Search NASA⌕ Search

SEARCH · Search NASA

Results for “decommissioning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Development of the 3 m{sup 3} Low Level Radioactive Waste Container in Taiwan - 20037

Chinshan Nuclear Power Plant stopped its business operation in July, 2019, and Kuosheng Nuclear Power Plant will also be permanently shut down in 2023. Nuclear Reactor Facilities Regulation Act requires a nuclear facility must be dismantled in 25 years after being permanently ceased operation. According to the approved decommissioning plan of Chinshan Nuclear Power Plant and the proposed one of Kuosheng Nuclear Power Plant, the 3 m{sup 3} low level radioactive waste container is planned to store the low level radioactive wastes with higher radiation produced during the decommissioning. However, 3 m{sup 3} low level radioactive waste containers are not used or developed in Taiwan before. To meet such need, Institute of Nuclear Energy Research develops a new type of 3 m{sup 3} low level radioactive waste container and performs the corresponding analyses and tests based on Guidelines of Applying the Usage License of Low Level Radioactive Waste Containers and Regulations for the Safe Transport of Radioactive Material. In this article, it provides the information of the low level radioactive waste containers that have been approved or is under reviewing in Taiwan, and so do the design specifications of the developed 3 m{sup 3} waste container. Besides, the numerical evaluation and test results of the developed 3 m{sup 3} waste container are also included in this article. Based on the evaluation and test results, the developed 3 m{sup 3} waste container satisfies the requirements of the storage container and industrial package type 2. Institute of Nuclear Energy Research will submit the usage license applications to the authority this year, and the usage licenses would be granted in 2021, expectedly. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Systematic Evidence Based Performance Approach to Regulation of Nuclear Sites in England and Wales - 20058

The Environment Agency for England has developed a systematic evidence-based approach to pursue our strategic environmental objectives for the regulation of nuclear sites. We use an annual evidence review process to ensure effective and efficient targeting of limited resources to achieve those objectives. Over the last 8 years, we have been developing and refining this approach to ensure risk-based and value driven regulation. The approach comprises nuclear site and nuclear sector review processes known as Site Environment Review (SER) and Nuclear Environment Review (NER). This approach complements our regulation of nuclear site permit holders under the Environmental Permitting Regulations (EPR). We deliver our regulation of nuclear sites in England and Wales alongside the Office for Nuclear Regulation. The SER process involves the lead regulator for each nuclear site assessing the permit holder's environmental performance across 14 themes, set within the context of the site's main activities and associated waste disposals. Our themes include environmental leadership, resources and climate change, radioactive waste management, facility management and decommissioning, groundwater, and environmental radiological protection. We use evidence from site inspections and working within our subject matter groups to grade current and predicted future environmental performance. We are particularly interested in sustainability and the application of Best Available Techniques (BAT) to prevent the creation, and minimise the disposal, of radioactive wastes. We use risk analysis (strengths, weaknesses, threats and opportunities) to examine performance against our strategic environmental objectives, which are set out, in our 5-year Nuclear Delivery Plan (NDP). The output supports the targeting of our resources at each nuclear site. We consult the relevant permit holders on the SER priorities and use their feedback to refine our plans. We expect all permit holders to take account of our priorities when considering their own programmes of work, objectives and plans. The NER process brings together what we learn and achieve through regulation across the sector. It provides input to planning priorities, supported by qualitative and semi-quantitative evidence. It covers the 28 nuclear sites in England and Wales and spans the same 14 environmental themes. During the process we collate, compile and summarise evidence from the SERs and other sources such as inspection reports and evidence from our other nuclear work programmes. The output is the NER annual report. This provides a snapshot of the status of the nuclear sector and gives insights to enable us to regulate more efficiently and effectively. It also takes account of cross-cutting issues and risks such as changes in international standards, domestic policy, regulatory framework, domestic standards and guidance, learning from experience such as incidents, events and good practice, and innovation, research and development. It provides graphics that illustrate the grading of environmental performance for the nuclear sector across the fourteen environmental themes. This analysis allows benchmarking of nuclear site's environmental performance and the visualisation provides a convenient comparison of performance across themes, sites, and over time. We use this intelligence to inform our investment in training and development of our staff, and our cross-cutting engagement on strategic issues with government, the Nuclear Decommissioning Authority (NDA) and other corporate organisations. Adopting this approach can provide benefits with organisational reputation, stakeholder participation and ensuring value from the public investment. This paper describes the history of the SER/NER process, a selection of outputs from the process and ideas for improvement. The paper will be of interest to other regulators and organisations across the world that are interested in supporting continuous improvement. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Optimization of the Post-Operational Phase on Two Belgian Multi-Unit Nuclear Power Plants: the Case of the Non-Fissile Irradiated Core Items - 20156

