Search NASASearch

SEARCH · Search NASA

Results for “interconnect”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Quantum communications work at SQMS

The Superconducting Quantum Materials and Systems (SQMS) Center is focused on advancing low-loss interconnectivity between quantum processing units (QPUs) to enable scalable quantum computing. In the short term, our goals include the development and optimization of 2D and 3D platforms with remotely entangled modules, refinement in microwave design and control schemes, and the achievement of high-fidelity quantum state transfer between superconducting quantum modules. Looking ahead, we aim to realize modular quantum computing with low-loss interconnects, maximize remote entanglement fidelity and implement robust quantum operations with error correction. We will leverage advanced microwave engineering and material science to optimize the performance of quantum interconnects and the coupling interfaces between the interconnects and the QPUs.

Vallières, André

OR-AGENT framework – Architecting electrified heavy-duty drayage applications

The widespread adoption of zero-emission vehicles in heavy-duty (HD) commercial freight transportation faces considerable technoeconomic challenges. For heavy-duty trucks, ensuring high uptime, cost parity with diesel, and safety standards is especially critical as these vehicles operate over long distances with heavy loads, where any downtime or off-nominal behaviors significantly impacts logistics, productivity, and the total cost of ownership. Unlike traditional diesel refueling, BEV charging infrastructure must be co-optimized with vehicle deployment, operational demands, and grid capacity to ensure cost-effective and reliable freight operations. However, the lack of a standardized ownership and service model has led to a fragmented approach—where commercial vehicle operators may invest in, own, and maintain both vehicle/batteries and charging/energy infrastructure. This disconnect may exclude energy service providers from the equation, forcing fleet operators to explore ‘behind-the-fence’ energy solutions that increase capital investment, operational downtime, overhead costs, and, in some cases, net carbon emissions. To address these issues, this study introduces OR-AGENT (Optimal Regional Architecture Generation for Efficient National Transport), a comprehensive modeling framework that integrates powertrain architectures, charging infrastructures, and energy backbone systems into a cohesive strategy. In this paper, OR-AGENT is applied to develop an interconnected systems architecture for energy efficiency and resiliency enhancement of heavy-duty drayage vehicles at the Port of Savannah, GA. This framework showcases an interconnected systems approach to electrifying heavy-duty drayage vehicles at the Port of Savannah, GA. The study assessed BEVs with 400–1200 kWh battery capacities, accounting for seasonal variations in weather and freight routing. A diverse charging mix (150 kW–1250 kW) was evaluated alongside grid capacity constraints, cost, and carbon intensity analysis, leading to the development of a strategic microgrid/Distributed Energy Resources (DER) deployment architecture to ensure a reliable and sustainable transition. However, the findings also highlight the need for alternative zero-emission solutions for remaining trips, such as larger batteries, electrified roadways, hydrogen powertrains, or net-zero emission fuels. In conclusion, the findings are incorporated into a Total Cost of Ownership (TCO) model to identify optimal architectures for an interconnected electrified ecosystem.

Commercial vehicles

Distributed Energy Resource Integration

This webinar focuses on the subject of DER integration, outlining the current industry state of the art and status of DER adoption in the US, a holistic view and roadmap of DER integration, DER interconnection standards, interconnection screening and study processes, interconnection automation, DER hosting capacity, AMI analytics, and non-wires alternatives.

29 ENERGY PLANNING, POLICY, AND ECONOMY

Use of Hardware-in-the-Loop to De-Risk Field Deployment of Hydrogen Assets

Grid-forming assets are required in microgrids to act as voltage-frequency masters. These grid-forming assets can operate in two modes of operation: grid-following mode and grid-forming mode. In grid-following mode of operation, these assets will follow real power and reactive power setpoints and in grid-forming mode of operation these assets will follow voltage and frequency setpoints. Traditionally, diesel generators or natural gas-based generators are widely used to act as a voltage-frequency master. However, many utilities are aiming to replace generators with grid forming-inverters supplied by solar photovoltaics (PV), batteries or fuel cells. Since grid-forming assets need a long-term reliable energy source, fuel cells are a reasonable and viable choice to supply the grid-forming inverters, but some of the challenges facing the wide deployment of grid-forming fuel cell inverters need to be addressed. Specifically, in our proposed work, we aim to focus on the interconnection and interoperability requirements of grid-forming fuel cell inverters. Currently, state-of-the-art fuel cell inverters follow the general interconnection requirements of distributed energy resources (DERs) and general interoperability requirements of DERs, but these requirements were built with PV and battery systems in mind. Fuel cells have different operational requirements, and therefore these requirements need to be appropriately modified for the grid operators to use. These additional steps add to the investment and operational cost to the grid operators. Through the ARIES platform, this proposed project aims to bridge this gap and use power hardware-in-the-loop (PHIL) and controller hardware-in-the-loop (CHIL) experiments to inform the creation of open-source interconnection and interoperability information that can aid in faster and cheaper installation and operation of grid-forming fuel cell inverters.

