Search NASA⌕ Search

SEARCH · Search NASA

Results for “asset management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

ISM In-Space Manufacturing Project Brochure

The In-Space Manufacturing (ISM) Project is a NASA asset managed out of Marshall Space Flight Center that is responsible for developing the capabilities to provide on-demand, sustainable manufacturing, repair, and recycling operations during NASA Exploration Missions (in-transit and on-surface). One of ISM’s primary objectives with the key capabilities being developed is a “Make it, Don’t take it” approach. This includes testing and advancing the desired technologies, as well as establishing the required skills and processes for the processes (such as certification and characterization) that will enable the technologies to become institutionalized.

Brochure↗

Cognitive Communications for NASA Space Systems

The growing complexity of spacecraft constellations, communication relay offerings, and mission architectures drives the need for the development of autonomous communication systems. NASA has traditionally launched single spacecraft missions that are served by the Space Communication and Navigation (SCaN) program. Operations on SCaN networks are typically scheduled weeks in advance, and often each asset serves a single user spacecraft at a time. Recent movement towards swarm missions could make the current approach unsustainable. Additionally, the integration of commercial communication service providers will substantially increase the data transfer options available to new missions. NASA science missions have found benefit in launching swarms of spacecraft, allowing coordinated simultaneous observations from different perspectives. Inter-spacecraft communication (mesh networking) is an enabler for this architecture, as are CubeSats that allow cost-effective provisioning of distributed mission assets. As more complex swarm missions launch, one challenge is coordinating communication within the swarm and choosing the appropriate mechanism for telemetry, tracking, control, and data services to and from Earth. Cognitive communications research conducted by SCaN aims to mitigate the increasing communication complexity for mission users by increasing the autonomy of links, networks, and service scheduling. By considering automation techniques including recent advances in artificial intelligence and machine learning, cognitive algorithms and related approaches enable increased mission science return, improved resource utilization for service provider networks, and resiliency in unpredictable or unplanned environments. The Cognitive Communications Project at the NASA Glenn Research Center develops applications of data-driven, non-deterministic methods to improve the autonomy of space communication. The project emphasizes development of decentralized space networks with artificial intelligence agents optimizing communication link throughput, data routing, and system-wide asset management. This paper discusses the objectives, approaches, and opportunities of the research to address growing needs of the space communications community.

Chelmins, David↗

STOCHASTIC OPTIMIZATION FOR LONG TERM CAPITAL STRUCTURES, SYSTEMS, AND COMPONENTS REFURBISHMENT AND REPLACEMENT

As commercial nuclear power plants (NPPs) pursue extended plant operations in the form of Second License Renewals (SLRs), opportunities exist for these plants to provide capital investments to ensure long-term, safe, and economic performance. Several utilities have already announced their intention to pursue extended operations for one or more of their NPPs via SLR2. The goal of this research is to develop a riskinformed approach to evaluate and prioritize plant capital investments made in preparation for, and during the period of, extended plant operations to support decisions in NPP operations. In order to prioritize project selection via a riskinformed approach we developed a single decision-making tool that integrates safety/reliability, cost, and stochastic optimization models to provide users with data analysis capabilities to more cost effectively manage plant assets. Both stochastic analysis methods—such as Monte Carlo-based sampling strategies—and multi-stage stochastic optimization strategies are employed to provide priority lists to decisionmakers in support of risk-informed decisions. We applied the proposed method to a trial application of projected replacement/refurbishment expenditures for plant capital assets (i.e., Structures, Systems, and Components [SSCs]). The objective is to optimize the SSC replacement/refurbishment schedule in terms of economic constraints, data uncertainties, and SSC reliability data, as well to generate a priority list for maximizing returns on investment.

42 ENGINEERING↗

Development and Application of a Risk Analysis Toolkit for Plant Resources Optimization