The current legal framework in Belgium foresees the progressive phase out of nuclear power between October 2022 (Doel 3) and December 2025 (Doel 2). Upon its definitive shutdown, each unit of the Tihange and Doel sites will enter a Post-Operational Phase (POP) and be prepared for its Decontamination and Decommissioning (D and D). Prior to obtaining the D and D license, the Operator Electrabel is legally required to remove any non-fissile irradiated core items stored in the deactivation pools. The non-fissile irradiated core items consist essentially of control rods, poison rods and source thimbles as well as thimble plugs and foreign materials irradiated during operation: - Their significant content in highly radiant radionuclides (up to 6 TBq of Co-60 per kg of irradiated material) renders all existing operational waste management processes inadequate due to insufficient biological shielding; - Their high concentrations in long-lived radionuclides call for their disposal in a geological repository for which no final design nor waste acceptance criteria are expected prior to 2050. Uncertainties in the Belgian energy supply and security, however, require the Operator to be prepared for a partial nuclear phase out, where one or more units would benefit from lifetime extension while the remaining units would undergo decommissioning. The present paper aims at presenting how Electrabel, in partnership with Tractebel, addressed this challenge by maximizing the use of synergies within the respective sites as well as between both sites themselves, all the while accounting for site specificities. The most recent results and state of progress of the project will be detailed and the first lessons learned will be shared. The project has been split in multiple tasks and phased as follows: - An inventory phase aimed at mapping the contents, origin, composition and history of the non-fissile irradiated core items; - A pre-characterization phase based on neutron activation models; - A waste sorting phase aimed at separating waste forms for which an evacuation route exists from those for which such route does not exist; - A feasibility phase aimed at exploring all possible scenarios for the management of non-fissile irradiated core items and identifying the optimal feasible solution for each site; - A preparation phase (currently ongoing), developing further the optimal solution and ensuring that back-up solutions are available for any foreseeable change of context (licensing issue, modification in the nuclear phase-out program, etc.) and initiating early contacts with potential subcontractors for segmentation works and cask manufacturers, as well as the Belgian regulatory body and waste management agency. This phase also foresees the investigation of destructive and non-destructive radiological measurements to support the detailed characterization of the waste forms; - A realization phase (future work). (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

GeoMelt{sup R} In-Container Vitrification (ICV){sup TM} for Fukushima Daiichi Water Treatment Secondary Wastes - 20212

