Search NASA⌕ Search

SEARCH · Search NASA

Results for “pilot system design”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Physics basis for the reference flat-top plasma scenario in the ST–E1 fusion power plant

As part of the U.S. Department of Energy’s Milestone-Based Fusion Energy Development Program, Tokamak Energy has completed the pre-concept design of the ST–E1 fusion power plant. ST–E1 is envisaged to operate in two phases: a pilot plant phase, targeting sustained net power production of 300 - 500 MWe for a duration >1 hr, followed by a commercial power plant phase targeting steady-state operations and a normalised overnight capital cost of ⩽12 000 $\$$/kWe. The design process adopted was highly iterative, integrating all major plant systems and progressing in a phased fidelity approach. At the pre-conceptual stage, the emphasis has been on exploring the design space, identifying the main system-level trade-offs, and making the key decisions that define the overall plant concept, rather than optimising a single operating point. This paper, part of a focused collection detailing the ST–E1 pre-concept design, addresses the development of a series of reference flat-top plasma operating points for the pilot plant phase. A modelling workflow was established to develop and assess candidate plasma design points and explore key dependencies. The workflow includes integrated core plasma modelling, magnetohydrodynamic (MHD) stability assessment, equilibrium generation, scrape-off-layer and exhaust modelling, heating & current drive design and optimisation, and turbulent transport modelling. Using this framework, the impact of several key parameters on the flat-top operating space was investigated, including the density limit, core radiation fraction and divertor power loading, level of external heating and curent drive power and assumed pedestal characteristics. The MHD stability, controllability and micro-stability characteristics of these plasmas were also analysed. These investigations informed the definition of a set of fully non-inductive, flat-top reference operating points that satisfy the high-level ST–E1 mission, including a low and high density case, a case that is stable to resistive wall modes and a case with reduced divertor power loading.

ST–E1↗

Solar-Plus-Storage Program Design: Frameworks and Examples [Slides]

The Columbia River Treaty Tribes in the Pacific Northwest - the Nez Perce, Umatilla, Warm Springs, and Yakama - hold treaty-reserved fishing rights for the Columbia River, the largest river in North America flowing into the Pacific Ocean. The four Tribes, through the Columbia River Inter-Tribal Fish Commission (CRITFC), prepared a vision for a more harmonized energy and water system in their 2022 Energy Vision for the Columbia River Basin. In it, the four Tribes envision a future where the Columbia Basin electric power system supports healthy and harvestable fish and wildlife populations, protects Tribal treaty and cultural resources, and provides clean, reliable, and affordable electricity. To help realize the Energy Vision, CRITFC received technical assistance from the National Renewable Energy Laboratory (NREL) through the Communities Local Energy Action Program (LEAP) pilot with the goal of ensuring that the Tribes are fully informed and prepared to integrate their interests into regional power system planning. This resource aims to provide an overview of program and policy design frameworks for behind-the-meter (BTM) energy storage and solar-plus-storage programs and examples from across the United States. This information is intended to build CRITFC's understanding of potential policies and program designs that could support the deployment of solar photovoltaics (PV) and energy storage in the Pacific Northwest.

14 SOLAR ENERGY↗

Assessment of Sandia's 2021 Pilot Program for Research Traineeships to Broaden and Diversify Fusion Energy Science: Development and Rapid Screening of Refractory Multi-Principal Elemental Composites for Plasma Facing Components

The Fusion Energy Sciences office supported “A Pilot Program for Research Traineeships to Broaden and Diversify Fusion Energy Sciences” at Sandia National Laboratories during the summer of 2021. This pilot project was motivated in part by the Fusion Energy Sciences Advisory Committee report observation that “The multidisciplinary workforce needed for fusion energy and plasma science requires that the community commit to the creation and maintenance of a healthy climate of diversity, equity, and inclusion, which will benefit the community as a whole and the mission of FES”. The pilot project was designed to work with North Carolina A&T (NCAT) University and leverage SNL efforts in FES to engage underrepresented students in developing and accessing advanced material solutions for plasma facing components in fusion systems. The intent was to create an environment conducive to the development of a sense of belonging amongst participants, foster a strong sense of physics identity among the participants, and provide financial support to enable students to advance academically while earning money. The purpose of this assessment is to review what worked well and lessons that can be learned. We reviewed implementation and execution of the pilot, describe successes and areas for improvement and propose a no-cost extension of the pilot project to apply these lessons and continue engagement activities in the summer of 2022.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

