Search NASA⌕ Search

SEARCH · Search NASA

Results for “collaborative grid”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Progress on the FabrIc for Frontier Experiments project at Fermilab

The FabrIc for Frontier Experiments (FIFE) project is an ambitious, major-impact initiative within the Fermilab Scientific Computing Division designed to lead the computing model for Fermilab experiments. FIFE is a collaborative effort between experimenters and computing professionals to design and develop integrated computing models for experiments of varying needs and infrastructure. The major focus of the FIFE project is the development, deployment, and integration of Open Science Grid solutions for high throughput computing, data management, database access and collaboration within experiment. To accomplish this goal, FIFE has developed workflows that utilize Open Science Grid sites along with dedicated and commercial cloud resources. The FIFE project has made significant progress integrating into experiment computing operations several services including new job submission services, software and reference data distribution through CVMFS repositories, flexible data transfer client, and access to opportunistic resources on the Open Science Grid. Hence, the progress with current experiments and plans for expansion with additional projects will be discussed. FIFE has taken a leading role in the definition of the computing model for Fermilab experiments, aided in the design of computing for experiments beyond Fermilab, and will continue to define the future direction of high throughput computing for future physics experiments worldwide

97 MATHEMATICS AND COMPUTING↗

Data Request for the Distribution Grid Atlas

Model-based, distribution powerflow analysis is a foundational component of system planning and grid modernization efforts, but data security is an impediment to collaboration among utility engineers, researchers, developers, community members, and other stakeholders. Pacific Northwest National Laboratory (PNNL) and the National Renewable Energy Laboratory (NREL) are partnering to develop the new Distribution Grid Atlas - a publicly available catalog of realistic, geographically relevant, representative distribution feeder models without sensitive geographic information, customer data, or disclosure of utility models. We are looking for utilities to share data for the Distribution Grid Atlas.

distribution↗

Grid-Ready Energy Analytics Training with Data (“GREAT with Data”)

GridEd is a collaborative educational initiative consisting of the Electric Power Research Institute (EPRI), 5 Partner Universities (Stony Brook University, The University of Texas at Austin, University of California – Riverside, Virginia Tech, Washington State University), and participating industry sponsors. This educational initiative focuses on developing and training the next generation of power engineers so they can help shape the electric grid of the future by anticipating and fulfilling the needs of changing electric industry requirements. GridEd is leveraging electric industry research to educate a future electric grid workforce by empowering new and continuing education students, not only to become competent and well-informed engineers, but also to participate and influence major technological, social, and policy decisions that address critical global challenges. GridEd’s activities are centered around four core pillars: Enhancement of university power systems engineering curricula; Professional development and training for a diverse electric industry workforce; Stimulating students to join the movement for the next generation of power engineers, and; Improve workforce development efforts in the electric utility industry. Major accomplishments over the course of the project were: Over 50 unique professional short courses were delivered by more than 30 instructors across the GridEd network; Over 3,600 unique learners, many who took multiple courses, received more than 27,000 professional development hours (PDH) and over 1,000 certificates of completion; Approximately 2,900 unique learners undertook a course that was offered LIVE online or in-person; Approximately 700 unique learners undertook a course that was offered as computer-based training (CBT); Over 35 unique university courses were delivered by more than 30 instructors to 1,500 university students across the GridEd network; One-hundred-and-fifty-seven (157) students were funded to completed 43 student projects in topics of power systems and data science, and; Six (6) Historically Black Colleges and Universities (HBCUs) recruited as Affiliate Universities via Utility Partners. The professional training initiative and workforce development activities launched by this project will be sustained through EPRI’s collaborative business model with industry. Stimulating students to join the power engineering workforce of the future and the enhancement of tertiary training may continue to need government support.

