Search NASA⌕ Search

SEARCH · Search NASA

Results for “local utility service”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Topological Machine Learning Methods for Power System Responses to Contingencies

While deep learning tools, coupled with the emerging machinery of topological data analysis, are proven to deliver various performance gains in a broad range of applications, from image classification to biosurveillance to blockchain fraud detection, their utility in areas of high societal importance such as power system modeling and, particularly, resilience quantification in the energy sector yet remains untapped. To provide fast acting synthetic regulation and contingency reserve services to the grid while having minimal disruptions on customer quality of service, we propose a new topology-based system that depends on a neural network architecture for impact metric classification and prediction in power systems. This novel topology-based system allows one to evaluate the impact of three power system contingency types, in conjunction with transmission lines, transformers, and transmission lines combined with transformers. We show that the proposed new neural network architecture equipped with local topological measures facilitates more accurate classification of unserved load as well as the amount of unserved load. In addition, we are able to learn more about the complex relationships between electrical properties and local topological measurements on their simulated response to contingencies for the NREL-SIIP power system.

contingency analysis↗

Plant Engineers Solar Energy Handbook: Southern California Region

Discussed in order after the introduction are solar components and systems (collectors, storage, service hot water systems, space heating with liquid and air systems, space cooling, heat pumps and controls); computer programs for system optimization; local solar and weather data; a description of buildings and plants in Southern California applying solar technology; current Federal and California solar legislation; standards, codes and performance testing information; a listing of manufacturers, distributors, and professional services available in Southern California region; and information access. Finally, solar design check lists for those engineers who wish to design their own systems. The program for the Solar Workshop for the Plant Engineer, March 30, 1978, Los Angeles, California is included.

14 SOLAR ENERGY↗

Application of Cyber-Informed Engineering for Protecting BESS

This white paper synthesizes an array of crucial grid services provided by BESS technology, assesses its architecture and communications, and presents a case study for analysis against the principles introduced by Cyber-Informed Engineering (CIE). Furthermore, in walking through the analysis, this paper presents a framework to evaluate risks and solutions when considering BESS components. Asset owners and buyers could perform this analysis to assess their BESS product implementations, alternative inverter-based resources (IBR), and energy management systems (EMS). Battery systems fulfill various roles contingent on the unique market demands and the specific challenges presented by regional grid infrastructures. These roles also vary due to the differing utility models for ownership and operation, which are adapted to meet regional and local capabilities and requirements. Concerns have been raised regarding the potential for adversaries to exploit knowledge of battery operational patterns to orchestrate decisive attacks. However, the security of operational data for these systems may not be the primary vulnerability, as much of this information is already well-understood within the community. Applying a modest degree of subject matter expertise can often yield valuable predictions regarding how a battery will respond under certain conditions, such as grid emergencies, high or low-temperature days, Public Safety Power Shutoff (PSPS) events, and outages. The operational characteristics of batteries are well-documented, and their capabilities, including the risks associated with misoperation and the resulting consequences, are published and understood within the industry. CIE practices represent the next step in gaining functional assurance and providing an acceptable level of risk, regardless of whether a battery vendor can support a trusted and validated supply chain. While this issue has exacerbated supply chain challenges, it is not an isolated condition. This foreign supply route is the primary source of BESS for the U.S. market. Significant efforts are underway through the Bipartisan Infrastructure Law (BIL) to change that. Still, strategic short-term operational mitigations are needed to ensure the security of our operational technology (OT) systems, which are enhanced by instilling trust and are separate from vendors implementing CIE principles.

