Beneficial uses of space

The study elicited over 100 ideas for Space Processing. Of the elicited ideas, more than 20% involved processing of biologicals, or related medical and life sciences applications. Among these were High Purity Separation of Isoenzymes, and Development of Biorhythms applications data. Program planning for four products is outlined. Experimentation and testing resulted in definition of nearly 70 series of tests in ground-based laboratories, sounding rockets, etc., and space shuttle. Development schedules established timing and interrelationships of decisions involved in carrying these products to the point of production. The potential profitability of the four products is determined. Resources needed to achieve full scale production included use of shuttle for transportation, for which cost apportionment model was developed. R and D resources for the four products totalled $46,000,000 with Isoenzymes requiring the smallest expenditure, $4,000,000. A computerized profitability model (INVEST) was used to determine the measures of profitability of each product. Results build confidence that there will be a payoff.

Bloom, H. L.↗

Automated space processing payloads study. Volume 3: Equipment development resource requirements

Facilities are described on which detailed preliminary design was undertaken and which may be used on early space shuttle missions in the 1979-1982 time-frame. The major hardware components making up each facility are identified, and development schedules for the major hardware items and the payload buildup are included. Cost data for the facilities, and the assumptions and ground rules supporting these data are given along with a recommended listing of supporting research and technology needed to ensure confidence in the ability to achieve successful development of the equipment and technology.

Source record↗

Computer programs for display

The developments of an information storage and retrieval system are presented. Computer programs used in the system are described; the programs allow display messages to be placed on disks in an off-line environment permitting a more efficient use of memory. A time table that shows complete and scheduled developments of the system is given.

Source record↗

NASA Technology Demonstrations Missions Program Overview

The National Aeronautics and Space Administration (NASA) Fiscal Year 2010 (FY10) budget introduced a new strategic plan that placed renewed emphasis on advanced missions beyond Earth orbit. This supports NASA s 2011 strategic goal to create innovative new space technologies for our exploration, science, and economic future. As a result of this focus on undertaking many and more complex missions, NASA placed its attention on a greater investment in technology development, and this shift resulted in the establishment of the Technology Demonstrations Missions (TDM) Program. The TDM Program, within the newly formed NASA Office of the Chief Technologist, supports NASA s grand challenges by providing a steady cadence of advanced space technology demonstrations (Figure 1), allowing the infusion of flexible path capabilities for future exploration. The TDM Program's goal is to mature crosscutting capabilities to flight readiness in support of multiple future space missions, including flight test projects where demonstration is needed before the capability can transition to direct mission The TDM Program has several unique criteria that set it apart from other NASA program offices. For instance, the TDM Office matures a small number of technologies that are of benefit to multiple customers to flight technology readiness level (TRL) 6 through relevant environment testing on a 3-year development schedule. These technologies must be crosscutting, which is defined as technology with potential to benefit multiple mission directorates, other government agencies, or the aerospace industry, and they must capture significant public interest and awareness. These projects will rely heavily on industry partner collaboration, and funding is capped for all elements of the flight test demonstration including planning, hardware development, software development, launch costs, ground operations, and post-test assessments. In order to inspire collaboration across government and industry, more than 70% of the TDM funds will be competitively awarded as a result of yearly calls for proposed flight demonstrators and selected based on possible payoff to NASA, technology maturity, customer interest, cost, and technical risk reduction. This paper will give an overview of the TDM Program s mission and organization, as well as its current status in delivering advanced space technologies that will enable more flexible and robust future missions. It also will provide several examples of missions that fit within these parameters and expected outcomes.

Turner, Susan↗

JPL's Space Flight Operations Center: Development project overview

The topics are covered in view graph form and include the following: (1) major elements of deep space flight programs; (2) development schedule; (3) primary design goals; (4) Space Flight Operations Center (SFOC) data systems architecture; (5) technical guidelines; (6) SFOC data system functional architecture; (7) typical SFOC node; (8) SFOC components; (9) SFOC software categories; (10) planned subsystem core diagram for Mars observer; (11) SFOC use of public domain/3rd party software; (12) SFOC hardware; (13) SFOC target six mission configuration; and (14) SFOC development status and plans.

