Search NASA⌕ Search

SEARCH · Search NASA

Results for “asset management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Distributed, Intelligent Edge-Sensing for a Smarter Grid

The electric grid is undergoing major transformations and developments resulting in unprecedented levels of volatility, uncertainty, and stress on grid infrastructure. Smart sensors and methods aiding in advanced visibility and situational awareness are key for tackling these issues. In this work, a decentralized architecture is proposed, where sensing, local computation and control capability are embedded in the edge devices, communicating with a set of trusted 'data mules' in a 'delay-tolerant' manner, while functioning autonomously. This system has been designed and implemented as an overall platform – called Global Asset Monitoring, Management and Analytics (GAMMA) Platform intended to provide the backbone for a global array of sensors and actuators. Further, as a building block for advanced current sensing solutions, a smart, low-cost ‘clip-on’ current sensor based on PCB-embedded Rogowski coil has been developed. The sensor hosts a novel signal conditioning stage allowing an 'auto-tuning' feature, resulting in a universal current sensor design for measuring a wide range of currents, including faults for smart grid applications. Finally, the research proposes a method to instrument and monitor key parameters for the most common electric utility asset – the pole-top distribution transformer. The work done in this research enables scalable, edge-intelligent sensing solutions for monitoring grid infrastructure, allowing utility operators to gain advanced visibility in an economical way.

Kulkarni, Shreyas Bhalchandra↗

Generative large language models for predictive maintenance planning

Maintenance planning and the generation of necessary components for tasks can prove time-consuming and complex. Automating the creation of recurring or similar tasks by leveraging previous planning packages and data, while uncovering insights to automate planning package generation, presents an opportunity to conserve valuable time and resources. This work aims to harness the textual and probabilistic capabilities of large language models (LLMs) to automate the generation of planning packages. Utilizing diverse data sources ranging from raw data to handwritten text, both singular and collaborative LLMs are trained and tested. Results demonstrate their capability to generate essential planning package components, effectively replicating the statistical patterns in the data. This demonstrates the use of these tools inside a digital asset for automated planning. This work outlines a methodology for constructing datasets, a training suite, and evaluation methods for LLM-based textual and conversational planning tools utilized in an asset digital twin. Results indicate that the fine-tuned models generate estimated planning information within the statistical ranges observed in real maintenance data. The models achieve high accuracy (>90%) in document question-answering and instruction generation tasks. Furthermore, the conversational retrieval-augmented generation (RAG) assistant system achieves 100% document retrieval accuracy, while conversational information capture exceeds 98% across the majority of work-package assistant modules.

97 MATHEMATICS AND COMPUTING↗

Complementary workflows for identifying one-hop network behavior and multi-hop network dependencies

A network analysis tool evaluates network flow information in complementary workflows to identify one-hop behavior of network assets and also identify multi-hop dependencies between network assets. In one workflow (e.g., using association rule learning), the network analysis tool can identify significant one-hop communication patterns to and/or from network assets, taken individually. Based on the identified one-hop behavior, the network analysis tool can discover patterns of similar communication among different network assets, which can inform decisions about deploying patch sets, mitigating damage, configuring a system, or detecting anomalous behavior. In a different workflow (e.g., using deep learning or cross-correlation analysis), the network analysis tool can identify significant multi-hop communication patterns that involve network assets in combination. Based on the identified multi-hop dependencies, the network analysis tool can discover functional relationships between network assets, which can inform decisions about configuring a system, managing critical network assets, or protecting critical network assets.

97 MATHEMATICS AND COMPUTING↗

Predictive Analytics for Hydropower Fleet Intelligence

A primary challenge in hydropower industry is the ability to maintain cost-competitiveness, reliability, and security of hydropower assets through evolving power system contexts and aging of the fleet. Maintaining cost-effective and reliable operations under these conditions is expected to require new modernization and maintenance paradigms for changing contexts. Changes in existing practices for O&M will require an understanding of the current state and health of hydropower assets, and the impact of changing paradigms on asset health and reliability. The Hydropower Fleet Intelligence project is developing and evaluating standardized methodologies and analysis tools for data-driven asset reliability and management technologies for hydropower, leading to eventual predictive maintenance planning, repair/replacement decision making, and asset-reliability and cost-optimized operations. A key question is the feasibility of using existing data sets at hydropower facilities to perform assessments of asset reliability. This document uses data from hydropower facilities to assess the potential for using available analytics methods for asset reliability estimates. In addition to reliability assessments, the feasibility of using existing analytics techniques for several other potential applications is discussed. Finally, a case study that a data-driven model is trained to learn nominal operations via vibration data from an asset of a certain plant, and then utilized to identify anomalies on a similar asset from a different plant, highlighting the generic use of proposed Prognostics and Health Management (PHM) approaches.

