Search NASA⌕ Search

SEARCH · Search NASA

Results for “schedule contingency”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

107 records · Page 6

Artificial neural network application for space station power system fault diagnosis

This study presents a methodology for fault diagnosis using a Two-Stage Artificial Neural Network Clustering Algorithm. Previously, SPICE models of a 5-bus DC power distribution system with assumed constant output power during contingencies from the DDCU were used to evaluate the ANN's fault diagnosis capabilities. This on-going study uses EMTP models of the components (distribution lines, SPDU, TPDU, loads) and power sources (DDCU) of Space Station Alpha's electrical Power Distribution System as a basis for the ANN fault diagnostic tool. The results from the two studies are contrasted. In the event of a major fault, ground controllers need the ability to identify the type of fault, isolate the fault to the orbital replaceable unit level and provide the necessary information for the power management expert system to optimally determine a degraded-mode load schedule. To accomplish these goals, the electrical power distribution system's architecture can be subdivided into three major classes: DC-DC converter to loads, DC Switching Unit (DCSU) to Main bus Switching Unit (MBSU), and Power Sources to DCSU. Each class which has its own electrical characteristics and operations, requires a unique fault analysis philosophy. This study identifies these philosophies as Riddles 1, 2 and 3 respectively. The results of the on-going study addresses Riddle-1. It is concluded in this study that the combination of the EMTP models of the DDCU, distribution cables and electrical loads yields a more accurate model of the behavior and in addition yielded more accurate fault diagnosis using ANN versus the results obtained with the SPICE models.

Momoh, James A.↗

Hubble Space Telescope Servicing Mission 3A Rendezvous Operations

The Hubble Space Telescope (HST) hardware complement includes six gas bearing, pulse rebalanced rate integrating gyros, any three of which are sufficient to conduct the science mission. After the loss of three gyros between April 1997 and April 1999 due to a known corrosion mechanism, NASA decided to split the third HST servicing mission into SM3A, accelerated to October 1999, and SM3B, scheduled for November 2001. SM3A was developed as a quick turnaround 'Launch on Need' mission to replace all six gyros. Loss of a fourth gyro in November 1999 caused HST to enter Zero Gyro Sunpoint (ZGSP) safemode, which uses sun sensors and magnetometers for attitude determination and momentum bias to maintain attitude stability during orbit night. Several instances of large attitude excursions during orbit night were observed, but ZGSP performance was adequate to provide power-positive sun pointing and to support low gain antenna communications. Body rates in ZGSP were estimated to exceed the nominal 0.1 deg/sec rendezvous limit, so rendezvous operations were restructured to utilize coarse, limited life, Retrieval Mode Gyros (RMGs) under Hardware Sunpoint (HWSP) safemode. Contingency procedures were developed to conduct the rendezvous in ZGSP in the event of RMGA or HWSP computer failure. Space Shuttle Mission STS-103 launched on December 19, 1999 after a series of weather and Shuttle-related delays. After successful rendezvous and grapple under HWSP/RMGA, the crew changed out all six gyros. Following deploy and systems checkout, HST returned to full science operations.

Lee, S.↗

Risk Management Structured for Today's Environment

Today's project management environment provides NASA with myriad challenges. We have smaller budgets and, consequently, smaller programs and shorter lead times. We have less money for development, and no money to recover from contingencies or mishaps. The NASA Administrator is leading the Agency away from operations, instilling a renewed focus on scientific research and the development and application of new cutting-edge technologies. We are using performance-based and fixed-price contracts with industry, and we are forming more and more partnerships with the international community. In addition to the environment, we have many NASA-unique conditions that challenge mission success. They include a higher level of performance requirements, limited production numbers, higher development efforts and cost, the inability to operate a space element fully under realistic conditions on the ground, limited access to the product during operation, and, of course, the need for more science for fewer dollars and on a shorter schedule.

Michael A. Greenfield↗

Apollo 16 Press Kit

The Apollo 16 spacecraft is scheduled for launch on Apr. 16, 1972 from Complex 39A at the Kennedy Space Center, Florida by the Saturn V launch vehicle. Crewmen are mission commander John W. Young, command module pilot Thomas K. Mattingly II and lunar module pilot Charles M. Duke Jr. Objectives of the mission, to last up to 12 days, as outlined by NASA: to perform selenological inspection, survey and sampling of materials in a preselected region of Descartes using a lunar roving' vehicle; deploy and activate Apollo surface experiments; develop man's capability to work in the lunar environment; obtain photographs of candidate exploration sites; and toconduct inflight experiments and photographic tasks in lunar orbit. Following launch, the spacecraft will reach Earth Parking Orbit and remain in orbit for about two and one-half revolutions prior to Translunar Injection. Next, the Command and Service Module docks with the Lunar Module and the spacecraft "coasts" to the moon. In orbit around the moon, the Command and Service Module/Lunar Module combination will descend to within 50,000 feet of the lunar surface before undocking. The Lunar Module will continue to descend while the Command and Service Module returns to an orbit approximately 60 miles high. Stay time on the lunar surface is scheduled for approximately 73 hours. The ascent stage of the Lunar Module then lifts the astronauts back into lunar orbit where they will dock with the Command/Service Module. The Lunar Module is jettisoned and Transearth Injection follows. Just prior to reentry into the earth's atmosphere, the Service Module is jettisoned, and the astronauts in the Command Module splashdown in the Pacific Ocean. The target point for end-of-mission splashdown is at 05 degrees 0 minutes north latitude and 158 degrees 40 minutes west longitude or approximately 985 nautical miles south of Honolulu, Hawaii. Splashdown is scheduled for Apr. 28, 1972 at 10:30 a.m. Hawaiian Standard Time (2:30 p.m. CST). Recovery forces for Apollo 16, stationed in both the Atlantic and Pacific Oceans, will consist of three ships, nine aircraft and nearly 1,700 personnel. CTF-130 (Manned Spacecraft Recovery Force, Pacific) forces will be stationed south of Hawaii. Three ships, eight helicopters and three Air Force HC-130H aircraft, and nearly 1,100 personnel, will take part. Task Force 140 (Manned Spacecraft Recovery Force, Atlantic), comprising one ship, six HC-130H aircraft, three helicopters and approximately 300 personnel, will be positioned for possible launch abort operations. Two ships in the Atlantic will also be used for acoustical testing. Other forces, primarily aircraft and personnel of the Air Force Aerospace Rescue and Recovery Service will be on alert around the world for contingency recovery support.

