Port Hope Area Initiative - Port Granby Project: Managing Highly Heterogeneous Low-Level Radioactive Waste - 20327

The Port Granby Project is a large remediation project currently approximately 95% complete. Initial waste characterization was provided through a borehole sampling program. As the waste was excavated, it was found to be highly heterogeneous, ranging from essentially 'clean' material to hundreds of Bq/g. This heterogeneity resulted in constantly changing site conditions. Methods to adapt to these conditions are described. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Toward Carbon Monoxide Methanation at Mild Conditions on Dual-Site Catalysts

The catalytic carbon monoxide (CO) methanation is an ideal model reaction for the fundamental understanding of catalysis on the gas–solid interface and is crucial for various industrial processes. However, the harsh operating conditions make the reaction unsustainable, and the limitations set by the scaling relations between the dissociation energy barrier and dissociative binding energy of CO further increase the difficulty in designing high-performance methanation catalysts operating under milder conditions. In this work, we proposed a theoretical strategy to circumvent the limitations elegantly and achieve both facile CO dissociation and C/O hydrogenation on the catalyst containing a confined dual site. The DFT-based microkinetic modeling (MKM) reveals that the designed Co-Cr 2 /G dual-site catalyst could provide 4–6 orders of magnitude higher turnover frequency for CH 4 production than the cobalt step sites. We believe that the proposed strategy in the current work will provide essential guidance for designing state-of-the-art methanation catalysts under mild conditions.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Quantification of energy and cost reduction from decreasing dissolved oxygen levels in full‐scale water resource recovery facilities

Abstract Aeration systems often lack the efficiency to maintain a desired residual dissolved oxygen (DO) concentration in the tank in part because little consideration is given to the dynamic daily and seasonal loading conditions. Although advanced aeration controllers exist, the majority of plants have DO set points typically based on common practice and literature values rather than site‐specific conditions, which can result in DO set points higher than those necessary to meet treatment objectives. DO set point reduction strategies have primarily been proposed through either static or dynamic simulations. In this study, the substantial improvements associated with DO set point reduction are demonstrated at full scale. A yearlong characterization of full‐scale aeration dynamics captured the effect of diurnal and seasonal fluctuations on oxygen transfer and energy demand and so facilitated the estimation of the potential savings of DO reduction strategies. Full‐scale validation provided direct evidence of DO reduction strategies inducing an overall enhancement of oxygen transfer efficiency along the different bioreactors, while confirming that energy savings as high as 20% were feasible. This study quantifies the influence of oxygen transfer efficiency on operating choices and site‐specific conditions (control strategy, loading conditions, and influent flow variability). Practitioner points We quantified the energy reduction and cost savings associated with a DO reduction in an aeration tank. For each 0.2 mg/L of DO decreased, the average power demand reduction per unit water treated exceeded 17%. Field measurements of dynamic alpha values eliminate the uncertainty in estimating aeration energy and cost savings from DO variations.

Pasini, Federico↗

A Comparison of RESRAD and GoldSim Models for Assessing Radiological Dose for a RCRA Landfill - 20418