14 SOLAR ENERGY↗

Sustaining and Extending the Open Science Grid: Science Innovation on a PetaScale Nationwide Facility (DE-FC02-06ER41436) SciDAC-2 Closeout Report

Under this SciDAC-2 grant the project’s goal w a s t o stimulate new discoveries by providing scientists with effective and dependable access to an unprecedented national distributed computational facility: the Open Science Grid (OSG). We proposed to achieve this through the work of the Open Science Grid Consortium: a unique hands-on multi-disciplinary collaboration of scientists, software developers and providers of computing resources. Together the stakeholders in this consortium sustain and use a shared distributed computing environment that transforms simulation and experimental science in the US. The OSG consortium is an open collaboration that actively engages new research communities. We operate an open facility that brings together a broad spectrum of compute, storage, and networking resources and interfaces to other cyberinfrastructures, including the US XSEDE (previously TeraGrid), the European Grids for ESciencE (EGEE), as well as campus and regional grids. We leverage middleware provided by computer science groups, facility IT support organizations, and computing programs of application communities for the benefit of consortium members and the US national CI.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Experimental Characterization of a Grid-Loss Event on a 2.5-MW Dynamometer Using Advanced Operational Modal Analysis: Preprint

This paper experimentally investigates a worst case grid loss event conducted on the National Renewable Energy Laboratory (NREL) Gearbox Reliability Collaborative (GRC) drivetrain mounted on the 2.5MW NREL dynamic nacelle test-rig. The GRC drivetrain has a directly grid-coupled, fixed speed asynchronous generator. The main goal is the assessment of the dynamic content driving this particular assess the dynamic content of the high-speed stage of the GRC gearbox. In addition to external accelerometers, high frequency sampled measurements of strain gauges were used to assess torque fluctuations and bending moments both at the nacelle main shaft and gearbox high-speed shaft (HSS) through the entire duration of the event. Modal analysis was conducted using a polyreference Least Squares Complex Frequency-domain (pLSCF) modal identification estimator. The event driving the torsional resonance was identified. Moreover, the pLSCF estimator identified main drivetrain resonances based on a combination of acceleration and strain measurements. Without external action during the grid-loss event, a mode shape characterized by counter phase rotation of the rotor and generator rotor determined by the drivetrain flexibility and rotor inertias was the main driver of the event. This behavior resulted in significant torque oscillations with large amplitude negative torque periods. Based on tooth strain measurements of the HSS pinion, this work showed that at each zero-crossing, the teeth lost contact and came into contact with the backside flank. In addition, dynamic nontorque loads between the gearbox and generator at the HSS played an important role, as indicated by strain gauge-measurements.

17 WIND ENERGY↗

Cyber-Physical System Security With Deceptive Virtual Hosts for Industrial Control Networks

A challenge facing industrial control network administrators is protecting the typically large number of connected assets for which they are responsible. These cyber devices may be tightly coupled with the physical processes they control and human induced failures risk dire real-world consequences. Dynamic virtual honeypots are effective tools for observing and attracting network intruder activity. This paper presents a design and implementation for self-configuring honeypots that passively examine control system network traffic and actively adapt to the observed environment. In contrast to prior work in the field, six tools were analyzed for suitability of network entity information gathering. Ettercap, an established network security tool not commonly used in this capacity, outperformed the other tools and was chosen for implementation. Utilizing Ettercap XML output, a novel four-step algorithm was developed for autonomous creation and update of a Honeyd configuration. This algorithm was tested on an existing small campus grid and sensor network by execution of a collaborative usage scenario. Automatically created virtual hosts were deployed in concert with an anomaly behavior (AB) system in an attack scenario. Virtual hosts were automatically configured with unique emulated network stack behaviors for 92% of the targeted devices. The AB system alerted on 100% of the monitored emulated devices.

97 MATHEMATICS AND COMPUTING↗

SuperLab 2.0 Showcase: Connecting Five Labs to Tackle Grid Complexity and Unlock Unique Grid Asset Potential

SuperLab 2.0 (a five-lab demonstration) is a collaborative, national-scale experiment showcasing the coordination of geographically distributed energy assets in real time. The demonstration integrates 25 physical and digital assets, spanning wind, photovoltaics, batteries, electrolyzers, DC fast chargers, microgrid controllers, building automation systems, small modular reactors, control centers, and gas turbines, across five U.S. Department of Energy (DOE) national laboratories: National Laboratory of the Rockies (NLR), Idaho National Laboratory, National Energy Technology Laboratory, Lawrence Berkeley National Laboratory, and Sandia National Laboratories. These assets are unified using Energy Sciences Network (ESnet), a low-latency, high-performance DOE network, and are controlled via a centralized energy controller hosted at NLR's Advanced Research on Integrated Energy Systems facility. The demonstration validates the ability to stress-test hybrid energy systems under dynamic scenarios to de-risk advanced control strategies for greater resilience and flexibility.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Demonstration of a Novel Technology to Manage Electricity Demand in Grid-Independent Military Microgrids