25 ENERGY STORAGE↗

Understanding the Charging Flexibility of Shared Automated Electric Vehicle Fleets

The combined anticipated trends of vehicle sharing (ride-hailing), automated control, and powertrain electrification are poised to disrupt the current paradigm of predominately owner-driven gasoline vehicles with low levels of utilization. Shared, automated, electric vehicle (SAEV) fleets offer the potential for lower cost and emissions and have garnered significant interest among the research community. While promising, unmanaged operation of these fleets may lead to unintended negative consequences. One potentially unintended consequence is a high quantity of SAEVs charging during peak demand hours on the electric grid, potentially increasing the required generation capacity. This research explores the flexibility associated with charging loads demanded by SAEV fleets in response to servicing personal mobility travel demands. Travel demand is synthesized in four major United States metropolitan areas: Detroit, MI; Austin, TX; Washington, DC; and Miami, FL. In each of these four cities, SAEV simulations are performed using local projected electricity prices from the Regional Energy Deployment System (ReEDS) for a handful of supply side scenarios. A coordinated charging model is introduced that seeks to reduce fleet charging costs in response to time-varying electricity prices and increasing shares of personal trip demand served (between 1% and 25% of all metro trips served by the SAEV fleet). Simulation results are presented across various scenarios assuming fleetwide coordination to minimize charging energy costs while constrained by offering adequate mobility service to fleet customers. The results indicate that the SAEV charging load is highly flexible; energy costs were shown to reduce between 13% and 46% across a wide range of simulated scenarios. In addition, these savings were realized without detrimentally impacting the fleet’s ability to service trips.

autonomous vehicle↗

eMosaic: Electrification Mosaic Platform for Grid Informed Smart Charging Management (Final Scientific/Technical Report)

ABB (Prime Contractor), in collaboration with its partners at the Utah State University (USU), Idaho National Laboratory, Rocky Mountain Power (RMP), and Electric Power Engineers (EPE), have performed research, development, and wide scale demonstration of a scalable and resilient Electrification Mosaic (eMosaic) platform for Smart Charge Management (SCM) for Electric Vehicle Infrastructure. Work was completed under DE EE0009194, titled “eMosaic Electrification Mosaic Platform for Grid Informed Smart Charging Management”, funded by the US Department of Energy. The project members developed algorithms that provide localized and bulk grid services and that reduce and stabilize costs all the way down the supply chain to the PEV owner through SCM. This platform aggregates telemetry from multiple data sources as pieces of the larger picture including personal, private fleet or transportation EVs, fast chargers and other supply equipment, weather service information, and geographically distributed charging sites such as public lots, garage and retail, and private or shared usage depots. ABB and the project team designed, tested, and improved a charging management system at local/edge and cloud levels. The ultimate objective of the project was to convincingly demonstrate that the developed secure eMosaic plat-form can be readily and favorably adopted by diverse utilities and site owners at scale. This was achieved through a demonstration plan with field deployment at several physical sites across 4 states and additional scalable simulation from high fidelity charging models.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Package Data for CERF-Data Centers