08 HYDROGEN

The Role of the U.S. Electric Distribution System in Serving Data Center and Other Large Loads

The rapid expansion of data centers in the United States is reshaping how the electric distribution system must plan for and accommodate large load interconnections. This report evaluates the role of the distribution grid in serving these loads, from small edge facilities to hyperscale campuses. Using national datasets, utility filings, and industry studies, we assess demand growth, reliability requirements, interconnection thresholds, and infrastructure needs at substations and feeders. The analysis highlights the mismatch between fast data center development timelines and slower utility planning and construction cycles, as well as strategies such as phased energization, on-site generation, hosting capacity maps, and structured interconnection frameworks. While focused on data centers, the insights also apply to other high-density loads such as advanced manufacturing, hydrogen production, and electrified transportation. The report concludes with approaches to align planning processes, transparency tools, and regulatory frameworks so utilities can manage new large loads in ways that support a reliable and resilient grid.

29 ENERGY PLANNING, POLICY, AND ECONOMY

Probabilistic Deliverability Assessment of Distributed Energy Resources via Scenario-Based AC Optimal Power Flow

As electric grids decarbonize and distributed energy resources (DERs) become increasingly prevalent, interconnection assessments must evolve to reflect operational variability and control flexibility. This paper highlights key modeling limitations observed in practice and reviews approaches for modeling uncertainty. It then introduces a Probabilistic Deliverability Assessment (PDA) framework designed to complement and extend existing procedures. The framework integrates scenario-based AC optimal power flow (AC OPF), corrective dispatch, and optional multi-temporal constraints. Together, these form a structured methodology for quantifying DER utilization, deliverability, and reliability under uncertainty in load, generation, and topology. Outputs include interpretable metrics with confidence intervals that inform siting decisions and evaluate compliance with reliability thresholds across sampled operating conditions. A case study on Puerto Rico’s publicly available bulk power system model demonstrates the framework’s application using minimal input data, consistent with current interconnection practice. Across staged fossil generation retirements, the PDA identifies high-value DER sites and regions requiring additional reactive power support. Results are presented through mean dispatch signals, reliability metrics, and geospatial visualizations, demonstrating how the framework provides transparent, data-driven siting recommendations. The framework’s modular design supports incremental adoption within existing workflows, encouraging broader use of AC OPF in interconnection and planning contexts.

14 SOLAR ENERGY

Investigating the effects of cooperative transmission expansion planning on grid performance during heat waves with varying spatial scales

There is growing recognition of the advantages of interregional transmission capacity to decarbonize electricity grids. A less explored benefit is potential performance improvements during extreme weather events. This study examines the impacts of cooperative transmission expansion planning using an advanced modeling chain to simulate power grid operations of the United States Western Interconnection in 2019 and 2059 under different levels of collaboration between transmission planning regions. Two historical heat waves in 2019 with varying geographical coverage are replayed under future climate change in 2059 to assess the transmission cooperation benefits during grid stress. The results show that cooperative transmission planning yields the best outcomes in terms of reducing wholesale electricity prices and minimizing energy outages both for the whole interconnection and individual transmission planning regions. Compared to individual planning, cooperative planning reduces wholesale electricity prices by 64.3 % and interconnection-wide total costs (transmission investments + grid operations) by 34.6 % in 2059. It also helps decrease greenhouse gas emissions by increasing renewable energy utilization. However, the benefits of cooperation diminish during the widespread heat wave when all regions face extreme electricity demand due to higher space cooling needs. Despite this, cooperative transmission planning remains advantageous, particularly for California Independent System Operator with significant diurnal solar generation capacity. This study suggests that cooperation in transmission planning is crucial for reducing costs and increasing reliability both during normal periods and extreme weather events. It highlights the importance of optimizing the strategic investments to mitigate challenges posed by wider-scale extreme weather events of the future.