BETO 2021 Peer Review - Biomethanation to Upgrade Biogas to Pipeline Grade Methane WBS 5.1.3.102

We are developing, innovating and de-risking a biomethanation process capable of megawatt-scale deployment that upgrades biogas waste streams to produce pipeline quality renewable natural gas (RNG). Biomethanation is a two-step process using a methanogenic microorganism to convert renewable hydrogen (H2) and waste carbon dioxide (CO2) to renewable methane (CH4) - the primary component in natural gas. Using biogenic CO2 from biogas sources like dairies, wastewater treatment plants, and landfills allows production of this drop-in direct replacement fuel to participate in the growing number of carbon markets; like California's Low Carbon Fuel Standard and the Federal Renewable Fuel Standard. The end-of-project goal is to demonstrate pipeline quality RNG production (> 95% CH4, < 4% H2, <1% CO2, < 0.2% O2 and < 4 parts per million hydrogen sulfide) using real biogas feedstocks. We will accomplish this goal by designing and building a pressurized (18 bar) mobile lab-scale (20L) bioreactor research platform, including integrated electrolyzer system, based on lessons learned from operating the 700L pilot system from Southern California Gas Company. In collaboration with Electrochaea, natural gas utilities and Argonne National lab, will provide the data to establish a preliminary range of carbon intensity to help accelerate the deployment of utility-scale H2 production and qualify the biomethanation pathway process for RNG production.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Application of Sequential Design of Experiments (SDoE) to Large Pilot-Scale Solvent-Based CO2 Capture Process at Technology Centre Mongstad (TCM)

The United States Department of Energy’s Carbon Capture Simulation for Industry Impact (CCSI2) program has developed a framework for sequential design of experiments (SDoE) that aims to maximize knowledge gained from budget- and schedule-limited pilot scale testing. SDoE was applied to the planning and execution of campaigns for testing CO2 capture systems at pilot-scale in order to optimally allocate resources available for the testing. In this methodology, a stochastic process model is developed by quantifying the parametric uncertainty in submodels of interest; for a solvent-based CO2 capture system, these may include physical properties and equipment performance submodels (e.g., mass transfer, interfacial area). This uncertainty is propagated through the full process model, over variable operating conditions, for estimating the resulting uncertainty in key model outputs (e.g., percentage of CO2 capture, solvent regeneration energy requirement). In developing a data collection plan, the predicted output uncertainty is incorporated into an algorithm that seeks simultaneously to select process operating conditions for which the predicted uncertainty is relatively high and to ensure that the entire space of operation is well represented. This test plan is then used to guide operation of the pilot plant at varying steady-state conditions, with resulting process data incorporated into the existing model using Bayesian inference to refine parameter distributions. The updated stochastic model, with reduced parametric uncertainty from data collected, is then used to guide additional data collection, thus the sequential nature of the experimental design. The SDoE process was implemented at the pilot test unit (12 MWe in scale) at Norway’s Technology Centre Mongstad (TCM) in a summer 2018 test campaign with aqueous monoethanolamine (MEA). During the test campaign, the varied operating conditions included the flowrates of circulated solvent, flue gas, and reboiler steam and the CO2 concentration in the flue gas. The process data were used to update probability distributions of mass transfer and interfacial area parameters of a stochastic process model developed by the CCSI2 team. Two iterations of the SDoE process were executed, resulting in the uncertainty in model predicted CO2 capture percentage decreasing by an average of 58.0 ± 4.7% over the full input space of interest. This work demonstrates the potential of the SDoE process for model refinement through reduction in process model parametric uncertainty, and ultimately risk in scale-up, in CO2 capture technology performance.

carbon capture↗

Operation and Process Control Development for a Pilot-Scale Leaching and Solvent Extraction Circuit Recovering Rare Earth Elements From Coal-Based Sources

