Search NASA⌕ Search

SEARCH · Search NASA

Results for “Layout”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,081 records · Page 60

Installation of Lysimeters and Monitoring Wells in Support of the Revised Approach to E-Area Performance Monitoring

Savannah River Site (SRS) has developed a revised approach to performance monitoring of the E Area Low Level Waste Facility (ELLWF) that adds a saturated zone component to the existing vadose zone monitoring program (Kubilius, 2019). The revised approach specifies modifications to the vadose zone monitoring program, the addition of new lysimeters at Engineered Trench 3 (ET3), and the installation of water table monitoring wells to complement the existing well network surrounding the ELLWF. This project summary report is intended to provide the final construction details and layout for the new vadose zone lysimeters at ET3 and the water table monitoring wells installed as part of the new saturated zone component of the revised performance monitoring program.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Cloud Droplet Measurement System for the ARM Tethered Balloon System (TBS) Field Campaign Report

The Mesa Photonics' cloud droplet measurement system (CDMS) performs in situ measurement of droplet size distribution and droplet number density in clouds. These characteristics are important cloud microphysical properties that are critical input parameters for atmospheric models and are also useful for proper calibration and validation of performance of other atmospheric measurement instrumentation. This small campaign was the first project (out of two) that involved integration of the CDMS into the U.S. Department of Energy (DOE) Atmospheric Radiation Measurement (ARM) user facility’s tethered balloon system (TBS) and its initial testing at the ARM Southern Great Plains (SGP) atmospheric observatory. The follow-up campaign (AFC07016) involved testing of the CDMS under relevant conditions at the third ARM Mobile Facility (AMF3) at Oliktok Point, Alaska and making in situ measurements in clouds. The goal of this small field campaign was to deploy the CDMS on the ARM TBS, demonstrate its integrity and compatibility with the TBS, and test the wireless telecommunication system in preparation for subsequent in-cloud measurements at ARM’s North Slope of Alaska (NSA) observatory at Utqiagvik (formerly Barrow). The specific technical objectives included: (1) Integration of the Mesa Photonics' CDMS into the ARM TBS, (2) testing of the wireless telecommunication system of the CDMS, (3) evaluating the data acquisition software and image processing algorithms especially under high-background-illumination conditions, and (4) testing the ruggedness of the instrument's optical alignment and other performance characteristics. All objectives have been successfully met. The mounting hardware was designed and built mostly at Sandia National Laboratories (SNL), which allowed reliable mounting of the CDMS on the TBS and co-locating the CDMS with other instruments. The field tests were performed by the principal investigator (PI) in collaboration with the TBS operational crew led by D. Dexheimer. The field testing demonstrated good compatibility of the CDMS with the TBS. During the TBS flights, the crew did not experience any operational issues with the CDMS. The instrument demonstrated reliable operational characteristics, including sufficient battery life and good thermal management. The wireless telecommunication system has been successfully tested at TBS flight altitudes of up to 1000 m. During all flights, the CDMS raw data were wirelessly transmitted to the ground station and processed in real time. The ruggedness of the instrument's optical alignment was evaluated by performing calibration of the CDMS (using Mesa Photonics' fixed-size monodisperse droplet generator) before and after the campaign. The calibration was stable within the instrument's measurement precision. In summary, the campaign demonstrated good compatibility of the Mesa Photonics' CDMS with the ARM TBS. The flight tests confirmed the mechanical integrity of the CDMS and stability of its optical layout, as well as reliability of the wireless telecommunication system. Successful completion of this campaign provided a solid basis for the next campaign (AFC07016, November 2020), that involved testing of the CDMS during in-cloud TBS flights at AMF3 at Oliktok Point.