Source record↗

Recommendations for Developing Space Suit Integrated Food Systems and Delivering Nutrition Before, During, and After Lunar EVA

The concept of providing hydration and nutrition during extravehicular activity (EVA) is nearly as old as the space program itself. Astronauts currently have access to 32 ounces of water through a disposable in-suit drink bag (DIDB) while they are confined to their space suit. During the Apollo program, methods for providing food/nutrition to crewmembers in space suits were included as contingency solutions (1) but were eventually abandoned. The main reasons that provision of in-suit nutrition beyond water was discontinued after Apollo were the complicated engineering requirements, the additional mass and volume that was required for the applicable food formulations, hardware needed for a suit-specialized food system, and because the perceived need for in-suit nutrition during EVAs was not sufficient during the Space Shuttle and the International Space Station (ISS) eras. A custom-made 165-kcal fruit bar was fitted into the EVA suit during the Space Shuttle program, but crewmembers rarely consumed it during the EVA and rather chose to consume it before or after suited activities (2). Since 2011, between 4 and 13 EVAs have been conducted from the ISS each year, with durations ranging from 1:32 to 8:17 hours (https://www.nasa.gov/mission_pages/station/spacewalks ). It has been acceptable for the crewmembers to schedule food intake around these relatively infrequent suited activities. Because upcoming Artemis missions will include nominal 8-hour lunar exploration EVAs that are expected to increase in frequency to several (4 to 5) sorties per week (3), the desire for an in-suit nutrition system has increased. In preparation for these missions, requirements to provide in-suit nutrition has been outlined in the most recent NASA Human Spaceflight Standards documents (4). Establishing general recommendations for in-suit nutrition systems precedes the selection of a lunar EVA pressure suit system. The current document is intended to define the rationale for nutrition to support EVA (whether in-suit or from the pantry in the habitat), document the requirements, constraints, and crewmember preferences, and recommend necessary next steps for developing an in-suit EVA nutrition system. Assessments presented in this report include a review of commercial off-the-shelf (COTS) food products as potential in-suit formulations, a comparison of conceptual designs for delivering nutrition to a crewmember while confined to a space suit, an evaluation of space suit volume constraints for the placement of in-suit nutrition systems, and feedback from astronauts regarding preferences for nutrition support during EVA. Based on these assessments, recommendations were formulated that can be used to help develop a method to deliver nutrition safely and acceptably to a crewmember while they are confined to a space suit for an EVA duration of up to 8 hours, and a total time in the suit of up to 12 hours.

space suit↗

Artificial Gravity in Mars Orbit for Crew Acclimation

NASA’s current baseline plan for a crewed Mars mission anticipates a transit time of up to three hundred days in microgravity and 3-14 days on the Martian surface for gravity acclimation before the crew can safely perform their first Extra-Vehicular Activity (EVA). While there are multiple options for how initial surface operations will be performed, all current designs involve acclimation on the surface, and the impacts on the mission schedule, required supplies, and crew lander systems are significant. This paper proposes an alternative option utilizing artificial gravity, which offers benefits in terms of mission scope, mass savings, crew health, and long-term strategic vision. By moving the acclimation requirement to the orbiting habitat’s existing systems, rather than adding redundant systems to the lander, the Mars Descent Vehicle (MDV) can be a much smaller, simpler, and lighter design. Rather than the lander being designed to support crew for days, it would be mere hours. While ambitious, the concept of pre-acclimation in orbit can be not only safe and feasible, but done with fairly minimal changes to the planned architecture and overall mass requirements. The data used draws on decades of established research and demonstrates how this capability can be not only used for pre-acclimation, but also to support crew during early orbital-only missions, surface abort contingency scenarios, return-to-orbit abort scenarios, and as an early proof of capability into larger and more ambitious artificial gravity designs needed for extended exploration missions in the future.

