under control. A particularly interesting pattern generated during collisions consists of a collimated spray of particles, known as a hadronic jet. To retain the interesting jets and efficiently reject the overwhelming background, optimal jet energy resolution is needed. Therefore the Jet trigger software requires CPU-intensive reconstruction algorithms. In order to reduce the resources needed for the reconstruction step, a partial detector readout scheme was developed, which effectively suppresses the low activity regions of the calorimeter. In this paper we describe the overall ATLAS trigger software, and the jet trigger in particular, along with the improvements made on the system. We then focus on detailed studies of the algorithm timing and the performance impact of the full and partial calorimeter readout schemes. We conclude with an outlook of the jet trigger plans for the next LHC data-taking period. (authors)

43 PARTICLE ACCELERATORS↗