54 ENVIRONMENTAL SCIENCES↗

Design and Performance of Kokkos Staging Space toward Scalable Resilient Application Couplings

With the growing number of applications designed for heterogeneous HPC devices, application programmers and users are finding it challenging to compose scalable workflows as ensembles of these applications, that are portable, performant and resilient. The Kokkos C++ library has been designed to simplify this cumbersome procedure by providing an intra-application uniform programming model and portable performance. However, assembling multiple Kokkos-enabled applications into a complex workflow is still a challenge. Although Kokkos enables a uniform programming model, the inter-application data exchange still remains a challenge from both performance and software development cost perspectives. In order to address this issue, we propose Kokkos data staging memory space, an extension of Kokkos' data abstraction (memory space) for heterogeneous computing systems. This new abstraction allows to express data on a virtual shared-space for multiple Kokkos applications, thus extending Kokkos to support inter-application data exchange to build an efficient application workflow. Additionally, we study the effectiveness of asynchronous data layout conversions for applications requiring different memory access patterns for the shared data. Our preliminary evaluation with a synthetic benchmark indicate the effectiveness of this conversion adapted to three different scenarios representing access frequency and use patterns of the shared data.

97 MATHEMATICS AND COMPUTING↗

Seismic Array Analysis Using Fiber-Optic Distributed Acoustic Sensing on Small Local and Regional Earthquakes

We examined the feasibility of using fiber-optic Distributed Acoustic Sensing (DAS) as an alternative to a traditional seismic array. Seismic arrays are used routinely globally to measure waveform propagation parameters and signal features including back-azimuth (BAZ) and apparent horizontal velocity through the process of beamforming or frequency-wavenumber (f-k) array analysis with the assumption that the signals travel across the array as a plane-wave. These measurements are useful for identifying signal detections as teleseismic, regional, or local distance seismic phases based on their velocities traveling across the array (e.g., Rost and Thomas, 2001). Signal enhancement is the main benefit of array processesing through the stacking of multiple channels as a phased array. This enhancement increases as the square root of the number of channels relative to a single seismic station (e.g., Rost and Thomas, 2001), which is a factor of 3 from a typical nine-channel array. DAS provides the potential of stacking waveforms from 100’s to 1000’s of channels. However, DAS is a novel technology designed for geophysical exploration and therefore has some limitations which we will explore. We started with the dataset from the PoroTomo project because of its unique experimental layout of colocated geophone array and DAS deployment so the two recording technologies can be compared side-by-side.

58 GEOSCIENCES↗

SECARB Regional Project Assessment

The SECARB Cranfield Early Test Project was designed to safely demonstrate large-scale, long-term CO 2 injection and storage in a CO 2 -enhanced oil recovery (EOR) operation and associated saline reservoir. Storage during EOR operations has the potential to offset commercial costs, holding a significant promise for future large-scale deployment in the southeastern United States. Denbury Onshore LLC began CO 2 -EOR operations in July 2008 at the Cranfield oilfield located east of Natchez, Mississippi (Figure 1). The location offered an ideal setting to investigate storage monitoring at a commercial CO 2 -EOR operation. The field team, led by the Gulf Coast Carbon Center of the Bureau of Economic Geology at the University of Texas at Austin, deployed the largest suite of monitoring, verification, accounting (MVA) technologies to collect data to assess long-term CO 2 utilization and storage. The CO 2 injection interval is within the 3,000-meter-deep fluvial lower Tuscaloosa Formation, a large and regionally extensive saline reservoir, at a broad four-way structural closure that defines the Cranfield oilfield. Tests were conducted in the oil-producing area as well as in the non-oil-producing brine aquifer. The CO 2 used during EOR operation was transported via pipeline from the Jackson Dome, a natural source of CO 2 . The study focused on four integrated research areas: (1) the High-Volume Injection Test area (HiVIT); (2) the Detailed Area of Study (DAS); (3) the Geomechanical area; and (4) the near-surface observatory, also called the “P-site.” CO 2 injection occurred at the HiVIT and the DAS (Figure 2 and Figure 3). The DAS was located down-dip of the oil-water interface of the Cranfield oilfield. The well layout included one injection well and two down-dip observation wells. The team was the first of the regional partnerships to monitor more than 1 million metric tons of CO 2 . At the end of the project, the team monitored more than 11 million metric tons of CO 2 injected and 5 million metric tons of CO 2 stored. The Cranfield Project was the fifth project worldwide, and the first such project in the United States, to reach this CO 2 injection volume while being monitored to demonstrate storage effectiveness.