Yucesan, Yigit↗

TrustDER: Trusted, Private and Scalable Coordination of Distributed Energy Resources

In this project, the Stanford and SLAC Teams have developed a Trusted, Private and Scalable platform for coordinating Coordination of Distributed Energy Resources (TrustDER). This is a layered system that ensures private, trusted and scalable coordination and monitoring of DERs. It accommodates a variety of resources, such as solar generation, gensets and loads, with a particular focus on battery systems-based resources, as they are a transformational technology experiencing fast growth in adoption by large critical facilities. The platform can be used as standalone or added to existing aggregation systems to enable trust, privacy and resilience. TrustDER consists of layers that address each of the shortcomings of the existing state of the art. Each layer in the platform can operate independently but provides information to the layers above it to enable a novel form of overall coordination architecture. The project consists of several tasks, with each task dedicated to the design of each layer. Task 2 Resource Virtualization defined a software abstraction layer for distributed energy resources (DERs). The goal of this abstraction was to simplify the implementation of algorithms utilizing cooperation of DERs resources in a variety of use cases. Task 3 is on Secure ID for Asset Authentication. Identity Management Systems (IDMS) are a foundational infrastructure for interactions between entities (organizations, users, devices, and services). Secure ID is blockchain-based a distributed identity management system allowing (1) identity provisioning, (2) authentication, (3) authorization, and (4) identity data sharing for IoT-enabled assets on the electricity grid. In this project, the SLAC team focused on designing and testing Keymaker, a protocol for authenticating device identity managed by Secure ID. Task 5 Private and Safe Integration is focused on the design and evaluation of a DER cooperation scheme which allows for the aggregation of DERs without impacting network reliability. The approach is designed based on realistic assumptions regarding data availability, communication infrastructure limitations, and privacy. Task 6 Scalable Distributed Privacy for Information explored how virtualized batteries could be managed privately. Specifically, it examined the case in which a principal provides a partitioned battery to multiple clients. Task 7 Use Cases was to ensure that this technology was applied in relevant situations and scenarios. Primarily, this means that virtualization needed to be employed in a manner that either improved flexibility, bolstered security or privacy, or decreased costs.

25 ENERGY STORAGE↗

Digital Twin Technology (“Morpheus”) for Optimized Building Operations [SWR-22-74]

The electrification of buildings is an important step to reducing greenhouse gas emissions across all industries. The management of increasingly electrified buildings is a complex pursuit, and there remains a need for cost-effective software capable of handling the computational burden required of such complexity. Through a partnership with Dallas Fort Worth (DFW) Airport, researchers at NREL have developed a digital twin modeling framework to optimize building operations, called Morpheus. Pairing predictive control with automatic fault detection and diagnostics, Morpheus decreases energy expenditures, costs, and faults for large facilities. Additionally, Morpheus employs artificial intelligence to continuously improve its performance using information provided by sensor systems, human experts with deep industry domain knowledge, and even from other similar machines or fleets of machines. Coupling this novel energy-management software with other digital twins, such as NREL’s Athena software for mobility operations, enables robust decision-making for asset and space management. The implementation of Morpheus at DFW has resulted in significantly improved HVAC system operations and reduced both peak power and overall energy consumption. This enhanced functionality comes at a more affordable price than previously developed digital twins and can be customized for other facilities’ geometries to provide optimal, individualized control of a facility’s energy consumption.

Chinde, Venkatesh↗

Transitioning to Hybrid Power Plants

Hybrid power plants are power generation systems that combine two or more types of electricity generation or storage, creating systems where the optimal dispatch provides more benefits that the sum of the individual components can. These plants exemplify the interconnected challenges of grid modernization. On one hand, rapid increase in deployment and enhanced controllability of renewable energy assets is needed to meet clean energy targets, but on the other, increasing electrification makes it more difficult to manage load and growth in the number of endpoints and stakeholders involved with hybrid plants complicates asset management and cybersecurity. This talk will cover trends in hybrid power plant technologies and deployments, identify future prospects for hybrid systems, and discuss the challenges and research opportunities that exist to transition from the traditional power grids of today to smart, distributed, hybrid power grids we may see in the next few decades.