Ebersole, M.↗

Online Small-Sat Knowledge Repositories and Modeling Tools for Risk Reduction and Enhanced Mission Success

Developers of small satellites face the challenges of a short development schedule, incomplete information about parts from vendors, and limited budgets. The situation is complicated by the need to use commercial electronic parts rather than radiation hardened parts to meet performance and budget constraints. Fortunately, a number of organizations are standing up new modeling and data resources that are available for free online. Motivation for sharing models, part data, and lessons learned include shorter development times, increased mission success likelihood, and training the next generation of space professionals. The purpose of this paper is to make these resources and their complementary capabilities known to the small satellite community.

Small Satellites↗

Work Breakdown Structure (WBS) Handbook

The purpose of this document is to provide program/project teams necessary instruction and guidance in the best practices for Work Breakdown Structure (WBS) and WBS dictionary development and use for project implementation and management control. This handbook can be used for all types of NASA projects and work activities including research, development, construction, test and evaluation, and operations. The products of these work efforts may be hardware, software, data, or service elements (alone or in combination). The aim of this document is to assist project teams in the development of effective work breakdown structures that provide a framework of common reference for all project elements. The WBS and WBS dictionary are effective management processes for planning, organizing, and administering NASA programs and projects. The guidance contained in this document is applicable to both in-house, NASA-led effort and contracted effort. It assists management teams from both entities in fulfilling necessary responsibilities for successful accomplishment of project cost, schedule, and technical goals. Benefits resulting from the use of an effective WBS include, but are not limited to: providing a basis for assigned project responsibilities, providing a basis for project schedule development, simplifying a project by dividing the total work scope into manageable units, and providing a common reference for all project communication.

Source record↗

A Near-Term, High-Confidence Heavy Lift Launch Vehicle

The use of well understood, legacy elements of the Space Shuttle system could yield a near-term, high-confidence Heavy Lift Launch Vehicle that offers significant performance, reliability, schedule, risk, cost, and work force transition benefits. A side-mount Shuttle-Derived Vehicle (SDV) concept has been defined that has major improvements over previous Shuttle-C concepts. This SDV is shown to carry crew plus large logistics payloads to the ISS, support an operationally efficient and cost effective program of lunar exploration, and offer the potential to support commercial launch operations. This paper provides the latest data and estimates on the configurations, performance, concept of operations, reliability and safety, development schedule, risks, costs, and work force transition opportunities for this optimized side-mount SDV concept. The results presented in this paper have been based on established models and fully validated analysis tools used by the Space Shuttle Program, and are consistent with similar analysis tools commonly used throughout the aerospace industry. While these results serve as a factual basis for comparisons with other launch system architectures, no such comparisons are presented in this paper. The authors welcome comparisons between this optimized SDV and other Heavy Lift Launch Vehicle concepts.

Rothschild, William J.↗

Improving Life-Cycle Cost Management of Spacecraft Missions

This presentation will explore the results of a recent NASA Life-Cycle Cost study and how project managers can use the findings and recommendations to improve planning and coordination early in the formulation cycle and avoid common pitfalls resulting in cost overruns. The typical NASA space science mission will exceed both the initial estimated and the confirmed life-cycle costs by the end of the mission. In a fixed-budget environment, these overruns translate to delays in starting or launching future missions, or in the worst case can lead to cancelled missions. Some of these overruns are due to issues outside the control of the project; others are due to the unpredictable problems (unknown unknowns) that can affect any development project. However, a recent study of life-cycle cost growth by the Discovery and New Frontiers Program Office identified a number of areas that are within the scope of project management to address. The study also found that the majority of the underlying causes for cost overruns are embedded in the project approach during the formulation and early design phases, but the actual impacts typically are not experienced until late in the project life cycle. Thus, project management focus in key areas such as integrated schedule development, management structure and contractor communications processes, heritage and technology assumptions, and operations planning, can be used to validate initial cost assumptions and set in place management processes to avoid the common pitfalls resulting in cost overruns.

Clardy, Dennon↗

Lessons Learned for Planning and Estimating Operations Support Requirements

Operations (phase E) costs are typically small compared to the spacecraft development and test costs. This, combined with the long lead time for realizing operations costs, can lead projects to focus on hardware development schedules and costs, de-emphasizing estimation of operations support requirements during proposal, early design, and replan cost exercises. The Discovery and New Frontiers (D&NF) programs comprise small, cost-capped missions supporting scientific exploration of the solar system. Even moderate yearly underestimates of the operations costs can present significant LCC impacts for deep space missions with long operational durations, and any LCC growth can directly impact the programs ability to fund new missions. The D&NF Program Office at Marshall Space Flight Center recently studied cost overruns for 7 D&NF missions related to phase C/D development of operational capabilities and phase E mission operations. The goal was to identify the underlying causes for the overruns and develop practical mitigations to assist the D&NF projects in identifying potential operations risks and controlling the associated impacts to operations development and execution costs. The study found that the drivers behind these overruns include overly optimistic assumptions regarding the savings resulting from the use of heritage technology, late development of operations requirements, inadequate planning for sustaining engineering and the special requirements of long duration missions (e.g., knowledge retention and hardware/software refresh), and delayed completion of ground system development work. This presentation summarizes the study and the results, providing a set of lessons NASA can use to improve early estimation and validation of operations costs.