The US Department of Energy in 2010 has identified several rare earth elements as critical materials to enable clean technologies. As part of ongoing research in REEs (rare earth elements) recovery from coal sources, the University of Kentucky has designed, developed and is demonstrating a ¼ ton/hour pilot-scale processing plant to produce high-grade REEs from coal sources. Due to the need to control critical variables (e.g. pH, tank level, etc.), process control is required. To ensure adequate process control, a study was conducted on leaching and solvent extraction control to evaluate the potential of achieving low-cost REE recovery in addition to developing a process control PLC system. The overall operational design and utilization of Six Sigma methodologies is discussed. Further, the application of the controls design, both procedural and electronic for the control of process variables such as pH is discussed. Variations in output parameters were quantified as a function of time. Data trends show that the mean process variable was maintained within prescribed limits. Future work for the utilization of data analysis and integration for data-based decision-making will be discussed.

coal, rare earth elements, pilot plant, automation↗

Pilot Development Progress to Demonstrate Electric Thermal Energy Storage (ETES) Using Low-Cost Particles

The rapid growth of future energy demand increases the need to economically store electrical energy over durations up to several days in long-duration energy storage (LDES) applications. LDES can reduce the grid stress for improving the resilience of the grid. The integration of renewable power and storage has several significant and positive impacts including expanding the renewable energy portion of electricity generation, meeting peak-load demand, and coordinating supply and demand. Several energy storage approaches including mechanical, chemical and electrochemical methods are currently deployed or under development. However, LDES requirements pose unique challenges for scalability, energy capacity, and cost. Thermal energy storage (TES) has the ability to store a large capacity of energy with improved site flexibility compared to incumbent LDES technologies (i.e., pumped hydro) and has attracted significant interest. Our development in TES technology using solid particles as the storage medium has shown feasibility and potential in serving LDES purposes. Particle TES has various advantages over commercialized molten nitrate salt TES and has emerged as a promising storage technology originating from Generation 3 concentrating solar power (CSP) development. Stable, inexpensive silica sand produced in the Midwestern U.S. was identified as a suitable storage medium and has been validated through lab heating and cycling tests. We have successfully developed particle TES for bidirectional electric energy storage to broaden the applications for TES beyond CSP technologies and into standalone electric-thermal energy storage (ETES) systems. Key component designs and performance were verified with prototype testing and model simulations. The ETES system uses high-temperature, low-cost particle thermal energy storage coupled with a unique pressurized fluidized bed heat exchanger that supports a high-efficiency, air-Brayton combined power cycle. At times of low energy demand or high renewable production, an electric particle heater heats large quantities of solid particles to high temperatures in excess of 1100 degrees C. The particles are stored in internally insulated silos. At times of high electricity demand, the hot particles are gravity-fed through the heat exchanger where stored thermal energy is transferred to the power cycle working fluid to drive the gas turbine power generation system, thereby converting the thermal energy back into electricity for the grid. The cold particles leaving the heat exchanger are returned to the storage silos by a well-insulated particle conveyor. This ETES technology using particle TES can be sited anywhere and is predicted to be economic and efficient. Moreover, this ETES technology could be co-located with a retired coal or gas plant to leverage existing power generation and grid infrastructure. Our work has focused on the development of each of the key components (e.g., the electric particle heater, particle storage silos, and the particle-to-gas pressurized fluidized bed heat exchanger) through conceptual designs, prototype testing, and computational modeling. These developments demonstrate technological feasibility and are an important step towards the next phase of development of this promising LDES technology. This presentation will show the progress in developing a pilot demonstration of the ETES system on a commercially relevant scale.