Rowe, Justin↗

Front-End Engineering Design for Piperazine with the Advanced Stripper

This Department of Energy (DOE) funded project was executed with the goal of preparing a Front-End Engineering Design (FEED) for the capture and compression of 90% of the CO2 that would normally be emitted from an existing natural gas combined cycle (NGCC) plant. The FEED focused on the application of the piperazine advanced stripper (PZAS) process at Mustang Station of the Golden Spread Electric Cooperative (GSEC), which consists of two gas turbines with common heat recovery steam generator (HRSG). The University of Texas at Austin (UT) served as the prime contractor, and subcontracted AECOM Technical Services and Trimeric Corporation to support FEED development. This project team has worked together to advance PZAS for more than a decade. ExxonMobil, Chevron, and Total provided project co-funding. The objectives of this work included: 1. To advance engineering design such that a comprehensive estimate for the total installed cost of a full-scale PZAS CO2 Capture Plant with CO2 compression can be developed on an existing NGCC power plant. a. These detailed costs can also be used to qualify PZAS and other related second generation (2G) amine scrubbing processes for use on cogeneration facilities in refineries and chemical plants that use gas turbines with HRSGs to produce steam. b. These detailed costs will help qualify 2G amine scrubbing for use on NGCC power plants and establish a more accurate baseline cost to be used as a target by other capture technologies. 2. To provide cost details to be used in the economic optimization of the process features of PZAS and other 2G amine scrubbing processes. 3. To provide DOE with a more detailed understanding of carbon capture costs in a commercial application, enabling DOE to better design its R&D program to improve the economics for carbon capture. 4. To provide the host site and cost share partners with the information necessary to determine whether a commercial project to capture and use CO2 for enhanced oil recovery (EOR) or for sequestration can be justified (when accounting for the 45Q tax credit). A key component of the FEED is the estimated total installed cost, which provides a basis for the likely capital investment necessary to implement the PZAS carbon capture process at this location and scale. In combination with the included economic analysis, which accounts for potential revenue from the produced CO2, potential avenues to profitability are explored. The major findings of the FEED are as follows: The Mustang Station PZAS CO2 Capture Plant estimated total project cost of $698 MM of which $384 MM was direct costs. The annual operating costs were $32.6 MM. The total investment for a PZAS facility at Mustang Station is $725 MM. This estimate includes owner’s cost of $25 million and a contingency of $110 MM. • The study estimated the CO2 capture plant at Mustang Station would generate CO2 at $110/tonne for EOR, assuming a 12% IRR (internal rate of return) and an 85% capacity factor. For CO2 storage, the same case would achieve a 12% IRR at about $114/tonne. At a capacity factor of 52%, the storage and EOR cases would break even when carbon is priced ~$150/tonne. The economic analysis determined that the capacity factor and utility pricing, among other variable factors, had a significant effect on the economics and will need additional studied. • The energy penalty of the PZAS plant would be about 46 MW in connected power and 35 MW in operating load. The natural gas requirement (for the Gas Boiler package) would be about 354 MMBTU/hr. • The FEED revealed no major risks in process maturity. However, some areas were outlined for further engineering during detailed design, which included the Gas Boiler system, general arrangement and site layout, air coolers, schedule development, and optimization of the process for higher CO2 removal. • If PZAS were to be implemented at another host site, additional opportunities for cost reduction for would include cost reduction through use of cooling water and steam extraction.

03 NATURAL GAS↗

Development of the European Service Module Propulsion Subsystem for the Multi-Purpose Crew Vehicle

Hardware Heritage Schedule limitations and budget constraints drove the need for extensive use of heritage hardware designs. In some cases (OMS and TVC) flight hardware reuse (from Shuttle) was required,and will be delta-qualified for use on Orion Primary sources of heritage: ATV Shuttle Orion CM PSS Ariane 5 EPS Targeted Development Testing Component development testing was performed to address the highest risk areas of heritage design compliance with Orion requirements Assembly level development testing was performed to understand complex assemblies and component interactions Heritage Direct re-use of assets from Shuttle Orbiters, all assets have varying flight history. Orion Use Used by Orion to gimbal the main engine during major translational maneuvers Development Testing Random vibration on controller box (lead to card retention design mod) Design Changes (only as required) Circuit board retention in controller box (single instance from Shuttle flight history) New, longer harnesses Basic Specs(8) fixed position engines Thrust: 105 lbf Nozzle area ratio: 164:1 Orion Use Nominally used for separation maneuvers and mid-course correction maneuvers In contingency scenario (failed main engine), used for major translational maneuvers Drives the need for long continuous duration firing Drives the need for off-pulsing (to steer) Control authority requires 50 duty cycle Development Testing Random Vibration (added vibration isolation bracket) Hot fire, duty cycle (changed MR)

pressure fed↗

SPHERES and Astrobee: Space Station Robotic Free Flyers

Free-flying space robots can be used when humans are present to off-load routine work, to increase astronaut productivity, and to handle contingencies. The International Space Station (ISS), for example, is a continuously manned orbital laboratory the size of a large house, which contains many thousands of inventory items and hundreds of diverse payloads and experiments - all of which have to be managed by 6 person crew. To help with this, NASA is developing and testing robotic free-flyers on the ISS. SPHERES (Synchronized Position Hold, Engage, Reorient, Experimental Satellites) is an ISS facility with three nano-satellites designed to research estimation, control, and autonomy algorithms. SPHERES are volleyball-sized, have their own power, propulsion and navigation systems, and work on the ISS under astronaut supervision. For more than 10 years, NASA has made SPHERES available to other U.S. government agencies, schools, commercial companies and students as a platform for science, technology development, and education. SPHERES will soon be succeeded by the new Astrobee free-flying robot. Astrobee builds on the success of SPHERES, but in addition to research, the robot will also be used for housekeeping and monitoring duties without astronaut supervision. Astrobee makes extensive use of open-source (the complete software stack is available on GitHub) and is scheduled to be installed on the ISS in late Spring 2018.