01 COAL, LIGNITE, AND PEAT↗

Refueling Infrastructure Scoping and Feasibility Assessment for Hydrogen Rail Applications

The feasibility and component cost of hydrogen rail refueling infrastructure is examined. Example reference stations can inform future studies on components and systems specifically for hydrogen rail refueling facilities. All of the 5 designs considered assumed the bulk storage of liquid hydrogen on-site, from which either gaseous or liquid hydrogen would be dispensed. The first design was estimated to refuel 10 multiple unit trains per day, each train containing 260 kg of gaseous hydrogen at 350 bar on-board. The second base design targeted the refueling of 50 passenger locomotives, each with 400 kg of gaseous hydrogen on-board at 350 bar. Variations from this basic design were made to consider the effect of two different filling times, two different hydrogen compression methods, and two different station design approaches. For each design variation, components were sized, approximate costs were estimated for major components, and physical layouts were created. For both gaseous hydrogen-dispensing base designs, the design of direct-fill using a cryopump design was the lowest cost due to the high cost of the cascade storage system and gas compressor. The last three base designs all assumed that liquid hydrogen was dispensed into tender cars for freight locomotives that required 7,500 kg of liquid hydrogen, and the three different designs assumed that 5, 50, or 200 tender cars were refueled every day. The total component costs are very different for each design, because each design has a very different dispensing capacity. The total component cost for these three designs are driven by the cost of the liquid hydrogen tank; additionally, delivering that much liquid hydrogen to the refueling facility may not be practical. Many of the designs needed the use of multiple evaporators, compressors, and cryopumps operating in parallel to meet required flow rates. In the future, the components identified here can be improved and scaled-up to better fit the needs of heavy-duty refueling facilities. This study provides basic feasibility and first-order design guidance for hydrogen refueling facilities serving emerging rail applications.

08 HYDROGEN↗

Positrons for Our Future

JLab Users want beams of polarized (and unpolarized) positrons, with beam qualities and modes of operation similar to those provided in the electron beams at CEBAF today [Gra19]. The creation of positrons with a high degree of spin polarization is however very challenging – limited to beta decay, self-polarization in rings, or via e+/e- pair-production, a process requiring a source of polarized gamma rays. At JLab we have a unique source of polarized gamma rays – the bremsstrahlung radiation produced when the spin polarized electron beams of CEBAF interacts with matter – called Polarized Electrons for Polarized Positrons (or PEPPo) [Abb04]. This project sought to extend the PEPPo concept by exploring a possible layout and parameter space for a polarized positron injector at CEBAF based on this approach.

74 ATOMIC AND MOLECULAR PHYSICS↗

Algorithmic and GPU enhancements for molecular dynamics in Cabana and LAMMPS

The focus of this milestone was to implement and test new algorithms and optimizations for improved GPU performance by molecular dynamics (MD) and related particle codes. The work was done in the CoPA Cabana library, the CabanaMD mini-app which uses Cabana to implement and benchmark prototypical MD models, and the LAMMPS MD code which is used by the ECP EXAALT project as well as for materials modeling generally. Efforts included (a) implementation of new or optimized algorithms for fundamental MD kernels like neighbor-list building and FFTs which are also widely used in other particle methods, (b) performance testing of data structure layouts for both simple pairwise and computationally intense neural network potentials, (c) optimizations aimed at improving GPU performance for models with small atom counts, and (d) optimizations specific to the SNAP interatomic potential due to its importance for the EXAALT project.