24 POWER TRANSMISSION AND DISTRIBUTION

Manufacturing Li 2 TiO 3 -based tritium breeder materials by volume-controlled spark plasma sintering with an optimized microstructure

Multifunctional ceramic breeder materials are highly desirable for the deuterium-tritium fusion to achieve high efficiency in breeding tritium through neutron irradiation of lithium-containing blankets. Li 2 TiO 3 displays unique attributes as a potential ceramic breeder material. An optimized microstructure with three-dimensional interconnected pore structure is required for rapid transport of the tritium for effective fuel cycle, which however enviably results in the degradation of the thermal-mechanical properties of the breeding materials. In this work, nanocrystalline porous Li 2 TiO 3 ceramic pellets with controlled porosities of 14% and 20% are manufactured by volume-controlled spark plasma sintering. An optimized 3D interconnected pore structure is achieved consisting of both micro-sized pores and nano-sized pores embedded in nanocrystalline matrix, which could be beneficial to facilitate easy removal of bred T and He. Further, the 3D interconnected porous structure is well maintained upon isothermal annealing of the SPS-fabricated pellets at relevant operation temperature of the solid breeding materials. Single-phasic porous pellets also display enhanced thermal-mechanical properties, superior to current state-of-the-art materials which establish their potential as a promising tritium breeder material for nuclear fusion applications.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY

Impacts of Spatial Resolution in a High-Fidelity Capacity Expansion Model: An ERCOT Case Study

Capacity expansion models are important tools in examining the evolution of the electric power sector. Embedded in these tools are many modeling choices with consequential impacts on computational burden and associated analysis. In this study, we adjust the spatial resolution of the Regional Energy Deployment System (ReEDS) to understand the implications of higher-fidelity modeling on energy system projections and model solve times. The native ReEDS regions capture the contiguous United States in 134 balancing areas whereas the regions in the higher-resolution version are defined by over 3,000 U.S. counties. Using both resolutions, we conduct a case study of the Texas Interconnection (The Electric Reliability Council of Texas [ERCOT]) to explore differences in model projections and to inform appropriate applications of high spatial resolution in a large-scale, applied capacity expansion model.

county

Fast Iterative Multi-site Hosting Capacity Analysis for Distribution Systems With Search Space Pruning

Interconnection studies for distributed energy resources (DERs) is a time-intensive process, primarily due to the necessity of solving large number of power flow scenarios. Hosting capacity analysis (HCA) is a time-consuming aspect of interconnection studies that is divided into single-site HCA (SHCA) and multi-site HCA (MHCA). From a computational and understandable standpoint, the industry seeks iteration-based solutions for SHCA, although it doesn't maximize the total DER hosting capacity (DERHC) of the grid, as MHCA does. While non-iterative solutions are available for MHCA, they involve a trade-off between the modeling accuracy of the distribution system, solution quality, and ease of understanding. In this work, we present a fast iterative solution for MHCA, reducing computational complexity by eliminating the need to solve power flows for a large amount of search space, thus making iterative solutions feasible. This iterative approach guarantees both a global optimal solution with sufficient time and a fast, close-to-optimal solution through efficient search space pruning. It also easily integrates with existing utility HCA tools. The results are demonstrated on select locations in the IEEE-123 bus system for community-scale interconnection studies. We highlight the benefits of skipping the need to solve millions of power flows, all while maximizing the grid's total DERHC.

Guddanti, Kishan Prudhvi

Planning Roadmap for DER Integration in India: Industry Best Practices and Resource Guide

Ensuring safe, reliable, cost-effective DER integration at scale requires holistic planning, broad stakeholder engagement, and should address key development areas such as standards adoption, equipment testing and certification, interoperability and cybersecurity, interconnection procedures, and advanced forecasting and DER management. Each of these areas currently represent significant challenges for utilities, regulators, OEMs, developers, and even consumers worldwide. India has already seen significant growth of DERs and has announced targets for substantial growth yet to come, with the potential for DERs to make up a non-negligible portion of the country's overall generation capacity. As such, it is of critical importance that Indian stakeholders consider the potential impacts of wide-spread adoption of DERs and take preemptive action related to the five development areas listed here, among others. India should consider strategies including the adoption of key DER standards related to interconnection, testing, and cybersecurity; enabling effective and secure communication channels for DER interoperability; testing and certifying DER equipment in accredited testing laboratories; building robust, streamlined interconnection procedures; and revamping legacy system planning structures to incorporate DERs in a holistic planning framework.