Benavides, Jose V.↗

Computational Algorithms for Unit Commitment with AC Power Flows (Final Report)

Security-constrained unit commitment (SCUC) is a key component in power system operations. When AC power flow constraints are considered in the SCUC model (AC-SCUC), the problem becomes extremely difficult due to its discrete and non-convex nature, as described in “Grid Optimization Competition Challenge 3 Problem Formulation (GOCC)”. There are four main challenges: (i) Discrete decisions regarding unit online/offline status and start-up/shut-down procedures for every single unit. The number of discrete decision variables increases considerably when a system integrates multiple generators; (ii) Configuration-based combined-cycle formulations, and multi-commodity models that include ramping products, spin/non-spin products, and regulation up/down products. The combined-cycle units introduce additional discrete decision variables and auxiliary service products further complicate the model by connecting multi-commodity products’ continuous and discrete variables; (iii) SCUC models with AC power flow constraints are far more complex due to massive bilinear terms in the large-scale nonlinear power balance equations. The nonlinear power balance equations are further complicated by the discrete step control variables of shunts; (iv) N − 1 contingency analysis. The size of the model increases linearly with the number of contingencies considered, greatly increasing the size of the optimization model. Accordingly, there is an emergent need to develop a robust algorithm capable of deriving a high-quality solution in a short time and passing through contingency tests simultaneously. In this project, we explore innovative techniques to address this challenging problem by integrating advanced polyhedral theory, approximation methods, relaxation strategies, decomposition techniques, and parallel computing. Each technique approaches the problem from a different perspective, leveraging its specific strengths to tackle distinct challenges. Each individual method has demonstrated its effectiveness in the PI’s previous research. Their integration is expected to significantly reduce the computational time required to solve the proposed complex problem. Successful completion of this project has the potential to transform the industry by enhancing optimization solvers capable of handling large-scale day-ahead energy market clearing models within strict time constraints, while incorporating AC power flow constraints. This advancement will lead to reduced overall generation costs and, consequently, increased social welfare.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Aerospace Safety Advisory Panel

This report covers the activities of the Aerospace Safety Advisory Panel (ASAP) for calendar year 1998-a year of sharp contrasts and significant successes at NASA. The year opened with the announcement of large workforce cutbacks. The slip in the schedule for launching the International Space Station (ISS) created a 5-month hiatus in Space Shuttle launches. This slack period ended with the successful and highly publicized launch of the STS-95 mission. As the year closed, ISS assembly began with the successful orbiting and joining of the Functional Cargo Block (FGB), Zarya, from Russia and the Unity Node from the United States. Throughout the year, the Panel maintained its scrutiny of NASAs safety processes. Of particular interest were the potential effects on safety of workforce reductions and the continued transition of functions to the Space Flight Operations Contractor. Attention was also given to the risk management plans of the Aero-Space Technology programs, including the X-33, X-34, and X-38. Overall, the Panel concluded that safety is well served for the present. The picture is not as clear for the future. Cutbacks have limited the depth of talent available. In many cases, technical specialties are "one deep." The extended hiring freeze has resulted in an older workforce that will inevitably suffer significant departures from retirements in the near future. The resulting "brain drain" could represent a future safety risk unless appropriate succession planning is started expeditiously. This and other topics are covered in the section addressing workforce. In the case of the Space Shuttle, beneficial and mandatory safety and operational upgrades are being delayed because of a lack of sufficient present funding. Likewise, the ISS has little flexibility to begin long lead-time items for upgrades or contingency planning.