The Japanese government is supporting development work implemented jointly by Veolia subsidiaries Kurion Japan, K.K., Veolia Nuclear Solutions (VNS), Inc., and Veolia Nuclear Solutions Federal Services, LLC for treating radioactive waste generated from Fukushima Daiichi Nuclear Power Station (NPS) water treatment using the GeoMelt{sup TM} In-Container Vitrification (ICV){sup TM} technology. The initial work consisted of glass formulation and engineering-scale testing which was completed in 2018, in the frame of an IRID (International Research Institute for Nuclear Decommissioning) program as part of a project subsidized by Japan's Ministry of Economy, Trade and Industry (METI). The Fukushima Daiichi NPS Mid- and Long-Term Road-map requires investigation of methods to stabilize solid wastes (and to immobilize radioisotopes in the wastes) generated as a result of emergency response and decommissioning activities. Cooling water treatment has resulted in a significant amount of solid and slurry secondary wastes (mostly adsorbents and ion-exchange materials) which will require processing at some point. GeoMelt{sup R} ICV{sup TM} is a joule-heated melter technology which uses a refractory-lined single-use container combining the melter and disposal container. There is no pouring required nor concerns with refractory corrosion which allows the process to accommodate a wide range of waste chemistries and high waste loadings. The testing described here consisted of three engineering-scale melts, each processing between 212 kg and 240 kg of waste simulants, glass formers, and non-radioactive cesium (Cs) and strontium (Sr) tracers. Continuous isokinetic stack sampling of off-gas emissions was performed for each test in order to calculate Cs and Sr retention in the glass wasteform. Single-pass retention of Cs in the final glass wasteform ranged from 91.46 to 99.30%, and single-pass retention of Sr ranged from 99.76 to 100%. Planned particulate recycle will increase these retention levels. Melt 1 processed a mixture of KUR-EH (a zeolite-based ion-exchange material), simulated Advanced Liquid Processing System (ALPS) Carbonate and Iron Slurries, and glass additives. Melt 2 processed a mixture of KUR-EH, KUR-TSG (a titanate-based adsorbent), and glass additives. Melt 3 processed a mixture of KUR-EH, simulated barium sulfate/iron ferrocyanide sludge (AREVA sludge), and glass additives. Waste loadings for these melts ranged from 70 weight percent (wt%) to 82 wt%. Vitrification produces a waste form much denser than the stored water treatment secondary waste wastes, resulting in significant volume reduction. Volume reductions for the three tests ranged from 74 to 79 vol%. Vitrification produces a chemically durable wasteform. Pacific Northwest National Laboratory (PNNL) tested three glass samples from each engineering-scale melt) by the Materials Characterization Center 1 (MCC-1) test, an international standard leach test of the chemical durability of nuclear waste glasses. PNNL also obtained one U.S. reference glass (EA Glass) and two Japan reference glasses P0798) and tested these under the same MCC-1 conditions (90 deg. C, 10 m-1, DIW, and 7, 14, 28-day) as the GeoMelt{sup R} ICV{sup TM} glasses. The GeoMelt{sup R} ICV{sup TM} glasses exhibited lower total normalized releases and 14- to 28-day normalized release rates than the three reference glasses. These results suggest that the GeoMelt{sup R} ICV{sup TM} glasses have durabilities on par with high-level waste glasses under standard test conditions. Post-melt process sampling and analysis indicated no Cs migration into the melter refractory materials and very little deposition of Cs or Sr onto the melter hood or off-gas piping internals. The results of the testing indicated good Cs retention in the glass, high volume reduction and waste loadings, and excellent chemical durability. These factors are important to minimize treatment costs and to protect workers and the environment. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Study on Radionuclides Selection for DCGLs Development for Site Release of KRR Units 1 and 2 site in Korea - 20256

The selection of Derived Concentration Guideline Levels (DCGLs) in nuclear facilities decommissioning is important because they serve as criteria for site characterization and final status surveys. DCGLs should be derived for KAERI TRIGA Mark II and III research reactor site clearance and prior to the work, a radionuclides list for DCGLs consideration was created. Radionuclides selection for DCGLs was performed according to the procedure proposed by the US NRC based on the characterization survey related to the decommission site. By evaluating the dose contribution of each radionuclide using D and D computer code, radionuclides with a dose contribution fraction of 0.1% or more for the entire radionuclide were selected. As a result, the selected radionuclides were beta radionuclides H-3, C-14 and Sr-90 and gamma radionuclides Co-60, Cs-137, Eu-152 and Eu-154. The selected radionuclides can be presented for consultation with domestic regulatory agencies in the future and will be used as the technical base of DCGLs for the final status survey. (authors)

07 ISOTOPE AND RADIATION SOURCES↗

Industry overview of TRANSCEND - 20271

The United Kingdom has a legacy of nuclear facilities to decommission and radioactive waste to manage and dispose of. The TRANSCEND programme is an independent research programme with significant participation from industrial organizations that are involved in that decommissioning programme and radioactive waste management. The participation has led to a programme that is both academically robust enough to attract significant funding from the EPSRC, the universities themselves and relevant enough to be supported financially by the industrial partners who see the needs and drivers. The programme offers benefits in terms of the development of people and in enabling and promoting innovation in both hardware and software tools. Industrial engagement is fundamental to being able to capitalise on that innovation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Electrolytically Assisted Surface Decontamination (EASD{sup TM}) for POCO Operations - 20282

