Search NASA⌕ Search

SEARCH · Search NASA

Results for “Upgrades”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Upgrades to the International Space Station Urine Processor Assembly

The ISS Urine Processor Assembly (UPA) began operations in November 2008. Though the UPA has successfully generated distillate from crew urine, several modifications and upgrades have been implemented to improve overall system performance throughout the years. Current and future upgrades to the UPA will continue to focus on improved system performance and reliability, focusing next on a flight demonstration experiment of a vacuum pump utilizing scroll pump technologies. The upgraded Distillation Assembly, described in further detail in previous publications, will also be available for on-orbit integration within the year. The following paper discusses progress on the Purge Pump and Separator Assembly (PPSA), and concept considerations for future UPA upgrades.

Jill P Williamson↗

Upgrades to the Single Stage Axial Compressor and Fan Facility For Low Pressure Ratio and Boundary Layer Ingesting Fan Research

Next generation aircraft engine efficiency goals will be met through high bypass ratio engines. To achieve these goals, a combination of small core and low pressure ratio fan technologies will be necessary. Additionally, advanced propulsion airframe integration concepts, such as boundary layer propulsion, and distributed electrically driven fans with short inlets or wing integration strategies, are beginning to be investigated for their potential fuel burn savings. In order to realize the potential fuel savings from these technologies, it is necessary to have testing capabilities for the components. The NASA Glenn Research Center (GRC) Single Stage Axial Fan and Compressor Facility (also called the GRC W-8 Facility) has recently undergone several significant upgrades in order to effectively test low pressure ratio fans and various inlet distortions. This paper will outline various challenges to testing low pressure ratio fans and the methods implemented to ensure that the W-8 facility is capable of performing these tests and acquiring high quality data. The upgrades include significant piping upgrades to reduce pressure loss and turbulence, capability for inlet total pressure and swirl distortion, increased test section length including a longer shaft, a two component balance, an upgraded rotating data system, and a new temperature characterization to reduce uncertainties in thermocouple measurements.

W-8 facitlity↗

Safety-Related Instrumentation & Control Pilot Upgrade Initiation Phase Implementation Report

This research report (1) describes the process followed and products developed during the SR I&C Pilot Project Initial Scoping Phase, and (2) captures lessons learned. Exelon Generation and LWRS collaborated to develop a Digital Transformation Strategy as part of a larger Advanced Concept of Operations. The proposed SR I&C Pilot Upgrade provides a foundation stone for this Digital Transformation that will improve plant safety, reliability, and operational performance while lowering plant Total Cost of Ownership (TCO). Initial Scoping Phase activities for this Pilot Project have been performed in accordance with industry processes that have been adapted to better support digital upgrades. These processes include IP-ENG-001, Standard Design Process (SDP) [Reference 2], NISP-EN-04, Standard Digital Engineering Process (SDEP) [Reference 3], and Electric Power Research Institute (EPRI) Report 3002011816, Digital Engineering Guide (DEG). Completing Initial Scoping Phase Engineering and Operations, Licensing, and Project Management Activities was necessary to sufficiently bound the scope, schedule, and estimated cost of the Project to enable utility management to authorize moving into the Conceptual Design Phase. A significant finding of the Business Case Analysis (BCA) methodology developed and applied as part of this effort was that the growth rate of material costs for sustaining the operation of obsolete SR I&C equipment is accelerating. This directly contributed to the Project Economic Analysis created to justify continuing the Project. Project Initial Scoping Phase lessons learned have also been captured to assist the larger industry in understanding the Digital Transformation Strategy and SR I&C Pilot Project Initial Scoping Phase efforts. This is in keeping with the public/private partnership that has been established between the Department of Energy (DOE) and Exelon for this effort with engagement from the NRC. By addressing first-of-a-kind (FOAK) risks and capturing lessons learned, the SR I&C Pilot Upgrade Project addresses technical, regulatory, and business risks to enable subsequent implementers of similar upgrades.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Progress on the Proton Power Upgrade at the Spallation Neutron Source

The Proton Power Upgrade Project at the Spallation Neutron Source (SNS) at Oak Ridge National Laboratory will double the proton power capability from 1.4 to 2.8 MW. This will be accomplished through an energy increase from 1.0 to 1.3 GeV and a beam current increase from 26 to 38 mA. The energy increase will be accomplished through the addition of 7 cryomodules to the linear accelerator (Linac). The beam current increase will be supported by upgrading several radio-frequency systems in the normal-conducting section of the Linac. Upgrades to the accumulator ring injection and extraction regions will accommodate the increase in beam energy. A new 2-MW-capable target and supporting systems will be developed and installed. Conventional facility upgrades include build-out of the existing klystron gallery and construction of a tunnel stub to facilitate future beam transport to the second target station. The project received approval to proceed with construction in October 2020. Procurements are in progress, and some installation activities have already occurred. Most of the installation will take place during three outages in 2022-2023. The project early finish is planned for 2025.

