Search NASA⌕ Search

SEARCH · Search NASA

Results for “Upgrades”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

NSTX-U Machine Core Vacuum Seals Upgrade Design

The vacuum in the National Spherical Torus Experiment Upgrade (NSTX-U) is in the range of 2.66x10⁻⁶ Pa (2x 10⁻⁸ torr). To enhance vacuum seals and lower gas permeation in the NSTX-U and therefore ensuring operation safety and quality, the machine core vacuum seal design has been upgraded using double elastomeric seals and pumped interspaces (guard channels). In NSTX-U machine core, there are six major vacuum seals, including upper and lower vacuum vessel main flanges, upper and lower bellows flanges, and two in the ceramic isolation ring assembly that are mounted to the upper vacuum vessel main flange. The elastomeric seals are commercially available and customized fluorocarbon (Viton) O-rings. To ensure appropriate O-ring compression ratios for the vacuum seal, the O-ring grooves are customized with appropriate tolerances considering specific situations for each seal. In this upgrade, the vacuum in each interspace is designed to reach 13.33 Pa (0.1 torr), thus the overall pressure difference crossing each double O-ring seal is expected to be reduced by at least three orders of magnitude, and accordingly the overall rates of leakage and permeation will be lowered by three orders of magnitude. The corresponding pump-down times for each seal, at room temperature, are estimated at about 60 s. Additionally, the vacuum pumped interspaces will be able to function as a real-time leak monitor.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Combined Normal and Disruption, Electromagnetic Transient, Thermal, and Structural Analysis of COMPASS Upgrade

We report that COMPASS Upgrade is a replacement for the COMPASS device at the Institute of Plasma Physics (IPP) of the Czech Academy of Sciences. It is a cryogenic copper machine with a major radius of 0.89 m, with 5 T at the plasma centerline and 2-MA plasma current. It is intended to develop ITER relevant plasma densities and high power fluxes in the divertor region. The entire vacuum vessel is planned to reach 500 °C. The COMPASS-U TF coil is a bitter plate-like design with radial conductor plates that extend the width of the TF inner leg. Currents redistribute radially based on resistive and inductive effects. This necessitates an electromagnetic (EM) transient analysis of the coil current distribution. For copper coils like COMPASS Upgrade, the solution must be coupled with a thermal solution to properly include the temperature-dependent resistive effects. The EM transient solution includes the TF magnetic loads, and a stress pass on the results produces in-plane loads. The EM solution chosen requires inclusion of all the conducting and nonconducting regions surrounding the TF coil. With the TF current distribution solved, the addition of the poloidal coils and resulting background fields allows the determination of the out-of-plane loads. Integration of the Joule heating produced from the EM solution produces temperature distributions throughout the shot, which can be read in to a structural pass to include thermal stresses in the evaluation. This is true of both TF and PF temperature prediction with appropriate packing fractions. Currents in the PF coils, with computed background fields, produce Lorentz loads. Time transients of the PF currents produce startup eddy currents in the structures included in the model; inclusion of the vessel and other passive structures allows these to be included in a stress pass. The EM transient solution includes all the elements needed for a disruption analysis with prescribed motions and quench of the plasma. From a model originally intended to simulate current diffusion in the TF coil, the analysis can be refined to be used to predict the performance of most of the components of the tokamak or provide boundary conditions for more detailed submodels. In this article, the use of the current diffusion model for bounding assessments of the COMPASS Upgrade TF, PF, vessel, external structure, and disruption analyses will be presented.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Optical damage considerations in the design of the matter in extreme condition upgrade (MEC-U) laser systems

The Matter in Extreme Conditions Upgrade (MEC-U) project is a major upgrade to the MEC instrument of the LINAC Coherent Light Source (LCLS) X-ray free electron laser (XFEL) user facility at SLAC National Accelerator Laboratory. Here, the envisioned MEC upgrade will significantly enhance the capabilities of the pump laser sources in current MEC experimental station, boosting the energy of the nanosecond shock driver from 100 J to the kJ level, and increasing the power and repetition rate of the short pulse laser from 25 TW at 5 Hz to 1 PW at 10 Hz rate. Building such high energy/power pump laser systems presents challenges to minimize and mitigate against laser-induced optical damage. Here, as part of the system design, we have identified the optics at high-risk to damage and we have designed the laser systems to mitigate against these damage risks to ensure sustained facility operation.