25 ENERGY STORAGE↗

State-of-the-art on research and applications of machine learning in the building life cycle

Fueled by big data, powerful and affordable computing resources, and advanced algorithms, machine learning has been explored and applied to buildings research for the past decades and has demonstrated its potential to enhance building performance. This study systematically surveyed how machine learning has been applied at different stages of building life cycle. By conducting a literature search on the Web of Knowledge platform, we found 9579 papers in this field and selected 153 papers for an in-depth review. The number of published papers is increasing year by year, with a focus on building design, operation, and control. However, no study was found using machine learning in building commissioning. There are successful pilot studies on fault detection and diagnosis of HVAC equipment and systems, load prediction, energy baseline estimate, load shape clustering, occupancy prediction, and learning occupant behaviors and energy use patterns. None of the existing studies were adopted broadly by the building industry, due to common challenges including (1) lack of large scale labeled data to train and validate the model, (2) lack of model transferability, which limits a model trained with one data-rich building to be used in another building with limited data, (3) lack of strong justification of costs and benefits of deploying machine learning, and (4) the performance might not be reliable and robust for the stated goals, as the method might work for some buildings but could not be generalized to others. Finally, findings from the study can inform future machine learning research to improve occupant comfort, energy efficiency, demand flexibility, and resilience of buildings, as well as to inspire young researchers in the field to explore multidisciplinary approaches that integrate building science, computing science, data science, and social science.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Flexible Pilot Jobs Framework for Distributed High Throughput Computing

Experimental particle physics has been at the forefront of analyzing the world’s largest datasets for decades. The high-energy physics (HEP) community was among the first to develop suitable software and computing tools for this purpose. GlideinWMS is a Glidein-based workload management system whose purpose is to provide experiments like CMS at CERN, DUNE at Fermilab, and others, a way to access and efficiently use vast amounts of computing resources. This system wants to provide a simple way to submit jobs to a set of computing resources, that will be provided to users behind the scenes. Glideins are the pilot jobs executed on the worker nodes at the grid sites, performing operations such as hardware detection, environment setup, and error handling. After all these operations, they will launch the actual user job. Many grid sites are supported, such as shared clusters, Google CE, and AWS. My internship aimed to design and code a flexible pilot jobs framework that will replace the one used by GlideinWMS, developing a modular and flexible skeleton of the Glidein and adding further functionalities. My project also focused on the application of machine learning techniques as support to this management system.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

A Combined Water and CO 2 Direct Air Capture System (Final Technical Report)

The primary objective of the project was to demonstrate the technical and economic performance of a technology that simultaneously captures CO 2 and water from the air – a Hybrid Direct Air Capture system (HDAC). In HDAC, air is passed over water capture section as well as a CO 2 selective sorbent to remove CO 2 from the air stream. Combining potable water generation and CO 2 capture in a single device with the unique energy conserving features of the proposed design enables long-term projected CAPEX under $\$$750/t-CO 2 and levelized cost of capture (LCOC) of $\$$140/t-CO 2 . Project DE-FE-0031970 "A Combined Water and CO 2 Direct Air Capture System" ran for four years and three months from 10/01/2020 to 12/31/2024 for three budget periods and an extension period. The total project budget at completion was $\$$3,534,408 consisting of a $\$$2,680,064 federal share and $\$$854,344 cost share. The pilot plant was successfully designed, engineered, built and commissioned during the initial three budget periods. The plant demonstrated successful water capture during this period, whereas initial CO 2 capture was well below target values. The project team requested an extension period during which alternate materials and beds were evaluated. By the end of the project, both moisture swing adsorption of CO 2 and water capture had successfully been demonstrated at target capture rates making further scale-up of the technology viable.