Source record↗

Manual Crew Override of Vehicle Landings Following G-Transitions

BACKGROUND Manual control during exploration spaceflight consists of both planned automated supervisory control and unplanned crew override. This crew override capability is critical to enable overall mission success during landing contingencies. However, the introduction of manual override capabilities must be implemented to enable crews to mitigate risks introduced by human error. Adaptive changes in the sensorimotor system can manifest during g-transitions as spatial disorientation. While training and landing aids enable successful landing through disorientation, these adaptive changes may increase cognitive demand that needs to be accounted for in the manual control strategy. It is important to characterize these effects as soon as possible following the G-transition to develop appropriate countermeasures. METHODS The following study seeks to inform the risk associated with altered sensorimotor and vestibular function impacting critical mission tasks. We aim to characterize the effects of short and long-duration weightlessness on manual control following G-transitions using simulated lunar landing on a six-degree-of-freedom (6DOF) motion base, a fixed base simulation, and a supervisory control tablet task. The primary goal is to understand the impact of spaceflight on crew ability to perform manual crew override and supervisory control. This aim will be assessed by comparing pre- versus postflight simulation performance in crewmembers assigned to either short duration (< 30 day) or long duration (~6- month) missions to the International Space Station (ISS). We hypothesize there will be postflight increases in the percent time that pilots are outside of the acceptable range for recommended vehicle state parameters and the reaction time for secondary cognitive tasks. Ground-based control subjects, who are demographically matched to the crew considering age (± 5 years) and gender, will undergo the same testing schedule as the crew to examine the effects of flight phase independent of microgravity exposure. The second aim is to examine how adaptive changes in vestibular and cognitive function relate to changes in manual crew override proficiency. Crew performance for a sensorimotor perceptual test battery will evaluate motion perception tracking, roll nulling, and/or vection sensitivity using the 6DOF motion base. We hypothesize that a higher severity of vestibular alterations will be associated with increased percent time outside of guidance limits. Motion sickness severity and sleepiness will also be evaluated. To determine the impact of “just-in-time” training, the third aim seeks to compare performance during on-board lunar landing tasks conducted late in-flight to early postflight. We hypothesize that proficiency on the “just-in-time” laptop trainer late in mission will be positively correlated with early postflight proficiency on the same task. The final aim will establish assessments of performance, training protocols, and the learning progression in a ground-control cohort of first-time users. RESULTS The assessment of the learning progression associated with the piloting task on the motion base system with thirty ground subjects will be reported. Learning curves will be established across four distinct sessions and within session considering trial difficulty. The difficulty of the landing task can be modulated with the landing divert distance and cross or downrange difficulty. Results may include changes in performance across multiple trials of a multi-attribute lunar tablet supervisory control task. Preliminary investigations of eighteen subjects who completed vestibular threshold and motion perception tasks offer expected performance ranges for upcoming preflight crew evaluations. The results yielded an average roll threshold of 0.46 ± 0.30 deg/s and an average roll nulling root mean square error performance of 2.52 ± 0.52 deg/s. RELEVANCE This project will deliver an operational demonstration of crew monitoring capability following spaceflight and identify potential deficits that may require remediation. Comparison of individual vestibular and cognitive changes with crew performance will help better characterize the manual control risks associated with sensorimotor alterations. Ground testing will evaluate learning progression, refine training protocols, and serve as a control cohort for comparisons to crew performance. ACKNOWLEDGEMENTS: The authors acknowledge contributions from Draper, the Dynamic Skills Trainer (DST) Lab, and the Software, Robotics, and Simulation Division toward the development of the lunar landing simulation platforms. This project is funded by the Human Health Countermeasures Element.

Hannah M. Weiss↗

STOCHASTIC OPTIMAL POWER FLOW FOR REAL-TIME MANAGEMENT OF DISTRIBUTED RENEWABLE GENERATION AND DEMAND RESPONSE (Final Report)

To meet the grand challenge of a sustainable energy future, there has been a surge of interest in renewable energy. Today, the uncertainty associated with renewable resources is handled by using operating reserves. The high penetration of renewable resources, however, introduces difficult-to-control dynamics and challenges for power system operation. Decision support tools are necessary at the bulk system operational level to recognize and efficiently utilize renewable resources and distributed demand response products in concert with traditional grid resources. It is envisaged that responsive load can potentially have very significant cost advantages over either spinning or non-spinning ramping reserve. Critical decisions are made during hour(s)-ahead and real-time power system operation regarding the commitment and dispatch of generators to ensure power delivery is both reliable and economic. These decisions are typically made by a security constrained optimal flow, which determines future generator commitments, dispatches, and ensures adequate reserves are available in the event of a contingency (unexpected outage) or if future system conditions deviate from forecasts. However, security has been always based on a pre-specified subset of contingency constraints whose enforcement does not guarantee security under all possible future possibilities while also giving little or no weight to the likelihood of each contingent event or the severity of its consequences. Existing tools, which are based exclusively on deterministic optimization models, do not yield optimal operational decisions to address these new challenges, in terms of both reliability and cost-effectiveness. This project has focused on developing a stochastic optimal power flow (SOPF) framework, which integrates renewable resource uncertainty, load uncertainty, distributed storage (DS), demand response (DR) products, in a holistic manner to address the uncertainty associated with ever-increasing renewable resources, along with the inclusion of distributed demand response products in future power systems. A proof-of-concept problem was created using the Pennsylvania-Jersey-Maryland (PJM) power system network. Synthetic wind generation was added to the system to simulate 50% wind penetration. A 1-hour test of SOPF operation indicated more than 6% operational cost savings. The project continued by adding the Midwestern Independent System Operator (MISO) as a partner, with focus shifting from SOPF to Stochastic Look-Ahead Unit Commitment (SLAC). Unlike PJM, MISO is faced with significant renewable energy resources within its footprint and is challenged with substantial uncertainty in its operations. The SLAC distinguishes itself from existing tools that operators use. At best, today’s tools solve two to three cases independently, where one or two system parameters, such as forecasted load level (e.g., a low, base, and high forecast), are varied and the resulting scenarios are analyzed independently. The stochastic-based optimization of SLAC leverages statistical information from an ensemble of potential operational scenarios and their respective likelihood. The SLAC output can be translated into valuable information to the operator such as suggested commitments, optimal scheduling and dispatch of resources, reserve requirements at both locational and zonal resolutions, ramping availability and requirements, availability of demand response including operational guidance concerning the near-term and real-time coordination between distributed energy resources, and utilization of distributed storage resources. The developed SOPF/SLAC tool, a stand-alone tool compatible with existing EMSs, will provide system operators with unprecedented visibility, flexibility and predictability to these resources and operational guidance concerning the real-time coordination between DERs and DR/DS products. The game changing and practical impact of this disruptive technology will be dramatic and will usher in a new era in the electric power industry, wherein green energy concepts are fully embraced, and electric power costs are lowered throughout the nation.