This dataset contains sample input 100m resolution raster files for running the CERF-DC python package (see https://github.com/IMMM-SFA/cerf_data_centers) at the state level across the CONUS. Due to data availability constraints, some of the items included in this dataset are proxies or assumptions for siting factors used in the model. These are individually noted in the item descriptions and can be exchanged with more detailed information upon availability. Data Descriptions The following raster files are included in the data download: state_siting_region.tif — State areas identified by state FIPS code composite_siting_suitability.tif — Value of 1 indicates suitable siting location, 0 otherwise. The following areas are excluded from siting: Areas within 300m of a federal airport runway Waterbodies Areas with slope >16% Areas susceptible to sinkholes High coastal or inland flood risk areas Local, state, and federal parks, leisure areas, and cemeteries Areas >2 km away from electric substations Areas >5 km away from a municipal water supplier service area Areas >2 km away from high-speed fiber provider service territory Protected Areas Database of the United States (PAD-US) areas Railroads, major roadways, and minor roadways Military areas and training grounds Developed lands Areas >0.8 km (0.5 miles) from developed lands land_value_dollar_per_sqft.tif — USD per square foot (sqft) derived from USDA $/acre land cost personal_property_tax_rate.tif — Personal property tax rate by state. Uses an assumed 0.0125 personal property tax rate for states with personal property tax, 0 for states without personal property tax. real_property_tax_rate.tif — Real property tax rate. Based on county level residential real estate property tax rates. sales_tax_rate.tif — Sales tax rate by state. mechanical_cooling_fraction.tif — Fraction of year (values between 0 and 1, inclusive) that the data center would be cooled through mechanical processes based on local water stress and humidity levels. water_cooling_fraction.tif — Fraction of year (values between 0 and 1, inclusive) that the data center would be cooled through evaporative (water cooled) processes based on local water stress and humidity levels. distance_to_substation.tif — Distance to nearest substation in hundreds of meters (i.e., value of 1 equals a distance of 100m). Offshore areas have a value of 0. industrial_electricity_rates_dollar_per_kwh.tif — USD/kWh industrial electricity rates. Represents the average industrial rate across all utilities that operate within a given county. Values are derived from the US Utility Rate Database. commercial_electricity_rates_dollar_per_kwh.tif — USD/kWh commercial electricity rates. Represents the average commercial rate across all utilities that operate within a given county. Values are derived from the US Utility Rate Database. data_center_market_locations.tif — Grid cells with positive values represent the centroid of existing data center market clusters. The value of non-zero grid cells represents the number of data centers in the market cluster. All other grid cells have a value of 0. Geospatial Metadata CRS: Albers Equal Area Conic (ESRI:102003) Extent: -2415585.0000000023283064,-1441981.2605773280374706 : 2384414.9999999976716936,1708018.7394226719625294 Dimensions: X: 48000 Y: 31500 Bands: 1 Origin: -2415585.0000000023283064,1708018.7394226719625294 Pixel Size: 100,-100 Acknowledgment IM3 is a multi-institutional effort led by Pacific Northwest National Laboratory and supported by the U.S. Department of Energy's Office of Science as part of research in MultiSector Dynamics, Earth and Environmental Systems Modeling Program. License This data is made available under a CCBY4.0 License Disclaimer This material was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor the United States Department of Energy, nor the Contractor, nor any or their employees, nor any jurisdiction or organization that has cooperated in the development of these materials, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness or any information, apparatus, product, software, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency thereof, or Battelle Memorial Institute. The views and opinions of authors expressed herein do not necessarily state or reflect those of the United States Government or any agency thereof. PACIFIC NORTHWEST NATIONAL LABORATORYoperated byBATTELLEfor theUNITED STATES DEPARTMENT OF ENERGYunder Contract DE-AC05-76RL01830

Mongird, Kendall↗

Precursor Analysis Report: Conti Ransomware Attack on the Health Service Executive of Ireland 2021

The Conti Ransomware Attack on the Health Service Executive (HSE) of Ireland 2021 Precursor Analysis Report leverages publicly available information about the attack and catalogs anomalous observables for each technique employed by the adversary. This analysis is based upon the methodology of the Cybersecurity for the Operational Technology Environment (CyOTE) program. The HSE provides public healthcare corporate services and operational services throughout Ireland, with critical functions including the acute national ambulance service, acute hospital service, and community healthcare service. On 14 May 2021, Conti ransomware encrypted 80 percent of the HSE’s Information Technology (IT) infrastructure across corporate, hospital, community, and electronic health record services. Conti is a ransomware-as-a-service operation that encrypts local files, uses double extortion against victims, and is facilitated by many intrusion tools. The attack forced the HSE to shut down its entire IT infrastructure to contain the ransomware, forcing employees to revert to pen and paper recordkeeping and leading to the cancellation of many appointments and procedures. The adversary also exfiltrated 700 GB of data, compromising the confidentiality of patients’ protected health information. Had the adversary targeted the COVID-19 cloud systems or operational technology assets, such as Internet of Medical Things medical devices or smart building management systems, the impact of the attack would almost certainly have been far more severe. Researchers and analysts identified 21 unique techniques (used in a sequence of 23 steps) likely utilized during the attack with a total of 1,185 observables using MITRE ATT&CK® for Industrial Control Systems. The CyOTE program assesses observables accompanying techniques used prior to the triggering event to identify opportunities to detect malicious activity. If observables accompanying the attack techniques are perceived and investigated prior to the triggering event, earlier comprehension of malicious activity can take place. Twenty-one of the identified techniques used during the attack on the HSE were precursors to the triggering event. Analysis identified 1,086 observables associated with these precursor techniques, 850 of which were assessed to have an increased likelihood of being perceived in the 57 days preceding the triggering event. The response and comprehension time could have been reduced if the observables had been identified earlier. The information gathered in this report contributes to a library of observables tied to a repository of artifacts, data sources, and technique detection references for practitioners and developers to support the comprehension of indicators of attack. Asset owners and operators can use these products if they experience similar observables or to prepare for comparable scenarios.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Package Data for CERF-Data Centers