Barbier, Charlotte↗

Combining CO2 Electrolysis with Biological Upgrading to Fuels and Chemicals: Turning Waste into Fuels

The utilization of flue gas-derived CO2 presents an opportunity to enhance carbon utilization in the bioethanol industry, contributing to the production of valuable products. In the context of a 90 million-gallon-per-year corn ethanol plant generating approximately 30 tons per hour of 99% pure CO2, a collaborative effort involving six national laboratories has been established. This initiative, known as the CO2 Reduction and Upgrading for e-Fuels (CO2RUe) Consortium, is funded by the Department of Energy's BioEnergy Technologies Office (BETO). The primary objective of the CO2RUe Consortium is to explore innovative approaches to harness CO2 as a valuable feedstock. This interdisciplinary consortium integrates electrochemistry with biological upgrading techniques, aiming to yield sustainable, value-added products and aviation fuels. The presentation will delve into the recent advancements in the realms of electrochemistry and biological upgrading, with a specific focus on formic acid and CO. Additionally, the talk will include an analysis of future electricity grid scenarios, technoeconomic evaluations, and life-cycle assessments. These assessments aim to provide a comprehensive understanding of the impacts of various conversion pathways on both cost and carbon intensity. The CO2RUe Consortium is at the forefront of steering the development of economically favorable and sustainable processes for CO2 utilization. The presentation will showcase the consortium's progress in driving the advancement of technology and processes, emphasizing the economic viability and sustainability of CO2 utilization within the broader context of the bioethanol industry.

biological upgrading↗

Assessment of lignite upgrade and hydrogen evolution via electrolysis

Lignite, considered as the lowest-rank coal, accounts for 45% of the total coal resources worldwide, and its low carbon and high ash contents limit its large-scale application. In order to upgrade lignite effectively, a modified coal electrolytic cell (MCEC) was designed, built, and then evaluated for lignite upgrade and hydrogen production through electrolysis, and the operating conditions were optimized. The results show that the performance of the MCEC outperformed the previous coal electrolytic cell (CEC). The operating temperature and iron concentration significantly impact the average current density per milligram of catalyst (ACDMC). The content of dry fixed carbon and heating value increased by 20.9% (wt%) and 8.15%, respectively, in electrolyzed lignite compared with raw lignite. Besides, 71.5% ash and 39.6% mercury were removed from raw lignite after electrolysis, which is the first report. The Faradaic efficiency (FE) for hydrogen evolution reached 99% using MCEC. In addition, the analysis of spectroscopy methods (SEM, EDX, FTIR, and XRD) revealed that the lignite particles were cracked; the oxygen-containing functional groups increased; the minerals of quartz and hematite formed on the surface of lignite particles after electrolysis. Furthermore, the facts indicate that electrolysis of lignite is a competitive approach for lignite upgrade and hydrogen production.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Life Cycle Greenhouse Gas Emissions of Biogas Upgrading for Fuel Production

Waste-to-Renewable Natural Gas (RNG) offers a promising solution to alleviating waste management challenges by converting waste into renewable fuels. Here, this process can significantly reduce greenhouse gas (GHG) emissions, as demonstrated through a comprehensive life cycle analysis. Biogas upgrading is essential to enhance the methane concentration, though it could be energy-intensive and susceptible to methane slippage. Four commonly adopted biogas upgrading technologies, including pressure swing adsorption, membrane separation, chemical absorption, and water scrubbing, are considered. Our study evaluates the life cycle GHG emissions of RNG production from major sources of waste in the U.S. including wastewater sludge, food waste, landfill gas, dairy cow manure, and swine manure. Meta-analysis was conducted to assess methane slippage and energy consumption of biogas upgrading and associated GHG emissions, while accounting for potential avoided emissions from conventional waste management, which vary widely (ranging from −481.0 to 101.8 g CO 2 -eq/MJ). Under default upstream assumptions, representative carbon intensity of RNG varies from about −125 g of CO 2 -eq/MJ (dairy cow manure) to about 41 g of CO 2 -eq/MJ (wastewater sludge). We also explored RNG applications in producing hydrogen, ammonia, and compressed/liquefied forms. These findings highlight the potential of RNG and RNG-derived fuels to reduce GHG emissions and bolster the U.S. energy supply.