Coating↗

Upgrading biocrude oil into sustainable aviation fuel using zeolite-supported iron-molybdenum carbide nanocatalysts

Food waste is an underdeveloped source for production of sustainable aviation fuel (SAF). Now, there is no certified conversion process of food waste for SAF by American Society for Testing and Materials (ASTM). We report the use of zeolite-supported molybdenum carbide nanocatalysts in upgrading biocrudes, produced from food wastes through HTL, into SAF precursors. Our data show a complete removal of oxygen from the biocrude through hydrodeoxygenation and a higher heating value of 46.5 MJ/kg, which is comparable to that of Jet A (46.1 MJ/kg). The prescreening tests (tier alpha and beta) show the average carbon number of the distillation cut (150° to 230°C) of upgraded fuel is 10.6, close to the value of 11.4 for average conventional jet fuel, and the specifications of properties including surface tension, viscosity, heating value, flash point, and freezing point were found to meet the standards of SAF. The metal carbide nanocatalysts were reusable in upgrading tests, and the activity of deoxygenation was retained.

10 SYNTHETIC FUELS↗

Facility upgrade for superheavy-element research at RIKEN

The RIKEN Nishina Center (RNC) executed an accelerator upgrade project for the heavy-ion linac (called RILAC). A superconducting RIKEN linear accelerator (SRILAC) and a new superconducting electron-cyclotron-resonance ion source (SC-ECRIS) to boost the final energy and intensity were constructed, aimed at synthesizing a new superheavy element, 119, through a hot fusion reaction. The project included the construction of a gas-filled recoil ion separator (GARIS-III) suitable for detecting the residues of the hot-fusion reaction. To avoid research interruption during the SRILAC construction period (2017–2019) and gain experience in hot-fusion reaction processes, GARIS-II located in the GARIS experimental hall in LINAC building was moved to the E6 experimental hall in Nishina building. Certain exploratory measurements were performed employing the beams accelerated by RILAC2 and the RIKEN ring cyclotron (RRC), which is a part of the existing accelerator complex of the radioactive isotope beam factory (RIBF). Further, commissioning experiments with the upgraded facility (SRILAC and GARIS-III) were performed. The upgrade project and its commissioning results are chronologically described in this article.

43 PARTICLE ACCELERATORS↗

Shielding Analyses for SNS Accelerator Power Upgrade

The Proton Power Upgrade (PPU) project [1] at Spallation Neutron Source (SNS) is aiming at increasing the neutron beam intensities at the First Target Station (FTS) and advancing accelerator capability to additionally power a future Second Target Station (STS) [2]. PPU will involve upgrading the SNS accelerator complex to double the currently available proton beam power from 1.4 to 2.8 MW, by increasing the proton beam energy from 1 GeV to 1.3 GeV and by increasing the proton beam current.PPU will enable new science capabilities enhancing the experiment throughput of the 19 existing FTS instruments, which are heavily oversubscribed. STS will include 22 additional neutron scattering instruments. Numerous neutronics analyses are performed to support PPU evaluating the FTS systems for higher beam power and for system upgrades. Part of the PPU scope is an extension of the Ring to Target Beam Transport (RTBT) line, a stub out of the accelerator tunnel for the future Ring to STS Transport (RTST) line[3]. As the RTST tunnel will not be built within the PPU project, the stub will be shielded by a plug, which is planned to be made from regular concrete.In order to provide radiation protection safety, analyses are required to design adequate plug thickness for the stub. The thickness of the stub is driven by the criterion that the area downstream of the plug is “unrestricted access area”, demanding the dose rate downstream the stub be below 0.25 mrem/h at 30 cm from the surface at normal operation and below 20 Rem/hr for accident cases. Additionally, analyses verifying the amount of soil for shielding the accelerator tunnel to the above stated requirements are performed.