NNL in collaboration with C-Tech Innovation Ltd and Sellafield Ltd has been exploring innovative technologies to enable a significant reduction of radiological hazards within facilities during the Post Operational Clean Out (POCO) phase of a nuclear plant's life cycle. Reducing the hazard by effectively decontaminating plants in-situ during POCO delivers huge cost reductions for future decommissioning operations. These cost reduction benefits are realized by reducing the number and complexity of remote operations as well as lowering the long-term waste disposal costs. Whilst chemical decontamination can achieve the desired level of decontamination, applying aggressive chemical reagents is hazardous, potentially difficult to control and requires there to be complimentary effluent treatment and waste routes. This work has aimed to develop flexible and controllable decontamination processes which could be operated without the additional complexity and issues associated with chemical decontamination. The processes needed to be relatively fast and effective to minimize the time operators would spend in an active area. In addition, there was a driver to produce decontamination methodologies which generated a secondary waste compatible with current routes and which takes advantage of current waste capacity. The strategy therefore was to come up with a solution that works with, rather than against, the science and engineering behind process plants at Sellafield. Electrolytically Assisted Surface Decontamination (EASD{sup TM}) is an innovative electrochemical decontamination process (developed by NNL and C-Tech Innovation Ltd) that can remove activity from contaminated metal in very short time periods. Application of the patented electric waveform to the surface when treating contaminated metal with nitric acid has been shown to significantly enhance the decontamination performance. When compared to proposed baseline washout procedures at Sellafield, the only change to the process is the applied electrical waveform which is temporary and controllable. The current causes dissolution of the metal surface being decontaminated which leads to activity transferring from the plant item into the nitric acid effluent stream. This innovation has the potential to transform the POCO process and allow a nitric acid based washout approach to deliver POCO quickly and cost effectively within the existing infrastructure. Several devices have now been designed that incorporate this EASD{sup TM} technology and enable the decontamination process to be applied to a range items commonly identified as being contaminated during nuclear decommissioning programmes such as pipework, tanks and hotspots of walls/floors. Inactive and active laboratory-scale testing has been completed using both simulated and 'real-life' contaminated (low level waste) metallic items retrieved from different nuclear sites. Active trials demonstrated that contaminated items could be treated to free release levels within minutes. Engineering scale tests are currently being performed, with guidance from Sellafield's system engineers and plant managers, to provide the necessary re-assurance the designed devices could be successfully deployed in an on-plant scenario. The final stage of this development work is to carry out an active demonstration of the decontamination technology on Thorp at Sellafield. This paper aims to highlight progress made to date with the EASD{sup TM} technology and, more specifically, the development of an in-situ decontamination device for deployment within radioactive pipework. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Dose Assessment Model for Radioactive Waste Exposed by Gully Erosion at West Valley - 20513

The Western New York Nuclear Service Center (WNYNSC), located approximately 48 km south of Buffalo, New York, is the site of a former nuclear fuel reprocessing and radioactive waste disposal facility. Spent nuclear fuel was processed there from 1966 to 1972, leaving behind radioactive and chemical wastes in two disposal areas and a waste tank farm. Site operations also resulted in releases of radioactivity to site soils, groundwater, and to surface waters draining the site. The New York State Energy Research and Development Authority (NYSERDA) and the U.S. Department of Energy (DOE) are collaborating in a process of decision making for decommissioning those facilities remaining at the WNYNSC following the completion of Phase 1 decommissioning. Neptune and Company, Inc. (Neptune) was contracted to develop a probabilistic performance assessment (PPA) computer model to assist the agencies in this process. The PPA Model includes a contaminant transport component focusing on the movement of contaminants within and among environmental media including groundwater and surface water transport, contaminant translocation by plants and animals, diffusion, and erosion. The model also includes evaluation of potential exposure and health effects for a Resident Farmer exposure scenario, where the Resident Farmer represents a critical group, described as that group of individuals reasonably expected to receive the greatest exposure to residual radioactivity for any applicable set of circumstances. The West Valley Site is located in the glaciated Allegheny Plateau region of western New York State. The waste reprocessing and disposal areas were constructed on a relatively fat area of plateau dissected by drainages of Buttermilk Creek, including Erdman Brook, Franks Creek, and Quarry Creek. An important aspect of the contaminant transport component of the PPA model is consideration of erosive processes such as slumping of the stream slopes and the advance of gullies from these streams. These erosion processes remove material from the plateau, growing the size of the creek valleys and making them wider and deeper. Of particular interest for the impact of erosion is radioactive waste contained in the Nuclear Regulatory Commission (NRC)-Licensed Disposal Area (NDA), the New York State-Licensed Disposal Area (SDA), and residual radiological inventory in the underground storage tanks at the Waste Tank Farm (WTF). The PPA Model is organized around geographically-defined facilities which were constructed upon the plateau, including the NDA, SDA, and WTF. Ongoing stream erosion processes will potentially transfer radioactive waste and residual inventory from these facilities to the ground surface on adjacent hillslope areas where erosion has breached the facility. Hence, it is important to evaluate the consequences of potential exposures to a Resident Farmer on the hillslopes below a breached facility. Two interrelated aspects of the dose assessment model related to hillslope exposure are discussed: 1) representation of the physical processes related to transport of radionuclides from facilities onto the hillslopes, and from the hillslopes into adjoining creeks where contaminated material migrates downstream with surface water and sediment, and; 2) adaptation of the activities associated with the Resident Farmer scenario to assess potential exposures to contamination in the hillslope areas. This discussion will cover the conceptual basis of the hillslope exposure and transport models, and also implementation in the PPA computer model. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Best practices for predictions of radionuclide activity concentrations and total absorbed dose rates to freshwater organisms exposed to uranium mining/milling