This report summarizes the R&D activities of the Risk Informed Asset Management (RIAM) project during fiscal year 2020 (FY20). This project focuses on the development of methods designed to optimize plant operations (e.g., maintenance/replacement schedule, optimal maintenance posture) provided system/component health/cost data. This project development lives in cooperation with the Plant Health Management (PHM) project which focuses on the development of methods that integrate component health data and propagate such information at the system level to evaluate most relevant sources of risk. This year’s activities for the RIAM project focused on the continuation of schedule optimization algorithms developed in FY19. While in FY19 we focused on both deterministic and stochastic capital budgeting methods, in FY20 we moved forward by implementing two versions of schedule optimization methods. The first one reformulates the capital budgeting problem in a distributionally robust form which allows the user to rely on data directly rather than proposing a distribution from the data itself. The second version reformulates the capital budgeting explicitly using risk measures as variables to maximize/minimize. Lastly, we focused on the development of methods designed to identify the optimal maintenance posture based on the Pareto Frontier analysis. Rather than performing a tradeoff analysis (i.e., identify the absolute best posture), the Pareto Frontier analysis performs a trade space exploration approach (i.e., identify value and costs of several postures and have the analyst perform the task of imposing desired value and cost constraints). This is performed by identifying maintenance postures that maximize value (e.g., system availability) and minimize operational costs, i.e., the Pareto frontier in a value-cost trade space.

97 MATHEMATICS AND COMPUTING↗

Nuclear Deactivation and Downgrade of Enriched Uranium Facilities at the Y-12 National Security Complex

Buildings 9206 and 9212 at the Y-12 National Security Complex are both Hazard Category 2 nuclear facilities from the Manhattan Project era that supported various missions over the decades, including the processing of enriched uranium. The production mission for Building 9206 ended in the 1990s, while Building 9212 is still an active production facility. The disposition process for contaminated excess facilities is generally described in the U.S. Department of Energy (DOE) Guide DOE O 430.1A, Life Cycle Asset Management, which provides guidance on facility surveillance and maintenance, deactivation, decommissioning, and transition in supplemental guides DOE G 430.1-2 through 430.1-5. Historically, production facilities similar to Buildings 9206 and 9212 have not always been cleaned out and deactivated prior to being excessed, which significantly complicates the decommissioning phase. Many legacy facilities were shut down before the formal DOE guidance was established. This paper presents the practical application and implementation of the DOE guidance for the nuclear deactivation of Buildings 9206 and 9212, and summarizes the lessons learned for application across the DOE enterprise.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Data Curation for Machine Learning Applied to Geothermal Power Plant Operational Data for GOOML: Geothermal Operational Optimization with Machine Learning: Preprint

Geothermal Operational Optimization with Machine Learning (GOOML) is a transferable and extensible component-based geothermal asset modeling framework that considers complex steamfield relationships and identifies optimization prospects using a data-driven approach to physics-guided, data-centric machine learning. This framework has been used to develop digital twins that provide steamfield operators with operational environments to analyze and understand historical and forecasted power production, explore new steamfield configuration possibilities, and seek optimal asset management in real world applications. To create, test, and apply the GOOML framework, diverse time-series datasets spanning multiple years were sourced from various geothermal power plant components within several complex real-world geothermal operations. These operations are based in the United States and New Zealand and include a variety of technologies, end-uses and configurations, collectively covering nearly all relevant operating conditions for modern geothermal fields. Datasets were acquired from multiple sources to ensure that machine learning experiments generalized properly to various operating conditions. It was found that the data varied in quality, format, and completeness. To ensure consistency between the various datasets, a standardized data curation process was developed to reliably streamline data preparation. This paper will discuss best practices as learned from the GOOML data curation process which takes the following steps: 1) acquisition of large quantities of data from power plant operators, 2) digestion of data to gain an initial understanding of what is included, 3) data transformation, which includes converting the data into a standardized machine-readable format so that they can be visualized, quality checked, and cleaned, 4) quality assurance and quality control, involving identification of significant data gaps and apparent anomalies through mapping of data features to real world componentry via the GOOML historical model, followed by discussion with modelers and power plant operators to identify additional data needs and to resolve issues, 5) use in machine learning algorithms, and 6) repetition of steps one through five until all data needs are met and data are deemed suitable for producing trustworthy modeling results which may be disseminated, ideally along with the curated dataset. This iterative process is focused on improving the quality of the data rather than tuning machine learning model parameters and supports a shift towards data-centric AI as a means to improving real-world applicability of geothermal machine learning projects.

access↗

Nuclear Deactivation and Downgrade of Enriched Uranium Facilities at the Y-12 National Security Complex