Popova, Irina I.↗

HERO WEC V1 Upgrades - SolidWorks Models (WEC, RO System, and Submersible Pump Housing)

The attached zip files include SolidWorks pack-and-go assemblies of NREL's HERO WEC (hydraulic and electric reverse osmosis wave energy converter), the reverse osmosis (RO) assembly, and the submersible pump assembly that is used to provide flow to the RO assembly in the electric configuration. These 3 models were upgraded in 2023 from their baseline models. The HERO WEC model does not include all aspects of the design (i.e. RO system, electrical enclosure, hose, cable), it only includes the WEC and PTO (power take-off) design. This model supersedes the old MHKDR model submission, linked below. The RO model file includes a SolidWorks (version 2023) pack-and-go assembly of the RO assembly that was used for HERO WEC as it was upgraded in 2023. This model ONLY includes the RO assembly and not the WEC, hoses, etc. The submersible pump enclosure model includes a SolidWorks (version 2023) pack-and-go assembly of the submersible pump assembly that is used to provide flow to the RO assembly in the electric configuration HERO WECas it was upgraded in 2023. This model ONLY includes the submersible pump assembly and not the WEC, RO system, hoses, etc. This work has been developed by the National Renewable Energy Laboratory, operated by Alliance for Sustainable Energy, LLC, for the U.S. Department of Energy (DOE) under Contract No. DE-AC36-08GO28308. Funding provided U.S. Department of Energy Office of Energy Efficiency and Renewable Energy Water Power Technologies Office.

16 TIDAL AND WAVE POWER↗

HIGH VOLTAGE DESIGN AND EVALUATION OF WIEN FILTERS FOR THE CEBAF 200 keV INJECTOR UPGRADE

High-energy nuclear physics experiments at the Jefferson Lab Continuous Electron Beam Accelerator Facility (CEBAF) require highly spin-polarization electron beams, produced from strained super-lattice GaAs photocathodes, activated to negative electron affinity in a photogun operating at 130 kV dc. A pair of Wien filter spin rotators in the injector defines the orientation of the electron beam polarization at the end station target. An upgrade of the CEBAF injector to better support the upcoming MOLLER experiment requires increasing the electron beam energy to 200 keV, to reduce unwanted helicity correlated intensity and position systematics and provide precise control of the polarization orientation. Our contribution describes design, fabrication and testing of the high voltage system to upgrade the Wien spin rotator to be compatible with the 200 keV beam. This required Solidworks modeling, CST and Opera electro- and magnetostatic simulations, upgrading HV vacuum feedthroughs, and assembly techniques for improving electrode alignment. The electric and magnetic fields required by the Wien condition and the successful HV characterization under vacuum conditions are also presented.

Palacios-Serrano, G.↗

New Insertion Device Control System for the APS Upgrade

New Hybrid Permanent Magnet Undulators (HPMUs) have been designed and manufactured using servo motors for precise and reliable gap motion control for the Advanced Photon Source Upgrade (APS-U) project. Meanwhile, existing HPMUs equipped with legacy stepper motors are systematically replaced with servo motors. In parallel with mechanical modifications of the undulators, a comprehensive upgrade has been implemented for the control of the devices. This upgrade includes integration of standardized industrial components for replacement of motor controllers and motor drives using the Kollmorgen Programmable Controller Multi-axis Master (PCMM) controllers and the AKD2G series servo drives. Soft Input Output Controllers (IOCs) are developed and deployed to replace the legacy VME-based IOCs for both single-period undulators and Revolver undulators. In this paper, we will present the architecture of the new insertion device control system, including control mechanisms, interlock protocols, and tools for diagnostics and troubleshooting.

Li, W.↗

Progress towards the completion of the proton power upgrade project

The Proton Power Upgrade project at the Spallation Neutron Source at Oak Ridge National Laboratory will increase the proton beam power capability from 1.4 to 2.8 MW. Upon completion in early 2025, 2 MW of beam power will be available for neutron production at the existing first target station (FTS) with the remaining beam power available for the future second target station (STS). The project has installed seven superconducting radio-frequency (RF) cryomodules and supporting RF power systems to increase the beam energy by 30% to 1.3 GeV, and the beam current will be increased by 50%. The injection and extraction region of the accumulator ring are being upgraded, and a new 2 MW mercury target has been developed along with supporting equipment for high-flow gas injection to mitigate cavitation and fatigue stress. The first four cryomodules and supporting systems were commissioned in 2022-2023 and supported neutron production at 1.05 GeV, 1.7 MW with high reliability. The first-article 2 MW target was operated successfully for approximately 4400 MW-Hours over two run periods. The long outage began in August 2023 for installation of the remaining technical equipment and construction of the Ring-to-Target Beam Transport tunnel stub that will enable connection to the STS without interrupting operation of the FTS. The upgrade is proceeding on-schedule and on-budget, and resumption of neutron production for the user program is planned for July 2024.