This dataset contains sample input 100m resolution raster files for running the CERF-DC python package (see https://github.com/IMMM-SFA/cerf_data_centers) at the state level across the CONUS. Due to data availability constraints, some of the items included in this dataset are proxies or assumptions for siting factors used in the model. These are individually noted in the item descriptions and can be exchanged with more detailed information upon availability. Data Descriptions The following raster files are included in the data download: state_siting_region.tif — State areas identified by state FIPS code composite_siting_suitability.tif — Value of 1 indicates suitable siting location, 0 otherwise. The following areas are excluded from siting: Areas within 300 m of a federal airport runway or within an airport area boundary Waterbodies Areas with slope >16% Areas susceptible to sinkholes High coastal or inland flood risk areas Local, state, and federal parks, leisure areas, and cemeteries Areas >2 km away from electric substations Areas >5 km away from a municipal water supplier service area Areas >2 km away from high-speed fiber provider service territory USGS Protected Areas Database of the United States (PAD-US) GAP status 1, 2, or 3 areas US National Parks Wetlands USFWS critical habitats BIA land areas Railroads, major roadways, and minor roadways Military areas and training grounds NLCD developed lands Areas >0.8 km (0.5 miles) from NLCD developed lands land_value_dollar_per_sqft.tif — USD per square foot (sqft) derived from USDA $/acre land cost personal_property_tax_rate.tif — Personal property tax rate by state. Uses an assumed 0.0125 personal property tax rate for states with personal property tax, 0 for states without personal property tax. real_property_tax_rate.tif — Real property tax rate. Based on county level residential real estate property tax rates. sales_tax_rate.tif — Sales tax rate by state. mechanical_cooling_fraction.tif — Fraction of year (values between 0 and 1, inclusive) that the data center would be cooled through mechanical processes based on local water stress and humidity levels. water_cooling_fraction.tif — Fraction of year (values between 0 and 1, inclusive) that the data center would be cooled through evaporative (water cooled) processes based on local water stress and humidity levels. distance_to_substation.tif — Distance to nearest substation in hundreds of meters (i.e., value of 1 equals a distance of 100m). Offshore areas have a value of 0. industrial_electricity_rates_dollar_per_kwh.tif — USD/kWh industrial electricity rates. Represents the average industrial rate across all utilities that operate within a given county. Values are derived from the US Utility Rate Database. commercial_electricity_rates_dollar_per_kwh.tif — USD/kWh commercial electricity rates. Represents the average commercial rate across all utilities that operate within a given county. Values are derived from the US Utility Rate Database. data_center_market_locations.tif — Grid cells with positive values represent the centroid of existing data center market clusters. The value of non-zero grid cells represents the number of data centers in the market cluster. All other grid cells have a value of 0. Geospatial Metadata CRS: Albers Equal Area Conic (ESRI:102003) Extent: -2415585.0000000023283064,-1441981.2605773280374706 : 2384414.9999999976716936,1708018.7394226719625294 Dimensions: X: 48000 Y: 31500 Bands: 1 Origin: -2415585.0000000023283064,1708018.7394226719625294 Pixel Size: 100,-100 Acknowledgment IM3 is a multi-institutional effort led by Pacific Northwest National Laboratory and supported by the U.S. Department of Energy's Office of Science as part of research in MultiSector Dynamics, Earth and Environmental Systems Modeling Program. License This data is made available under a CCBY4.0 License Disclaimer This material was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor the United States Department of Energy, nor the Contractor, nor any or their employees, nor any jurisdiction or organization that has cooperated in the development of these materials, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness or any information, apparatus, product, software, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency thereof, or Battelle Memorial Institute. The views and opinions of authors expressed herein do not necessarily state or reflect those of the United States Government or any agency thereof. PACIFIC NORTHWEST NATIONAL LABORATORYoperated byBATTELLEfor theUNITED STATES DEPARTMENT OF ENERGYunder Contract DE-AC05-76RL01830