Buildings 9206 and 9212 at the Y-12 National Security Complex are both Hazard Category 2 nuclear facilities from the Manhattan Project era that supported various missions over the decades, including the processing of enriched uranium. The production mission for Building 9206 ended in the 1990s, while Building 9212 is still an active production facility. The disposition process for contaminated excess facilities is generally described in the U.S. Department of Energy (DOE) Guide DOE O 430.1A, Life Cycle Asset Management, which provides guidance on facility surveillance and maintenance, deactivation, decommissioning, and transition in supplemental guides DOE G 430.1-2 through 430.1-5. Historically, production facilities similar to Buildings 9206 and 9212 have not always been cleaned out and deactivated prior to being excessed, which significantly complicates the decommissioning phase. Many legacy facilities were shut down before the formal DOE guidance was established. This paper presents the practical application and implementation of the DOE guidance for the nuclear deactivation of Buildings 9206 and 9212, and summarizes the lessons learned for application across the DOE enterprise.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Simulating Impacts of Extreme Events on Grids with High Penetrations of Wind Power Resources: Preprint

As extreme weather events become more frequent and intense, the demand for connecting grid operation and infrastructure planning with extreme event models will increase as well. We present a methodology for creating damage contingencies and scenarios for electric transmission grids during a hurricane strike. Included is an example case study: Hurricane Dolly damaging a synthetic 2000 bus test system during its landing in Southern Texas. Using WIND Toolkit meteorological data in conjunction with fragility curves for various electric grid elements, we generate stochastic damage scenarios that can be used for short- and long-term planning problems including emergency asset management. We perform statistical analysis of damages and quantify topological effects on example synthetic grid. Also, we investigate loss-of-load events during two-day economic dispatch experiment. Finally, we point out various shortcomings of our method and suggest how it can be improved.

contingencies↗

GOOML - Finding Optimization Opportunities for Geothermal Operations: Preprint

Geothermal Operational Optimization with Machine Learning (GOOML) is a transferable and extensible component-based geothermal asset modeling framework that considers complex steamfield relationships and identifies optimization prospects using a data-driven approach. We have used this framework to develop digital twins that provide steamfield operators with an operational environment to analyze and understand historical and forecasted power production, explore new steamfield configuration possibilities, and seek optimal asset management for real world applications. The GOOML modeling software is built on a generic component-based systems framework that allows for both historical and forecast analysis. A GOOML model can perform historical data-assimilation using first-principal thermodynamics to create a meaningful data model. Historical production data can then be coupled with a forecast framework to train machine-learning models of steamfield components to predict future outputs. This modeling environment enables digital exploration of steamfield design configurations and operational scenarios. GOOML digital twins have been developed for steamfields in New Zealand and the United States representing differing power generation and field conditions. These digital twins have been validated by comparing hindcast predictions against historical production data. Reinforcement learning experiments were conducted to demonstrate the ability to programmatically explore the operations space using machine learning agents. Our initial results are compelling; two to five percent increases in annual energy production were demonstrated by the GOOML models with no additional infrastructure build required. GOOML offers a new approach to geothermal operations by applying state-of-the-art machine learning algorithms, comprehensive data analytics, and interaction with digital twins. Through application of these tools, operators will realize greater availability and higher net generation which will increase the cost effectiveness of geothermal energy projects.

access↗

ON THE LANGUAGE OF RELIABILITY: A SYSTEM ENGINEER PERSPECTIVE

In its classical definition, risk is defined by three elements: what can go wrong, what are its consequences and how likely is it to occur. While this definition makes sense in a regulatory based framework to estimate risk associated to power plants (in terms of core damage frequency and large early release frequency), this approach does not provide a useful snapshot of the health of the plant. A possible alternate path can start by redefining the word “risk” to a broader meaning that better reflects the needs of a system health and asset management decision making process. Rather than asking how likely an event can occur (in probabilistic terms), we can ask how far this event is from occurring. We will show how, given the data available from plant equipment reliability and monitoring/diagnostic/prognostic centers, a margin can be described and determined for all type of maintenance approaches (e.g., corrective or predictive maintenance). We will show how to link SSC margin-based reliability models to system reliability models (i.e., fault trees) in order to assess system/plant health and how to perform margin-based system calculations. These calculations are not solved using classical probabilistic calculations applied to sets (as performed by any PRA code) but, instead, through metric spaces operations (i.e., distance/margin based approach).