42 ENGINEERING↗

First Results from NASA's Lunar Atmosphere and Dust Environment Explorer (LADEE)

As of early August, 2013, the Lunar Atmosphere and Dust Environment Explorer (LADEE) mission is scheduled for launch on a Minotaur V rocket from Wallops Flight Facility during a five-day launch period that opens on Sept. 6, 2013 (early Sept. 7 UTC). LADEE will address 40 year-old mysteries of the lunar atmosphere and the question of levitated lunar dust. It will also pioneer the next generation of optical space communications. LADEE will assess the composition of the lunar atmosphere and investigate the processes that control its distribution and variability, including sources, sinks, and surface interactions. LADEE will also determine whether dust is present in the lunar exosphere, and reveal its sources and variability. These investigations are relevant to our understanding of surface boundary exospheres and dust processes occurring at many objects throughout the solar system, address questions regarding the origin and evolution of lunar volatiles, and have potential implications for future exploration activities. Following a successful launch, LADEE will enter a series of phasing orbits, which allows the spacecraft to arrive at the Moon at the proper time and phase. This approach accommodates any dispersion in the Minotaur V launch injection. LADEE's arrival at the moon in early October. The spacecraft will approach the moon from its leading edge, travel behind the Moon out of sight of the Earth, and then re-emerge and execute a three-minute Lunar Orbit Insertion maneuver. This will place LADEE in an elliptical retrograde equatorial orbit with an orbital period of approximately 24 hours. A series of maneuvers is then performed to reduce the orbit to become nearly circular with a 156-mile (250- kilometer) altitude. Spacecraft checkout and science instrument commissioning will commence in early-October and will nominally span 30 days but can be extended for an additional 30 days in the event of contingencies. Following commissioning, the 100-day Science Phase is performed at an orbit with periapsis between 20-60 km. This orbit must be constantly managed due to the Moon's highly inhomogeneous gravity field. During the Science Phase, the moon will rotate more than three times underneath the LADEE orbit. LADEE employs a high heritage instrument payload: a Neutral Mass Spectrometer (NMS) from Goddard Space Flight Center, an Ultraviolet/Visible Spectrometer (UVS) from Ames Research Center, and a dust detection experiment (LDEX) from the University of Colorado/LASP. It will also carry the Lunar Laser Communications Demonstration (LLCD) as a technology demonstration. The LLCD is funded by the Human Exploration Operations Mission Directorate (HEOMD), managed by GSFC, and built by the MIT Lincoln Lab. Contingent upon LADEE's successful lunar orbit insertion and checkout, we will report the early results from the science investigations.

Moon↗

Austin Sustainable and Holistic Integration of Energy Storage and Solar PV [Austin SHINES]. Final Report, Version 2