Mongird, Kendall↗

EMPOWERED Distributed Energy Resources Permit Accelerator Pilot

This report summarizes the EMPOWERED Distributed Energy Resources (DER) Permit Accelerator Pilot project. Its primary objective was to streamline the design, installation, permitting, and inspections of targeted Distributed Energy Resource (DER) solutions. Streamlining these processes is critical to strengthening and accelerating the adoption of DER solutions nationwide. Moreover, streamlined processes help expedite the clean energy transition and expand energy resilience by improving understanding and capability among key stakeholders like property owners, code officials, and the general workforce. The project team accomplished this by developing and deploying a set of design and permitting guides for simple DER solutions, which they rolled out via a permitting pilot program. The project team developed nine permitting and inspection guides for simple DER solutions, as follows: 1. Single-Family and Duplex: Electric Vehicle Service Equipment (EVSE), and Storage, Solar + Storage (each in two code cycles) 2. Multi-family and Office: EVSE, Storage, Solar + Storage (each in two code cycles) 3. A permitting process guide to support the implementation of the permitting guides. The guides cover key code requirements via plan review and field inspection checklists for code officials and building owners to follow to streamline the permitting and inspections process for DER solutions. Following the development of the initial set of guides, the project team formed two cohorts, each made up of four jurisdictions, to participate in the Permit Accelerator Pilot. Each cohort received training and technical assistance to support them in incorporating the guides into use. The project successfully engaged jurisdictions in two disparate US regions: Chelsea, Somerville, Natick, and Norwood in metro Boston; and Pima County, Town of Gilbert, Flagstaff, and Sedona in Arizona. Feedback gathered from the project was valuable in refining the guides to better address jurisdictional needs. After the pilot period, the project team developed final versions of the guides based on extensive feedback from the cohorts and from external technical peer review. Feedback included needs and barriers related to implementation, as well as detailed technical improvements from external peer review. The final guides were presented in a series of webinars with a national reach, with 192 attendees from 35 states in the live session of the final webinar, and the final guides are posted online and available for use nationwide. Key findings: • The most receptive jurisdictions were those adjacent to other jurisdictions that had already adopted similar initiatives. The least receptive jurisdictions were those in the midst of adopting new code cycles. • The most common barrier to jurisdictional adoption of new guidelines were internal administrative and process delays, more so than technical barriers. • The main technical barrier to adoption proved to be the concern of fire hazard risks posed by energy storage systems. There is some apprehension in the code enforcement community about the safety of the batteries. Education coordinated with fire and safety services will help alleviate concerns and increase confidence in the acceptance of innovative technologies. • Opportunities to further leverage and advance the guides and related resources include outreach, education, and jurisdictional support; updates to the resources to align with code cycle changes and local requirements; and advancements supporting emerging technologies.

14 SOLAR ENERGY↗

Financing Microgrids in the Federal Sector

Recent high-impact events such as hurricanes and wildfires highlight the need for energy system resilience. One potential impact of these events is the loss of utility grid power to federal sites, negatively affecting the ability to carry out their missions. Depending on the need to sustain critical functions, it may be important to continue operations during an outage of the electric grid, or at least have power restored quickly after the event. One approach to addressing this need is through a microgrid. Microgrids can provide a more reliable solution than the traditional approach of using a backup generator at individual buildings. A microgrid can enhance a site’s electrical power system during normal operations, as well as provide reliable backup power to critical loads when electric utility power is interrupted. Many times, certain components of a microgrid (and potentially the entire system) can be justified economically and paid for out of energy savings or avoided costs. In cases where savings can cover the project costs, one of several privately financed procurement mechanisms may be used to implement the project. Procurement options available to all federal agencies include utility energy services contracts (UESC), energy savings performance contracts (ESPC), and utility services contracts (USC); other mechanisms such as a power purchase agreement (PPA), enhanced use lease (EUL), and utility privatization (UP) may also be useful to agencies that have the authority to use them. Implementing a microgrid in a comprehensive effort that also includes energy efficiency can provide an important savings component, while reducing power requirements for critical loads, thus reducing the cost of the microgrid and associated distributed energy resources (DER). However, it can be difficult to achieve enough savings and avoided costs to cover the entire microgrid system, so leveraging these avoided costs in combination with appropriated funds may be necessary to implement the full project. When a site is deciding if a microgrid is the best solution, activities early in the process include identifying critical loads and existing DERs, conversations with the local electric utility, and implementation options that work best for the agency and site. This paper explores procurement options and agreements that may be useful to federal agencies interested in implementing microgrids at their sites. Microgrid complexities, implementation considerations, and suggestions to get started are also discussed. This information will be most useful to agencies when they are exploring electric energy system resilience options and/or considering different procurement options to meet their needs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