97 - MATHEMATICS AND COMPUTING↗

Implementing Reliability Centered Maintenance (RCM) with State of the Art PT&I Technologies

Building on the work that was started two decades ago, Jacobs Space Operations Group has utilized state of the art PTI technologies to assess the current condition of the assets they manage under the Test and Operations Support Contract (TOSC). Specifically, the Asset Management department leveraged the benefits of ultrasound technology to quantify a motor issue in the Liquid Oxygen Storage Area, and troubleshoot the sources prior to loading the tank to perform Verification and Validation (VV) activities. This technology was efficient, easy to implement, and provided system engineers with data on a possible source of the problem. In situations where legacy motors are exhibiting unexpected noises, it may seem easier to remove and refurbish the motor and replace the bearings because that solution resolves most of the common causes of the noise. However, that solution would have involved additional spending and may not have solved issues stemming from the foundation, if those existed. By utilizing the ultrasound equipment provided by UE Systems, the sound profiles allowed Jacobs TOSC team to determine that the issue resembled a faulty bearing. After replacing the bearing, the unexpected noise ceased.

Reliability Centered Maintenance↗

Deep Analysis Net with Causal Embedding for Coal-fired Power Plant Fault Detection and Diagnosis (DANCE4CFDD)

Fault detection and diagnosis is critical to power plant operation to ensure attaining high reliability while reducing operation cost. As more renewable power is introduced to the power grid, traditional fossil power plants take on the extra burden of excessive load cycling to compensate the generation variability from renewable power. Such load cycling will pose more reliability challenges to power plant operation. There are a number of challenges faced by today’s asset health management system in coal- fired (or gas) power plants: 1) high-dimensional nonlinear interaction among multiple time series measurements; 2) high measurement variance induced by operational conditions/modes; 3) variation among asset types and plant configurations; and 4) a small number of faulty events to learn from. To cope with these challenges, today’s fielded asset health management systems rely heavily on manual efforts from domain experts and hand-crafted features or rules based on domain knowledge. Despite its role in plant reliability, such a practice is costly and hinders its scalability and sustainability, particularly when a plant undergoes modifications. The objective of this project is to develop a novel end-to-end AI learning system that is trainable (i.e., the AI representation of a complex system behavior can be directly learned from properly labeled data) for accurate fault detection and root cause analysis. The ability to create a fault detection model directly from time series could alleviate the efforts associated with today’s asset management solution development. In the course of this project, we have achieved the following: Created an AI model development environment incorporating state-of-the-art neural network architectures for rapid model development and evaluation; Developed novel learning strategies for training of fault detection model; Developed special-purpose neural network architecture embedded with variable association graph aiming for better interpretability; Developed a learning strategy to leverage a small number of faulty events for enhanced fault detection capability; Conducted detailed experimental study based on public benchmark datasets and demonstrated the effectiveness of the proposed solution; and Validated the developed system with data from both a coal-fired plant boiler dynamic simulation model and real-world coal-fired power plant covering multiple asset and fault types. Overall, the project attained a technology readiness level of TRL 5 from TRL 2 at the beginning of the project.

20 FOSSIL-FUELED POWER PLANTS↗

Imagery Integration Team

The Human Exploration Science Office (KX) provides leadership for NASA's Imagery Integration (Integration 2) Team, an affiliation of experts in the use of engineering-class imagery intended to monitor the performance of launch vehicles and crewed spacecraft in flight. Typical engineering imagery assessments include studying and characterizing the liftoff and ascent debris environments; launch vehicle and propulsion element performance; in-flight activities; and entry, landing, and recovery operations. Integration 2 support has been provided not only for U.S. Government spaceflight (e.g., Space Shuttle, Ares I-X) but also for commercial launch providers, such as Space Exploration Technologies Corporation (SpaceX) and Orbital Sciences Corporation, servicing the International Space Station. The NASA Integration 2 Team is composed of imagery integration specialists from JSC, the Marshall Space Flight Center (MSFC), and the Kennedy Space Center (KSC), who have access to a vast pool of experience and capabilities related to program integration, deployment and management of imagery assets, imagery data management, and photogrammetric analysis. The Integration 2 team is currently providing integration services to commercial demonstration flights, Exploration Flight Test-1 (EFT-1), and the Space Launch System (SLS)-based Exploration Missions (EM)-1 and EM-2. EM-2 will be the first attempt to fly a piloted mission with the Orion spacecraft. The Integration 2 Team provides the customer (both commercial and Government) with access to a wide array of imagery options - ground-based, airborne, seaborne, or vehicle-based - that are available through the Government and commercial vendors. The team guides the customer in assembling the appropriate complement of imagery acquisition assets at the customer's facilities, minimizing costs associated with market research and the risk of purchasing inadequate assets. The NASA Integration 2 capability simplifies the process of securing one-of-a-kind imagery assets and skill sets, such as ground-based fixed and tracking cameras, crew-in the-loop imaging applications, and the integration of custom or commercial-off-the-shelf sensors onboard spacecraft. For spaceflight applications, the Integration 2 Team leverages modeling, analytical, and scientific resources along with decades of experience and lessons learned to assist the customer in optimizing engineering imagery acquisition and management schemes for any phase of flight - launch, ascent, on-orbit, descent, and landing. The Integration 2 Team guides the customer in using NASA's world-class imagery analysis teams, which specialize in overcoming inherent challenges associated with spaceflight imagery sets. Precision motion tracking, two-dimensional (2D) and three-dimensional (3D) photogrammetry, image stabilization, 3D modeling of imagery data, lighting assessment, and vehicle fiducial marking assessments are available. During a mission or test, the Integration 2 Team provides oversight of imagery operations to verify fulfillment of imagery requirements. The team oversees the collection, screening, and analysis of imagery to build a set of imagery findings. It integrates and corroborates the imagery findings with other mission data sets, generating executive summaries to support time-critical mission decisions.