Biogas upgrades↗

The systems engineering upgrade intiative at NASA's Jet Propulsion Laboratory

JPL is implementing an initiative to significantly upgrade our systems engineering capabilities. This Systems Engineering Upgrade Initiative [SUI] has been authorized by the highest level technical management body of JPL and is sponsored with internal funds. The SUI objective is to upgrade system engineering at JPL to a level that is world class, professional and efficient compared to the FY04/05 baseline. JPL system engineering, along with the other engineering disciplines, is intended to support optimum designs; controlled and efficient implementations; and high quality, reliable, cost effective products. SUI technical activities are categorized into those dealing with people, process and tools. The purpose of this paper is to describe the rationale, objectives/plans and current status of the JPL SUI.

Systems Engineering Upgrade Initiative (SUI)↗

Simultaneously upgrading CO 2 and light alkanes into value-added products

We will discuss recent results from our group in reacting CO 2 and light alkanes to produce syngas, olefins, aromatics, and oxygenates. We will mainly use the simultaneous upgrading of CO 2 and ethane (SU-CO 2 Et) as examples to demonstrate the feasibility and reaction pathways of these processes. We will briefly discuss synthesis methods and essential structural characterization techniques that can be applied to SU-CO 2 Et catalysts. We will then illustrate how to identify and apply distinct active sites for different upgrading processes, using a combination of kinetic studies, in situ characterization, and density functional theory (DFT) calculations. We will conclude the Perspective by pointing out challenges and potential directions in catalyst design and synthesis, as well as structural characterization and mechanistic investigations, to further advance the simultaneous upgrading of CO 2 and light alkanes.

03 NATURAL GAS↗

Combustion dynamics of crude and upgraded Thermal DeOxygenation oils in a compression ignition engine

Thermal DeOxygenation (TDO) is a robust thermochemical conversion scheme to produce hydrocarbons from biomass feedstock. The process targets the carbohydrate fraction of biomass to yield a broad mixture of primarily aromatic hydrocarbons within a boiling point range of 348–798 K with low oxygen content (<4 wt%). The resulting materials are amenable to traditional hydrotreating and distillation processes with approximately 70% by mass in the distillate fuel range. The simple conversion scheme combined with commercially viable upgrading routes makes TDO oils a feasible alternative fuel for transportation applications. Here this paper is the first systematic treatment of fit-for-purpose testing of TDO oils in a compression ignition engine. Blends of partially upgraded TDO oils (e.g. whole oil, distilled oil, hydrotreated oil and hydrotreated-distilled oil) are prepared with certified ultra-low sulfur diesel at 5%, 10%, 15% and 20% by volume. The resulting fuels are analyzed for fuel characteristics and combustion dynamics in an instrumented single-cylinder compression ignition engine. All fuel blends at 10% blend level by volume exhibited adequate engine performance. Hydrotreating of the oils is a necessary step to meet cetane number and EPA soot emissions requirements at 20% blend volume. Combined distillation and hydrotreatment meet or exceed all fuel specification and engine performance benchmarks. Partially upgraded TDO oils are suitable fuel options for compression ignition applications.

42 ENGINEERING↗

Advanced light source-Upgrade accumulator-ring gas bremsstrahlung production

Lawrence Berkeley National Laboratory is designing a new electron synchrotron for scientific research using synchrotron radiation. An upgrade of the Advanced Light Source (ALS) would position the nation to retain its international competitiveness in the soft X-ray sciences. The ALS is a 1.9 GeV storage ring operating at 500 mA of beam current. It is optimized to produce intense beams of soft X-rays, which offer spectroscopic contrast, nanometer-scale resolution, and broad temporal sensitivity. Upgrading the ALS storage ring from a triple-bend-achromat to a multibend-achromat (MBA) lattice design will provide a soft X-ray source that is up to 100–1,000 times brighter than today’s ALS and will provide a significantly higher fraction of coherent light in the soft X-ray region than is currently available at the ALS. Further, the upgraded ALS will offer the highest coherent flux of any existing or planned storage-ring facility, worldwide, up to a photon energy of 3.5 keV. The addition of an accumulator ring that enables on-axis, swap-out, recovery, and exchange of bunch trains is required to achieve this coherence and brightness. Analysis of the radiation generated and shielding required by the addition of this new accelerator is presented in this paper.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Multi-parametric analysis for mixed integer linear programming: An application to transmission upgrade and congestion management