This research was conducted by the National Renewable Energy Laboratory (NREL) in collaboration with the S&C Electric Inc. through funding provided by the ESTCP. The project demonstrates use of cybersecure Automated Demand Response (ADR) technology to effectively manage microgrid loads during grid-independent, also known as "islanded," operation. When military microgrids become isolated from the main electrical grid, they are required to balance electricity supply and demand locally. Given that local generation may be constrained, the prevailing strategy involves shedding all but the most critical loads by tripping smart circuit breakers, which then necessitate manual resetting. This approach is generally implemented at the building level, which means that the buildings with mission-critical activities are exempt from load management and remain fully powered, whereas those deemed non-critical can experience a complete loss of service. In this research we developed a method that allows building automation systems to selectively control their assets in response to load shedding request from a microgrid controller, avoiding total loss of service in contrast to the conventional control approach. A commercial OpenADR client server by GridFabric is used for communication between the microgrid controller and the building management system (BMS). The microgrid controller monitors both generation capacity and various assets within the microgrid and issues a demand reduction request when necessary. This request is communicated to the OpenADR server via Modbus. Upon receiving the request, the OpenADR server forwards it to the BMS utilizing the OpenADR protocol. The BMS is pre-configured with various levels of load reduction strategies based on the controllable assets available, allowing for a nuanced approach to demand reduction. Both lab and field tests were performed that considered load shedding needed to achieve closed transition into island mode and to accommodate changing loads and power source availability while islanded. A commercial microgrid controller was used for these tests with normal programming within the expected constraints of the system capabilities. That is, the solution did not require any specialized modification to the code base of the controller. Given the latency of the round-trip communication path between the microgrid controller and the various devices involved with the load shed processes, there are certain scenarios for which the demonstrated solution are appropriate and some which are not. The methods described in this report can be used for load shedding/restoration during transitions between islanded and grid-tied modes of operation, as well as accommodating normal variations in load and the need to remove a power source from operation for maintenance. These methods should not be used for scenarios that require load shedding within a second or two such as sudden and unanticipated significant load increases or loss of power sources through equipment faults.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Interconnection Standard Grid-Support Function Evaluations Using an Automated Hardware-in-the-Loop Testbed

Grid operators are increasingly turning to advanced grid-support functions in distributed energy resources (DER) to assist with distribution circuit voltage regulation, bulk system frequency control, and power system protection. The U.S. DER certification standard, Underwriters Laboratories (UL) 1741, was revised in September 2016 to add test procedures for multiple grid-support functions. Sandia National Laboratories, SunSpec Alliance, and growing community of collaborators have undertaken a multiyear effort to create an open-source system validation platform (SVP) that automates DER interconnection and interoperability test procedures by communicating with grid simulators, photovoltaic (PV) simulators, data acquisition systems, and interoperable equipment under test. However, the power hardware required for generating the test conditions may be untenable for many organizations. In this paper, we discuss development of the SVP testing capabilities for UL 1741 tests utilizing a controller hardware-in-the-loop testbed that precludes the need for power hardware using a 34.5 kW Austrian Institute of Technology smart grid controller. Finally, analysis of normal ramp rate, soft start ramp rate, specified power factor, volt-VAr, and frequency-watt advanced grid functions, and the effectiveness of the UL 1741 test protocols are included.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Plug-in Electric Vehicle Charging Response Characterization for Grid Integration: Implications for Smart Charge Management

The rapid expansion of plug-in electric vehicles (PEVs) has created a unique challenge for electrical grids due to their significant power demand. At the same time, PEVs also create a unique opportunity to ease their own burden on the power grid, as they create a growing fleet of distributed energy resources capable of providing grid services such as demand response, frequency regulation, and renewable balancing. For aggregators and grid operators to effectively integrate PEVs into grid management, it is essential to first understand and characterize how they would respond in such situations. This study examines 25 models of PEVs across 25 makes, spanning model years from 2013 to 2025, to characterize their responses to the basic controls used in vehicle-grid integration (VGI): stopping, starting, and modulating the charge rate. Each vehicle was tested in a controlled laboratory setting to evaluate its performance in response to varying the maximum allowable current via the SAE J1772 control pilot signal, as well as its response to wake-up commands outlined in SAE J1772. Results show measurable differences across vehicle makes in the accuracy, latency, and precision with which PEVs respond to changes in ampacity, as well as varying sleep and wake-up behavior. The test results show that all vehicles respond to changes in ampacity, though with varying accuracy, precision, latency, and resolution. Wake-up behavior also differs across makes and models. These findings indicate that effective grid integration strategies must account for these differences. The results provide a foundation for understanding current vehicle behavior and advancing smart-charging methods while also highlighting the need for further testing, broader standardization, and manufacturer collaboration to ensure the successful integration of PEVs into the electrical grid.