36 MATERIALS SCIENCE↗

BayoTech Risk and Modeling Support of NM Gas Site

The BayoTech hydrogen generation system has been evaluated in terms of safety considerations at the NM Gas site. The consequence of a leak in different components in the system was evaluated in terms of plume dispersion and overpressure. Additionally, the likelihood of a leak scenario for different hydrogen components was identified. The worst-case plume dispersion cases, full-bore leaks, resulted in relatively large plumes. However, these cases were noted to be far less likely than the partial break cases that were evaluated. The partial break cases resulted in nearly negligible plume lengths. Similarly, the overpressure analysis of the full-bore break scenarios resulted in much larger overpressures than the partial break cases (which resulted in negligible overpressure at the lot line). There were several cases evaluated in the analysis that represented leak scenarios from both hydrogen and natural gas sources. Generally, the natural gas leak scenarios resulted in a smaller horizontal impact than that of hydrogen leaks. The worst-case consequence from a hydrogen leak resulted from the compressors, storage pods, or dispensing system. To consider the safety features that may isolate the leak, the consequence was evaluated at different times after the leak event to show the reduction of pressure. After 2 seconds, the plume dispersion from this event is contained within the perimeter of the site. The worst-case consequences show that the plume may disperse to adjacent facilities and to the street. When considering both likelihood and consequence, the risk may be considered low because the maximum frequency of a full-bore leak from any component within the hydrogen compound is 8.2 E-5/yr. This means that a full-bore leak is expected to occur less than once every 10,000 years. The risk can be further reduced by implementing mitigative countermeasures, such as CMU walls along the sides of the equipment compound. This would reduce the overall consequence of the worst-case dispersion scenarios (horizontal impact of plume). In terms of siting and safety analysis, the NFPA 2 code was used to provide a high-level evaluation of the current site plan. The most limiting equipment in terms of set-back distance are the compressors/storage units because of the high-pressure hydrogen. The site layout was evaluated for an acceptable location for the compression/storage unit based on NFPA 2 set-back distances. It is important to note that the NFPA 2 set-back distances consider both likelihood and consequence. This is important because the worst-case results evaluated herein also represent the least likely leak scenario. Other site-specific considerations were evaluated, including the parking shade structure with photovoltaic cells and refueling vehicles. These issues were dispositioned and determined to not present a safety risk.

08 HYDROGEN↗

ANL Design Team Analysis: Transportable Modular Reactor by Balance of Plant Elimination

HolosGen LLC is developing “Holos-Quad” a transportable gas-cooled reactor, with integral load following power conversion systems equipping subcritical power modules (SPMs), fully comprised within standard transport containers. The design eliminates the Balance of Plant (BoP) and greatly simplifies the design layout. A closed-loop full Brayton gas thermodynamic cycle converts the fuel cartridges thermal energy into electricity. This ARPA-E project utilizes advanced reactor modeling tools and manufacturing-testing of a scaled SPM equipped with a surrogate fuel cartridge to eliminate the most significant technology gaps to accelerate commercialization. The Argonne Design Team contributes to the research by demonstrating feasibility of various aspects of the Holos-Quad design by performing high-fidelity neutronic modeling, and investigating various reactivity control systems. This work consists of two main tasks: evaluation of HolosGen’s design features and alternative options study for reactivity control.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Initial Core Physics and Safety Analyses Supporting the Versatile Test Reactor

The Versatile Test Reactor (VTR) is a proposed integrated facility for investigations into the behavior of fuels and materials subjected to high, fast neutron fluxes prototypical of fast reactor environments. Detailed design of the reactor is currently being performed by a group of U.S. National Laboratories, including Argonne National Laboratory. The current design of the reactor is a 300 MW sodium-cooled pool-type fast reactor fueled with ternary U-20Pu-10Zr metallic fuel. This report documents reactor core physics and preliminary safety analyses that have been performed. The reference VTR core has 313 assembly positions, 66 of which contain fuel assemblies. The remaining assembly positions are loaded with reflector, shield, control rod duct, and test assemblies. Ten positions are available in the reference design for experimental or test assemblies, however the VTR will support test assemblies in any position in the core for alternate core loadings. The performance of the reference VTR core has been assessed for an assumed equilibrium cycle. The core power distribution and reactivity feedback coefficients have been calculated. Preliminary assessments of the reactivity coefficients have shown that each of them results in a negative reactivity change for increasing temperatures. Safety analysis of a VTR layout has been performed using the SAS4A/SASSYS-1 fast reactor safety analysis code. A model has been developed to represent the current core design and a reference heat transport system design. The model has been used to simulate and perform analysis of protected and unprotected loss of heat sink, station blackout, and transient overpower accident scenarios. These scenarios represent the three main ways to perturb the reactor core, through changes to the core inlet temperature, mass flow rate, or reactivity insertions and are credible bounding scenarios for the evaluated transient categories. The results of these simulations have been assessed against simplified criteria for Anticipated Operational Occurrences for the protected transients and for Beyond Design Basis Events for the unprotected transients. Because the primary heat transport system is able to transition quickly and effectively to natural circulation and because the shutdown heat removal system provides sufficient heat rejection capability, large margins for all criteria were predicted for all protected transients. Large margins were also predicted for the unprotected loss of heat sink and station blackout transients due to the strong negative reactivity feedbacks generated by the core. Because of the high power density in the reactor, smaller fuel melting margins are predicted for the unprotected transient overpower accident.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Hydrogen Energy Storage Integrated with a Combined Cycle Plant