Newhouse, Marilyn↗

Space Nuclear Propulsion for Deep Space Science Missions

The use of nuclear thermal propulsion (NTP) 1 and nuclear electric propulsion (NEP) 2 systems on deep space science missions to the outer planets and into the interstellar medium 3 can yield significant spacecraft system and mission performance benefits and improvements relative to the use of conventional chemical propulsion systems. Several recent and ongoing programs are developing the technologies and systems required to realize a near-term deep space nuclear propulsion capability. NTP provides improved propulsion efficiencies compared to chemical propulsion, while also providing substantial thrust. This combination of high thrust and increased specific impulse (I_sp) provides high acceleration and extended thrusting periods, enabling greatly reduced trip-times on certain types of missions compared to various propulsive alternatives. For examples, compared to a baseline mission using chemical propulsion, NTP-powered missions to Jupiter or Uranus could deliver approximately 2.4-3.6 times more payload (in the case of Jupiter, the payload delivery is significantly larger than the Juno spacecraft). In this comparison, the higher end of the payload advantage is obtained when the trip time is held equal for the NTP-powered vehicle and a vehicle using a chemical propulsion departure stage. NTP systems are presently under development by multiple government agencies. NASA’s Space Nuclear Propulsion (SNP) project aims to demonstrate a hydrogen-fed NTP engine at 900 s specific impulse (I_sp) and approximately 10-15 klb_f of thrust. DARPA’s Demonstration Rocket for Agile Cislunar Operations (DRACO) program is targeting a demonstration of an NTP system in the cislunar space between the Earth and the Moon. An appropriately phased development plan that applies the development of the reactor technology for an NTP engine in this performance class and leverages mature, existing liquid rocket component hardware provides a path to a lower cost propulsion system that can be realized on a shorter development schedule. NEP, with high Isp in the 2,000-8,000 s range, can also provide advantages over chemical propulsion, including a much greater payload delivery mass and the flexibility for planners to trade between delivered mass and a wider window of mission trajectory options. Electric propulsion (EP) systems have demonstrated great utility, performing notably on the Dawn mission to enable rendezvous and orbital insertion at two separate bodies, Vesta and Ceres. An NEP-powered vehicle would have a similar capability to visit multiple bodies, loitering at each before moving to the next. A 10 kW_e NEP system provides a power- rich environment on the spacecraft that is simply not possible using present radioisotope power systems, giving mission planners more scientific instrument and communication hardware options. Several programs and projects are presently developing NEP systems and subsystems in the 10 kW_e power range, leveraging past reactor work and recent nuclear power generation risk-reduction demonstration activities such as the Demonstration Using Flattop Fission (DUFF) and the Kilopower Reactor Using Stirling TechnologY (KRUSTY). The goal of the Air Force Research Laboratory’s Joint Energy Technology Supplying On-Orbit Nuclear Power (JETSON) program is an in-space demonstration vehicle that has a 10 kW_e -class fission power source. These past and present efforts can be combined with the ongoing development of 10 kW_e -class electric propulsion systems (notably the NEXT-C ion thruster or the Hall-effect thrusters for Power and Propulsion Element of the Lunar Gateway) to provide a pathway to a low-cost, reliable NEP system for deep space science application.