24 POWER TRANSMISSION AND DISTRIBUTION↗

EV Charging Infrastructure Energization An Overview of Approaches for Simplifying and Accelerating Timelines to Processing EV Charging Load Service Requests

The United States has seen significant growth in electric vehicle (EV) adoption, leading to increased demand for EV charging infrastructure. Over the past decade, EV charging infrastructure site developers, site hosts, and electric distribution utilities have navigated the process to integrate chargers onto the electric grid. Site developers and site hosts have raised the alarm that the integration process for high-powered EV charging projects does not meet the needs of the EV market for timeliness or cost. High-powered charging stations typically require a load service request or an agreement with the local utility to connect to the grid. The process of energizing a new high-powered charging site can be complex and time-consuming, often taking up to 2 years. This timeline is the result of current utility energization processes having been designed for construction projects that take longer to build (i.e., buildings). The specific challenges stem from various factors, including compartmentalization in application processes, the integration of EV charging process approvals with other distributed energy resources (DERs), and the need to ensure grid reliability. The energization process needs to evolve to meet the growing demand for high-powered EV charging. This white paper compiles information gathered through various conversations with key stakeholders, including utilities, utility regulators, EV charging operators, site developers, and authorities having jurisdiction (AHJ) as well as through an extensive literature review. This document identifies the challenges and provides potential solutions to streamline the process of connecting EV charging infrastructure to the power grid in the United States, serving as a starting point for future conversations around these solutions. The solutions noted in this white paper require collaborative efforts among utilities, regulators, and EV charging infrastructure developers to streamline the grid connection process for EV charging infrastructure. They are broadly organized into four areas: 1. Increase data access and transparency: Develop automated load service request tools, integrate hosting capacity and load service request analyses, incorporate EV adoption forecasts, and provide transparency on the processing queue. 2. Improve energization processes and timing: Create fast-track options based on prescreening criteria, provide flexibility or phased approvals in the load service request/interconnection process, build internal knowledge within utilities about EV charging technologies, and provide standardized workforce training. 3. Promote economic efficiency: Right size distribution components to accurately reflect the load requirements of EV charging infrastructure, make proactive investments in grid infrastructure based on EV adoption forecasts and growth projections, and consider energy equity and environmental justice factors such as equitable access to EV charging when planning infrastructure. 4. Improve grid reliability and resilience: Use load management/power control systems (PCS) at EV charging stations, adopt and implement harmonized standards for communication protocols and information models between the EV charging and grid control infrastructure, and address cybersecurity considerations by implementing robust security measures and standards for EV charging infrastructure—with particular emphasis on clarifying the security requirements for the interface to the grid. The objective of the solutions proposed in this white paper is to accelerate the timeline and decrease costs associated with connecting EV charging infrastructure to the grid. Electric utilities, utility regulators, EV charging infrastructure developers, and site hosts will first need to understand which solutions are available in their service territory, and if warranted, which combination of solutions would support their specific needs. Through the successful implementations of solutions at scale detailed here, industry will demonstrate a new and innovative ecosystem where timely deployment and energization of EV charging infrastructure with greater grid resiliency and reliability is a reality.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Analysis of Differential Financial Impacts of LWR Load-Following Operations. Revision 1