14 SOLAR ENERGY↗

Software Bill of Materials in the Nuclear Industry

Nuclear power plants (NPP) have thousands of digital assets throughout their facility. Typically, NPPs have asset and configuration management programs that capture the make, model, and version of a component. This information, however, usually only includes first- or second-tier components and does not capture the complete enumeration of software components and their dependencies within operational technology (OT) equipment. As seen with recent cyberattacks, this level of detail is insufficient for identifying if and where an exploitable vulnerability exists within a facility. A software bill of materials (SBOM) provides this detailed enumeration. Further, integrating SBOMs with vulnerability data sources and vulnerability attestation reports can provide improved awareness leading to better cyber risk management and incident response. Preferably, SBOMs are provided by the supplier; however, when an NPP already owns a device, it is less likely they will have a supplier provided-SBOM. Fortunately, SBOMs can be generated on installed digital assets. This paper provides an introduction to the U.S. Department of Energy Office of Nuclear Energy paper titled “Towards Software Bill of Materials in the Nuclear Industry,” which describes the SBOM ecosystem and provides a suggested approach to methodically and seamlessly integrate an SBOM program in an NPP.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

NREL's Advanced Distribution Management System (ADMS) Test Bed

Transform utility electric distribution management systems to enable the integration and management of all assets and functions across the utility enterprise regardless of vendor or technology. Four program areas: Platform: Develop an open-source platform; evaluate advanced applications. Test bed: Build a vendor-neutral test bed to evaluate existing and future advanced distribution management system (ADMS) functionalities in a realistic setting. Applications: Develop an initial suite of ADMS applications. Advanced control: Develop new integrated optimization and control solutions.

ADMS test bed↗

An intelligent energy router for managing behind-the-meter resources and assets

With increase in distributed energy resources (DERs) and smart loads, each energy resource and load need a separate power conversion system leading to complex coordination and interaction, reduced energy conversion efficiency, coordinating compliance to grid standards (IEEE 1547) from multiple sources, reduced security. Also, multiple vendors with legacy system designs and proprietary communications interfaces result in redundancy and increase in cost of power electronics systems. This paper presents an energy router concept for buildings applications which provides autonomous power flow between sources and loads with a novel agent-based software interface.

Chinthavali, Madhu Sudhan↗

Expedited Walkdowns and Preparation of Cost Estimates for Decontamination and Demolition of Excess Facilities - 20335

Lawrence Livermore National Security, LLC (LLNS) is the prime contractor responsible for managing and operating Lawrence Livermore National Laboratory (LLNL). The mission of the LLNL is to strengthen security of the United States through development and application of world-class science and technology to enhance the nation's defense, reduce the global threat from terrorism and weapons of mass destruction, and respond with vision, quality, integrity, and technical excellence to scientific issues of national importance. To accomplish its mission, LLNL must plan and manage its campus space and facilities to optimize use of its relatively small one-square-mile footprint. LLNL currently has numerous excess facilities that require decontamination and demolition (D and D). The LLNL Legacy Facility Program is responsible for stewardship and risk reduction programs to effectively manage these excess assets at LLNL. The Legacy Facility Program identified 10 excess facilities at LLNL that were candidates for demolition based on risks from further degradation of the facilities, potential exposure to hazardous materials, or need for removal to make way for new program facilities. The buildings range from a structure built in 1943 to serve as a US Navy drill hall during World War II, to a facility that provided neutrons to study material properties for the fusion energy program. The National Nuclear Security Administration (NNSA) appropriated FY19 funding for the development of Class 3 estimates for these 10 excess facilities that would be used to develop a Program Management Plan for funding consideration. Class 3 estimates are not conceptual, nor overly detailed, but adequate to be used for budget and appropriation purposes. Using existing strategic sourcing agreements, LLNL was able to organize a team of senior subject matter experts (SMEs) with diverse technical backgrounds across the Department of Energy (DOE) Complex to complete extensive process knowledge (PK) reviews and walk-downs of each excess facility and to deliver accurate and complete estimates under an expedited schedule (i.e., within eight weeks). To facilitate the expedited schedule, LLNL was fully prepared for the arrival of the JGMS team, which consisted of the following companies: J.G. Management Systems, Inc. (JGMS); Strata-G, LLC; and Michael Baker International. LLNL provided background and PK information on the excess facilities, pictures, supporting historical documentation, and radiological survey history as well as escorted access to the facilities. The JGMS team has previous experience supporting Program Management Plans for excess facilities at the Y-12 National Security Complex. The team mobilized to LLNL and performed the facility walk-downs from January 22-25, 2019. Using a methodical evaluation process, expertise, and experience, the team was able to deliver walk-down draft reports and estimates to LLNL before their February 8, 2019 deadline. LLNL then in turn reviewed, completed the estimates by adding waste management costs and other LLNL costs, and delivered the estimates to NNSA by February 15, 2019. The completed final reports, including draft D and D estimates, were delivered to LLNL before their March 6, 2019 deadline. The work was successfully completed ahead of the expedited schedule required by LLNL, resulting in a commendation from the client. This paper describes how the partnership and collaboration as a fully integrated team comprised of the prime contractor, LLNS, and the JGMS team successfully met the needs of the US government, resulting in the performance of expedited site walk-downs, the development of summary evaluation reports, and the preparation of draft Class 3 estimates and preliminary schedules for the D and D of 10 excess facilities at LLNL. The efforts of the team will enable the D and D of the first excess facility in the 2020-2021 time frame. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Nuclear Quality Assurance Certification of the MCNP-ORIGEN Activation Automation tool