Kurt A. Polzin↗

Space Nuclear Propulsion for Deep Space Science Missions

The use of nuclear thermal propulsion (NTP) 1 and nuclear electric propulsion (NEP) 2 systems on deep space science missions to the outer planets and into the interstellar medium 3 can yield significant spacecraft system and mission performance benefits and improvements relative to the use of conventional chemical propulsion systems. Several recent and ongoing programs are developing the technologies and systems required to realize a near-term deep space nuclear propulsion capability. NTP provides improved propulsion efficiencies compared to chemical propulsion, while also providing substantial thrust. This combination of high thrust and increased specific impulse (I_sp) provides high acceleration and extended thrusting periods, enabling greatly reduced trip-times on certain types of missions compared to various propulsive alternatives. For examples, compared to a baseline mission using chemical propulsion, NTP-powered missions to Jupiter or Uranus could deliver approximately 2.4-3.6 times more payload (in the case of Jupiter, the payload delivery is significantly larger than the Juno spacecraft). In this comparison, the higher end of the payload advantage is obtained when the trip time is held equal for the NTP-powered vehicle and a vehicle using a chemical propulsion departure stage. NTP systems are presently under development by multiple government agencies. NASA’s Space Nuclear Propulsion (SNP) project aims to demonstrate a hydrogen-fed NTP engine at 900 s specific impulse (I_sp) and approximately 10-15 klb_f of thrust. DARPA’s Demonstration Rocket for Agile Cislunar Operations (DRACO) program is targeting a demonstration of an NTP system in the cislunar space between the Earth and the Moon. An appropriately phased development plan that applies the development of the reactor technology for an NTP engine in this performance class and leverages mature, existing liquid rocket component hardware provides a path to a lower cost propulsion system that can be realized on a shorter development schedule. NEP, with high Isp in the 2,000-8,000 s range, can also provide advantages over chemical propulsion, including a much greater payload delivery mass and the flexibility for planners to trade between delivered mass and a wider window of mission trajectory options. Electric propulsion (EP) systems have demonstrated great utility, performing notably on the Dawn mission to enable rendezvous and orbital insertion at two separate bodies, Vesta and Ceres. An NEP-powered vehicle would have a similar capability to visit multiple bodies, loitering at each before moving to the next. A 10 kW_e NEP system provides a power- rich environment on the spacecraft that is simply not possible using present radioisotope power systems, giving mission planners more scientific instrument and communication hardware options. Several programs and projects are presently developing NEP systems and subsystems in the 10 kW_e power range, leveraging past reactor work and recent nuclear power generation risk-reduction demonstration activities such as the Demonstration Using Flattop Fission (DUFF) and the Kilopower Reactor Using Stirling TechnologY (KRUSTY). The goal of the Air Force Research Laboratory’s Joint Energy Technology Supplying On-Orbit Nuclear Power (JETSON) program is an in-space demonstration vehicle that has a 10 kW_e -class fission power source. These past and present efforts can be combined with the ongoing development of 10 kW_e -class electric propulsion systems (notably the NEXT-C ion thruster or the Hall-effect thrusters for Power and Propulsion Element of the Lunar Gateway) to provide a pathway to a low-cost, reliable NEP system for deep space science application.

Kurt A. Polzin↗

System Engineering on the Use for Ares I,V - the Simpler, the Better

The Ares I and Ares V Vehicles will utilize the J-2X rocket engine developed for NASA by the Pratt & Whitney Rocketdyne Company. The J-2X is an improved higher power version of the original J-2 engine used during the Apollo program. With higher power and updated requirements for safety and performance, the J-2X becomes a new engine using state-of-the-art design methodology, materials and manufacturing processes. The implementation of Systems Engineering (SE) principles enables the rapid J-2X development program to remain aligned with the ARES I and V vehicle programs, Meeting the aggressive development schedule is a challenge. Coordinating the best expertise thai NASA and PWR have to offer requires effectively utilizing resources at multiple sites. This presents formidable communication challenges. SE allows honest and open discussions of issues and problems. This simple idea is often overlooked in large and complex SE programs. Regular and effective meetings linking SE objectives to component designs are used to voice differences of opinions with customer and contractor in attendance so that the best mutual decisions can be made on the shortest possible schedule. Regular technical interchange meetings on secure program wide computer networks and CM processes are effective,in the "Controlled Change" process that exemplifies good SE. Good communication is a key effective SE implementation. The System of Systems approach is the vision of the Orion program which facilitates the establishment of dynamic SE processes at all levels including the engine. SE enables requirements evolution by facilitating organizational and process agility. Flow down and distribution of requirements is controlled by Allocation Reports which breakdown numerical design objectives (weight, reliability, etc.) into quanta goals for each component area. Linked databases of design and verification requirements helps eliminate redundancy and potential mistakes inherent m separated systems. Another tool, the Architecture Design Description, is being used to control J-2X system architecture and effectively communicate configuration changes to those involved in the design process. But the proof is in successful program accomplishment. The SE is the methodology being used to meet the challenge of completing J-2X engine certification 2 years ahead of any engine program ever developed at PWR. The Ares I SE system of systems has delivered according to expectations thus far. All major design reviews (SRR. PDR, CDR) have been successfully conducted to satisfy overall program objectives using SE as the basis for accomplishment. The paper describes SE tools and techniques utilized to achieve this success.