A project is being developed that will build upon the existing infrastructure and resources at the Intermountain Power Project (IPP) site to provide reliable, dispatchable energy and to support the transmission of renewable energy resources while transitioning to an economical green energy future. The concept study depicted in this report outlines a techno-economic optimization to fulfill the demand for 30% vol hydrogen co-firing in the IPP 840 MW advanced class combined cycle power plant. In an initial step, a site assessment concluded the site has sufficient land available to co-locate a hydrogen production and storage facility. The team evaluated and defined a scalable concept that considered technology characteristics, including input and output models to be used for optimization purposes. The concept for the hydrogen production and storage system integrates multiple technologies, to determine system size and scalable approach, for each of the technologies evaluated, the team defined component and subcomponent sizes, minimum and maximum capacity, modularity, component utility consumption (electric, water), component flexibility and servicing, layout, and technology status, as well as technology alternatives. For hydrogen generation, the project considers Siemens Energy’s Silyzer-300 (S300) technology, a 17.5 MW modular Proton Exchange Membrane (PEM) electrolyzer. For the S300 configuration, the team determined that three S300 arrays, or approximately 1,000 kg/hr, per block would yield a compact block design. This configuration results in a fairly wide and flexible arrangement that fits well into the spaces available at the site. Therefore, the overall design approach is based on multiple identical blocks of 3 arrays to minimize engineering cost and optimize constructability. In parallel, a transmission screening study was conducted to determine any potential transmission constraints from the energy sources that could feed the hydrogen production equipment. The study results show that minimum transmission constraints would be encountered to deliver 400 MW renewable generation from southern California, or south-central Wyoming. At last, the techno-economic analysis concluded that a scenario that uses solar and wind power yields the lowest levelized cost of hydrogen (LCOH 2 ) production and the lowest cost per tonne of CO 2 reduced. In this optimized scenario, the hydrogen production plant was determined as 6,201 kg/hr and the hydrogen storage (underground cavern) was determined as 4,600 tonnes. The resulting capacity factor for the hydrogen production plant was 66.33% with 8,745 operating hours in one year. This techno-economic analysis provided various options for integrating hydrogen storage at the Intermountain Power Plant site to co-fire the CCPP units. The results provide insightful data about the magnitude of capacity needed and the economics of producing hydrogen and reducing CO 2 emissions.