Upgrading the capacity of existing transmission lines is essential for meeting the growing energy demands, facilitating the integration of renewable energy, and ensuring the security of the transmission system. This study focuses on the selection of lines whose capacities and by how much should be expanded from the perspective of the Independent System Operators (ISOs) to minimize the total system cost. We employ advanced multi-parametric programming and an enhanced branch-and-bound algorithm to address complex mixed-integer linear programming (MILP) problems, considering multi-period time constraints and physical limitations of generators and transmission lines. To characterize the various decisions in transmission expansion, we model the increased capacity of existing lines as parameters within a specified range. This study first relaxes the binary variables to continuous variables and applies the Lagrange method and Karush-Kuhn-Tucker (KKT) conditions to obtain optimal solutions and identify critical regions associated with active and inactive constraints. Moreover, we extend the traditional branch-and-bound (B&B) method by determining the problem’s upper and lower bounds at each node of the B&B decision tree, helping to manage computational challenges in large-scale MILP problems. Here, we compare the difference between the upper and lower bounds to obtain an approximate optimal solution within the decision-makers’ tolerable error range. In addition, the first derivative of the objective function on the parameters of each line is used to inform the selection of lines for easing congestion and maximizing social welfare. Finally, the capacity upgrades are selected by weighing the reductions in system costs against the expense of upgrading line capacities. The findings are supported by numerical simulations and provide transmission-line planners with decision-making guidance.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Vacuum system design, construction, and operation for the Cornell High Energy Synchrotron Source upgrade

During the summer and fall 2018, the Cornell High Energy Synchrotron Source (CHESS), underwent an upgrade that recast the facility as primarily a low emittance X-ray source. The upgrade replaced one sixth of the Cornell Electron Storage Ring (CESR) with six double-bend achromats, featuring four novel CHESS Compact Undulator (CCU) insertion devices, and switched CESR to single particle beam operation. At the time of this writing, the upgraded storage ring has achieved the CHESS-U design goal of operating with 200 mA of positron current at 6.0 GeV beam energy. Additionally, seven out of eleven CHESS-U beamlines are currently in X-ray user operation. The construction and the commissioning of the new section of the CESR accelerator required novel solutions to design, fabrication, and vacuum system operations. Significant design considerations and efforts were made to minimize X-ray ‘dark-time’, returning to operation less than 1 year. This paper describes the important milestones of the process, the solutions implemented, and the present status of CHESS-U.

43 PARTICLE ACCELERATORS↗

Thermal Oxo-degradation and Catalytic Upgrading of Plastic Waste to Light Olefins for a Circular Economy

The commercialization of conventional pyrolysis of plastic in an inert atmosphere has been hindered by large thermal requirements stemming from long reaction rates. The rate of thermal depolymerization of waste plastics can be accelerated by the addition of oxygen in a process known as thermal oxo-degradation (TOD). This study offers the prospect of TOD to upcycle postconsumer waste rapidly and efficiently. Using moderate temperatures and small amounts of air in a fluidized bed reactor, we demonstrated that waste high-density polyethylene and polypropylene are rapidly deconstructed to condensable products. These condensable products were catalytically upgraded in a micropyrolysis reactor using commercially available zeolite (HZSM-5) to monomeric olefins. The olefin yields proved to be greater than those achieved through the catalytic upgrading of condensable products from (nonoxidative) the pyrolysis of the same plastic wastes. The coupling of TOD with catalytic upgrading proves to be an energy-efficient pathway in a plastics circular economy for the production of light olefins from wastes.

Enthalpy↗

A System Level Analysis of Ethanol Upgrading to Middle Distillates

We systematically study the upgrading of ethanol toward middle distillates with desired properties. To survey the large design space, we introduce a novel superstructure-based optimization framework integrating process design and fuel formulation. We show that biorefineries that produce middle distillates by upgrading lignocellulosic ethanol can have an energy return on investment (EROI) greater than 1. Additionally, we show that technological improvements can lead to significant increases in EROI. Furthermore, trade-offs between fuel properties and biorefinery profitability are established, showing how process economics are strongly influenced by fuel properties. In the case of diesel, the feasibility of producing high cetane number biofuels is demonstrated, coupled with a discussion of the technological requirements and costs to produce these superior fuels. It is also shown that the minimum fuel selling price (MFSP) can be reduced by increasing the biorefinery complexity. Lastly, we discuss the possibility of satisfying current and projected middle distillates demand in the U.S. using biofuels produced by ethanol upgrading, and we estimate the potential CO2 mitigation of these technologies.