Kelly, William↗

Development of a Q-band Propagation Campaign in the United States

The imminent saturation of commercial Ka-band services has generated increased interest by the SATCOM industry, as well as NASA (via potential commercially provided SATCOM services), to investigate the use of the Q-band (37-42 GHz) for future space-to-earth communications spectrum utilization. It is well understood that the use of higher frequencies (i.e. , Q-band) offers wider bandwidth, higher data rate services, but an understanding of Q-band performance limitations as they pertain to atmospheric propagation, particularly at NASA and commercial sites of interest, is not well characterized. Thus, the first steps towards system performance determination will be the initiation of a propagation campaign to statistically The imminent saturation of commercial Ka-band services has generated increased interest by the SATCOM industry, as well as NASA (via potential commercially provided SATCOM services), to investigate the use of the Q-band (37-42 GHz) for future space-to-earth communications spectrum utilization. It is well understood that the use of higher frequencies (i .e., Q-band) offers wider bandwidth, higher data rate services, but an understanding of Q-band performance limitations as they pertain to atmospheric propagation, particularly at NASA and commercial sites of interest, is not well characterized. Thus, the first steps towards system performance determination will be the initiation of a propagation campaign to statistically quantify long-term degradation parameters due to the atmosphere. As such, NASA Glenn Research Center (GRC), in collaboration with Space Systems/Loral(SS/L), is leading an effort to characterize Q-band link performance at key sites to determine its potential for use in future space communications architectures. The proposed propagation campaign is divided into phases, beginning with passive radiometric observations in the Q-band, and eventually leading to an active beacon experiment. Herein, we describe the schedule, development, and architecture of the first Q-band propagation campaign being conducted in the US and the proposed objectives of the effort.

Nessel, James A.↗

Front-End Engineering Design for Piperazine with the Advanced Stripper

This Department of Energy (DOE) funded project was executed with the goal of preparing a Front-End Engineering Design (FEED) for the capture and compression of 90% of the CO2 that would normally be emitted from an existing natural gas combined cycle (NGCC) plant. The FEED focused on the application of the piperazine advanced stripper (PZAS) process at Mustang Station of the Golden Spread Electric Cooperative (GSEC), which consists of two gas turbines with common heat recovery steam generator (HRSG). The University of Texas at Austin (UT) served as the prime contractor, and subcontracted AECOM Technical Services and Trimeric Corporation to support FEED development. This project team has worked together to advance PZAS for more than a decade. ExxonMobil, Chevron, and Total provided project co-funding. The objectives of this work included: 1. To advance engineering design such that a comprehensive estimate for the total installed cost of a full-scale PZAS CO2 Capture Plant with CO2 compression can be developed on an existing NGCC power plant. a. These detailed costs can also be used to qualify PZAS and other related second generation (2G) amine scrubbing processes for use on cogeneration facilities in refineries and chemical plants that use gas turbines with HRSGs to produce steam. b. These detailed costs will help qualify 2G amine scrubbing for use on NGCC power plants and establish a more accurate baseline cost to be used as a target by other capture technologies. 2. To provide cost details to be used in the economic optimization of the process features of PZAS and other 2G amine scrubbing processes. 3. To provide DOE with a more detailed understanding of carbon capture costs in a commercial application, enabling DOE to better design its R&D program to improve the economics for carbon capture. 4. To provide the host site and cost share partners with the information necessary to determine whether a commercial project to capture and use CO2 for enhanced oil recovery (EOR) or for sequestration can be justified (when accounting for the 45Q tax credit). A key component of the FEED is the estimated total installed cost, which provides a basis for the likely capital investment necessary to implement the PZAS carbon capture process at this location and scale. In combination with the included economic analysis, which accounts for potential revenue from the produced CO2, potential avenues to profitability are explored. The major findings of the FEED are as follows: The Mustang Station PZAS CO2 Capture Plant estimated total project cost of $698 MM of which $384 MM was direct costs. The annual operating costs were $32.6 MM. The total investment for a PZAS facility at Mustang Station is $725 MM. This estimate includes owner’s cost of $25 million and a contingency of $110 MM. • The study estimated the CO2 capture plant at Mustang Station would generate CO2 at $110/tonne for EOR, assuming a 12% IRR (internal rate of return) and an 85% capacity factor. For CO2 storage, the same case would achieve a 12% IRR at about $114/tonne. At a capacity factor of 52%, the storage and EOR cases would break even when carbon is priced ~$150/tonne. The economic analysis determined that the capacity factor and utility pricing, among other variable factors, had a significant effect on the economics and will need additional studied. • The energy penalty of the PZAS plant would be about 46 MW in connected power and 35 MW in operating load. The natural gas requirement (for the Gas Boiler package) would be about 354 MMBTU/hr. • The FEED revealed no major risks in process maturity. However, some areas were outlined for further engineering during detailed design, which included the Gas Boiler system, general arrangement and site layout, air coolers, schedule development, and optimization of the process for higher CO2 removal. • If PZAS were to be implemented at another host site, additional opportunities for cost reduction for would include cost reduction through use of cooling water and steam extraction.