This document reports the application of HERON (Holistic Energy Resource Optimization Network), a newly-developed RAVEN (Risk Analysis Virtual ENvironment) plugin for grid and capacity optimization, to a case study conducted in collaboration with Arizona Public Service (APS). The study is a work in progress; this report presents a description of current models and corresponding results for a particular consideration. APS is anticipating several operational challenges. The first is rapid growth of Variable Renewable Energy (VRE) sources such as wind and solar power providing energy to the grid in the APS service region. This creates challenges for baseload operation of the Palo Verde Generating Station (PVGS), a nuclear power plant co-owned and operated by APS. The second challenge for APS is a change in the cooling water acquisition contract with the Sub Regional Operating Group (SROG). The existing contract is expiring soon, and a renewal is only available for a significantly higher price of water. These two challenges represent a difficulty in maintaining profitability for PVGS as local area demand is highly fluctuant and water prices may increase. Furthermore, excess production at PVGS is currently traded on the Palo Verde energy Hub (PVH), which occasionally offers very low or negative locational marginal prices (LMP) for electricity. This analysis considers the potential benefits of occasional curtailment of PVGS as a method to mitigate unprofitable production hours. Similar to load following, optional daily curtailment would allow APS to elect curtailment of PVGS as low as 70% of its nominal operating level between the hours of 08:00 and 16:00 provided local area demand is met and it is profitable to do so. This document reports a stochastic differential analysis of the Net Present Value (NPV) of PVGS as operated by NPS as a result of optional curtailment operation. To model this differential case, HERON has been designed from previous efforts in this study as a generic tool to accelerate the design and execution of RAVEN workflows for technoeconomic analysis of grid energy systems. HERON leverages both RAVEN and the CashFlow plugin for RAVEN to stochastically explore or optimize a response surface with energy grid system production capacities as inputs and mean NPV as a goal function. HERON performs these evaluations by stochastically sampling market, weather, and demand events using RAVEN’s ARMA reduced-order model capability to generate boundary conditions for dispatch optimization. The algorithm performs the dispatch optimization for each of the synthetic scenarios. For this case, HERON designs workflows to simulate behavior of the PVH, wind, solar, and APS local area demand, and use these synthetic scenarios to stochastically evaluate the differential benefit of optional curtailment for each scenario. While this study finds optional curtailment to be a potential source of revenue, the magnitude of the differential NPV is sufficiently small that it is unlikely a priority for increasing the profitability of PVGS. Further, the differential NPV shrinks throughout the simulated years, suggesting the long-term benefit of such operation given current assumptions is negligible.

14 SOLAR ENERGY↗

The Earth System Grid Federation: An Open Infrastructure for Access to Distributed Geospatial Data

The Earth System Grid Federation (ESGF) is a multi-agency, international collaboration that aims at developing the software infrastructure needed to facilitate and empower the study of climate change on a global scale. The ESGF s architecture employs a system of geographically distributed peer nodes, which are independently administered yet united by the adoption of common federation protocols and application programming interfaces (APIs). The cornerstones of its interoperability are the peer-to-peer messaging that is continuously exchanged among all nodes in the federation; a shared architecture and API for search and discovery; and a security infrastructure based on industry standards (OpenID, SSL, GSI and SAML). The ESGF software is developed collaboratively across institutional boundaries and made available to the community as open source. It has now been adopted by multiple Earth science projects and allows access to petabytes of geophysical data, including the entire model output used for the next international assessment report on climate change (IPCC-AR5) and a suite of satellite observations (obs4MIPs) and reanalysis data sets (ANA4MIPs).

Climate Modelling↗

Electric Vehicle Communications Standards Testing and Validation - Phase II: SAE J2931/1