The Austin SHINES project and solution is a software management platform, for an electric grid with a high penetration of dispersed photovoltaic (PV) solar generation sites, which maintains the traditional power quality and reliability associated with grid service. This project developed and deployed the platform as a Distributed Energy Resource Management System (DERMS), engaging multiple advanced controls, to evaluate operation and optimization of a fleet of diverse DER assets, installed at several locations among Austin Energy’s customers and distribution system. The project also produced a methodology to create a replicable DERMS template, adaptable to other regions and market structures. Last, Austin SHINES aimed to demonstrate the solution’s methodology would enable the DER grid ecosystem to serve load at a technical cost (System Levelized Cost of Electricity, or System LCOE) of less than the U.S. Department of Energy SHINES program metric of $0.14/kWh, in a defined boundary, while enabling a high penetration of distributed PV. Research was categorized in 6 reports (Final Deliverables = FD) listed below, with titles and descriptions indicating which area of understanding was investigated: FD-1: System Levelized Cost of Electricity (System LCOE) Methodology The creation and use of the System LCOE to Serve Load metric that encompasses the holistic, system-level costs and benefits of all resources, and enables them to be evaluated based on their ability to support an efficient and low-cost integrated grid ecosystem. FD-2: Software Platform Product Description The creation of new DER control methodologies deployable within a utility-grade software platform that enable DER's to maximize their benefit within a grid, that is capable of serving load enabling a high penetration of distributed PV generation. FD-3: Optimal Design Methodology Optimal design methodologies for individual DER installations that enable utilities to determine the optimal combinations and sizing for individual DER sites. FD-4: Austin SHINES Ownership and Operation Models for DER System Performance A comparison of multiple DER aggregation and ownership methodologies including direct utility control, third-party aggregator, and autonomous. FD-5: Economic Modeling & Optimization A comparison of multiple DER technology mixes and configurations within the distribution system, providing insight into an optimal blend of technologies that best enable the distribution system to serve load at the lowest cost at high penetrations of solar. FD-6: Fielded Assets Deployed DER assets within the Austin Energy SHINES circuits. Austin SHINES provided an opening for state-of-the-art technology products to be deployed, providing a rich opportunity for improving how each of the products perform as stand-alone products, and in concert with other complementary products. The Austin SHINES project comprised of two key metrics for System LCOE: SystemLCOE_SHINES<$0.14/kWh Modeled ΔSystemLCOE_SHINES/ΔSystemLCOE_Base≥20% at same solar penetration The System LCOE calculation uses the costs of the utility-owned infrastructure as it exists today, the cost of the DERs that exist in the system today, and the cost of the purchase of energy from ERCOT wholesale markets over the course of the calendar year. All costs are on an annualized basis. The capital and operating costs are derived from the rate case, which produces a yearly cost. The net cost of energy and services imported to the system is integrated over the test year, as is the load served and solar penetration. The first metric was easily achieved by every scenario considered. The goal was set when the Department of Energy’s SHINES Funding Opportunity Announcement was written in 2015 and was a more difficult target at the time. Due mostly to rapidly declining costs for DERs and the significant decrease in the Electric Reliability Council of Texas (ERCOT) energy market prices, which results in lower net cost of energy purchases, the System LCOE is well below this target for all scenarios considered. A fleet of DERs can assume different mixtures, each of which serves the load at a different LCOE. The optimal mixture of DERs serves load at the smallest System LCOE. The second metric (hereinafter %delta metric) asks that the holistic DERMS controls reduce the incremental cost above the baseline of going to a high solar penetration future by at least 20% as compared to the case of a DER deployment with no sophisticated controls (autonomous). Many comparison sets were created throughout this project. Physical technology was installed for informing utility engineering and testing several types of operational control schemes, through the DERMS. The types of operational control which were compared for valuation of the System LCOE Metric were: Holistic control = using the full suite of the DERMS platform to decide and optimize how/why the systems operate depending on weather, market, and reliability signal input. Autonomous control = a local mode at the asset site, wherein a schedule operates the asset, with visibility into performance only No control = the baseline for comparing value against the other two types of control The types of ownership control included: Direct Utility control = the utility dispatches a signal to each asset Third-Party Aggregator = a third party aggregates a fleet of assets and the utility dispatches one signal for all Autonomous = a local mode is set for operation at the asset site, wherein a schedule operates the asset, with visibility into performance only The types of control methodologies deployable within a utility-grade software platform included: Utility Peak Load Reduction = Lower transmission cost obligation Day-Ahead Energy Arbitrage = Realize economic value through price differential Real-Time Price Dispatch = Realize economic value from real-time price spikes Voltage support = Reduce losses and increase solar generation Distribution Congestion Management = Increase local grid reliability Demand Charge Reduction = Lower customer bills and realize system benefit The fielded assets deployed for the project were: Utility Scale Kingsbery Energy Storage System: 1.5 MW / 3 MWh Li-Ion battery storage Mueller Energy Storage System: 1.75 MW / 3.2 MWh Li-Ion battery storage, 7 Energy Storage Units (250 kW each) La Loma Community Solar: 2.6 MW Commercial Scale Aggregated storage installations at 3 sites, with existing solar (300+ kW): One 18 kW / 36 kWh Li-Ion battery storage Two 72 kW / 144 kWh Li-Ion battery storage Residential Scale Aggregated storage installations: -Six stationary battery storage systems (10 kWh each) at homes with existing solar -One Electric Vehicle installed as Vehicle-to-Grid (V2G) Utility-Controlled Solar via Smart Inverters at 12 homes Autonomously-Controlled Smart Inverters at 6 homes Over the course of the project, Austin SHINES undertook installing more than 3 MW of distributed battery energy storage, smart PV inverters, a DER control platform, and other enabling technologies utilizing customer and utility locations and aggregation models. All of these resources were to be integrated and optimized at the utility level. DER assets and control methodologies were designed to achieve a credible pathway to a System LCOE for energy delivered to load of $0.14//kWh or less by 2020, while maximizing distributed solar generation and maintaining acceptable standards of power quality. The project also established a template for other regions to follow, to maximize the adoption of distributed solar PV in support of an economic and efficient grid. In total, the Austin SHINES project added value to the DER subject area in each layer of integration. From utility, to commercial to residential scales, the sheer hierarchy of communication and coordination was a significant accomplishment in addition to learnings from what these communications revealed was unique to each. Economically, the most effective method demonstrated was the criticality of planning phases. Contingencies and multiple projection scenarios helped guide the project to deploy optimal design as close as feasible, in real world conditions. The project and reports will serve public benefit by outlining specific areas of DER strategy and installation where many stakeholders and needs can be addressed with improved efficiency. Overall, communities and utilities should use the results to guide the increasing options available for powering the grid with DER, renewables, and carbon considerate energy.