42 ENGINEERING↗

A Novel Process for Carbon Dioxide Conversion to Fuel

In this project, TDA developed a new mixed metal oxide-based sorbent that converts CO2 (captured from coal fired power plants) to CO, which can then be combined with renewable H2 generated by water electrolysis or H2 from steam methane reforming to produce different liquid fuels. TDA’s absorbent-based CO2 conversion process uses a redox process, which splits the catalytic reforming of methane with CO2 reaction into two stages: CO2 reduction to CO and CH4 reforming into H2 and CO which eliminates the equilibrium limitations. The CO produced in the two-stage reactor system can then be further reacted with renewable H2 to produce methanol, naphtha, diesel, or gasoline. We worked with the Advanced Power & Energy Program (APEP) of University of California, Irvine (UCI) to design and develop the liquid fuel synthesis process that is built around this new material. We demonstrated the techno-economic viability of the new sorbent based redox process to convert CO2 into synthesis gas by demonstrating continuous carbon dioxide reduction in a prototype test system for over 585 hours while converting up to 10 kg CO2/day. With the successful completion of the R&D effort, the technology is now ready for a larger pilot-scale demonstration and the technology readiness has been raised from TRL 3 to TRL 5. In collaboration with UCI, we completed a high-fidelity process design and economic analysis. The required sale price (RSP) for gasoline (Case 1 NG-MTG) is $4.91/gal and naphtha and diesel (Case 2 NG-FT) are $4.23/gal and $6.07/gal, respectively, on a 2011 dollar basis. To put these costs in perspective, the California prices in current dollars (with its strict specifications) for regular grade gasoline from last year to current year have varied from a low of $3.10/gal in January 2021 to a high of $5.76/gal in March 2022, while prices for diesel from last year to current year have varied from a low of $3.40/gal in January 2021 to a high of $6.41/gal in May 2022 according to the U.S. Energy Information Agency data. It should be noted that the gasoline and diesel produced by these designs of Case 1 and Case 2 would be of very high quality and both nitrogen and sulfur free. These RSPs are based on a cost of imported electricity of $64/MWh based on the low-end current wind generated electricity cost (Genevieve 2011). This cost is by far the largest component of the variable costs used in computing the RSPs. A sensitivity analysis of these RSPs to the cost of imported electricity shows that the cost of the imported electricity has a significant effect on the RSPs. The life cycle analysis (LCA) shows that the total cradle-to-gate CO2 emissions for both liquid fuels (diesel and gasoline) were negative, indicating that overall more CO2 is consumed than released during production of the fuel from CO2 feed stack for both cases (-296 kgCO2 per MT gasoline for Case 1 and -705 kgCO2 per MT diesel for Case 2). On a cradle-to-grave comparison, the use of diesel produced using TDA’s process (2,457 kgCO2 per MT diesel) would release 37.6% less CO2 compared to petroleum based diesel (3,937 kgCO2 per MT diesel) while the use of gasoline produced using TDA’s process (2,792 kgCO2 per MT gasoline) would release 29.3% less CO2 compared to petroleum based gasoline (3,946 kgCO2 per MT gasoline). With the successful completion of the R&D effort, the technology is now ready for a bench-scale demonstration and the technology readiness has been raised from TRL 3 (Analytical and experimental critical function and/or characteristic proof of concept) to TRL 5 (Laboratory scale similar system validation in relevant environment).

20 FOSSIL-FUELED POWER PLANTS↗

Packages of Distributed Energy Technologies Demonstrating Demand Flexibility at Community Scale