Predictions of radionuclide dose rates to freshwater organisms can be used to evaluate the radiological environmental impacts of releases from uranium mining and milling projects. These predictions help inform decisions on the implementation of mitigation measures. The objective of this study was to identify how dose rate modelling could be improved to reduce uncertainty in predictions to non-human biota. For this purpose, we modelled the activity concentrations of 210 Pb, 210 Po, 226 Ra, 230 Th, and 238 U downstream of uranium mines and mills in northern Saskatchewan, Canada, together with associated weighted absorbed dose rates for a freshwater food chain using measured activity concentrations in water and sediments. Differences in predictions of radionuclide activity concentrations occurred mainly from the different default partition coefficient and concentration ratio values from one model to another and including all or only some 238 U decay daughters in the dose rate assessments. Consequently, we recommend a standardized best-practice approach to calculate weighted absorbed dose rates to freshwater biota whether a facility is at the planning, operating or decommissioned stage. At the initial planning stage, the best-practice approach recommend using conservative site-specific baseline activity concentrations in water, sediments and organisms and predict conservative incremental activity concentrations in these media by selecting concentration ratios based on species similarity and similar water quality conditions to reduce the uncertainty in dose rate calculations. At the operating and decommissioned stages, the best-practice approach recommends relying on measured activity concentrations in water, sediment, fish tissue and wholebody of small organisms to further reduce uncertainty in dose rate estimates. This approach would allow for more realistic but still conservative dose assessments when evaluating impacts from uranium mining projects and making decision on adequate controls of releases.

63 RADIATION, THERMAL, AND OTHER ENVIRON. POLLUTAN↗

How fast can one resize a distributed file system?

Efficient resource utilization becomes a major concern as large-scale distributed computing infrastructures keep growing in size. Malleability, the possibility for resource managers to dynamically increase or decrease the amount of resources allocated to a job, is a promising way to save energy and costs. However, state-of-the-art parallel and distributed storage systems have not been designed with malleability in mind. The reason is mainly the supposedly high cost of data transfers required by resizing operations. Nevertheless, as network and storage technologies evolve, old assumptions about potential bottlenecks can be revisited. In this study, we evaluate the viability of malleability as a design principle for a distributed storage system. We specifically model the minimal duration of the commission and decommission operations. To show how our models can be used in practice, we evaluate the performance of these operations in HDFS, a relevant state-of-the-art distributed file system. We show that the existing decommission mechanism of HDFS is good when the network is the bottleneck, but can be accelerated by up to a factor 3 when storage is the limiting factor. We also show that the commission in HDFS can be substantially accelerated. With the highlights provided by our model, we suggest improvements to speed both operations in HDFS. We discuss how the proposed models can be generalized for distributed file systems with different assumptions and what perspectives are open for the design of efficient malleable distributed file systems.