43 PARTICLE ACCELERATORS↗

Upgrade to Fixed and Translating Scintillation-based Loss Detector System in the Fermilab Drift Tube Linac

The closed-off structure of the Fermilab Drift Tube Linac precludes a robust array of instrumentation from directly monitoring the H- beam that is accelerated from 750 keV to 116 MeV. To improve beam tuning and operational assessment of Drift Tube Linac performance, scintillator-based loss monitors were previously installed along the exterior of the first two accelerating cavities to assess low energy beam losses. Here we present a recent upgrade to the loss monitor system, including significant improvements in analog signal processing to address baseline-interfering noise; digitization of the signals to enable regular operational use and tuning; and a new remote operation upgrade of the translating loss monitor with precise positioning of the loss monitor along its nine-foot track. Data from the fixed and translating detectors collected under varying beam conditions validate the utility of the upgrade.

Chen, E. V. [Fermilab]↗

Physics motivation and detector upgrades for the new era of the ATLAS experiment

The ATLAS experiment at CERN’s Large Hadron Collider (LHC) will be upgraded in two stages to prepare first for the Run~3 data-taking campaign, during which the integrated luminosity will roughly double, and then for the High-Luminosity LHC program with an ultimate integrated luminosity of up to 4 ab ^{{-1}} − 1 . These upgrades and high-statistics datasets will allow ATLAS to perform searches and precision measurements to constrain the Standard Model in yet-unexplored phase spaces and in the Higgs sector. This contribution summarizes the ATLAS detector upgrades and selected physics prospects for Run~3 and the HL-LHC.

Nielsen, Jason↗

HERMES 2019 Upgrade Characterization - Quick Look Report (UUR)

Characterizing the electromagnetic environment created by the recently upgraded HERMES III pulser is the primary objective addressed by this report. The pulser upgrade design was intended not only to provide higher electric field and magnetic field illumination amplitudes but also to provide a more collimated beam, focused along the center-line of the courtyard. For high-voltage pulsers to be useful as qualification systems, they must have the requisite peak values and uniform, predictable peak field spatial patterns. To assess the peak electric field values and uniformity of the spatial pattern of the electric fields for the upgraded HERMES system, a 1 6 full-power shot illumination of 9 electric and 9 magnetic field sensors in the courtyard of the HERMES III facility was conducted. The data acquired from this test showed an increase an increase in electric field amplitude, but still an asymmetry in the spatial distributions.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

An Upgrade Path for the Fermilab Accelerator Complex

The completion of the PIP-II project and its superconducting linear accelerator will provide up to 1.2 MW of beam power to the LBNF/DUNE facility for neutrino physics. It will also be able to produce high-power beams directly from the linac that can be used for lower-energy particle physics experiments as well, such as directing beam toward the Muon Campus at Fermilab for example. Any further significant upgrade of the beam power to DUNE, however, will be impeded by the limitations of the present Booster synchrotron at the facility. To increase the power to DUNE by a factor of two would require a new accelerator arrangement to feed the Main Injector that does not include the Booster. In what follows, a path toward upgrading the Fermilab accelerator complex to bring the beam power for DUNE to 2.4 MW is presented, using a new rapid-cycling synchrotron plus an energy upgrade to the PIP-II linac. The path includes the ability to instigate a new lower-energy, very high-power beam delivery system for experiments that can address much of the science program presented by the Booster Replacement Science Working Group. It also allows for the future possibility to go beyond 2.4 MW up to roughly 4 MW from the Main Injector.