The MCNP-ORIGEN Activation Automation (MOAA) tool couples MCNP and ORIGEN-S, allowing to support ATR and TREAT experiments by predicting their composition and activity before their irradiation takes place. MOAA is developed and maintained by the Irradiation Experiment Neutronics Analysis group (C-150) at INL. This poster presents the motivation behind the development of MOAA, its main workflow, as well as the software quality assurance (SQA) efforts required by LWP-13620, "Managing Information Technology Assets."

07 ISOTOPE AND RADIATION SOURCES↗

Application of Banking Scoring and Rating for Coherent Risk Measures in Electricity Systems ABSCORES

This project developed a framework for asset and system risk management that can be incorporated into current electricity system operations to improve economic efficiency and establish an Electric Assets Risk Bureau. We leveraged scoring and ratings from banking and financial institutions alongside current optimization methods in dispatching power systems to help system operators and electricity markets schedule resources. This approach is based on the observation that there are major discrepancies between the power scheduled by a system operator and the actual power generated/consumed. These discrepancies—exacerbated by unplanned contingencies (e.g., natural disasters)—are caused by multiple factors, including the different financial, environmental and risk preferences of power producers, consumers, and aggregators. We developed a framework that counteracts two failures in electricity system operations: imperfect information and missing markets for products. The technical approach included five tasks. Tasks 1 and 2 supported the development of risk scores at the asset level with historical data collected for this project. Tasks 3, 4, and 5 incorporated scoring into decision-making at the system level. The proposed effort achieved PERFORM's Program Objectives because the proposed outputs and algorithms do not exist in the electricity industry and are an innovative approach to managing risk. Since the acknowledged need to better assess and act upon risk profiles for grid assets has not been met by the industry, this project will also impact ARPA-E's Mission Areas, including improving energy efficiency and giving the U.S. a technological lead in advanced energy technologies.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Competing Interests and Creating Value - Balancing Durable and Enforceable Institutional Controls with Beneficial Reuse - 20320

US DOE LM has various real property interests at the 100 sites within its current portfolio, with an anticipated total of 127 sites within the next 5 years. Each site has its own narrative with respect to the real property assets. Since the regulatory time frame for long-term surveillance and maintenance activities at some sites can be in perpetuity, durable and effective instruments and documentation are necessary to support LM's unique mission as a federal land manager and steward. More than half of the sites currently in LM's inventory do not allow unrestricted use, and institutional controls (ICs) are required to limit human and environmental exposures to residual contamination. LM's Asset Management program balances protection of human health and the environment with a goal of optimizing its land portfolio through mitigation of risk, limiting liability, and creating value, whether tangible or intangible, in these types of assets. The IC layering strategy utilizes multiple types, restrictions, and legal authorities to protect human health and the environment. This layering strategy influences the transition of these properties into LM's portfolio to assess potential beneficial reuses. The LM's beneficial reuse program aims to repurpose former contaminated sites to restore the environment, protect the public health, revitalize communities, and spur economic growth. LM strives to create value in a perceived valueless asset and reevaluates and revisits the potential opportunities for these sites as long-term surveillance and maintenance activities are performed and objectives are achieved. Beneficial reuse also promotes protectiveness by ensuring activities are compatible with long-term maintenance and protection of public health and the environment as well as ensuring activities are environmentally sound by retaining good stewardship of natural resources. LM has recently revised both the Institutional Control Program Guidance and its Beneficial Reuse Management Plan to integrate the issues of land use with ICs, creating value in these impaired assets. This paper presents the following topics: (1) a general overview of LM's IC and beneficial reuse programs; (2) the unique aspects of each of these programs as a result of the multiple regulatory requirements and programs that affect LM sites; (3) case studies of LM sites to show examples of how LM created value while complying with the ICs and layering strategies; and (4) the most common challenges to beneficial reuses at LM sites and potential options for value creation in impaired assets. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Benefits of a Software Bill of Materials Program at Nuclear Facilities