08 HYDROGEN↗

Consolidated Hydropower Data Repository: Value and Opportunities

Hydropower is one of several types of generating assets that provides energy, capacity, and services to electric power systems. It does so under rubrics and objectives—market driven and regulated, internal and external to asset and fleet owners—that address reliability, cost, price, and, increasingly, flexibility of output. The aggregation of data from multiple hydropower units can provide insights into asset operations and maintenance practices and needs and assist in meeting hydropower objectives. This paper examines the concept and potential benefits of aggregating hydropower asset data—primarily supervisory control and data acquisition (SCADA) information—with examples of insights developed from data aggregated by the Hydropower Research Institute (HRI). Data aggregation as discussed herein, and as implemented by the HRI, extends beyond multiple units in a powerhouse and beyond multiple hydropower facilities in an electric utility fleet or river system. Examples of research and analytics from such aggregated datasets range from unit load dependency analyses to modeling sensor measurements to detect and diagnose anomalies in assets. These examples showed the benefits of utilizing the entire dataset for insights into how the sensor layout of a single unit or set of units compares to the hydropower industry overall. Such insights include whether additional sensors are needed to complete analyses or to make decisions. In addition, utilizing multiple sensors of the same kind within a unit can provide an indication of possible current or upcoming problems with equipment. Although other analyses are possible, their use requires the development of complex models and, potentially, access to types of data that are currently not included with the example dataset used in this study. However, the examples studied herein confirmed the value of data aggregation in the fleet and unit contexts, and the value extends beyond multiple units in a powerhouse and beyond multiple hydropower facilities in an electric utility fleet or river system. The assessments also provided insights into potential extensions to the data aggregation concept that could further add to their value to the hydropower community, and these are included in this document as a set of recommendations.

13 HYDRO ENERGY↗

TEMPI: An Interposed MPI Library with Canonical Representation of MPI Datatypes [Poster]

TEMPI provides a transparent non-contiguous data-handling layer compatible with various MPIs. MPI Datatypes are a powerful abstraction for allowing an MPI implementation to operate on non-contiguous data. CUDA-aware MPI implementations must also manage transfer of such data between the host system and GPU. The non-unique and recursive nature of MPI datatypes mean that providing fast GPU handling is a challenge. The same noncontiguous pattern may be described in a variety of ways, all of which should be treated equivalently by an implementation. This work introduces a novel technique to do this for strided datatypes. Methods for transferring non-contiguous data between the CPU and GPU depends on the properties of the data layout. This work shows that a simple performance model can accurately select the fastest method. Unfortunately, the combination of MPI software and system hardware available may not provide sufficient performance. The contributions of this work are deployed on OLCF Summit through an interposer library which does not require privileged access to the system to use

97 MATHEMATICS AND COMPUTING↗

Hydrogen Storage for Flexible Fossil Fuel Power Generation: Integration of Underground Hydrogen Storage with Gas Turbine (Final Report)