US Ecology Idaho (USEI) operates a Resource Conservation and Recovery Act (RCRA) Subtitle C, Hazardous Waste Treatment, Storage, and Disposal (TSD) Facility on a 640-acre property in Owyhee County, Idaho. USEI accepts a wide variety of RCRA-exempt low activity radioactive wastes, including naturally occurring radioactive material (NORM) and technologically enhanced NORM (TENORM) (USEI 2009). The performance of the landfill with regard to radiological operating permit requirements was previously assessed using a model constructed with the residual radioactivity (RESRAD) computer program, developed by Argonne National Laboratory for the U.S. Department of Energy (DOE). RESRAD supports the evaluation of several environmental transport pathways related to a radionuclide-contaminated soil source term, but it was not conceived as a model for the evaluation of landfill radiological performance. A more comprehensive and realistic model is desired in order to better support submissions to both the State of Idaho's Department of Environmental Quality as well as the U.S. Nuclear Regulatory Commission. A Performance Assessment (PA) computer model was developed using GoldSim software for the USEI RCRA Subtitle C landfill. The RESRAD computer model was specifically developed for calculating soil cleanup criteria and radiological dose and cancer risk from residual radioactive material in soil. To evaluate site-specific conditions, users may select from among a number of available environmental transport and exposure pathways and modify 'default' parameter values. In GoldSim, a user must construct the model 'from scratch.' However, this modeling is facilitated by a number of specialized elements available in GoldSim to support a radiological mass transport model. These include elements for defining radiological decay and ingrowth, container failure and radiological release, advective and diffusive transport, and other processes. Advantages afforded by the use of RESRAD for modeling radiological dose for a RCRA Subtitle C landfill include ease of use and reasonable flexibility in specifying site-specific conditions. GoldSim allows for considerably more flexibility and site-specificity than RESRAD, including evaluation of potentially relevant environmental transport processes not supported in RESRAD. The probabilistic modeling capabilities of GoldSim also far exceed those of RESRAD. The pros and cons of RESRAD and GoldSim for this modeling problem are explored with a focus on identifying approaches and critical factors in identifying the appropriate platform. The capabilities of RESRAD and GoldSim for mathematically modeling the disposal system will be contrasted and compared. For example, the existing RESRAD radiological safety assessment evaluated potentially complete exposure pathways related to infiltration to groundwater and upwards diffusion of radon. Additional transport pathways identified in the USEI Idaho facility Conceptual Site Model include deposition of radon decay products in cover material, root uptake of radionuclides in disposed wastes by native plants, and mixing of cover material by burrowing animals. Results of the two models and how the different transport and dose pathways affect results will be discussed. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

HD 222925: A New Opportunity to Explore the Astrophysical and Nuclear Conditions of r-process Sites

Abstract With the most trans-iron elements detected of any star outside the solar system, HD 222925 represents the most complete chemical inventory among metal-poor stars enhanced with elements made by the rapid neutron capture (“ r ”) process. As such, HD 222925 may be a new “template” for the observational r -process, where before the (much higher-metallicity) solar r -process residuals were used. In this work, we test under which conditions a single site accounts for the entire elemental r -process abundance pattern of HD 222925. We found that several of our tests—with the single exception of the black hole–neutron star merger case—challenge the single-site assumption by producing an ejecta distribution that is highly constrained, in disagreement with simulation predictions. However, we found that ejecta distributions that are more in line with simulations can be obtained under the condition that the nuclear data near the second r -process peak are changed. Therefore, for HD 222925 to be a canonical r -process template likely as a product of a single astrophysical source, the nuclear data need to be reevaluated. The new elemental abundance pattern of HD 222925—including the abundances obtained from space-based, ultraviolet (UV) data—call for a deeper understanding of both astrophysical r -process sites and nuclear data. Similar UV observations of additional r -process–enhanced stars will be required to determine whether the elemental abundance pattern of HD 222925 is indeed a canonical template (or an outlier) for the r -process at low metallicity.

79 ASTRONOMY AND ASTROPHYSICS↗

Public water supply infrastructure extensification and diversification in surface waters is insufficient to meet future demands in Texas