24 POWER TRANSMISSION AND DISTRIBUTION

i2X Technical Assistance: Solar and Storage Industries Institute

This report evaluates the economic benefits of flexible interconnection by quantifying potential curtailment under different interconnection scenarios as well as their economic cost. The results are combined with estimates of capital expenditures to produce a net present value under different interconnection service decisions.

14 SOLAR ENERGY

Adaptive Protection and Validated Models to Enable Deployment of High Penetrations of Solar PV (PV-MOD)

The availability and validation of various PV models in commercial tools differ, with some models not yet thoroughly validated for advanced inverter functionalities and reliable performance under weak system conditions. Many existing models do not fully incorporate new inverter control functions, which can affect system stability. The increasing deployment of solar PV and other inverter-based resources (IBRs), including distributed energy resources (DERs), is influencing the reliable operation of protection schemes in distribution systems and microgrids. Emerging adaptive protection schemes (APS) offer new opportunities for protecting these systems during varying configurations and DER operating conditions, though their demonstration and validation remain limited. Adaptive protection schemes face similar challenges, as they are typically designed for specific configurations. There is a growing need for tools and methodologies to streamline the deployment of adaptive protection for safe and reliable DER integration. The project main objective was to develop and validate high-fidelity generic models of solar PV facilities for stability, protection, EMT, and QSTS analyses. This objective was achieved, and these models can now be integrated into commercial software tools, enabling utilities, vendors, and developers to study high-penetration PV systems more confidently. The project also demonstrated advanced applications of these models, including the design and deployment of adaptive protection schemes in high-penetration field applications and microgrids, supporting grid safety and reliability. Several milestones were reached by the end of the project. A sophisticated inverter test plan was developed, and inverters representative of the North American marketplace were selected. EPRI and NREL tested various inverters, conforming to IEEE standards. Improvements were made to existing generic models of IBR units, IBR plants, and aggregated feeders for various analyses. The first generic electromagnetic transient (EMT) model for a solar PV plant was developed, conforming to IEEE Std 2800™-2022 and validated against laboratory measurements of a 2.2 MVA large-scale battery energy storage system (BESS) inverter. That model was then used to produce reference responses illustrating examples of validated and verified IBR plant models that pass or fail tests for technical minimum capability and performance as specified in the IEEE standard. The developed, tested, and validated generic models can be used for transmission planning, stability assessments, expansion planning, and evaluating potential future IBR interconnection requirements. They can also support interconnection screens and conformity assessments of IBR plants, including solar PV. The project significantly contributed to the ongoing standardization and model-based representation and verification of IBR responses. The project further addressed challenges of common distribution protection schemes with increasing deployment of DER by developing, validating, and demonstrating adaptive protection schemes (APS) that can improve the reliable and safe integration of DER into distribution systems. New APS were designed using improved DER models for three common distribution systems: a radial feeder, a meshed network, and a microgrid. Modeling and hardware-in-the-loop (HIL) testing of the APS were conducted, successfully showing their effectiveness and selectivity. Proof-of-concept field demonstration was achieved for two APS, i.e., one on a radial feeder and another one in a microgrid. Field demonstration could not be achieved for the APS on a meshed network, primarily due apprehension of one utility partner and also due to limited access to the protective algorithms in the network protectors. Guidelines developed from the lessons learned in the project lay out the general process followed in the design, installation, and commissioning of APS for various distribution systems. Distribution utility partners’ apprehension about field demonstration of the new APS were addressed—with varying success—by taking a stepped risk-management approach of modeling of a wide range of sensitivities first, performing in-depth proof-of-concept testing in the laboratory including HIL next, and finally deliberately implementing and commissioning the actual protection equipment and algorithms into parts of—or in parallel operation to—the three real distribution systems. Future work should include pilot projects that further show the acceptable performance of the developed APS before these schemes be rolled out more widely. Inclusion of both utility and original equipment manufacturers (OEMs) in future projects could increase chances of successful field demonstration. Despite challenges in achieving the field demonstration goal of the project for all three APS, the research significantly contributed to the innovation of adaptive protection solutions for scalable and reliable DER integration into distribution systems. This project significantly enhances the understanding of the impact of using appropriate inverter models on distribution and transmission (T&D) systems. By addressing the limitations of existing generic models, the project introduces high-fidelity models for stability, protection, electromagnetic transient (EMT), and quasi-static time series (QSTS) analyses. These models, integrated into commercial software tools, enable utilities, vendors, and developers to confidently study high-penetration PV systems. The project also demonstrates advanced applications, including adaptive protection schemes (APS) for distribution systems and microgrids, ensuring grid safety and reliability. The technical effectiveness and economic feasibility of the methods are evident through the development and validation of sophisticated inverter test plans and the selection of representative inverters. Testing by EPRI and NREL on retail, commercial, and utility-scale inverters, conforming to IEEE standards, underscores the robustness of the models. Improvements to existing generic models for various analyses further enhance their validity and applicability. The project also identifies gaps in common distribution protection schemes and designed new APS using improved DER models, demonstrating their effectiveness through modeling and hardware-in-the-loop (HIL) testing. The project’s benefits to the public are manifold. By advancing the standardization and model-based representation of IBR response, it supports transmission planning, stability assessments, and future IBR interconnection requirements. The generic models can facilitate better communication between transmission planners and developers, supporting expected IBR plant capability and performance. Additionally, the development of APS for radial feeders, meshed networks, and microgrids supports the integration of distributed energy resources (DERs) into distribution systems, enhancing grid reliability and safety. The project’s emphasis on thorough testing and simplicity in design ensures practical and scalable solutions for DER integration.