97 MATHEMATICS AND COMPUTING↗

Challenges and Opportunities Specific to Microreactors: Compact and Light-Weight Shielding During Operation and Transportation

The problem of designing a shield for a mobile microreactor has been addressed. The principal challenges encountered in this endeavor are the dual goals of increasing radiation protection and decreasing weight. It is recognized that these two goals are contradictory. Increasing shielding naturally increases weight. Conversely, decreasing weight naturally calls for decreasing material inventory, including possibly decreasing shield mass. The operational and regulatory drivers for shielding and transportation constraints are identified and summarized. The main constraints pertain to volume, mass, radiation dose, material feasibility and availability, and decommissioning expectations. The latter are limits on residual contamination and dose rates after the reactor is removed. Progress toward solving the challenge of shielding a transportable microreactor is made by considering a tungsten tetraboride (WB4) shell surrounding the reactor vessel. The shield and a generic microreactor were modeled using the MCNP code. It was determined that the presence of a 16-cm-thick WB4 shield reduces the dose equivalent rate during operations to 3.6 mrem/h just outside of a concrete vault and dome and soil berm surrounding the reactor, which is very near the occupational dose rate limits. Without the WB4 layer, the dose rate at the same location outside the berm would be 120 mrem/h. Most importantly, the presence of the WB4 shield substantially protects the surrounding concrete and soil from activation, thus decreasing the duration of administrative control for the site following removal of the reactor from 16 to 3.4 years. At that point, the site may be decommissioned and returned to unrestricted public access. A limitation on the incorporation of a WB4 shield as an intrinsic component of a microreactor is that it results in a design that is transportable only by using the largest road conveyances and that the load would require special permits for transit through the U.S. highway system. New directions for further improvements and possibly more effective solutions to the shielding problem of a mobile microreactor are discussed in the conclusion section.

Microreactor↗

U.S. Effort Support to Examinations at Fukushima - Meeting Notes with Updated Information Requests (FY2020)

Much is still not known about the end-state of core materials in each unit that was operating on March 11, 2011 at the Fukushima Daiichi Nuclear Power Station (Daiichi). Information obtained from Daiichi is required to inform Decontamination and Decommissioning (D&D) activities, improving the ability of the Tokyo Electric Power Company Holdings, Incorporated (TEPCO Holdings) to characterize potential hazards and to ensure the safety of workers involved with cleanup activities. This document, which has been updated to include Fiscal Year 2020 (FY2020) information, summarizes results from a U.S. effort to review Daiichi information and extract insights to enhance the safety of existing and future nuclear power plant designs. This U.S. effort, which was initiated in 2014 by the Department of Energy Office of Nuclear Energy (DOE-NE), is completed by a group of experts in reactor safety and plant operations that identify examination needs and evaluate recent Daiichi examination data to address these needs. Since its inception, comprehensive annual reports were issued that document significant safety insights being obtained in areas of special emphasis: system and component performance, radionuclide surveys and sampling, debris end-state location, combustible gas effects, and plant operations and maintenance. In addition to reducing uncertainties related to severe accident modeling progression, these insights have and continue to be used to update guidance for severe accident prevention, mitigation, and emergency planning. Reduced uncertainties in modeling the events at Daiichi improve the realism of reactor safety evaluations that inform future D&D activities. For FY2020, it was decided that the program would gain more benefit from a more concise report that emphasizes new information and insights that affect prior findings and recommendations from the U.S. experts participating in this effort. A key aspect of prior U.S. efforts, the updated list of information requests, is included in this letter report to ensure that they are transmitted to organizations within Japan. In addition, findings and associated recommendations are provided regarding information presented by TEPCO Holdings, Nuclear Damage Compensation and Decommissioning Facilitation Corporation (NDF), and the Japan Atomic Energy Agency (JAEA). This letter report also continues to emphasize how information obtained from the affected reactors at Daiichi has been and will continue to be used to update severe accident management strategies, improve maintenance activities (especially in areas of radiation protection) and reduce uncertainties in systems analysis code models. In addition, recommendations are included that would expand the use of this information to provide insights regarding maintenance, radiation protection, design, and siting activities of existing and new reactors.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Conceptual Model Update of Mercury Sources and Flux at Y-12 and Upper East Fork Poplar Creek, Oak Ridge,Tennessee