14 SOLAR ENERGY↗

Microgravity Flight - Accommodating Non-Human Primates

Spacelab Life Sciences-3 (SLS-3) was scheduled to be the first United States man-tended microgravity flight containing Rhesus monkeys. The goal of this flight as in the five untended Russian COSMOS Bion flights and an earlier American Biosatellite flight, was to understand the biomedical and biological effects of a microgravity environment using the non-human primate as human surrogate. The SLS-3/Rhesus Project and COSMOS Primate-BIOS flights all utilized the rhesus monkey Macaca mulatta. The ultimate objective of all flights with an animal surrogate has been to evaluate and understand biological mechanisms at both the system and cellular level, thus enabling rational effective countermeasures for future long duration human activity under microgravity conditions and enabling technical application to correction of common human physiological problems within earth's gravity, e.g., muscle strength and reloading, osteoporosis, immune deficiency diseases. Hardware developed for the SLS-3/Rhesus Project was the result of a joint effort with the French Centre National d'Etudes Spatiales (CNES) and the United States National Aeronautics and Space Administration (NASA) extending over the last decade. The flight hardware design and development required implementation of sufficient automation to insure flight crew and animal bio-isolation and maintenance with minimal impact to crew activities. A variety of hardware of varying functional capabilities was developed to support the scientific objectives of the original 22 combined French and American experiments, along with 5 Russian co-investigations, including musculoskeletal, metabolic, and behavioral studies. Unique elements of the Rhesus Research Facility (RRF) included separation of waste for daily delivery of urine and fecal samples for metabolic studies and a psychomotor test system for behavioral studies along with monitored food measurement. As in untended flights, telemetry measurements would allow monitoring of thermoregulation, muscular, and cardiac responses to weightlessness. In contrast, the five completed Cosmos/Bion flights, lacked the metabolic samples and behavioral task monitoring, but did facilitate studies of the neurovestibular system during several of the flights. The RRF accommodated two adult 8-11 kg rhesus monkeys, while the Russian experiments and hardware were configured for a younger animal in the 44 kg range. Both the American and Russian hardware maintained a controlled environmental system, specifically temperature, humidity, a timed lighting cycle, and had means for providing food and fluids to the animal(s). Crew availability during a Shuttle mission was to be an optimal condition for retrieval and refrigeration of the animal urine samples along with a manual calcein injection which could lead to greater understanding of bone calcium incorporation. A special portable bioisolation glove box was under development to support this aspect of the experiment profile along with the capability of any contingency human intervention. As a result of recent U.S./Russian negotiations, funding for Space Station, and a series of other events, the SLS-3 mission was cancelled and applicable Rhesus Project experiments incorporated into the Russian Bion 11 and 12 missions. A presentation of the RRF and COSMOS/Bion rhesus hardware is presented along with current plans for the hardware.

Dalton, Bonnie P.↗

Microgravity Flight: Accommodating Non-Human Primates

Spacelab Life Sciences-3 (SLS-3) was scheduled to be the first United States man-tended microgravity flight containing Rhesus monkeys. The goal of this flight as in the five untended Russian COSMOS Bion flights and an earlier American Biosatellite flight, was to understand the biomedical and biological effects of a microgravity environment using the non-human primate as human surrogate. The SLS-3/Rhesus Project and COSMOS Primate-BIOS flights all utilized the rhesus monkey, Macaca mulatta. The ultimate objective of all flights with an animal surrogate has been to evaluate and understand biological mechanisms at both the system and cellular level, thus enabling rational effective countermeasures for future long duration human activity under microgravity conditions and enabling technical application to correction of common human physiological problems within earth's gravity, e.g., muscle strength and reloading, osteoporosis, immune deficiency diseases. Hardware developed for the SLS-3/Rhesus Project was the result of a joint effort with the French Centre National d'Etudes Spatiales (CNES) and the United States National Aeronautics and Space Administration (NASA) extending over the last decade. The flight hardware design and development required implementation of sufficient automation to insure flight crew and animal bio-isolation and maintenance with minimal impact to crew activities. A variety of hardware of varying functional capabilities was developed to support the scientific objectives of the original 22 combined French and American experiments, along with 5 Russian co-investigations, including musculoskeletal, metabolic, and behavioral studies. Unique elements of the Rhesus Research Facility (RRF) included separation of waste for daily delivery of urine and fecal samples for metabolic studies and a psychomotor test system for behavioral studies along with monitored food measurement. As in untended flights, telemetry measurements would allow monitoring of thermoregulation, muscular, and cardiac responses to weightlessness. In contrast, the five completed Cosmos/Bion flights, lacked the metabolic samples and behavioral task monitoring, but did facilitate studies of the neurovestibular system during several of the flights. The RRF accommodated two adult 8-11 kg rhesus monkeys, while the Russian experiments and hardware were configured for a younger animal in the 44 kg range. Both the American and Russian hardware maintained a controlled environmental system, specifically temperature, humidity, a timed lighting cycle, and had means for providing food and fluids to the animal(s). Crew availability during a Shuttle mission was to be an optimal condition for retrieval and refrigeration of the animal urine samples along with a manual calcein injection which could lead to greater understanding of bone calcium incorporation. A special portable bioisolation glove box was under development to support this aspect of the experiment profile along with the capability of any contingency human intervention. As a result of recent U.S./Russian negotiations, funding for Space Station, and a series of other events, the SLS-3 mission was cancelled and applicable Rhesus Project experiments incorporated into the Russian Bion 11 and 12 missions. A presentation of the RRF and COSMOS/Bion rhesus hardware is presented along with current plans for the hardware.

Dalton, Bonnie P.↗