14 SOLAR ENERGY

Hydropower Black Start: A Guidebook for Retrofitting Grid Dependent Hydropower

Not all United States (US) hydropower plants were designed to provide black start, but they are increasingly needed to uphold resilience in the evolving electric grid. This guidance is designed to help understand the minimal retrofits required for grid dependent hydropower (GDH) plants behind the point of interconnection (POI). For distribution connected hydropower plants or those with dedicated cranking paths, such upgrades can be sufficient for the plant to provide black start. For others, more coordination with the transmission system operator will be needed. This guidebook answers a number of questions relevant to retrofitting hydropower plants with black start capabilities. For example, the guidebook answers: • How flexible do the wicket gate controls need to be? • Who needs to do hydro governor model validation, why, and how? • How robust and flexible do the excitation and AVR controls need to be? • What protection settings need to be adjusted? • What relay(s) will need to be bypassed or overridden and at what risk? • What is the electrical energy demand of the station load or auxiliary power systems? • What should the strategy to energize transformer(s) along cranking path to address inrush currents be? • How should the critical load restoration be sequenced? In addition to outlining the specifications that hydropower plants need to meet for each component to be able to perform black start, this guidebook provides a set of case studies for specific upgrades needed at actual plants. Between the case studies of plants that have already performed black start retrofits and the examples of how this guidebook can be applied to scope future retrofits, five key themes have been identified for retrofit needs. 1. Protection needs “black start” mode: hydropower plants that are not designed with black start capabilities will have protections that prevent them from interconnecting to a “dead bus.” These protections will need to be overridden in every retrofit case and a separate black start mode should be established so that operators can safely switch between black start and grid connected modes, minimizing the risk to the plant. 2. Wicket gates need modern controls: digital governors accelerate the parameter tuning process and gate position sensors improve controllability, so plants with mechanical governors should be upgraded. Furthermore, a black start and islanding mode should be established for controls to maximize plant performance. 3. Robust excitation support: the DC system or excitation generator needs to be reliable enough to form and sustain the rotor electromagnetic field. These systems are typically undersized in plants that were not designed for black start, so they will need to be upgraded. 4. Turbine-governor model validation and operator training: validation of a standard hydro governor model is needed to characterize the dynamic response (i.e., inertial and primary frequency response) of the GDH. This is required for control development and old hydropower plants often have outdated or incorrect models. Operator training is also typically required to ensure the hardware retrofits are utilized correctly during the black start process. 5. Transformer and cranking path energization: any upgradation and control adjustment in front of the POI will depend upon the existing interconnection. Coordination with the transmission or distribution operator may be required.