The data were developed to evaluate the capacity of existing and potential new surface water supply infrastructure to meet projected public water demands across districts in Texas under multiple future socioeconomic and climate scenarios. The database integrates hydrologic, water quality, infrastructure, energy, cost, demographic, and demand-projection information for candidate surface water supply locations. Candidate sites include stream reaches, waterbodies, reservoir surplus locations, and potential new reservoir sites. Water availability is characterized using historical and projected flow conditions, while site suitability is evaluated using five indicators: Water Availability Index (WAI), Water Quality Index (WQI), Energy Requirement Index (ERI), Water Treatment Cost (WTC), and Water Infrastructure Cost (WIC). The datasets include statewide candidate-site information, district-level demand projections under Shared Socioeconomic Pathways (SSPs), runoff-based allocation constraints, climate-stress metrics, and optimization outputs evaluating alternative infrastructure planning strategies. Optimization results compare Business-as-Usual (BAU) and All Surface Water (AllSW) demand-management approaches under both scaled and fixed cost-cap strategies. Associated validation datasets provide district-level feasibility assessments, infrastructure selection outcomes, cost-cap utilization, demand satisfaction metrics, and constraint diagnostics. Additional datasets quantify projected changes in storage and flow conditions as well as water availability stress for both existing and newly selected intake locations under the SSP5 scenario for mid-century and late-century climate conditions. Together, these datasets support assessment of the extent to which surface-water infrastructure expansion and diversification strategies can satisfy future public water demands while accounting for hydrologic, economic, and planning constraints across Texas. Dataset(s) Description Dataset_preoptimization.xlsx Comprehensive pre-optimization dataset containing candidate water-supply sites and associated hydrologic, water-quality, infrastructure, climate, demographic, runoff, and demand-projection variables used as inputs to the optimization analyses. Includes variable descriptions and the full statewide candidate-site database. District_level_site_selection.zip - Compressed archive containing all SSP-specific district-level optimization result files MESIO_ssp1_results.xlsx District-level site selection results for SSP1 (MESIO). Includes variable descriptions, BAU and AllSW site-selection results under scaled and fixed cost strategies, and district-level validation diagnostics. MESID_ssp2_results.xlsx District-level site selection results for SSP2 (MESID). Includes variable descriptions, BAU and AllSW site-selection results under scaled and fixed cost strategies, and district-level validation diagnostics. LCMRD_ssp3_results.xlsx District-level site selection results for SSP3 (LCMRD). Includes variable descriptions, BAU and AllSW site-selection results under scaled and fixed cost strategies, and district-level validation diagnostics. IRDev-Low_ssp4l_results.xlsx District-level site selection results for SSP4-Low (IRDev-Low). Includes variable descriptions, BAU and AllSW site-selection results under scaled and fixed cost strategies, and district-level validation diagnostics. IRDev-High_ssp4h_results.xlsx District-level site selection results for SSP4-High (IRDev-High). Includes variable descriptions, BAU and AllSW site-selection results under scaled and fixed cost strategies, and district-level validation diagnostics. RSIM_ssp5_results.xlsx District-level site selection results for SSP5 (RSIM). Includes variable descriptions, BAU and AllSW site-selection results under scaled and fixed cost strategies, and district-level validation diagnostics. tx_hydrological_stress.xlsx Hydrological stress dataset for existing and newly selected intake locations. Includes projected mid-century and late-century changes, gain/loss classifications, planning strategy information, and accompanying variable descriptions. Also includes water-stress metrics derived from historical and projected low-flow conditions.

Okoye, Perpetua I. (ORCID:0000000215545033)↗

Geothermal Reserve Pits: Considerations for Installation on BLM-Administered Lands

Reserve pits, also known as sumps, are a common aspect of geothermal drilling operations. This paper describes the Bureau of Land Management's regulatory authorities and key environmental considerations associated with geothermal reserve pits. Reserve pit design, the need for environmental compliance measures, and reclamation approaches will vary depending on site-specific conditions. Groundwater and wildlife impacts are the most common environmental considerations related to reserve pits. In some cases, regulations or groundwater or soil conditions necessitate the use of a synthetic liner. However, the chemical composition of most geothermal drilling fluids and muds, completion fluids, and produced fluids that are discharged to reserve pits does not warrant pit liners. The potential for hazardous fluids, high water temperatures, and entrapment are concerns for wildlife. Common wildlife impact avoidance and mitigation measures include fencing, netting, and escape ramps. The need for these measures depends on localized site and environmental conditions. There are requirements to reclaim reserve pits following geothermal drilling operations. Reserve pits often remain in place to accommodate multiple phases of drilling and well testing. They are eventually backfilled and decommissioned.