The combination of increased electric load growth across all sectors, deferred electrical infrastructure investment, and other factors resulting in variable electric power supply, has created technical challenges to maintaining a resilient and reliable grid. Many federal, regional, and local efforts are in play to modernize the electric grid, including advancing building technologies and distributed energy resources (DERs) that are utilizing smarter controls to become responsive to both occupant and grid needs. This report reviews ten pilot projects demonstrating how groups of buildings combined with behind-the-meter (BTM) DERs such as electric vehicle (EV) charging, battery storage, flexible HVAC and domestic hot water systems, and photovoltaic systems can reliably and cost effectively provide grid services. Each of the ten pilot projects aim to deliver both energy efficiency and demand flexibility (DF) while supporting load growth. The ten demonstration teams are piloting flexible DER packages across diverse communities of residential and commercial buildings to address a variety of regional grid needs. The outcomes of these pilot projects will be used to inform future scaling through utility program development. This paper characterizes the ten teams, showcasing the decision-making process used by each group to develop their packages (Section 2), the grid services they plan to deliver (Section 3), the types of DER packages selected for deployment within building sectors (Section 4) and trends between building sector, DER types, and grid services In order to achieve community scale benefits, the pilot projects must utilize aggregated control mechanisms for coordinating buildings and DERs together. Several types of coordinated control architectures have evolved amongst the teams, influenced by use type, existing market conditions, and integration type. Three coordinated controls architectures have been characterized, highlighting their use cases, benefits, challenges, and tradeoffs in their design. These insights can aid utilities, control vendors, and developers in scaling community-level energy systems (Paul, 2024). Ultimately, the technology packages selected by the ten teams will be coordinated to provide power system services, also known as grid services. Insights from these demonstrations will be useful for grid operators, regulators, aggregators and other stakeholders as they look to deploy demand flexible resources as grid services in the future. The grid services that each team is targeting for demonstration are described in Section 3 and Section 4. Methods for evaluating the grid services have been described in the paper Metrics for Evaluating Grid Service Provision from Communities of Grid-interactive and Efficient Buildings and other DER (MacDonald, 2023). To identify technology packages for demonstration, Section 2 shows that project teams used a range of analysis approaches, including building energy modeling, AMI data analysis, cost-benefit frameworks, and utility pilot data. Some teams emphasized technical modeling to quantify grid impacts and demand reduction potential, while others prioritized economic evaluations, stakeholder input, or exploratory pilots to inform deployment decisions. This diversity reflects the need to tailor selection methods to project goals, available data, and organizational context. Section 5 discusses trends between the DER technologies deployed and the grid service provisions from each team. Residential buildings (multifamily and single family) lean towards technologies that enhance energy efficiency (e.g. weatherization upgrades, smart thermostats) and onsite power generation integration (e.g. solar PV). Commercial building demonstrations prioritize technologies that ensure operational reliability (e.g. battery storage) and centralized energy management systems and optimization solutions. Teams that are deploying controllable storage-based technologies are more likely to provide grid services that require a near real-time response. Teams incorporating load shifting technologies like smart thermostats with HEMs are likely to include energy markets participation and customer bill management offerings. Campus demonstrations are adopting diverse sets of DERs to emphasize renewable generation, paired with centralized control. This section also describes technologies that were considered during project planning but ultimately excluded from final deployment. These demonstrations reveal that effective DER package design should be tailored to building type, customer segment, and construction vintage. Multifamily buildings benefit from centralized HVAC upgrades and supervisory controls, while single-family homes are well-suited for individualized technologies like solar, storage, and smart home energy monitors. Commercial and campus settings prioritize EMIS integration and load optimization. New construction enables cost-effective integration of DER-ready infrastructure, whereas retrofits require deployments aligned with owner and tenant value streams. For utility program planners, early coordination with developers and building owners, paired with segmented and modular program offerings, can improve adoption, scalability, and grid impact.

24 POWER TRANSMISSION AND DISTRIBUTION↗

The development of a Sustained High Power Density (SHPD) facility

A Sustained High Power Density (SHPD) facility is being planned within the U.S. as a non DT device which can be a bridge to a Compact Fusion Pilot Plant (CFPP) DT operated facility with the future capacity to produce a levelised cost of electricity at a rate competitive with current power generating systems. To accomplish this a review of ITER cost data and recent next step physics/engineering studies that promoted technology development, physics enhancements and innovated configuration improvements that increase operating availability have been injected into a proposed PPPL SHPD design. Much of the physics and engineering design basis for this effort centers on a series of ST studies carried out in recent years attempting to maximize the low aspect ratio (AR) ST performance within realistic engineering constraints of this compact fusion device. One issue found in the low AR design is the lack of volt-seconds generated by a small central solenoid that resides in the available space left after sizing the TF structure to support the high current density/HTS TF coil. Although not required in a larger pilot plant device, a solenoid wrapped around the plasma side of the SC TF coil was considered for the small low aspect ratio SHPD device. Adding a solenoid to the plasma side of the TF imposes a major change to the device configuration – a change which has been found to have cost and assembly issues when compared with an OH solenoid located at the machine center. Finally, the inclusion of a liquid metal first wall divertor system, the integration of local pairs of outboard DCLL blanket segments and a summary of physics performance conditions will be presented.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

SolarAPP+ Pilot Analysis: Performance and Impact of Instant, Online Solar Permitting