The Future of Energy Efficiency for U.S. Buildings - Drivers and Market Scenarios

This paper identifies likely drivers of building efficiency over the next ten years and expectations for how efficiency markets may evolve over this period. To prepare these predictions, we conducted an extensive literature review, interviewed 22 experts, reviewed legislation and executive orders in 12 states, and implemented a detailed questionnaire completed by 41 efficiency practitioners. The two most important drivers revealed by our research are (1) public policies and regulations, particularly those associated with climate change mitigation and adaptation and (2) the cost of energy relative to the cost of delivering efficiency. Other important drivers are technology changes, economic conditions, social priorities, and industry (including utility) business practices for increasing the uptake of efficiency in buildings. Our research indicates that efficiency markets will increasingly focus on supporting building decarbonization and enabling demand flexibility through the use of controls in grid-interactive efficient buildings and communities. Efficiency improvements for specific technologies (e.g., heat pumps, controls, and windows) and technological advances not specific to energy technologies (e.g., interoperability, artificial intelligence, and universal internet access) will improve the efficacy of efficiency measures and actions. Marketing of efficient products and services will increasingly focus on grid services, decarbonization, non-energy benefits for consumers, and integration with other distributed energy resources (DERs). We anticipate increased investment in disadvantaged and historically underserved communities, recognizing the social, health, and safety benefits of efficient energy usage and remediating historical biases. Lastly, we predict that while state and local government actions will vary, jurisdictions will increase their efficiency goals overall.

Schiller, Steven R↗

Vegetation Management Cost and Maintenance Implications of Different Ground Covers at Utility-Scale Solar Sites

Utility-scale solar photovoltaics (PV) is the largest and fastest-growing sector of the solar energy market, and plays an important role in ensuring that state and local jurisdictions can meet renewable energy targets. Potential adverse environmental impacts of utility-scale solar PV are well-documented, and the effects of diverse mitigation and dual land use strategies under the banner of ’low-impact solar’ are justly receiving more attention; this article seeks to contribute to improving understanding of this topic. Capital costs for different PV configurations are well-documented; however, operation and maintenance (O&M) costs for vegetation management at low-impact utility-scale solar PV sites are not as well-understood, particularly as they compare to costs for sites that use more conventional ground cover practices, such as turfgrass or gravel. After a literature review of different vegetation strategies and O&M cost considerations, we collected data from utility-scale solar PV O&M stakeholders, including site owners/operators, O&M service providers, vegetation maintenance companies, and solar graziers, on costs and activities associated with vegetation management at low-impact, agrivoltaic, and conventional PV sites. In this paper, we perform data analysis to detail the per-activity and total O&M costs for vegetation management at PV sites with different ground covers and management practices, providing the most comprehensive and detailed assessment of PV vegetation O&M costs to date. For the 54 sites included in our analysis, we found that while the per-acre and per-kilowattdc (kWdc) costs for individual activities, such as mowing, trimming, and herbicide application at native or pollinator friendly ground covers, were lower than at turfgrass sites, the total combined vegetation O&M costs were slightly higher; this is presumably because more individual activities are required for the first 3–5 years of vegetation establishment. Qualitative results include recommendations from data providers for site and system design, and ongoing vegetation management operations.