Calhoun, Tracy↗

Substation Secondary Asset Health Monitoring and Management System (SSHM)

Electric Power Group, LLC (EPG) was awarded DOE OE0000850 to design, develop, and demonstrate a real-time software application for substation secondary equipment health monitoring and management at host utility American Electric Power (AEP), a cost share partner. This project addresses the need for monitoring substation equipment health and providing operators with tools to identify and take pre-emptive action to avoid catastrophic equipment failure. By monitoring synchrophasor data in real time, data anomalies that indicate potential asset failure can be detected and alerts can be sent to operators in time to take corrective actions. EPG developed two data driven algorithms to identify abnormal equipment signature patterns as well as a method using substation linear state estimation (SLSE). The software has been deployed on hardened PC’s and tested and validated for cost share partner AEP’s substations - 138kV and 765 kV. The SSHM software has been accepted by AEP and final demonstration of DOE - OE0000850 for AEP and DOE was successfully completed on March 17th, 2020. EPG developed the Substation Secondary Asset Health Monitoring (SSHM) Platform to analyze equipment failure signatures in PMU data and alert substation personnel when pre-emptive inspection, repairs and other actions are warranted to prevent potential catastrophic failures. This is the first system that automatically monitors the health of substation secondary assets and alerts users to emerging failures using synchrophasor measurements. SSHM uses high resolution PMU data from PTs, CTs, and CCVTs to analyze equipment signatures and identify anomalies that are precursor indicators of potential equipment failure. When an anomaly is detected, there is a likelihood of potential failure of monitored equipment, the system alerts the user with visual alarms including alarm trend charts and indicator lights on a oneline diagram of the substation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Portfolio Management

Enterprise Business Information Services Division (EBIS) supports the Laboratory and its functions through the implementation and support of business information systems on behalf of its business community. EBIS Five Strategic Focus Areas: (1) Improve project estimating, planning and delivery capability (2) Improve maintainability and sustainability of EBIS Application Portfolio (3) Leap forward in IT Leadership (4) Comprehensive Talent Management (5) Continuous IT Security Program. Portfolio Management is a strategy in which software applications are managed as assets

Information Technology Applications↗

Earned Value Management Systems for Operations Activities

An earned value management system (EVMS), which monitors contractor performance, is a requirement for program and project management for all major acquisitions by the United States Federal Government with development effort: (i.e., an asset requiring management attention because of its importance to an agency’s mission; high development, operating, or maintenance costs; high risk and/or high return). As an area less explored in earned value management (EVM) practices, this paper will survey the application of an EVMS for operations activities defined as: (1) Non-capital asset activities that are projects (or project - like) with definable start and end dates, with discrete scopes of work, and measurable accomplishments; as well as (2) Routine or recurring facility or environmental operations. This paper will examine the use of an EVMS to evaluate performance of operations and maintenance activities required once construction of a capital asset is complete and being used as intended. Such activities include upgrades and maintenance in order for capital assets to meet their mission function over a life-cycle (through repair, replacement, etc.). This paper will provide background on this topic from the perspective of the Department of Energy (DOE) Environmental Management (EM) Program. In addition, it will provide material from a panel discussion provided by a group of experts from the October 2019 Office of Environmental Management Project Management Workshop, as well as material from subsequent research on this topic.

97 MATHEMATICS AND COMPUTING↗