BLM↗

Ground Motion Inputs for the Seismic Shake Table Test

Currently, spent nuclear fuel (SNF) is stored in on-site independent spent-fuel storage installations (ISFSIs) at seventythree (73) nuclear power plants (NPPs) in the US. Because a site for geologic repository for permanent disposal of SNF has not been constructed, the SNF will remain in dry storage significantly longer than planned. During this time, the ISFSIs, and potentially consolidated storage facilities, will experience earthquakes of different magnitudes. The dry storage systems are designed and licensed to withstand large seismic loads. When dry storage systems experience seismic loads, there are little data on the response of SNF assemblies contained within them. The Spent Fuel Waste Disposition (SFWD) program is planning to conduct a full-scale seismic shake table test to close the gap related to the seismic loads on the fuel assemblies in dry storage systems. This test will allow for quantifying the strains and accelerations on surrogate fuel assembly hardware and cladding during earthquakes of different magnitudes and frequency content. The main component of the test unit will be the full-scale NUHOMS 32 PTH2 dry storage canister. The canister will be loaded with three surrogate fuel assemblies and twenty-nine dummy assemblies. Two dry storage configurations will be tested – horizontal and vertical above-ground concrete overpacks. These configurations cover 91% of the current dry storage configurations. The major input into the shake table test are the seismic excitations or the earthquake ground motions – acceleration time histories in two horizontal and one vertical direction that will be applied to the shake table surface during the tests. The shake table surface represents the top of the concrete pad on which a dry storage system is placed. The goal of the ground motion task is to develop the ground motions that would be representative of the range of seismotectonic and other conditions that any site in the Western US (WUS) or Central Eastern US (CEUS) might entail. This task is challenging because of the large number of the ISFSI sites, variety of seismotectonic and site conditions, and effects that soil amplification, soil-structure interaction, and pad flexibility may have on the ground motions.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Continuous cost movement models

Use of current space imaging systems and airborne platforms has direct use in survey design and site location when used in concert with a comprehensive GIS environment. Local conditions and site physical and chemical properties are key factors in successful applications. Conjoining of environmental constraints and site properties are present for the later prehistoric occupations in the Arkansas and Mississippi River areas. Direct linkages between comprehensive site databases and satellite images can be used to evaluate site distributions for research and management.

Limp, W. Fredrick↗

Bioremediation Retrospective: DOE Experiences and Lessons Learned – 26131

The U.S. Department of Energy (DOE) has implemented bioremediation strategies for chlorinated volatile organic compounds (cVOCs) for more than three decades across multiple contaminated groundwater sites. A retrospective analysis conducted by the Savannah River National Laboratory (SRNL) and collaborating field sites evaluated the design, performance, and outcomes of bioremediation projects at DOE’s Savannah River, Hanford, Idaho, Mound, and Pinellas sites. This retrospective was based on a series of case studies, leveraging historical documentation and site interviews. Technical approaches employed at the various sites were explored, including active bioremediation, enhanced attenuation (EA), and monitored natural attenuation, with specific sub-sections discussing anaerobic, aerobic, and combined anaerobic-aerobic strategies. Each case study includes detailed descriptions of the site-specific conditions, deployment strategies, regulatory considerations, metrics, and performance. Key findings include general cost savings compared to traditional remedies such as pump and treat (P&T), significant success in applying enhanced attenuation to transition remedies toward a passive site management strategy, and documentation of robust subsurface microbial communities at most sites limiting the need for bioaugmentation. Challenges highlighted in the study include underperformance due to poor amendment delivery in low-permeability zones and unfavorable biogeochemical conditions, emphasizing the importance of site-specific designs. Cost analysis across DOE sites suggests bioremediation may offer long-term economic benefits. The retrospective study underscores valuable lessons that can help inform current and future bioremediation efforts.

Newby, Deborah T. [Savannah River National Laborat↗

Uncovering the True Active Sites in Ni–N–C Catalysts for CO 2 Electroreduction

Understanding and designing active sites in single-atom catalysts (SACs) requires going beyond static models to capture their dynamic evolution under realistic electrochemical conditions. Here, in this work, we develop an integrated theoretical framework that accounts for operational conditions, by combining grand canonical density functional theory (GC-DFT) with machine-learning-accelerated sampling, to uncover structure–activity–stability relationships in Ni–N–C SACs for the CO 2 reduction reaction (CO 2 RR). A library of NiN x C 4–x (x = 0–4) motifs─representing coordination defects likely formed during high-temperature synthesis─was systematically evaluated. Under working conditions, these sites were found to undergo hydrogenation, and NiN 3 C 1_ H 1 was identified as the most probable active site. At reducing potentials, hydrogen adsorbs spontaneously at C–Ni bridge sites rather than Ni top sites, while subsurface hydrogen facilitates bent CO 2 adsorption crucial for activation. High CO 2 RR selectivity toward CO arises from site separation: Ni centers drive CO2RR, while the hydrogen evolution reaction (HER) occurs at the C–Ni bridge or N sites and from thermodynamic suppression of HER at moderate hydrogen coverage. At more negative potentials, a shift in the CO 2 RR rate-determining process (RDP) and Ni out-of-surface displacement induced by coadsorption of H and H 2 O jointly reduce activity and selectivity. Thus, both the high CO2RR selectivity of Ni–N–C catalysts and its reversal with more negative potentials can be rationalized by accounting for hydrogenated surfaces. This highlights the necessity of modeling realistic; in situ conditions. This framework provides generalizable insights into the dynamic behavior of active sites in SACs, offering guidance for the rational design of active and robust catalysts for a wide range of electrochemical reactions.