The interactions between the key processes that control the fate and transport of mercury (Hg) in the sediments, groundwater, and stream water within the Y-12 National Security Complex (Y-12) in Oak Ridge, Tennessee are complex, and many aspects are not well understood. In contaminated environments such as Y-12, conceptual models are frequently developed to aid in visualizing and understanding the dynamic nature of the hydrologic, geochemical, and physical environment. These conceptual models integrate data in an internally consistent manner to understand processes that control the fate and transport of contaminants. Over the past few decades of environmental investigation at Y-12, a number of conceptual models have been developed to identify and define various technical processes at various scales. The main purpose of the activities described in this report is to update the 2011 conceptual model for Upper East Fork Poplar Creek using the most recent Hg concentration and flux data and informed scientific interpretation. Emphasis was placed on improving the previous model by implementing a more detailed spatial and temporal approach to visualize transport pathways in the watershed and trends in flux and concentration over time, and to compare baseflow and stormflow system dynamics. Detailed descriptions of historical and current Hg sources and transport pathways are also provided for the east and west ends of the facility. This conceptual model will allow the US Department of Energy to evaluate past and present remedial activities and provide a strong technical basis for prioritizing and optimizing remedial responses in a cost-effective and efficient manner. Twenty years ago, Hg flux from Outfall (OF) 200 at the headwaters of East Fork Poplar Creek represented approximately 20% of the overall flux leaving Y-12. By the time of the 2011 conceptual model report, that percentage had increased to 70%–80%. Flux estimates compiled for this report using data from 2009 to 2018 show that OF200 accounted for roughly 60% of the flux leaving Y-12. The relative role of the four storm drain conduits to OF200 appeared similar to 2011, with OF163 being the greatest contributor to downstream flux. An increase in Hg concentrations and flux occurred throughout and downstream of west end storm drains in 2011 in response to a storm drain cleanout. Leading up to the 2011 storm drain cleanout, annual baseflow flux was higher at OF200A6 than at Station 17. From 2011 to 2018, the trend reversed with concentrations and flux being higher at Station 17 than at OF200A6. A spike in concentrations occurred in July 2018, potentially due to a one-time influx of Hg that occurred during COLEX decontamination and decommissioning activities at Y-12. This report includes recommendations for improving our conceptual understanding of Hg sources, transport pathways, and flux at Y-12. Important recommendations include further evaluation of transport pathways, concurrent measurement of Hg concentration and flux under baseflow and stormflow conditions at multiple sites, and research to understand the connections among periphyton and methylmercury concentration, bioavailability, and bioaccumulation. Ongoing facility decontamination and decommissioning efforts, site characterization, remedial actions, and research are facilitating the collection of new Hg data at Y-12. The conceptual model update provided herein takes advantage of the extensive recent Hg sampling to provide an updated assessment of Hg mass balance and support a refined understanding of Hg behavior at or near Y-12. This assessment should assist in future environmental management decisions and in mitigating the impacts of Hg on the surrounding environment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Permanent Foam Fixatives for Radioactive Contamination Control: Environmental Chamber Testing

The Department of Energy (DOE) Office of Environmental Management (EM) is tasked with closing cleanup sites throughout the DOE-EM complex. A major component of successfully closing the sites is the deactivation and decommissioning (D&D) of radioactively contaminated buildings in nuclear facilities. Deactivation consists of the process of placing a contaminated facility in stable condition in order to minimize any risks that could affect workers, the public, and the environment. Successful deactivation and decommissioning consists of leaving the buildings in an agreed upon end state to provide future protection against hazards. Hazards include radiation but can also include asbestos, polychlorinated biphenyls, and other environmental and physical hazards.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Research to Develop Flood Barrier Testing Strategies for Nuclear Power Plants

This report presents results of research performed by Idaho National Laboratory (INL) for the Nuclear Regulatory Commission (NRC) to identify and develop strategies for testing nuclear power plant (NPP) flood barriers. This research project began with a literature review that documented the results of previous NRC-funded research, work performed by other government agencies, reports generated by industry organizations, NRC licensee submittals, information from testing facilities, and information from commercial firms engaged in NPP decommissioning. This literature review was then used to develop a simplified flood protection categorization scheme and related glossaries. Using this categorization scheme and glossaries, a survey of currently used flood barriers was conducted, focusing on both permanent and temporary flood barriers. External flood barriers such as levees and berms were outside the scope of this survey. This research project also assessed the current state of NPP decommissioning for potential flood barrier harvesting opportunities, surveyed capabilities of domestic and international flood testing facilities, and explored technical challenges to harvesting and testing of flood barriers. Other factors that should be considered in developing flood barrier testing strategies were also explored and are documented in this report (e.g., selection of flood barriers for testing, codes and standards for flood barrier testing, potential alternatives to harvesting such as in-situ testing, testing performance criteria, and testing parameters).