14 SOLAR ENERGY↗

A Path to 100 Percent Renewable Energy: Grid-Forming Inverters will Give Us the Grid We Need Now

This is a more urgent problem than it might sound. The westernmost Hawaiian island of significant size, Kauai is home to around 70,000 residents and 30,000 tourists at any given time. Renewable energy accounts for 70 percent of the energy produced in a typical year - a proportion that's among the highest in the world and that can be hard to sustain for such a small and isolated grid. During the day, the local system operator, the Kauai Island Utility Cooperative, sometimes reaches levels of 90 percent from solar alone. But on 2 April, the 26-MW generator was running near its peak output, to compensate for the drop in solar output as the sun set. At the moment when it failed, that single generator had been supplying 60 percent of the load for the entire island, with the rest being met by a mix of smaller generators and several utility-scale solar-and-battery systems.

battery management systems↗

Middlesex South FUSRAP Site: Collaboration Towards Beneficial Reuse - 20338

The US Department of Energy (DOE) Office of Legacy Management (LM) manages DoE's post-closure responsibilities and ensures the future protection of human health and the environment with respect to sites that have no continuing DOE mission after undergoing remediation. LM's beneficial reuse program promotes the LM strategic goal to sustainably manage and optimize use of public lands. The beneficial reuse program aims to repurpose former contaminated sites to restore the environment, protect the public health, revitalize communities, and spur economic growth. Benefits from the reuse of a site may increase the local tax base, facilitate job growth, utilize existing infrastructure, and enhance or protect natural resources. Beneficial reuse also promotes protectiveness by ensuring activities are compatible with long-term maintenance and protection of public health and the environment, as well as by retaining good stewardship of natural resources. LM actively participates in promoting the economic development vision of the surrounding communities by collaborating with local communities to promote regional or municipal initiatives. The Borough of Middlesex, New Jersey, has prepared the Lincoln Boulevard Redevelopment Plan, which will reinvent a once-viable downtown and enhance the quality of life for the community. The Middlesex South, New Jersey, Formerly Utilized Sites Remedial Action Program (FUSRAP) site lies within the boundaries of this redevelopment area. In support of this development plan, the Borough is interested in acquiring the site for its Department of Public Works and to increase street access in the future commercial district to be built near adjacent properties. The opportunity to put the FUSRAP site into productive use aligns with LM's mission and strategic goals. In support of beneficial reuse activities, DOE can dispose of excess real property using several mechanisms. The two disposal options applicable to the Middlesex south site include (1) utilizing the US General Services Administration (GSA) or (2) using the Title 10 Code of Federal Regulations Section 770, 'Transfer of Real Property at Defense Nuclear Facilities for Economic Development' (known as a '770 transfer') process. Using the 770 transfer requires economic development as the primary driver, and a specific redevelopment proposal must be submitted. If there is no interest in specific economic development, the GSA option becomes the default mechanism for disposal of the property. In the case of the Middlesex south site, the 770 transfer process is being utilized and the Borough has submitted its economic development proposal to LM. Although LM is encouraged by the opportunity to put the site into productive use, the Middlesex south site is currently on the US Environmental Protection Agency (EPA) National Priorities List and remediation is being performed by the US Army Corp of Engineers (USACE) under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). Consequently, any property transfer must meet the requirements under CERCLA Section 120(h), 'Property Transferred by Federal Agencies.' As the groundwater remedy will not be in place for several years, approval would be required from the US EPA administrator and the governor of the state of New Jersey to perform an early transfer of the site (before all response actions have been completed). The time frame for these approvals to occur under the normal process conflicts with the proposed redevelopment schedule; therefore, various options for expedited sale, transfer, or lease of portions of the site to the Borough were evaluated. The subsequent decision on a mutually beneficial path forward was the result of a collaborative effort between LM, USACE, the Borough and its redevelopment team, EPA, and the New Jersey Department of Environmental Protection. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Recommendations for Establishing Local Rural Electrification Programs Using Photovoltaic Systems [Recomendaciones Para la Implantacidn de Programas Locales de Electrificacidn Rural con Sistemas Fotovoltaicos]