25 ENERGY STORAGE↗

Precipitation of dopants on acceptor-doped LaMnO3±δ revealed by defect chemistry from first principles

Perovskite oxides degrade at elevated temperatures while precipitating dopant-rich particles on the surface. A knowledge-based improvement of surface stability requires a fundamental and quantitative understanding of the dopant precipitation mechanism on these materials. We propose that dopant precipitation is a consequence of the variation of dopant solubility between calcination and operating conditions in solid oxide fuel cells (SOFCs) and electrolyzer cells (SOECs). To study dopant precipitation, we use 20% (D = Ca, Sr, Ba)-doped LaMnO3+δ (LDM20) as a model system. We employ a defect model taking input from density functional theory calculations. The defect model considers the equilibration of LDM20 with a reservoir consisting of dopant oxide (DO), peroxide (DO2), and O2 in the gas phase. The equilibrated non-stoichiometry of the A-site and B-site as a function of temperature, T, and oxygen partial pressure, p(O2), reveals three regimes for LDM20: A-site deficient (oxidizing conditions), A-site rich (atmospheric conditions), and near-stoichiometric (reducing conditions). Assuming an initial A/B non-stoichiometry, we compute the dopant precipitation boundaries in a p–T phase diagram. Our model predicts precipitation both under reducing (DO) and under highly oxidizing conditions (DO2). We found precipitation under anodic, SOEC conditions to be promoted by large dopant size, while under cathodic, SOFC conditions precipitation is promoted by initial A-site excess. The main driving forces for precipitation are oxygen uptake by the condensed phase under oxidizing conditions and oxygen release assisted by B-site vacancies under reducing conditions. Possible strategies for mitigating dopant precipitation under in electrolytic and fuel cell conditions are discussed.

Hess, Franziska (ORCID:000000024460643X)↗

High Altitude Long Endurance UAV Analysis Model Development and Application Study Comparing Solar Powered Airplane and Airship Station-Keeping Capabilities

There have been ongoing efforts in the Aeronautics Systems Analysis Branch at NASA Langley Research Center to develop a suite of integrated physics-based computational utilities suitable for modeling and analyzing extended-duration missions carried out using solar powered aircraft. From these efforts, SolFlyte has emerged as a state-of-the-art vehicle analysis and mission simulation tool capable of modeling both heavier-than-air (HTA) and lighter-than-air (LTA) vehicle concepts. This study compares solar powered airplane and airship station-keeping capability during a variety of high altitude missions, using SolFlyte as the primary analysis component. Three Unmanned Aerial Vehicle (UAV) concepts were designed for this study: an airplane (Operating Empty Weight (OEW) = 3285 kilograms, span = 127 meters, array area = 450 square meters), a small airship (OEW = 3790 kilograms, length = 115 meters, array area = 570 square meters), and a large airship (OEW = 6250 kilograms, length = 135 meters, array area = 1080 square meters). All the vehicles were sized for payload weight and power requirements of 454 kilograms and 5 kilowatts, respectively. Seven mission sites distributed throughout the United States were selected to provide a basis for assessing the vehicle energy budgets and site-persistent operational availability. Seasonal, 30-day duration missions were simulated at each of the sites during March, June, September, and December; one-year duration missions were simulated at three of the sites. Atmospheric conditions during the simulated missions were correlated to National Climatic Data Center (NCDC) historical data measurements at each mission site, at four flight levels. Unique features of the SolFlyte model are described, including methods for calculating recoverable and energy-optimal flight trajectories and the effects of shadows on solar energy collection. Results of this study indicate that: 1) the airplane concept attained longer periods of on-site capability than either airship concept, and 2) the airship concepts can attain higher levels of energy collection and storage than the airplane concept; however, attaining these energy benefits requires adverse design trades of reduced performance (small airship) or excessive solar array area (large airship).