43 PARTICLE ACCELERATORS↗

ACE: Proton beam upgrade plan at Fermilab

aFor Snowmass and P5, Fermilab recently proposed a new upgrade plan known as Accelerator Complex Evolution (ACE) to occur after PIP-II upgrade in tandem with DUNE/LBNF operation. The first phase of ACE, ACE-MIRT, is the ACE Main Injector Ramp and Targetry upgrade, which would raise the LBNF beam power from 1.2 MW to 2 MW by shortening the Main Injector cycle time to around 0.65s. The second phase of ACE, AC-BR, is the ACE Booster Replacement, which would replace the Booster with a new machine and achieve 2.4 MW for DUNE/LBNF. The implications for the Fermilab neutrino program and future experiments hosted at Fermilab will be discussed.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Risk-based System Upgrade Planning for AOT-IC [Capstone Project]

The Accelerator Operations and Technology Instrumentation and Controls Group (AOT IC) at the Los Alamos Neutron Science Center (LANSCE) has established a comprehensive risk-based system upgrade planning strategy which has been utilized as a tool to prioritize system upgrade projects for the past several years. A challenge with the current system is that the group often lacks the data to quantify the probability and impact of system failures, so the group often relies instead on qualitative risk assessments as well as evaluations of a potential upgrade project’s alignment with group strategy and vision to prioritize projects. A proposed framework to enable quantitative risk probability and impact assessments has been developed and tested on three pilot systems chosen to broadly represent the types and conditions of equipment used by the group. The proposed framework incorporates availability data gathered from the LANSCE control room logbooks and the LANSCE work control system, as well as a system health evaluation which is conducted from a variety of resources to assess the probability of equipment failure. The impact of system failure is viewed from the perspective of impact on mission and schedule, where spares status, system documentation status, and the functional distribution of deployed systems are used to quantify these impacts.

43 PARTICLE ACCELERATORS↗

Catalytic Upgrading of Renewable Feedstock (Final Technical Report)

The goal of this DOE-funded project was to investigate the fundamental science related to the development of homogeneous (de)hydrogenation catalysts in order to enable energy-relevant transformations of bio-relevant chemical feedstocks including ethanol. The primary focus was to improve the activity of ethanol upgrading catalysts, specifically informed through mechanistic studies, in order to enable rational design optimization strategies. Following in depth mechanistic studies, targeted reaction optimization approaches included ligand redesign to improve catalyst stability, developing new carbon-carbon bond forming reactions using ethanol as a precursor, and examining photochemically-mediated reactions, ultimately to integrate within other reactor designs such as continuous flow reactors. The high modularity of the catalyst components (ligands) has enabled the preparation and analyses of multiple catalyst precursors. These studies uncovered an unexpectedly beneficial substitution pattern of the ligand structure that led to the development of new catalysts that are the best in class for upgrading ethanol to butanol with a turnover number of 155,890 and a turnover frequency of 12,690 h –1 . In addition to upgrading ethanol to butanol, cascade reaction sequences were developed to form new C-C bonds using ethanol as a bio-relevant feedstock, providing access to platform chemicals from renewable sources. As part of the reaction discovery process, new mechanistic details were uncovered that provided insights into: a) catalyst speciation, b) decomposition pathways, c) carbon monoxide releasing pathways, and d) carbon-carbon and carbon hydrogen bond breaking pathways. Most of these outcomes were previously not known; however, they provide important directions for new catalyst design strategies. Finally, use of high throughput and in situ photochemical reaction analyses enabled detailed studies into changes to the catalyst structure upon irradiation. Irradiation was found to improve hydrogen transfer catalysis, by promoting a ligand dissociation event.

09 BIOMASS FUELS↗

End-Use Savings Shapes Upgrade Package Documentation: Wall and Roof Insulation, New Windows, LED Lighting, HP-RTU and ASHP-Boiler

Building on the successfully completed effort to calibrate and validate the U.S. Department of Energy’s ResStock™ and ComStock™ models over the past 3 years, the objective of this work is to produce national data sets that empower analysts working for federal, state, utility, city, and manufacturer stakeholders to answer a broad range of analysis questions. The goal of this work is to develop energy efficiency, electrification, and demand flexibility enduse load shapes (electricity, gas, propane, or fuel oil) that cover a majority of the high-impact, market-ready (or nearly market-ready) upgrade measures, or upgrades. “Measures” refers to energy efficiency variables that can be applied to buildings during modeling. An end-use savings shape is the difference in energy consumption between a baseline building and a building with an energy efficiency, electrification, or demand flexibility upgrade applied. It results in a time-series profile that is broken down by end use and fuel (electricity or on-site gas, propane, or fuel oil use) at each time step.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