Software supply chain attacks are becoming increasingly more prevalent in both information communications technology and operational technology environments. Often, a supplier or other entity discloses vulnerability information about software components and subcomponents used in a digital asset, but an asset owner is unable to quickly ascertain if the vulnerable component is installed in their facility. The generation and use of a software bill of materials (SBOM) for installed digital assets can enable an asset owner to quickly identify if and where a component is used, allowing them to evaluate the risk and determine necessary risk treatments. The integration of an SBOM program into a nuclear facility not only improves vulnerability management and risk management processes, it also benefits asset and configuration management, cybersecurity, and supply chain programs. This paper reviews the U.S. Department of Energy Office of Nuclear Energy Cybersecurity Crosscutting Technology Development program’s work on integrating an SBOM program into a nuclear facility. It also provides a discussion on the benefits of such a program.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

SuperLab 2.0 Showcase: Connecting Five Labs to Tackle Grid Complexity and Unlock Unique Grid Asset Potential

SuperLab 2.0 (5-Lab Demo) is a collaborative, national-scale experiment showcasing the coordination of geographically distributed energy assets in real time. The demonstration integrates 25 physical and digital assets, spanning wind, PV, batteries, electrolyzers, DC fast chargers, microgrid controllers, building automation systems, small modular reactor (SMR), control centers, and gas turbines, across five DOE national laboratories-NLR, INL, NETL, LBNL, and SNL. These assets are unified using Energy Sciences Network (ESnet), a low-latency, high-performance U.S. Department of Energy's (DOE) network, and controlled via a centralized energy controller hosted at NLR's ARIES facility. The demonstration validates the ability to stress-test hybrid energy systems under dynamic scenarios to de-risk advanced control strategies for greater resilience and flexibility. SuperLab 2.0 (5-Lab Demo) showcased a major advancement in federated national laboratory collaboration, enabling real-time, cross-laboratory experimentation to coordinate geographically dispersed distributed energy resources (DERs) using various communication protocols and networks. SuperLab 2.0 (5-Lab Demo) built on previous demonstrations conducted between NLR-PNNL and NLR-INL connecting diverse assets including distant protection devices, a SMR simulator, and a high temperature electrolyzer (HTE). Previous demos were based on a single connection between two labs with minimal coordination challenges. The 5-Lab demo with a centralized controller, distributed testbeds across different geographical locations, and use of protocols-based communication represents a scenario closer to real-world grid operations that coordinate resources across a region to meet system needs. This experiment studied how local DER controllers interact with a centralized energy controller during normal and abnormal events to maintain reliability. The SuperLab team across the five labs implemented a notional power system model equivalent of transmission and distribution lines, represented by the data networks interconnecting the labs. Each lab continuously exchanged local parameters (such as P and Q) from its Hardware-In-Loop (CHIL) and Power Hardware-In-Loop (PHIL) assets through centralized energy controller at NLR, enabling real-time interaction and coordination across sites. By leveraging ESnet as the communication backbone, the team successfully operated the distributed assets as a unified power system, with each bus represented by a different laboratory. This setup mirrors how assets interact in real-world power systems across dispersed locations with various protocols and latencies. At each lab site, assets were operated using their own local controllers which were coordinated through an overarching operation and control layer of centralized energy controller, equivalent to how an energy management system (EMS) orchestrates assets across a regional or national grid. SuperLab's federated connectivity utilized a Digital Real-Time Simulators (DRTS)-type gateway to connect Controller Hardware-In-Loop (CHIL) and PHIL assets between labs. To enable this federated connection through ESnet, a deterministic network was established where latency variations were consistent. This consistency allowed the development of digital filters for the power system assets across CHIL and PHIL interfaces to avoid unstable and unreliable grid conditions. This report provides an overview of the cross-laboratory configuration and offers insights into interconnecting geographically distributed research assets to test them as if they were co-located. This experiment represents a step toward linking nine DOE national laboratories, enabling nation-wide simulations that can address utility-driven challenges with grid resilience, flexibility, and modernization.

24 POWER TRANSMISSION AND DISTRIBUTION↗

SRNL Nuclear Material Management Strategy

Started in FY22 to categorize with the goal of determining assets and liabilities for the new management team and reducing SRNL’s excess inventory. • Allow for program growth within the current material limits. • Prior to FY22 inventory was a ‘blackbox’. • No formal system for tracking utilization or future needs until items arrived. • Created friction between management and researchers • Slowed down incoming projects • Risk of breaking safety and/or security limits • Risk of jepardizing program growth.

Ramsey, Catherine M.↗