Ozoroski, Thomas A.↗

Corral Summit Pumped Storage Hydropower Hybrid: Site Suitability Assessment

In 2024, Idaho National Laboratory (INL) and Pacific Northwest National Laboratory (PNNL) initiated a technical-assistance project to support Cat Creek Energy, LLC, (CCE) in evaluating site suitability for the proposed Corral Summit Pumped Storage Hydropower (PSH) project in south-central Idaho near Mackay Reservoir. The Corral Summit facility incorporates battery storage and photovoltaic (PV) solar arrays in a Trybrid configuration to deliver large-volume long-duration (LVLD) storage solutions for rural electric cooperatives in eastern Idaho. The evaluation process focused on determining the most-suitable location for the upper reservoir of the PSH system, guided by a comprehensive assessment framework spanning multiple categories, including physical characteristics, environmental constraints, building infrastructure, regulatory constraints, cultural resources and sensitivity, social factors, and power market and grid integration. Each site was analyzed based on a ranking scale (0–1), which scores ranging from “severely disfavored” to “highly favored,” allowing detailed comparisons of site-specific conditions. Categories such as hydraulic head, utilities corridor, land ownership, and transmission-grid limitations emerged as key contributors to the overall assessment. Site 2 (Idaho Trust) demonstrated a slight advantage over Site 1 (Bureau of Land Management) primarily due to favorable outcomes in regulatory constraints, building infrastructure, and power-market integration. However, Site 1 outperformed Site 2 in factors related to physical characteristics and social factors. The report emphasizes the need for further evaluation of both sites before clear determination of which site is preferred, due to the limited information available on either site at the time of this report. Key areas of evaluation to clearly define the preferred site are ecological impacts, cultural-resource surveys, and economic-feasibility assessments. For successful project execution, recommended follow-up actions include seismic and geotechnical surveys, groundwater and habitat monitoring, regulatory reviews of water rights and right-of-way agreements, cultural engagement with local tribal governments, and enhanced stakeholder strategies. These efforts will ensure the Corral Summit Trybrid facility meets local energy needs while balancing environmental, social, and regulatory responsibilities.

13 - HYDRO ENERGY↗

Corral Summit Pumped Storage Hydropower Hybrid Site Suitability Assessment (Rev.1)

In 2024, Idaho National Laboratory (INL) and Pacific Northwest National Laboratory (PNNL) initiated a technical-assistance project to support Cat Creek Energy, LLC, (CCE) in evaluating site suitability for the proposed Corral Summit Pumped Storage Hydropower (PSH) project in south-central Idaho near Mackay Reservoir. The Corral Summit facility incorporates battery storage and photovoltaic (PV) solar arrays in a Trybrid configuration to deliver large-volume long-duration (LVLD) storage solutions for rural electric cooperatives in eastern Idaho. The evaluation process focused on determining the most-suitable location for the upper reservoir of the PSH system, guided by a comprehensive assessment framework spanning multiple categories, including physical characteristics, environmental constraints, building infrastructure, regulatory constraints, cultural resources and sensitivity, social factors, and power market and grid integration. Each site was analyzed based on a ranking scale (0–1), which scores ranging from “severely disfavored” to “highly favored,” allowing detailed comparisons of site-specific conditions. Categories such as hydraulic head, utilities corridor, land ownership, and transmission-grid limitations emerged as key contributors to the overall assessment. Site 2 (Idaho Trust) demonstrated a slight advantage over Site 1 (Bureau of Land Management) primarily due to favorable outcomes in regulatory constraints, building infrastructure, and power-market integration. However, Site 1 outperformed Site 2 in factors related to physical characteristics and social factors. The report emphasizes the need for further evaluation of both sites before clear determination of which site is preferred, due to the limited information available on either site at the time of this report. Key areas of evaluation to clearly define the preferred site are ecological impacts, cultural-resource surveys, and economic-feasibility assessments. For successful project execution, recommended follow-up actions include seismic and geotechnical surveys, groundwater and habitat monitoring, regulatory reviews of water rights and right-of-way agreements, cultural engagement with local tribal governments, and enhanced stakeholder strategies. These efforts will ensure the Corral Summit Trybrid facility meets local energy needs while balancing environmental, social, and regulatory responsibilities.

13 - HYDRO ENERGY↗