The National Renewable Energy Laboratory (NREL) led a collaborative effort to develop the Solar Automated Permit Processing Plus (SolarAPP+), a no-cost solar permitting software solution to address residential solar photovoltaic (PV) permitting resource constraints and streamline solar adoption processes among authorities having jurisdiction (AHJs). The SolarAPP+ is an online portal that automates permit plan review, enabling an instant permit approval process for code-compliant residential PV systems. Based on national model building, electrical, and fire codes, the SolarAPP+ automatically performs a compliance check of permit inputs against code requirements and produces an inspection checklist that can be used to verify installation practices, workmanship, and adherence to the approved design. NREL conducted a two-phase pilot with five participating AHJs and 16 solar contractors, spanning from November 2020 through December 2021, evaluating the ability of SolarAPP+ to deliver instant permits and its impact on four critical areas within each AHJ: permit review timelines; solar adoption timelines; AHJ time saved; and inspection results. The pilot confirmed that SolarAPP+ reduced permit review times to less than one day, reduced solar adoption timelines by an average of 12 days, saved an estimated 2,067 staff hours, and had comparable inspection results to those found in traditional permitting. The pilot further identified key lessons for improving SolarAPP+, including ways to streamline SolarAPP+ adoption, development of training resources, and expansion of supported products.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Design of Experiments for Dynamic Test Runs in Solvent-Based CO 2 Capture Pilot Plants

Test runs in the pilot plants consume significant resources, and therefore, the learning from test runs should be maximized. Test runs conducted in the pilot plants are often steady state. It takes several hours for reaching steady-state in the pilot plants, and thus, the duration of the test runs needs to be long even for collecting few steady-state data points. On the other hand, a large number of measurements can be collected through dynamic test runs in a short span of time. This paper presents a systematic design of dynamic experiments (DoDEs) for identifiability of model parameters, which is achieved by persistently exciting the inputs signals. A pseudorandom binary sequence (PRBS) is designed as the input signal for DoDE due to its efficiency in obtaining sufficient spectral content. However, due to the long sequence size of the PRBS signal, a Schroeder-phase input signal, which is a multisine signal, is also designed. Tests for both types of signals are run in the Pilot Solvent Test Unit (PSTU) at the National Carbon Capture Center in Wilsonville, Alabama. The transient data are used to solve dynamic data reconciliation and parameter estimation problem. The estimated parameters are found to be not only superior to those estimated from using data collected from hundreds of steady-state test runs in a nonreactive (air–water) system, but the parameters could be estimated by using the dynamic data collected for about 24 h from the pilot plant for the MEA-H 2 O–CO 2 system.

CO2 capture↗

A New Process for Carbon Dioxide Conversion to Fuel

In this project, TDA developed a new mixed metal oxide-based sorbent that converts CO 2 (captured from coal fired power plant) to CO, which can then be combined with renewable H 2 generated by water electrolysis to produce different liquid fuels. TDA’s absorbent-based CO 2 conversion process uses a redox process, which splits the reverse water gas shift reaction steps into two stages: CO 2 reduction to CO and H 2 oxidation to H 2 O and eliminates the equilibrium limitations. The CO produced in the two-stage reactor system can then be further reacted with renewable H 2 to produce methanol, naphtha, diesel, or gasoline. We worked with the Gas Technology Institute (GTI) and Advanced Power & Energy Program (APEP) of University of California, Irvine (UCI) to design and develop the liquid fuel synthesis process that is built around this new material. We demonstrated the techno-economic viability of the new sorbent based redox process to convert CO 2 into synthesis gas by: 1) demonstrating continuous carbon dioxide reduction in a prototype test system for over 500 hours while converting up to 0.4 kg CO 2 /day. With the successful completion of the R&D effort, the technology is now ready for a larger pilot-scale demonstration and the technology readiness has been raised from TRL 3 to TRL 5. In collaboration UCI, we also completed a high-fidelity process design and economic analysis. The required selling price (RSP) for methanol (Case 1 H2-MeOH) is $\$$3.06/gal, naphtha and diesel (Case 2 H2-FT) are $\$$6.21/gal and $\$$8.91/gal, and for gasoline (Case 3 H2-MTG) is $\$$6.96/gal on a 2011 dollar basis. To put these costs in perspective, the recent (June 2020) U.S. price for methanol made from natural gas is about $\$$1.19/gal according to Methanex, a major methanol producer in North America. The recent (June 2, 2020) California prices for gasoline and diesel with California’s strict specifications are $\$$3.35/gal and $\$$3.73/gal according to the U.S. Energy Information Agency. On the other hand, it should be noted that the gasoline and diesel produced by the designs of Case 2 and Case 3 would be both nitrogen and sulfur free. These RSPs are based on a cost of imported electricity of $\$$64/MWh based on the low-end current wind generated electricity cost (Genevieve and Ramsden, Wind Electrolysis: Hydrogen Cost Optimization, Technical Report, June 2011, NREL/TP-5600-50408). This cost is by far the largest component of the variable costs used in computing the RSPs. The cost of the imported electricity has to approach zero for the RSP to be competitive for methanol produced in Case 1 and naphtha and diesel produced in Case 2 while the cost of electricity has to be less than $\$$10/MWh for gasoline produced in Case 3.