Vehicle to grid communication standards enable interoperability among vehicles, charging stations and utility providers and provide the capability to implement charge management. Several standards initiatives by the Society of Automobile Engineers (SAE), International Standards Organization and International Electrotechnical Commission (ISO/IEC), and ZigBee/HomePlug Alliance are developing requirements for communication messages and protocols. Recent work by the Electric Power Research Institute (EPRI) in collaboration with SAE and automobile manufacturers has identified vehicle to grid communication performance requirements and developed a test plan as part of SAE J2931/1 committee work. This laboratory test plan was approved by the SAE J2931/1 committee and included test configurations, test methods, and performance requirements to verify reliability, robustness, repeatability, maximum communication distance, and authentication features of power line carrier (PLC) communication modules at the internet protocol layer level. The goal of the testing effort was to select a communication technology that would enable automobile manufacturers to begin the development and implementation process. The EPRI/Argonne National Laboratory (ANL)/Pacific Northwest National Laboratory (PNNL) testing teams divided the testing so that results for each test could be presented by two teams, performing the tests independently. The PNNL team performed narrowband PLC testing including the Texas Instruments (TI) Concerto, Ariane Controls AC-CPM1, and the MAXIM Tahoe 2 evaluation boards. The scope of testing was limited to measuring the vendor systems communication performance between Electric Vehicle Support Equipment (EVSE) and plug-in electric vehicles (PEV). The testing scope did not address PEV’s CAN bus to PLC or PLC to EVSE (Wi-Fi, cellular, PLC Mains, etc.) communication integration. In particular, no evaluation was performed to delineate the effort needed to translate the IPv6/SEP2.0 messages to PEV’s CAN bus. The J2931/1 laboratory test results were presented to the SAE membership on March 20-22, 2012. The SAE committee decided to select HomePlug GreenPHY (HPGP) as the communication technology to use between the PEV and EVSE. No technology completely met all performance requirements. Both the MAXIM Tahoe 2 and TI Concerto met the 100Kbps throughput requirement, are estimated to meet the latency measurement performance, and met the control pilot impairment requirements. But HPGP demonstrated the potential to provide a data throughput rate of 10x of the requirement and either met or showed the potential to meet the other requirements with further development.

33 ADVANCED PROPULSION SYSTEMS↗

Transforming Power Systems; 21st Century Power Partnership

The 21st Century Power Partnership - a multilateral effort of the Clean Energy Ministerial - serves as a platform for public-private collaboration to advance integrated solutions for the large-scale deployment of renewable energy in combination with deep energy ef?ciency and smart grid solutions.

21st Century Power↗

Modeling the Functional Forms of Grid Disturbances

This report introduces a functional form that may be used to quantitatively predict the impacts of new grid tools and changing system qualities on the likelihoods, durations, and depths of various grid disturbances. Each disturbance scenario is modeled to have three component stages—avoidance, reactance and recovery, which together parametrically estimate one disturbance’s impacts. The modeled scenario is then placed and replicated within an analysis period to represent the likelihood or frequency of the scenario and its consequent impacts. Whereas analysts have struggled to define and apply metrics for grid resilience, the functional form introduced by this report shares units of measurement with accepted grid-status measures (e.g., numbers of customers currently experiencing a service outage). Furthermore, the integrated and averaged functional form over an analysis period provides a meaningful normalized performance metric (e.g., customer outage minutes per year) that is ultimately independent of the duration of the period of. The approach may be applied similarly regardless of the severity or frequency of the disturbances that are being analyzed. Because metrics can be chosen to be identical in both the hypothetical future and the actual historical past, the historical past eventually becomes the test of the future predictions, at least in a statistical sense. The authors originally developed this approach to facilitate analysis of the effects of transactive energy (TE) systems effects on electric power grid resilience. TE systems invite energy suppliers and consumers to actively collaborate toward the discovery of, and their responses to, the locational value of energy. The findings from this process are often embodied as energy prices, the dynamics of which indicate the locational value of energy and can further represent important grid service needs. While some academic papers claim to quantify the value of a specific TE system design toward grid resilience, the answer, in general, has been elusive. Not only do multiple and conflicting definitions of resilience and reliability exist, but countless TE systems are being invented. We conclude the following: (1) The ideal analysis should harmonize rather than differentiate resilience and reliability. Therefore, this report uses the more general term disturbance whenever the overloaded terms resilience and reliability can be avoided. (2) The effectiveness of TE systems must be mapped to underlying qualities of a TE system, thereby avoiding presumptions that every TE design offers similar advantages. The authors seek to evaluate the parametric effects of TE system qualities (e.g., spatial granularity, granularity of time steps, length of future prediction horizon) on avoiding, reacting to, and recovering from grid disturbances. Furthermore, any advantages (or disadvantages) must be fairly compared with the many alternative tools, systems, and strategies that might offer comparable benefits.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Grid-Connected Modular Soft-Switching Solid State Transformers (M-S4T)