Photovoltaic (PV) technology is becoming one the best options for supplying electricity to rural communities far from electrical networks and which have a small and disperse demand for electricity. As the cost of the technology goes down and its development advances, opportunities for applying it continue to grow. As a result, in the near future we will probably see an increase in massive application programs of this technology in rural Mexico. This document presents some of the most relevant problems needing immediate solution to increase the possibility of success in establishing photovoltaic programs for rural electrification in Mexico. These problems are influenced by economic, technological, engineering, infrastructural, social and political issues. The paper presents the requirements for an industrial center based on PV technology, the accessibility of replacement parts and maintenance service, development of financial solutions, training of the users and introducing norms and technical regulations. The document summarizes the issue of rural electrification in Mexico, emphasizing the low population density in these areas. A brief description is given of photovoltaics showing different configurations that can be utilized for supplying electricity to the rural areas. The issues involved and recommendations for introducing PV systems to the rural area are described.

14 SOLAR ENERGY↗

Education, Training and Career Pathway Opportunities for Buildings Energy Efficiency Programs Within the Corps Network

The Corps Network (TCN) is a national association that represents more than 150 local organizations around the country that work to provide job training and employment to individuals working on projects that provide community benefits. Through its partnership in the Better Buildings Workforce Accelerator, TCN requested technical assistance from the National Renewable Energy Laboratory (NREL) to support Corps organizations involved in – or interested in developing – programs related to energy efficiency in buildings. The goal of this project is to provide industry-recognized energy efficiency education/training models and resources that can be tailored and replicated by Corps across the country, and which can best prepare Corpsmembers to enter the energy efficiency workforce when they complete their terms of service.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Employment access assessed using the mobility energy productivity (MEP) metric

Transit agencies, local governments, employers, and job-seekers have a shared interest in connecting residents with jobs in an affordable and time efficient manner, with public agencies also caring about energy efficiency and air quality. Employment hubs are an opportunity to solve the spatial mismatch between homes of job-seekers and the locations of desirable jobs. Such is the case in Columbus, Ohio, between Rickenbacker Industrial Park and the Linden neighborhood, which has experienced persistent poverty. Using the mobility energy productivity (MEP) metric to examine travel time, cost, and energy efficiency, we show current transit service is undesirable due to excessive travel time (70 min, MEP = 0), while driving alone (MEP = 0.20) may be less desirable than a hypothetical, fare-free microtransit service (MEP = 0.23). Updating MEP to use locally-derived input data can help identify parameters under which providing microtransit service in a specific place has compelling benefits in terms of vehicle energy efficiency as well as cost and travel time for riders.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

A macro-micro approach for identifying crystal plasticity parameters for necking and failure in nickel-based alloy haynes 282

Here, this work develops a two-scales macro-micro approach to address the challenge in calibrating crystal plasticity microstructural models when samples undergo necking prior to fracture. The crystal plasticity models are crucial for predicting the materials’ plastic deformation and failure at the microstructure level, identifying the materials’ intrinsic properties as well as investigating the microstructure-properties relationships. However, after necking occurs, the experimentally measured stress-strain curves fail to reflect the materials ‘true’ stress-strain behavior and cannot be directly fitted into crystal plasticity models. The proposed macro-micro approach employs a top-down strategy to address this challenge, which has been studied with experimental tests on precipitation-strengthened Ni-based superalloy Haynes® 282®. In this approach, a macro rate-dependent anisotropic plasticity model with Voce-type hardening and Rice-Tracey damage law is first utilized to model the deformation and failure of the tensile bar, and calibrated by matching the stress-strain curves, necking strain, and reduction of area. Especially, to match the testing results under different applied strain rates, the rate-sensitivity parameter m and saturation stress in the elasticity model are modified to incorporate dependence on the local strain rate. Then, the ‘true’ stress-strain behaviors are extracted from the necking zone of the macro-model, which are used to calibrate a micro-model with explicit microstructures and governed by an extended crystal plasticity law. The consistency between the micro-model and macro-model are enforced during calibration. The calibration outcomes from the crystal plasticity model elucidate the materials intrinsic properties for slip, hardening, and failure, which is vital for further investigations into the microstructure-properties relationship and for accurate prediction of the material behavior under various test and service conditions.

36 MATERIALS SCIENCE↗