13 HYDRO ENERGY

Interpreting Forced Oscillation Notifications from ESAMS: General Guidance for Reliability Coordinators

The Eastern Interconnection Situational Awareness Monitoring System (ESAMS) project demonstrated the feasibility of aggregating synchrophasor measurements from across an interconnection, analyzing them, and providing real-time wide-area situational awareness to system operators who may have excellent visibility within their footprint but lack an interconnection-wide view. An application within ESAMS that has garnered industry interest involves detecting forced oscillations visible across multiple areas, identifying the region where the oscillation originated from, quantifying the uncertainty in source localization results, and notifying users in real-time if the detected oscillation amplitudes cross a specified threshold. It is expected that system operators will utilize their internal SCADA/EMS/synchrophasor systems in conjunction with information provided by ESAMS to take effective mitigation actions if forced oscillation notifications are received. This report provides some general guidance on how the ESAMS information can be used for source localization and coordination among multiple reliability coordinators; and also identifies potential enhancements to ESAMS notifications for improved interpretability.

24 POWER TRANSMISSION AND DISTRIBUTION

American-Made Solar Prize: Edgeli Enables DER Integration (CRADA 615) (Final Report)

The purpose of this project was to demonstrate how granular time series data and automated data transformation, and impact assessment tools could speed interconnection approvals for distributed energy resource projects of various types and sizes. Types included community solar, rooftop solar, and EV charging projects. Using software routines to automate the transformation of data (e.g. GIS) to a network database and power flow model then applying scenarios to create hourly (8760) hosting capacity values and voltage and thermal impacts for specific projects, we were able to demonstrate the feasibility of quickly assembling and analyzing key utility data sets for interconnection purposes. The outcomes of this effort will become the foundation for future work that will enhance and encapsulate the software components developed as part of this project, into web services (e.g. APIs) that can be integrated into queue management systems and automate interconnection screening processes.

14 SOLAR ENERGY

Key Performance Indicators for Vehicle Grid Integration

Electric vehicle (EV) sales account for a rapidly growing portion of the light-duty vehicle market and a portion of medium and heavy-duty fleet vehicles. However, in many locations, charging stations will require costly utility grid upgrades with long lead times. Today, there are a few methods of smart charge management (SCM) which can reduce the costs and wait times for electric vehicle supply equipment (EVSE) interconnection approvals, as well as reduce impacts of the charging stations on the grid and on EV driver transportation costs. It is crucial for the EV charging industry to understand the vehicle grid integration (VGI) requirements for EVSE to prevent adverse impacts from EVSE interconnections and assure that charging loads and interconnections are affordable.

33 - ADVANCED PROPULSION SYSTEMS

A Methodology to Evaluate the Grid Reliability Impact of Oscillations Induced by Large Loads

The rapid growth of hyperscale AI data centers is bringing renewed attention to the reliability risk that sustained forced oscillations pose to bulk power systems, with cyclic computational workloads emerging as a new forcing source. Unlike the broadband, stochastic disturbances from traditional industrial loads such as arc furnaces, AI training and inference facilities can inject large active power swings concentrated at specific frequencies over extended durations - characteristics that existing grid planning practices do not account for. While the North American Electric Reliability Corporation (NERC) has recognized this gap and called for system-level studies of large load interconnections, no standardized methodology exists to screen, simulate, and quantify these risks at the planning stage. This report presents the Risk Assessment Tool for Large Load-induced Events (RATLLE), a Python-based, publicly available script suite developed at the Pacific Northwest National Laboratory to evaluate bulk power system reliability risks from data center-induced oscillations. RATLLE implements a three-module workflow: a screening module that identifies vulnerable interconnection locations and excitable system modes; a simulation module that models cyclic data center load behavior using a commercial positive sequence simulation platform; and an analysis module that computes risk metrics and generates interactive visualization dashboards. The risk metrics, formulated around simulation observables, map oscillation impacts to a three-stage severity scale spanning latent equipment fatigue through imminent cascading failure. The methodology is demonstrated on two Western Electricity Coordinating Council (WECC) system models: a publicly available 240-bus reduced representation and a detailed 2031 Heavy Winter planning case. Case studies illustrate that even modest 50 MW forced oscillations at resonant frequencies can produce wide-area power swings, N-1 security constraint violations, and cascading generator trips through protection actions - outcomes that would not occur under normal operating conditions without oscillations present. The results underscore the need for standardized oscillation impact assessment in large load interconnection studies and provide a reproducible, extensible framework for utilities to adopt or customize within their existing planning workflows.

Biswas, Shuchismita