03 NATURAL GAS↗

Demand Driven Cycamore Archetypes

Future nuclear fuel cycle options may present advantages over today’s once-through fuel cycle. Nuclear fuel cycle simulation tools assess the performance of those fuel cycles as well as the dynamics of long-term technology transitions. In many nuclear fuel cycle simulation tools, it has historically been the responsibility of the user to manually define facility deployment schemes and all facility parameters. While this is straightforward in simple fuel cycles, transitions from one fuel cycle to another can be more complex. In particular, deployment schemes for supportive fuel cycle facilities beyond the reactor become complex if the analyst desires to avoid gaps in the nuclear fuel and power supply chain during those transition scenarios. As nuclear fuel cycle analysis approaches questions regarding the feasibility and performance of the deployment schemes and technology choices during technology transition, automation of this historically manual process is necessary. The main objective of this work was to develop and demonstrate Cyclus automation capabilities toward key nuclear fuel cycle transition scenarios. While deploying reactors to meet power demand is trivial, and existed in the earliest versions of CYCLUS, automated, predictive deployment and decommissioning of other facilities is more complex. These include mining, milling, enrichment, fuel fabrication, reprocessing, and others. For example, a balanced closed fuel cycle may require ensuring that there is enough fast reactor fuel for their operation and may drive deployment of a fleet of light water reactors. This concern comprises the main challenge that drove the project effort. The Demand-Driven Cycamore Archetype project (NEUP-FY16-10512) aimed to develop CYCAMORE demand-driven deployment capabilities and thereby automate transition scenario definition. The developed software package, d3ploy, in the form of a CYCLUS Institution agent, deploys Facilities to meet the front-end and back-end demands of the fuel cycle. The University of South Carolina and the University of Illinois applied multiple algorithmic approaches to this challenge. This project developed an in situ demand-driven development schedule calculation through non-optimizing, deterministic-optimizing, and stochastic-optimizing algorithms as CYCLUS archetypes and demonstrated these new archetypes in program-supporting fuel cycle transition scenarios. Both objectives were achieved. This report documents the results and deliverables obtained toward these achievements in detail.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Experience with Mercury Spacecraft Systems

Design of a manned spacecraft in 1958 and 1959 required that many decisions be made with no background of direct experience with similar vehicles and very little background of experience on vehicles of any type which had been exposed to the rigors of space. Under such circumstances, it was necessary to establish certain fundamental design principles which were believed to represent the proper balance between the conservatism required by the unknowns, the desired development schedule, and the extreme necessity to conserve weight. One of the foremost of the program objectives was, of course, safety. Broadly speaking, the design principles chosen to achieve the level of safety desired in such an unknown venture were very similar to those used for manned aircraft design.

Spacecraft↗

Development of a laboratory prototype water quality monitoring system suitable for use in zero gravity

The development of a laboratory prototype water quality monitoring system for use in the evaluation of candidate water recovery systems and for study of techniques for measuring potability parameters is reported. Sensing techniques for monitoring of the most desirable parameters are reviewed in terms of their sensitivities and complexities, and their recommendations for sensing techniques are presented. Rationale for selection of those parameters to be monitored (pH, specific conductivity, Cr(+6), I2, total carbon, and bacteria) in a next generation water monitor is presented along with an estimate of flight system specifications. A master water monitor development schedule is included.

Misselhorn, J. E.↗