09 BIOMASS FUELS↗

The Phase-2 Upgrade of the CMS Data Acquisition

The High Luminosity LHC (HL-LHC) will start operating in 2027 after the third Long Shutdown (LS3), and is designed to provide an ultimate instantaneous luminosity of 7:5 × 10$^{34}$ cm$^{-2}$ s$^{-1}$, at the price of extreme pileup of up to 200 interactions per crossing. The number of overlapping interactions in HL-LHC collisions, their density, and the resulting intense radiation environment, warrant an almost complete upgrade of the CMS detector. The upgraded CMS detector will be read out by approximately fifty thousand highspeed front-end optical links at an unprecedented data rate of up to 80 Tb/s, for an average expected total event size of approximately 8 - 10 MB. Following the present established design, the CMS trigger and data acquisition system will continue to feature two trigger levels, with only one synchronous hardware-based Level-1 Trigger (L1), consisting of custom electronic boards and operating on dedicated data streams, and a second level, the High Level Trigger (HLT), using software algorithms running asynchronously on standard processors and making use of the full detector data to select events for offline storage and analysis. The upgraded CMS data acquisition system will collect data fragments for Level-1 accepted events from the detector back-end modules at a rate up to 750 kHz, aggregate fragments corresponding to individual Level- 1 accepts into events, and distribute them to the HLT processors where they will be filtered further. Events accepted by the HLT will be stored permanently at a rate of up to 7.5 kHz. This paper describes the baseline design of the DAQ and HLT systems for the Phase-2 of CMS.

Badaro, Gilbert↗

Upgrade of DIII-D radial interferometer–polarimeter for large bandwidth, low noise, and toroidal mode number measurements

Near ion-cyclotron frequency (f ci ) fluctuations, such as those originating from Global and Compressional Alfvén Eigenmodes (GAEs/CAEs), are expected to be present in future fusion reactors but are not well understood due to the limited availability of core measurements in present-day tokamaks. The measurement bandwidth of the Radial Interferometer–Polarimeter (RIP) diagnostic has been upgraded from 1 to 5 MHz to detect these fluctuations in DIII-D. RIP adopts the three-wave technique for simultaneous polarimetric and interferometric measurements. Solid-state microwave sources operating at 650 GHz are used as probe beams and provide 5 MHz bandwidth for both polarimetric and interferometric measurements. Bandwidths of related hardware, including mixer amplifier, signal cable, and digital phase demodulator, are increased correspondingly. Measurement noise is minimized by reducing the time delay between reference and probe signals to nanosecond level and employing correlation-based techniques. Using the upgraded diagnostic, CAE/GAE-like bursting fluctuations are observed in neutral-beam heated plasmas with toroidal magnetic field B φ ≈ 1 T. Current upgrades being undertaken would enable the evaluation of toroidal mode number for these modes. Furthermore, this work opens the possibility of better understanding near ion-cyclotron frequency fluctuations in fusion relevant plasmas.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

First measurements of energetic protons in Mega Amp Spherical Tokamak Upgrade (MAST-U)

First proton production rates from the d(d,p)t reaction in the Mega Amp Spherical Tokamak Upgrade (MAST-U) are measured. The data were taken during the MAST-U experimental campaign with an upgraded version of the proton detector (PD) previously used in MAST. The new detector array consists of three collimated silicon surface barrier detectors with a depletion depth of 300 μm and a collimated 120 μm thick diamond detector, mounted on the MAST-U reciprocating probe arm. This array measures the energies of unconfined energetic 3 MeV protons and 1 MeV tritons mainly produced by beam-thermal DD reactions during neutral beam injection heating. Diamond detectors have the potential to be uniquely suited to detect charged fusion products as they promise to be much more radiation resistant and much less sensitive to temperature variations compared to silicon-based detectors. Using silicon and diamond-based detectors simultaneously allowed us to directly compare the performance of these two detector types. PD particle rates measured during different plasma scenarios are presented and compared to neutron rates measured using the neutron camera upgrade and TRANSP predictions.

Instruments & Instrumentation↗