As the nation continues to encourage, through market structures and financial incentives, the proliferation of intermittent renewable electricity, how to optimize the ever-changing electric grid and identify means to retain and improve resilience, while ensuring continued reductions in GHG emissions, will be critical. According to Bloomberg, wind & solar generated 10.5% of US electricity in 2020 and that percentage continues to grow. In support of expanding renewable energy use, and to address its intermittent nature, this project will develop the Hydrogen Storage for Flexible Fossil Fuel Power Generation platform that is dispatchable, reliable, repeatable and have the ability to produce zero or negative carbon power while interfacing with geology capable of CO2 and hydrogen storage. GTI Energy (GTIE) and team members Illinois State Geological Survey (ISGS), Mitsubishi Heavy Industries America (MHIA), Ameren Illinois, Hexagon Purus, and the Low Carbon Resources Initiative (LCRI) completed a Phase I Conceptual Study under contract DE-FE0032012 for Hydrogen Storage for Flexible Fossil Fuel Power Generation: Integration of Underground Hydrogen Storage with Gas Turbine. The Hydrogen Storage for Flexible Fossil Fuel Power Generation platform addresses the intermittent nature of the expanding use of Variable Renewable Energy (VRE) generation. The low cost of the electricity (COE) generated results in greater dispatch and more operation at higher power levels (higher efficiency), fewer short intervals, and fewer start/stop cycles. The reliable, resilient system can produce zero carbon power and store hydrogen. It will demonstrate hydrogen storage in geologic formations like those used in natural gas underground storage thus enabling large scale storage of hydrogen in sedimentary strata across the United States rather than in geographically restricted salt caverns. The Phase I study confirmed the system is feasible and generates power at lower cost than other low carbon approaches. The demonstration defines the pathway for broad commercial application and will accelerate the development of larger systems suitable for centralized utility scale electricity production. The study advanced the maturity of the H 2 storage-based system with flexible power generation by completing a Pre-FEED study (Phase II). The Pre-FEED focused on the selected Energy Farm on the University of Illinois Urbana-Champaign (UIUC) site that includes above ground and underground hydrogen storage, low-carbon hydrogen production (GTI’s Compact Hydrogen Generator, CHG) with underground CO2 sequestration, and a 40-MW class gas turbine. The Pre-FEED addressed the entire system and its interconnection to the natural gas and electric grid and mitigation of key risks, such as storage behavior, load-following, and system operation. During Phase 1 of the project, the team completed key tasks, which moved the entire demonstration project, specific components and approaches closer to commercialization. These Phase I Accomplishments include: Completing System Requirements Review; Completing System Layout and Modeling - Heat & Mass Balance and Process Flow Diagram; Completing modelling of 9 turbine performance cases; Evaluating rock strata for underground storage of hydrogen and sequestration of carbon dioxide; Completing initial modelling of underground storage of hydrogen and withdrawal with evaluation of loss and water production; Identifying roadable storage for above ground hydrogen storage; Identifying existing electrical infrastructure for receiving/delivering electricity; Identifying existing gas supply infrastructure for receiving natural gas; Document concept design/development plans in required reports. Conclusions: The 12-month Feasibility study in Phase I study was completed and confirmed the system is feasible and generates power at lower cost than other low carbon approaches and even lower cost than the reference NGCC plant without carbon capture when taking advantage of 45Q carbon credits. The study enabled the fidelity of the concept to be improved and allowed identification of the requirements for the system. Defining the individual system and component requirements was performed via the system requirements review with the whole team. These requirements were then incorporated into and iterated with our Heat & Mass Balance process model and process flow diagrams were generated to reflect the overall system. This information was then used to complete the TEA and show economic feasibility. Large scale non-salt geologic storage of hydrogen is an enabling technology for a hydrogen-fired turbine that can be retrofitted into large-scale electric generating units (EGU). Our demonstration will include 428 MWh or ~4 hours full load of hydrogen storage (above and underground). Carbon capture inherent to the CHG process can capture 90% CO 2 (with upgrades to >98%). This system provides a COE of 23% savings relative to an NGCC with a post combustion amine system. Our proposed storage system decouples carbon capture and hydrogen production from power production; therefore, we expect our proposed system’s efficiency and variable COE to be superior resulting in overall higher dispatch and reduced deep cycling. Our demonstration will be full to multi-day hydrogen storage and has the potential for longer (seasonal) duration commercially. The demonstration defines the pathway for broad commercial application and will accelerate the development of larger systems suitable for centralized utility scale electricity production.

03 NATURAL GAS↗

Benchmark Exercise for the Control Rod Swelling Evaluation

The VTR core has six reactivity control assemblies and three safety assemblies. The control assemblies or primary control rods are adjusted during the normal operation to balance the core reactivity and to control the reactor power. A typical control assembly radial layout is presented in Figure 1. The figure shows the swelled absorber (B 4 C) rod. Initially, helium gas fills the gap between the pin and the cladding before irradiation swelling takes place. For VTR, HT9 steel was selected as the cladding and duct material. The main neutron absorbing material used in the VTR is B 4 C. When residing in the core, the neutronics, thermophysical, and mechanical properties of the materials used in a control assembly will degrade due to accumulated neutron damage. Material degradation limits how long a control assembly can reside in the core. Many phenomena affect the control assembly lifetime, such as the loss of reactivity worth due to B 4 C depletion, the mechanical interaction of the absorber rod and the cladding due to B 4 C swelling, the helium gas buildup in the pin due to B-10 capture, etc. B 4 C swelling, which causes closure of the gap between the absorber rod and the cladding, is usually considered as the main limiting factor from past experience. An initial study was conducted at PNNL to evaluate the irradiation behavior of a VTR control assembly. The evaluation was performed using the CNRD2 code that was initially developed for the FFTF. The study also included an assessment of the VTR control assembly and focused on a 61-pin control assembly design, which is different from that used (37-pin design) in the core design study. The study conducted by PNNL was reviewed independently by ANL. A Python script referred to as the Control Assembly Evaluation Script (CAES) was developed for the independent review and additional assessment of 37-pin control assembly design. The script has focused on the assessment of the absorber rod swelling for its importance in determining the control assembly lifetime. CAES uses geometry, neutronics, materials data as input to predict the swelling of the absorber rod during its residence in the reactor core. The results from CAES showed some non-negligible differences against the PNNL results. Some of the differences can be attributed to the different interpretation of the control rod assembly dimensions. To resolve this issue, a benchmark exercise was proposed. The benchmark specification was developed by PNNL. The benchmark exercise was performed independently at PNNL and ANL using different codes/scripts (CRND2 and CAES). This memo documents the results calculated using the different codes. However, this report is limited to presenting the results obtained. Further investigation of the cause of the observed difference will be performed as part of future activities, pending continuation of the VTR program.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Front-End Engineering Design for Piperazine with the Advanced Stripper