01 COAL, LIGNITE, AND PEAT↗

3D Play Fairway Analysis for Examining of Superhot Reservoir Production Scenarios

The DEEPEN (DE-risking Exploration for geothermal Plays in magmatic ENvironments) project was a multi-laboratory, international effort to reduce uncertainty and improve resource characterization in superhot geothermal systems. Building on this foundation, this work advances open-source tools designed to lower the exploration risk and cost of superhot geothermal projects while promoting transparency, reproducibility, and efficiency in exploration workflows. These tools are being tested at two key sites: (1) the Nesjavellir Geothermal Area in Iceland, where the Icelandic Deep Drilling Project (IDDP) will drill its third well, and (2) Newberry Volcano in Oregon, USA, where Mazama Energy will pilot the first superhot enhanced geothermal system (EGS). A major outcome is the creation of a modular, open-source Python framework for play fairway analysis (PFA) in 2D and 3D, called geoPFA. The PFA workflow has been expanded to produce pseudo conceptual models, and will soon be refined to assess reservoir components through integration with the thermo-hydraulic-mechanical-chemical (THMC) simulator TReactMech, to enable iterative coupling between PFA and THMC models, improving characterization of superhot systems. All three of the Icelandic Deep Drilling Project's production scenarios were analyzed via this framework: (1) a superhot deep injection well paired with conventional production wells at Nesjavellir, (2) a superhot deep production well at Nesjavellir, and (3) superhot enhanced geothermal system at Newberry Volcano. This analysis provides useful insights around conceptual modeling of these production scenarios, helping to inform decisions around which scenario is best suited for which types of environments.

15 GEOTHERMAL ENERGY↗

3D Play Fairway Analysis for Examining of Superhot Drilling Production Scenarios: Preprint

The DEEPEN (DE-risking Exploration for geothermal Plays in magmatic ENvironments) project was a multi-laboratory, international effort to reduce uncertainty and improve resource characterization in superhot geothermal systems. Building on this foundation, this work advances open-source tools designed to lower the exploration risk and cost of superhot geothermal projects while promoting transparency, reproducibility, and efficiency in exploration workflows. These tools are being tested at two key sites: (1) the Nesjavellir Geothermal Area in Iceland, where the Icelandic Deep Drilling Project (IDDP) will drill its third well, and (2) Newberry Volcano in Oregon, USA, where Mazama Energy will pilot the first superhot enhanced geothermal system (EGS). A major outcome is the creation of a modular, open-source Python framework for play fairway analysis (PFA) in 2D and 3D, called geoPFA. The PFA workflow has been expanded to produce pseudo conceptual models, and will soon be refined to assess reservoir components through integration with the thermo-hydraulic-mechanical-chemical (THMC) simulator TReactMech, to enable iterative coupling between PFA and THMC models, improving characterization of superhot systems. All three of the Icelandic Deep Drilling Project's production scenarios were analyzed via this framework: (1) a superhot deep injection well paired with conventional production wells at Nesjavellir, (2) a superhot deep production well at Nesjavellir, and (3) superhot enhanced geothermal system at Newberry Volcano. This analysis provides useful insights around conceptual modeling of these production scenarios, helping to inform decisions around which scenario is best suited for which types of environments.

15 GEOTHERMAL ENERGY↗