The objective of this project is to develop and verify the concept of a flexible and modular soft-switching solid-state transformer (M-S4T) for direct grid-connected applications. The ability to directly connect power electronics converters to the medium voltage grid (4 kV – 13 kV), and to potentially replace the passive and bulky, but ubiquitous 60 hertz service transformer in the 25 kVA to 100 kVA range, with a more flexible and controllable device, has been regarded as the ‘holy grail’ in grid control. However, this has proven to be extremely difficult. This project has developed the solutions to several key challenges of the direct grid-connected power electronics and realized a 7.2 kV M-S4T prototype. First, a protection method to protect the M-S4T from the high voltages (110 kV for the 13 kV system) that occur on the grid due to transients and lightning strikes have been developed and experimentally verified. Second, the realization and the operation of the M-S4T based on high-voltage SiC devices (>3.3 kV) and a medium-frequency medium-voltage low-leakage transformer in a single-stage solid-state transformer with zero-voltage switching, low dv/dt, and low electromagnetic interference has been successfully demonstrated up to 7.5 kV peak. Third, an oil-cooling system and stable communication and distributed control system for converter module voltage sharing have been developed and experimentally verified. The developed M-S4T has realized a modular universal high-performance power conversion system. This conversion system is scalable to different voltage and power levels and adaptable to four-quadrant bidirectional operation. Moreover, the use of passive cooling techniques meets the equipment life requirements, and the lightning protection scheme fulfills the basic insulation level specifications for direct grid connection. Such power conversion system opens up near-term opportunities, including energy storage, solar PV, or electric vehicle charging with significant cost and footprint savings. In the longer term, the possibility of replacing the utility distribution transformer with an M-S4T will be transformative for future distribution grids with a compact footprint and full controllability to enable high renewable energy and storage penetration. In addition to the main project, this report expands on the Plus-Up projected including as part of the main award. This project developed and demonstrated the technology for autonomous collaborative inverters that can be connected in an ad hoc manner to the grid. The aim of the project was to: (1) evaluate the existing techniques for grid-connected inverters and find their limitations; (2) develop detailed requirements for grid-connected inverters in the modern grid with millions of active nodes; (3) design a unified control strategy that brings more autonomy and intelligence to grid-connected inverters, and addresses parts of the issues with the existing techniques. The proposed technique, called UniCon, enables inverters to 1) connect/disconnect to/from the grid in an ad hoc manner; (2) work based on local sensing. Slow communication could be used for a more optimized behavior; (3) work automatically in both grid-forming/grid-following mode; (4) handle large disturbances, e.g., big load step and fault, in an oscillation-free manner; (5) work collaboratively with other inverters in steady-state and during transients. UniCon can be implemented in the middle-level control; hence it is agnostic to the vendor and to the implementation of the inner voltage/current and protection loops. Furthermore, a new synchronization scheme, based on deep learning, was developed that can extract the grid voltage phase and amplitude in a stable manner. The method is cheap to implement can improve the dynamic performance of the grid-connected inverters during fast transients, e.g., fault. The proposed control scheme was validated by (1) MATLAB/Simulink; (2) hardware-in-the-loop results, and; (3) experimental results using three inverters that form a microgrid in a down-scaled feeder. Lastly, both the M-S4T and UniCon have achieved promising tangible paths to markets. In the case of the M-S4T, the underlying technology — the Soft Switching Solid State Transformer (S4T) developed at the Georgia Tech Center for Distributed Energy (GT-CDE) has been licensed by GridBlock from the Georgia Tech Research Corporation, and GridBlock has been working with manufacturing partner Jabil (one of the largest US-based contract manufacturers) and system integrator Power Secure (largest deployer of microgrids in the US with 4.7 GW under management), to meet the strong initial demand. Similarly, GridBlock has an exclusive license to the UniCon technology, developed under this award by GT-CDE. The UniCon provides an intermediate control layer that enables the implementation of the higher-level ‘transactive’ control commands for the system. The architecture of the system - slow communications with the cloud for system optimization and setpoints, and the use of locally measured quantities for real-time control, provide a very robust and secure way of implementing a real-time must-run grid that is also secure and stable. This is a brand-new functionality that is critical for the future grid and key to GridBlock’s business model.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Navajo residential solar energy access as a global model

Here, this case study focuses on the Navajo Nation’s efforts to provided residential power access through solar photovoltaic systems to some of its approximately 34,000 remote off-grid tribal members. The solution the Nation has adopted in collaboration with Sandia National Laboratories offers insights into how the Navajo Tribal Utility Authority’s work could serve as a residential model to meet the needs of the 1.2 billion people globally who are without electrical residential power.

14 SOLAR ENERGY↗