This Department of Energy (DOE) funded project was executed with the goal of preparing a Front-End Engineering Design (FEED) for the capture and compression of 90% of the CO2 that would normally be emitted from an existing natural gas combined cycle (NGCC) plant. The FEED focused on the application of the piperazine advanced stripper (PZAS) process at Mustang Station of the Golden Spread Electric Cooperative (GSEC), which consists of two gas turbines with common heat recovery steam generator (HRSG). The University of Texas at Austin (UT) served as the prime contractor, and subcontracted AECOM Technical Services and Trimeric Corporation to support FEED development. This project team has worked together to advance PZAS for more than a decade. ExxonMobil, Chevron, and Total provided project co-funding. The objectives of this work included: 1. To advance engineering design such that a comprehensive estimate for the total installed cost of a full-scale PZAS CO2 Capture Plant with CO2 compression can be developed on an existing NGCC power plant. a. These detailed costs can also be used to qualify PZAS and other related second generation (2G) amine scrubbing processes for use on cogeneration facilities in refineries and chemical plants that use gas turbines with HRSGs to produce steam. b. These detailed costs will help qualify 2G amine scrubbing for use on NGCC power plants and establish a more accurate baseline cost to be used as a target by other capture technologies. 2. To provide cost details to be used in the economic optimization of the process features of PZAS and other 2G amine scrubbing processes. 3. To provide DOE with a more detailed understanding of carbon capture costs in a commercial application, enabling DOE to better design its R&D program to improve the economics for carbon capture. 4. To provide the host site and cost share partners with the information necessary to determine whether a commercial project to capture and use CO2 for enhanced oil recovery (EOR) or for sequestration can be justified (when accounting for the 45Q tax credit). A key component of the FEED is the estimated total installed cost, which provides a basis for the likely capital investment necessary to implement the PZAS carbon capture process at this location and scale. In combination with the included economic analysis, which accounts for potential revenue from the produced CO2, potential avenues to profitability are explored. The major findings of the FEED are as follows: The Mustang Station PZAS CO2 Capture Plant estimated total project cost of $698 MM of which $384 MM was direct costs. The annual operating costs were $32.6 MM. The total investment for a PZAS facility at Mustang Station is $725 MM. This estimate includes owner’s cost of $25 million and a contingency of $110 MM. • The study estimated the CO2 capture plant at Mustang Station would generate CO2 at $110/tonne for EOR, assuming a 12% IRR (internal rate of return) and an 85% capacity factor. For CO2 storage, the same case would achieve a 12% IRR at about $114/tonne. At a capacity factor of 52%, the storage and EOR cases would break even when carbon is priced ~$150/tonne. The economic analysis determined that the capacity factor and utility pricing, among other variable factors, had a significant effect on the economics and will need additional studied. • The energy penalty of the PZAS plant would be about 46 MW in connected power and 35 MW in operating load. The natural gas requirement (for the Gas Boiler package) would be about 354 MMBTU/hr. • The FEED revealed no major risks in process maturity. However, some areas were outlined for further engineering during detailed design, which included the Gas Boiler system, general arrangement and site layout, air coolers, schedule development, and optimization of the process for higher CO2 removal. • If PZAS were to be implemented at another host site, additional opportunities for cost reduction for would include cost reduction through use of cooling water and steam extraction.

03 NATURAL GAS↗