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Cracking Behavior of Irradiated Ex-Plant Materials

The cracking behavior of reactor core internal materials is a key factor for the long-term safety and availability of light water reactors. Subject to high-temperature coolant, thermal and mechanical loading, and neutron irradiation, reactor core internal materials are susceptible to several degradation mechanisms during power operation. To understand the long-term effects of neutron irradiation, irradiated materials harvested from a decommissioned reactor were studied for their cracking susceptibility and fracture resistance. Small compact-tension specimens were machined from different locations on the baffle plates with irradiation doses ranging from 0.06 to 48.5 dpa. Crack growth rate and fracture toughness J-resistance (J-R) curve tests were performed on these specimens in a simulated light water reactor environment, and the fracture morphologies of the tested samples were examined with a scanning electron microscope. All samples behaved similarly under cyclic loading, and no deteriorated corrosion-fatigue behavior was observed in the test environments. Under constant load, no elevated cracking susceptibility was observed either in these samples at low stress intensity factors. However, a rapid cracking behavior featuring very high crack growth rates was observed in several high-dose samples. This rapid crack growth behavior was activated when the applied stress intensity factor, K, was sufficiently high. Once activated, the rapid crack growth remained steady even when the K was lowered to the pre-activation level and stopped only when the K was reduced drastically. Yet, the rapid crack growth could be re-activated repeatedly in these samples by raising the K above the initial activation level. This rapid cracking response may be related to the severe irradiation embrittlement experienced by these samples. The J-R curve tests performed with these samples showed a significant decline in fracture toughness with increasing neutron irradiation. Local cracking at the crack tip facilitated by the severe irradiation embrittlement of this material may be responsible for the rapid crack growth behavior demonstrated by this decommissioned material.

36 MATERIALS SCIENCE↗

County Land-Use Regulations for Solar Energy Development in Colorado

We present a survey of county-level policies on ground-mounted solar development across Colorado, including both solar-specific ordinances as well as general land-use code that might be applicable in counties without solar-specific policies. This report provides an accessible reference for stakeholders interested in identifying counties with particular regulations or in analyzing the diversity of regulations across Colorado. We defined a set of search criteria to find information on solar definitions and classifications, permitting processes, and use-specific requirements in each of Colorado's 64 counties. With those criteria, we reviewed relevant ordinances, land-use code, and comprehensive and master plans. If any uncertainties were identified, we contacted county officials for clarification. The findings are categorized and mapped to illustrate the distribution of key policies adopted across Colorado's counties on the following topics: solar definitions, solar siting policy documentation, categorization of PV systems for permitting, 1041 permitting, solar on agricultural land, panel height restrictions, fencing requirements, vegetation management, visual impacts, decommissioning plans, and financial assurance for decommissioning. Additionally, we identify and discuss policies that might impact the deployment of agrivoltaics, a dual land use combining both agriculture and solar on the same land, which might not fit neatly in existing zoning definitions and solar-specific regulations.

14 SOLAR ENERGY↗

Mechanical Test Results and Microstructural Characterization of the Harvested and Baseline Archival Zion RPV Materials

The decommissioning of the Zion Units 1 and 2 Nuclear Generating Station in Zion, Illinois, presented a unique opportunity for developing a better understanding of materials degradation and other issues associated with extending the lifetime of existing nuclear power plants (NPPs) beyond 60 years of service. In support of extended service and current operations of the US nuclear reactor fleet, the Oak Ridge National Laboratory (ORNL), through the Department of Energy (DOE), Office of Nuclear Energy, Light Water Reactor Sustainability (LWRS) Program, coordinated with Zion Solutions, LLC, a subsidiary of Energy Solutions (ES), the selective procurement of materials, structures, and components, from the decommissioned reactors including multiple segments of the Zion Unit 1 Reactor Pressure Vessel (RPV).

22 GENERAL STUDIES OF NUCLEAR REACTORS↗